China
Prior art keywords
early
formwork
wall column
wall
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811455855.8A
Other languages
Chinese (zh)
Other versions
CN109441098B (en
Inventor
丁巍
陈学跟
宋煜
李林
牛旭东
罗德军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201811455855.8A priority Critical patent/CN109441098B/en
Publication of CN109441098A publication Critical patent/CN109441098A/en
Application granted granted Critical
Publication of CN109441098B publication Critical patent/CN109441098B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/085End form panels for walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of early-dismantling formwork system and its construction methods, including lining system, Side fascia system, corner formwork and floor support plate system;Floor support plate system includes slab form and early-dismantling device, early-dismantling device include vertical independent support rod, clamping be arranged in vertical independent support bar top morning tear open branch fastener and it is early tear beam open, early tear support overhead fitting open and the early lower surface for tearing beam open be set;The fitting of Liangping row interval is early torn open to be arranged in slab form lower surface;Lining system includes two piece of first wall column formwork, the first back cord that the first wall column formwork lateral surface is arranged in, top plate connection template, connection lock and split bolt, first wall column formwork lower end is arranged on lower layer's floor, and the lower end that the first wall column formwork upper end connect template with top plate passes through connection lock connection.Good forming effect of the present invention, is unlikely to deform, and template system is reliable, meets high strength concrete and the winter applies demand.

Description

A kind of early-dismantling formwork system and its construction method
Technical field
The present invention relates to technical field of building construction, especially a kind of early-dismantling formwork system and its construction method.
Background technique
In existing one-pass molding early stripping formwork system construction technology, the early-dismantling formwork system of technology maturation is mainly aluminium alloy mould Plate body system.Because generalling use the connection of pin selling sheet between aluminum alloy mould plate plate, in construction, difficulty is larger.
Currently, being using main problem existing for aluminum alloy pattern plate system: first, it changes in structure, as wall thickness, layer are high It when etc. changing, can only redesign, with mould, supplementing, changing the template for being not suitable with structure change, leading to template utilization rate It is low;Second, aluminum alloy pattern plate thermal coefficient is high, is unfavorable for high strength concrete and winter construction;Third, aluminum alloy mould plate is in head In secondary use process, due to the chemical activity of aluminium itself, the release agent of formulated is needed, to ensure the perception of concrete surface Quality.
Summary of the invention
The object of the present invention is to provide a kind of early-dismantling formwork system and its construction method, wall column beam slab knot at this stage is solved Structure is not easy one-pass molding, and scene is inconvenient with mould, and concrete formation effect is unstable, is unable to satisfy high strength concrete And the technical issues of winter construction requirement.
To achieve the above object, the present invention adopts the following technical scheme: one aspect of the present invention provides a kind of early stripping formwork system body System, including lining system, Side fascia system, corner formwork and floor support plate system;
The floor support plate system includes slab form and early-dismantling device, and the early-dismantling device includes vertical independent support rod, clamping Be arranged in vertical independent support bar top morning tear open branch fastener and it is early tear beam open, early tear support overhead fitting open and be arranged in and early tear beam open Lower surface;
The fitting of Liangping row interval is early torn open to be arranged in slab form lower surface;
The lining system includes two piece of first wall column formwork, the first back cord that the first wall column formwork lateral surface is arranged in, top Plate connects template, connection lock and split bolt, and the first wall column formwork lower end is arranged on lower layer's floor, on the first wall column formwork The lower end that end connect template with top plate passes through connection lock connection;
The upper end of top plate connection template is against slab form lower surface;By to drawing spiral shell between first wall column formwork of interior wall two sides It tethers and connects;
The Side fascia system includes setting the first wall column formwork indoors, is arranged in the first of the first wall column formwork lateral surface Back cord, split bolt, erects the second back cord that the second outdoor wall column formwork is arranged in, the second wall column formwork lateral surface is arranged in It is arranged on lower layer's floor to steel pipe, exterior wall bearing plate and positioning hanging seat, first wall column formwork lower end is reinforced, the first wall column By connection lock connection between template upper end and the lower end of top plate connection template, the upper end of top plate connection template is against building slab Plate lower surface;
Positioning hanging seat is located on substrustion exterior wall by built-in fitting, and positioning hanging seat top is provided with exterior wall bearing plate, and described the Two wall column formwork lower ends are arranged on exterior wall bearing plate, are connected between the first wall column formwork and the second wall column formwork by split bolt It connects;Second wall column formwork lateral surface is additionally provided with vertical reinforcing steel pipe.
Further, corner formwork includes external angle formwork and internal corner formwork.
Further, external angle formwork includes that equilateral L-type template and two are respectively symmetrically bonded setting in equilateral L-type template opening Erecting for medial surface is stupefied;Internal corner formwork includes steel form, the steel rib that steel form surrounding is arranged in and floor of putting more energy into.
Further, circular hole is offered on the second back cord, vertical steel pipe of reinforcing passes through several reinforcing crotches and the second wall column Second back cord of template lateral surface is fixedly connected.
Further, reinforcing crotch is self-locking drag hook, reinforces the tail portion of crotch in hook-shaped.
Further, lining system further includes wall end carriage bottom lock;Wall end carriage bottom lock includes screw rod, the first block, spiral shell Mother, the second block and butterfly button, screw rod side is arranged in the first block and the nut by the way that the first block lateral surface is arranged in is solid It is fixed;Screw rod other side is arranged in second block and the butterfly button by the way that the second block lateral surface is arranged in is fixed.
Further, adjustable lock is additionally provided between top plate connection template and wall column formwork;Adjustable lock includes screw rod, curved Hook and wing nut, the crotch include sleeve sections and the latch hook that is arranged on sleeve sections, crotch there are two and pass through sleeve Section is symmetrically socketed in screw rod two sides.In use, the spacing between symmetrically arranged two crotches is contracted by rotation wing nut It is small, thus by the back cord of slab form or wall column formwork and common templates back cord clamping fixed.
Further, the first wall column formwork includes wood moulding panel, the steel frame that wood moulding panel edge position is arranged in With the ribbed stiffener being welded on steel frame.
Further, top plate connection template includes wood moulding panel, the steel frame that wood moulding panel edge position is arranged in With the ribbed stiffener being welded on steel frame.
Further, the second wall column formwork includes wood moulding panel, the steel frame that wood moulding panel edge position is arranged in With the ribbed stiffener being welded on steel frame.
Further, wood moulding plate thickness is 13-20mm;Wood moulding panel is wood plywood template, wood plywood template surface It is covered with the hard modeling face processed with a thickness of 2mm.
Further, the high 64mm of frame, wide 25mm.
Another aspect of the present invention provides the construction method of above-mentioned early-dismantling formwork system, the specific steps are as follows:
Step 1 carries out Compound of the formworks Deepen Design according to structural design drawing paper;Stock;
Step 2, the first wall column formwork of processing, the second wall column formwork, top plate connection template and slab form;Template completes the process After be numbered, and transport to scene;
Step 3, levelling, unwrapping wire and corner positioning carry out wall steel bar binding construction, by entering next process after checking and accepting;
Step 4, vertical formwork installation;Wall column formwork position line is put, absolute altitude copies survey, installs standard wall column formwork;Nonstandard layer construction When, verticality and flatness are checked after nonstandard plank sheathing is installed;
S1, the construction of interior wall system, the first wall column formwork bottom are arranged on lower layer's floor, and the first wall column formwork upper end and top plate connect The lower end for connecing template is connected by connection lock, passes through connection lock connection, the first wall column of wall two sides between adjacent wall studs template It is connected between template by split bolt;It is synchronous to set up external angle formwork and internal corner formwork;
First back cord is set on the outside of the first wall column formwork, and the first back cord is fixed by split bolt;
S2, external wall system construction need to be when next floor be constructed, pre-buried spacer bar in advance;Completion is poured in lower-layer concrete And after removing outer wall template, expose pre-buried spacer bar;
When outer wall template is installed, first installation positions hanging seat and is connect by bolt with pre-buried spacer bar, sets at the top of positioning hanging seat It is equipped with exterior wall bearing plate, is fixed by exterior wall bearing plate and the second wall column formwork;The first wall column formwork of external wall two sides and It is connected between two wall column formworks by split bolt;Second back cord is set, and the second back cord is fixed by split bolt;In the second wall The installation of column template lateral surface is vertical to reinforce steel pipe;It is synchronous to set up external angle formwork and internal corner formwork;
Step 5, installation is early to tear beam open, installs slab form, checks slab form flatness and compound wall column is vertical and flatness;
Slab form is fought recklessly using early tearing beam open as support, is left no gaps;Early tearing Liang Yizao open and tearing branch fastener open is support, early tears branch open When fastener is in installation condition, early tears beam open and fitted closely with slab form;Floor surrounding template is installed on top plate connection template Upper end, and pass through connection lock connection;Spacing is 1.2m between adjacent vertical independent support rod;
Step 6 after slab form installation examination passes through, carries out beam reinforced steel bar binding, electromechanical set aside pre-embedded construction;
Step 7, casting concrete, structural concrete construction is using horizontal, vertical structure one-time-concreting construction;
Step 8, form removable;Striking time is determined according to the concrete condition of engineering project, generally in weather under normal circumstances 24 It is removed after hour;
Template should guarantee that all stulls, back cord, lock etc. have been removed before removing wall form since the top of a wall;
Step 9 removes slab form and early tears beam open, can after floorslab concrete intensity reaches concrete design strength 50% Slab form is carried out early to tear open;Reach the i.e. dismountable beam bottom board of design strength 75% in concrete strength;Retain vertical independent support rod It is motionless, first knock one by one it is early tear support sliding pin plate open, slab form tears beam open early and will fall 200mm or so, then removes building in turn Template die plate tears beam open early;
Step 10, vertical independent support rod, it is early tear the dismounting of branch fastener open, according to span of the beam and the plank, concrete strength reach accordingly across After the strength of mould stripping that metric model allows, carries out vertical independent support rod and remove.
Further, the first back cord and the second back cord are horizontal steel tube.
The beneficial effects of the present invention are embodied in:
1, a kind of early-dismantling formwork system provided by the invention and its construction method, structure is simple, and design rationally, guarantees effectively fastening Under the premise of, avoid influencing each other between various components.
2, steel framework Wood-plastic formwork and common plank sheathing are linked together using adjustable lock.It, can be local when structure change Using plank sheathing, without configuring steel framework Wood-plastic formwork.The use of all kinds of Special lock catchs, so that construction is more convenient, use is firm, Construction efficiency is high.
3, a kind of early-dismantling formwork system provided by the invention and its construction method make full use of the spy of steel framework and Wood-plastic formwork Property, good forming effect are unlikely to deform, and template system is reliable, meets high strength concrete and the winter applies demand, even more important It is: recycling can be had enough to meet the need, while template system connection is reliable, concrete structure one-pass molding, while incorporating and early tearing technology open, it is real Existing early-dismantling.Steel framework Wood-plastic formwork face rigidity is big, and concrete flatness is fine, and bubble is few, up to clear-water concrete effect.
4, it is no matter square from cost, concrete formation effect, template universality etc. compared to similar aluminium alloy early-dismantling formwork system Face consider, have apparent advantage, steel framework Wood-plastic formwork is used in turn number 30~50 times, and damaged panel is replaceable, steel framework with Template is recyclable.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification It is clear that understand through the implementation of the invention.The main object of the present invention and further advantage can be by specifications, power Specifically noted scheme is achieved and obtained in sharp claim.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is positive structure schematic of the present invention.
Fig. 2 is external angle formwork and internal corner formwork connection schematic diagram.
Fig. 3 is that early tearing Liang Yuzao open tears branch fastener Facad structure decomposition diagram open.
Fig. 4 is that early tearing Liang Yuzao open tears branch fastener side structure decomposition diagram open.
Fig. 5 is wall end carriage bottom lock use state diagram.
Fig. 6 is the structural schematic diagram of wall end carriage bottom lock.
Fig. 7 is the structural schematic diagram of adjustable lock.
Appended drawing reference: 1- early tears beam open, and 2- early tears branch fastener open, and vertically independent support rod, 4- slab form, 5- top plate connect 3- Template, 6- split bolt, the first wall column formwork of 7-, 8- connection lock, 9- reinforce crotch, and 10- vertically reinforces steel pipe, 11- exterior wall Bearing plate, 12- positioning hanging seat, 13- external angle formwork, 14- internal corner formwork, the second wall column formwork of 15-, the wall end carriage bottom 16- lock, 17- is adjustable lock, 18- lower layer floor.
Specific embodiment
Carry out the technical solution that the present invention will be described in detail by the following examples, embodiment below is only exemplary, It is only capable of for explanation and illustration technical solution of the present invention, and the limitation to technical solution of the present invention cannot be construed to.
As shown in Figure 1,3, it is simple to provide a kind of structure for one aspect of the present invention, designs reasonable early-dismantling formwork system, including Lining system, Side fascia system, corner formwork and floor support plate system;The floor support plate system includes slab form 4 and early tears open Device, the early-dismantling device include the morning that vertically independent support rod 3, clamping are arranged at the top of vertical independent support rod 3 tearing support open First 2 tear beam 1 open with early, early tear fitting at the top of branch fastener 2 open and the early lower surface for tearing beam 1 open is arranged in;Early tear the fitting setting of 1 parallel interval of beam open In 4 lower surface of slab form.It can satisfy the uniformity of Liang Peimo, while adjustable since the inconsistent bring of deck-molding matches mould Problem.
It referring to Fig. 4, tears beam 1 open early with early and tears branch fastener 2 open as support, when early tearing branch fastener 2 open and being in installation condition, early tear beam 1 open It is fitted closely with slab form 4, when early tearing branch fastener 2 open and being in falling state, early can tear branch fastener 2 open retaining and independent support Striking job is completed under the premise of bar 3.
The lining system includes two piece of first wall column formwork 7, the first back that 7 lateral surface of the first wall column formwork is arranged in Stupefied, top plate connection template 5, connection lock 8 and split bolt 6,7 lower end of the first wall column formwork are arranged on lower layer's floor 18, the The lower end that one wall column formwork, 7 upper end connect template 5 with top plate passes through 8 connection of connection lock.The upper end of top plate connection template 5 is against 4 lower surface of slab form;It is connected between first wall column formwork 7 of interior wall two sides by split bolt 6.
The Side fascia system includes setting the first wall column formwork 7 indoors, is arranged in 7 lateral surface of the first wall column formwork The first back cord, the second outdoor wall column formwork 15 is set, 15 lateral surface of the second wall column formwork is set the second back cord, right Bolt 6, vertical steel pipe 10, exterior wall bearing plate 11 and positioning hanging seat 12,7 lower end of the first wall column formwork of reinforcing is drawn to be arranged under On floor plate 18, by 8 connection of connection lock between 7 upper end of the first wall column formwork and the lower end of top plate connection template 5, top plate connects The upper end for connecing template 5 is against 4 lower surface of slab form.Further, the first back cord and the second back cord are horizontal steel tube.Second back Circular hole is offered on stupefied, vertical reinforcing steel pipe 10 reinforces the second of crotches 9 and 15 lateral surface of the second wall column formwork by several Back cord is fixedly connected.Reinforcing crotch 9 is self-locking drag hook, reinforces the tail portion of crotch 9 in hook-shaped.
Positioning hanging seat 12 is located on substrustion exterior wall by built-in fitting, is positioned and is provided with exterior wall bearing plate at the top of hanging seat 12 11,15 lower end of the second wall column formwork is arranged on exterior wall bearing plate 11, the first wall column formwork 7 and the second wall column formwork 15 it Between connected by split bolt 6;Second wall column formwork, 15 lateral surface is additionally provided with vertical reinforcing steel pipe 10.
As shown in Fig. 2, the corner formwork includes external angle formwork 13 and internal corner formwork 14, external angle formwork 13 includes equilateral L Respectively symmetrically that erecting for equilateral L-type template opening medial surface is arranged in is stupefied for fitting by pattern plate and two;Internal corner formwork 14 includes punching block Plate, the steel rib that steel form surrounding is set and floor of putting more energy into.13 He of external angle formwork of design different length combination can be passed through Internal corner formwork 14 with realize wall thickness variation with mould.
As shown in fig. 6, wall end carriage bottom lock 16 includes screw rod, the first block, nut, and the second block and butterfly button, first Screw rod side is arranged in block and the nut by the way that the first block lateral surface is arranged in is fixed;Second block setting screw rod in addition The side and butterfly button by being arranged in the second block lateral surface is fixed.
As shown in fig. 7, being additionally provided with adjustable lock 17 between top plate connection template 5 and wall column formwork;Adjustable 17 packet of lock Include screw rod, crotch and wing nut, the crotch includes sleeve sections and the latch hook that is arranged on sleeve sections, crotch there are two and Screw rod two sides are symmetrically socketed in by sleeve sections.In use, will be between symmetrically arranged two crotches by rotation wing nut Spacing reduce, thus by the back cord of slab form 4 or wall column formwork and common templates back cord clamping fixed.Using adjustable lock 17 link together steel framework Wood-plastic formwork and common plank sheathing.When structure change, plank sheathing can be locally used, without configuring steel Frame Wood-plastic formwork.
As shown in figure 5, needing wall end carriage bottom can also be used to lock to when drawing fixed on the outside of beam bottom mother plate and wall Side Template Button 16.The use of each component-dedicated lock, so that construction is more convenient, use is firm, and construction efficiency is high.Guaranteeing effectively fastening Under the premise of, avoid influencing each other between various components.
Above-mentioned first wall column formwork 7, top plate connection template 5 and the second wall column formwork 15 exist including wood moulding panel, setting The steel frame of wood moulding panel edge position and the ribbed stiffener being welded on steel frame.Wood moulding plate thickness is 13- 20mm;Wood moulding panel is wood plywood template, the hard modeling face processed that wood plywood template surface is covered with a thickness of 2mm.Frame is high 64mm, wide 25mm;Steel plate thickness is 2mm.Specifically, wood moulding panel periphery be embedded in steel framework, and with sunk screw tightly by panel with Steel framework and primary and secondary rib are fixed;Frame is the width 25mm as made of the rolling of 2mm thick steel plate, high 64mm steel framework, spacing 600mm on frame Rolling has semi-circular groove, mountable screw rod through walls;Primary and secondary rib is the back cord as made of the rolling of 2mm thick steel plate.First wall column mould Plate 7, top plate connection template 5 and 15 width of the second wall column formwork can be 200mm-600mm, and height is no more than 2400mm;Building 4 width of template die plate is 300-600mm, of length no more than 1200mm.
Above-mentioned design makes full use of the characteristic of steel framework and Wood-plastic formwork, and good forming effect is unlikely to deform, and template system can It leans on, meets high strength concrete and the winter applies demand, more importantly: recycling can be had enough to meet the need, while template system connects Reliable, concrete structure one-pass molding is connect, while incorporating and early tearing technology open, realizes early-dismantling.Steel framework Wood-plastic formwork face rigidity is big, Concrete flatness is fine, and bubble is few, up to clear-water concrete effect.
Another aspect of the present invention provides the construction method of above-mentioned early-dismantling formwork system, the specific steps are as follows:
Step 1 carries out Compound of the formworks Deepen Design according to structural design drawing paper;Stock;
Step 2, the first wall column formwork 7 of processing, the second wall column formwork 15, top plate connection template 5 and slab form 4;Template processing It is numbered, and is transported to scene after the completion;
Step 3, levelling, unwrapping wire and corner positioning carry out wall steel bar binding construction, by entering next process after checking and accepting;
Step 4, vertical formwork installation;Wall column formwork position line is put, absolute altitude copies survey, installs standard wall column formwork;Nonstandard layer construction When, verticality and flatness are checked after nonstandard plank sheathing is installed;
S1, the construction of interior wall system, 7 bottom of the first wall column formwork are arranged on lower layer's floor 18,7 upper end of the first wall column formwork and top Plate connects the lower end of template 5 by 8 connection of connection lock, by 8 connection of connection lock between adjacent wall studs template, wall two sides the It is connected between one wall column formwork 7 by split bolt 6;It is synchronous to set up external angle formwork 13 and internal corner formwork 14;
First back cord is set on the outside of wall column formwork, and the first back cord is fixed by split bolt 6;
S2, external wall system construction need to be when next floor be constructed, pre-buried spacer bar in advance;Completion is poured in lower-layer concrete And after removing outer wall template, expose pre-buried spacer bar;
When outer wall template is installed, first installation positions hanging seat 12 and is connect by bolt with pre-buried spacer bar, and positioning hanging seat 12 pushes up Portion is provided with exterior wall bearing plate 11, fixed by exterior wall bearing plate 11 and the second wall column formwork 15;The first wall of external wall two sides It is connected between column template 7 and the second wall column formwork 15 by split bolt 6;
Second back cord is set on the outside of wall column formwork, and the second back cord is fixed by split bolt 6;In 15 lateral surface of the second wall column formwork Installation is vertical to reinforce steel pipe 10;It is synchronous to set up external angle formwork 13 and internal corner formwork 14;
Step 5, installation is early to tear beam 1 open, installs slab form 4, checks that 4 flatness of slab form and compound wall column are vertically and smooth Degree;
Slab form 4 is fought recklessly using early tearing beam 1 open as support, is left no gaps;It early tears beam 1 open and tears branch fastener 2 open for support, early with early When tearing branch fastener 2 open and being in installation condition, early tears beam 1 open and fitted closely with slab form 4;Floor surrounding template is installed on top plate connection The upper end of template 5, and pass through 8 connection of connection lock;Spacing is 1.2m between adjacent vertical independent support rod 3;
Step 6 after the installation examination of slab form 4 passes through, carries out beam reinforced steel bar binding, electromechanical set aside pre-embedded construction;
Step 7, casting concrete, structural concrete construction is using horizontal, vertical structure one-time-concreting construction;
Step 8, form removable;Striking time is determined according to the concrete condition of engineering project, generally in weather under normal circumstances 24 Wall mould is removed after hour;
Template should guarantee that all stulls, back cord, lock etc. have been removed before removing wall form since the top of a wall;
Step 9 removes slab form 4 and early tears beam 1 open, after floorslab concrete intensity reaches concrete design strength 50%, Slab form 4 can be carried out early to tear open;Reach the i.e. dismountable beam bottom board of design strength 75% in concrete strength;Retain vertical independent branch Strut 3 is motionless, first knock one by one it is early tear support sliding pin plate open, slab form 4 tears beam 1 open early and will fall 200mm or so, then in turn It removes slab form 4 and tears beam 1 open early;
Step 10, vertical independent support rod 3, early branch fastener 2 of tearing open are removed, and according to span of the beam and the plank, reach corresponding in concrete strength After the strength of mould stripping that span specification allows, carries out vertical independent support rod 3 and remove.
A kind of early-dismantling formwork system provided by the invention and its construction method, it is reasonable in design, it can be used for high-rise, super The building engineering structures concrete constructions such as the wall column beam slab of high-rise, multi-storey building and utilities building.It can be to avoid between various components Influence each other.Concrete flatness after molding is fine, and bubble is few, up to clear-water concrete effect.Compared to similar aluminium alloy No matter early-dismantling formwork system has apparent advantage, steel from cost, concrete formation effect, template universality etc. consideration Frame Wood-plastic formwork is used in turn number 30~50 times, and damaged panel is replaceable, and steel framework and template are recyclable.
The foregoing is merely the preferable specific embodiments of the present invention, but scope of protection of the present invention is not limited thereto, The change or replacement that anyone skilled in the art is expected in the technical scope disclosed by the present invention should all be contained Lid is within protection scope of the present invention.

Claims (10)

1. a kind of early-dismantling formwork system, which is characterized in that including lining system, Side fascia system, corner formwork and floor support plate System;
The floor support plate system includes slab form (4) and early-dismantling device, and the early-dismantling device includes vertical independent support rod (3), morning of the clamping setting at the top of vertical independent support rod (3) tears branch fastener (2) open and early tears beam (1) open, early tears branch fastener (2) top open Portion's fitting setting is in the lower surface for early tearing beam (1) open;The fitting of beam (1) parallel interval is early torn open to be arranged in slab form (4) lower surface;
The lining system includes two piece of first wall column formwork (7), is arranged and carries on the back the first of the first wall column formwork (7) lateral surface Stupefied, top plate connection template (5), connection lock (8) and split bolt (6), the first wall column formwork (7) lower end are arranged in lower layer's floor (18) on, the lower end that the first wall column formwork (7) upper end connect template (5) with top plate passes through connection lock (8) connection;
The upper end of top plate connection template (5) is against slab form (4) lower surface;Between the first wall column formwork (7) of interior wall two sides It is connected by split bolt (6);
The Side fascia system includes setting the first wall column formwork (7) indoors, is arranged in the first wall column formwork (7) lateral surface The first back cord, be arranged in outdoor the second wall column formwork (15), setting the second wall column formwork (15) lateral surface the second back Stupefied, split bolt (6) vertically reinforces steel pipe (10), exterior wall bearing plate (11) and positioning hanging seat (12), first wall column formwork (7) lower end is arranged on lower layer's floor (18), and the first wall column formwork (7) upper end, which is connect between the lower end of template (5) with top plate, to be led to Connection lock (8) connection is crossed, the upper end of top plate connection template (5) is against slab form (4) lower surface;
Positioning hanging seat (12) is located on substrustion exterior wall by built-in fitting, is provided with exterior wall bearing plate at the top of positioning hanging seat (12) (11), the second wall column formwork (15) lower end is arranged on exterior wall bearing plate (11), the first wall column formwork (7) and the second wall column It is connected between template (15) by split bolt (6);Second wall column formwork (15) lateral surface is additionally provided with vertical reinforcing steel pipe (10)。
2. early-dismantling formwork system as described in claim 1, which is characterized in that corner formwork includes external angle formwork (13) and inner corner trim Template (14).
3. early-dismantling formwork system as described in claim 1, which is characterized in that circular hole is offered on the second back cord, it is vertical to reinforce Steel pipe (10) is reinforced crotch (9) by several and is fixedly connected with second back cord of the second wall column formwork (15) lateral surface.
4. early-dismantling formwork system as claimed in claim 3, which is characterized in that reinforcing crotch (9) is self-locking drag hook, is reinforced curved The tail portion of hook (9) is in hook-shaped.
5. early-dismantling formwork system as described in claim 1, which is characterized in that lining system further includes wall end carriage bottom lock (16);Wall end carriage bottom lock (16) includes screw rod, the first block, nut, and the second block and butterfly button, the first block are arranged in spiral shell The bar side and nut by being arranged in the first block lateral surface is fixed;The setting of second block is in screw rod other side and by setting The butterfly button set in the second block lateral surface is fixed.
6. early-dismantling formwork system as described in claim 1, which is characterized in that top plate connects between template (5) and wall column formwork It is additionally provided with adjustable lock (17);Adjustable lock (17) includes screw rod, crotch and wing nut, the crotch include sleeve sections and Latch hook on sleeve sections is set;Crotch is symmetrically socketed in screw rod two sides there are two and by sleeve sections.
7. early-dismantling formwork system as described in claim 1, which is characterized in that the first wall column formwork (7) includes wood moulding panel, sets Set the steel frame in wood moulding panel edge position and the ribbed stiffener that is welded on steel frame.
8. early-dismantling formwork system as claimed in claim 7, which is characterized in that wood moulding plate thickness is 13-20mm;Wood moulding panel The hard modeling face processed being covered with for wood plywood template, wood plywood template surface with a thickness of 2mm.
9. early-dismantling formwork system as claimed in claim 7, which is characterized in that frame high 64mm, wide 25mm.
10. the construction method of early-dismantling formwork system as claimed in any one of claims 1-9 wherein, which is characterized in that specific steps It is as follows:
Step 1 carries out Compound of the formworks Deepen Design according to structural design drawing paper;Stock;
Step 2, processing the first wall column formwork (7), the second wall column formwork (15), top plate connection template (5) and slab form (4); It is numbered, and is transported to scene after processing is completed;
Step 3, levelling, unwrapping wire and corner positioning carry out wall steel bar binding construction, by entering next process after checking and accepting;
Step 4, vertical formwork installation;Wall column formwork position line is put, absolute altitude copies survey, installs standard wall column formwork;Nonstandard layer construction When, verticality and flatness are checked after nonstandard plank sheathing is installed;
S1, the construction of interior wall system, the first wall column formwork (7) bottom is arranged on lower layer's floor (18), on the first wall column formwork (7) The lower end that end connect template (5) with top plate is connected by connection lock (8), passes through connection lock (8) between adjacent wall studs template It connects, is connected between the first wall column formwork of wall two sides (7) by split bolt (6);It is synchronous to set up external angle formwork (13) and inner corner trim Template (14);
First back cord is set on the outside of the first wall column formwork (7), and the first back cord is fixed by split bolt (6);
S2, external wall system construction need to be when next floor be constructed, pre-buried spacer bar in advance;Completion is poured in lower-layer concrete And after removing outer wall template, expose pre-buried spacer bar;
When outer wall template is installed, first installation positioning hanging seat (12) is simultaneously connect by bolt with pre-buried spacer bar, positions hanging seat (12) top is provided with exterior wall bearing plate (11), fixed by exterior wall bearing plate (11) and the second wall column formwork (15);Building is outer It is connect between the first wall column formwork of wall two sides (7) and the second wall column formwork (15) by split bolt (6);
Second back cord is set, and the second back cord is fixed by split bolt (6);It is vertical in the installation of the second wall column formwork (15) lateral surface It reinforces steel pipe (10);It is synchronous to set up external angle formwork (13) and internal corner formwork (14);
Step 5, installation is early to tear open beam (1), installs slab form (4), checks that slab form (4) flatness and compound wall column are vertical And flatness;
Slab form (4) is fought recklessly using early tearing beam (1) open as support, is left no gaps;It early tears beam (1) open and tears branch fastener (2) open with early For support, when early tearing branch fastener (2) open and being in installation condition, early tears beam (1) open and fitted closely with slab form (4);Floor surrounding mould Plate is installed on the upper end of top plate connection template (5), and passes through connection lock (8) connection;Between adjacent vertical independent support rod (3) Spacing is 1.2m;
Step 6 after slab form (4) installation examination passes through, carries out beam reinforced steel bar binding, electromechanical set aside pre-embedded construction;
Step 7, casting concrete, structural concrete construction is using horizontal, vertical structure one-time-concreting construction;
Step 8, form removable;Striking time is determined according to the concrete condition of engineering project, generally in weather under normal circumstances 24 It is removed after hour;
Step 9, remove slab form (4) and morning tear beam (1) open, floorslab concrete intensity reach concrete design strength 50% with Afterwards, slab form (4) can be carried out early to tear open;Reach the i.e. dismountable beam bottom board of design strength 75% in concrete strength;Retain vertical only Vertical support rod (3) are motionless, first knock one by one it is early tear support sliding pin plate open, slab form (4) tears beam (1) open early and will fall 200mm Left and right, then remove slab form (4) in turn and tear beam (1) open early;
Step 10, vertical independent support rod (3), early tear open branch fastener (2) are removed, according to span of the beam and the plank, are reached in concrete strength After the strength of mould stripping that corresponding span specification allows, carries out vertical independent support rod (3) and remove.
CN201811455855.8A 2018-11-30 2018-11-30 Early-dismantling formwork system and construction method thereof Active CN109441098B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811455855.8A CN109441098B (en) 2018-11-30 2018-11-30 Early-dismantling formwork system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811455855.8A CN109441098B (en) 2018-11-30 2018-11-30 Early-dismantling formwork system and construction method thereof

Publications (2)

Publication Number Publication Date
CN109441098A true CN109441098A (en) 2019-03-08
CN109441098B CN109441098B (en) 2024-01-23

Family

ID=65555580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811455855.8A Active CN109441098B (en) 2018-11-30 2018-11-30 Early-dismantling formwork system and construction method thereof

Country Status (1)

Country Link
CN (1) CN109441098B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453913A (en) * 2019-09-06 2019-11-15 伍伟中 Top-hung horizontal formwork system and construction method thereof
CN110593562A (en) * 2019-10-18 2019-12-20 天津市东鑫新材料科技有限公司 Steel frame shaping building template system
CN111779260A (en) * 2020-07-10 2020-10-16 广西汇林达科技有限公司 Assembly type combined template system and construction method thereof
CN111852020A (en) * 2020-08-14 2020-10-30 中建八局第二建设有限公司 Construction method and system of building core tube
CN112482585A (en) * 2020-12-14 2021-03-12 张伟君 Steel structure support frame for prefabricated house
CN112523497A (en) * 2020-12-07 2021-03-19 中建八局第四建设有限公司 Aluminum mold system for walls on two sides of deformation joint of main structure
CN113089897A (en) * 2021-04-14 2021-07-09 河北晶达建筑科技股份有限公司 Construction method for integrally hoisting disassembly-free cement formwork
CN113107196A (en) * 2021-04-16 2021-07-13 广州市快易模板工程有限公司 Beam, wall and plate combined quick-mounting early-dismounting structure
CN114319900A (en) * 2022-01-11 2022-04-12 四川中旺易模科技有限公司 Quick-release clear water formwork system and construction method
CN115012646A (en) * 2022-07-22 2022-09-06 中国十七冶集团有限公司 Double shear wall formwork supporting structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131694A (en) * 2014-04-16 2014-11-05 中建四局第五建筑工程有限公司 Efficient and low-consumption combined formwork system and construction method thereof
CN105625719A (en) * 2015-12-29 2016-06-01 龙口市鑫铭铝业有限公司 Tensile sheet structure aluminum alloy formwork early-dismantling system and construction method thereof
CN105926942A (en) * 2016-05-13 2016-09-07 江苏中南建筑产业集团有限责任公司 Construction method of combined aluminum/steel frame wood-plastic formwork system
CN106320691A (en) * 2016-08-23 2017-01-11 中建八局第二建设有限公司 Aluminum-wood formwork construction method
WO2018170934A1 (en) * 2017-03-24 2018-09-27 广州毅昌模板工程有限公司 Early-stripping system for plastic formwork
CN209211875U (en) * 2018-11-30 2019-08-06 中建一局集团建设发展有限公司 A kind of early-dismantling formwork system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131694A (en) * 2014-04-16 2014-11-05 中建四局第五建筑工程有限公司 Efficient and low-consumption combined formwork system and construction method thereof
CN105625719A (en) * 2015-12-29 2016-06-01 龙口市鑫铭铝业有限公司 Tensile sheet structure aluminum alloy formwork early-dismantling system and construction method thereof
CN105926942A (en) * 2016-05-13 2016-09-07 江苏中南建筑产业集团有限责任公司 Construction method of combined aluminum/steel frame wood-plastic formwork system
CN106320691A (en) * 2016-08-23 2017-01-11 中建八局第二建设有限公司 Aluminum-wood formwork construction method
WO2018170934A1 (en) * 2017-03-24 2018-09-27 广州毅昌模板工程有限公司 Early-stripping system for plastic formwork
CN209211875U (en) * 2018-11-30 2019-08-06 中建一局集团建设发展有限公司 A kind of early-dismantling formwork system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453913A (en) * 2019-09-06 2019-11-15 伍伟中 Top-hung horizontal formwork system and construction method thereof
CN110593562A (en) * 2019-10-18 2019-12-20 天津市东鑫新材料科技有限公司 Steel frame shaping building template system
CN110593562B (en) * 2019-10-18 2024-03-22 天津市东鑫新材料科技有限公司 Steel frame shaping building template system
CN111779260A (en) * 2020-07-10 2020-10-16 广西汇林达科技有限公司 Assembly type combined template system and construction method thereof
CN111852020A (en) * 2020-08-14 2020-10-30 中建八局第二建设有限公司 Construction method and system of building core tube
CN112523497A (en) * 2020-12-07 2021-03-19 中建八局第四建设有限公司 Aluminum mold system for walls on two sides of deformation joint of main structure
CN112482585B (en) * 2020-12-14 2021-09-10 哈尔滨哈飞建筑安装工程有限责任公司 Steel structure support frame for prefabricated house
CN112482585A (en) * 2020-12-14 2021-03-12 张伟君 Steel structure support frame for prefabricated house
CN113089897A (en) * 2021-04-14 2021-07-09 河北晶达建筑科技股份有限公司 Construction method for integrally hoisting disassembly-free cement formwork
CN113089897B (en) * 2021-04-14 2022-05-03 河北晶达建筑科技股份有限公司 Construction method for integrally hoisting disassembly-free cement formwork
CN113107196A (en) * 2021-04-16 2021-07-13 广州市快易模板工程有限公司 Beam, wall and plate combined quick-mounting early-dismounting structure
CN114319900A (en) * 2022-01-11 2022-04-12 四川中旺易模科技有限公司 Quick-release clear water formwork system and construction method
CN115012646A (en) * 2022-07-22 2022-09-06 中国十七冶集团有限公司 Double shear wall formwork supporting structure and construction method thereof

Also Published As

Publication number Publication date
CN109441098B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
CN109441098A (en) A kind of early-dismantling formwork system and its construction method
CN104895318B (en) Aluminum alloy template system and construction method of same
CN102587647B (en) Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN106988525A (en) A kind of skyscraper aluminum alloy mould plate construction method
CN107762139B (en) Cast-in-place concrete haunch wall aluminium alloy chamfering formwork supporting adn fixing device and method
CN202954570U (en) High-rise building construction sump pit template
CN104295088A (en) Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure
CN105178597B (en) Floor slab back casting band template and mold method
CN110374322A (en) A kind of assembled waffle beam plate device
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN107090974A (en) A kind of top plate Quick Release support system and its construction method
CN209211875U (en) A kind of early-dismantling formwork system
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN207048309U (en) A kind of top plate Quick Release support system
CN105952140B (en) Tool-type steel framework Wood-plastic formwork system and its construction technology for cast-in-place concrete
CN209260960U (en) It is a kind of to facilitate the wall for installing interim bearing diagonal
CN110485723A (en) Go up and down the adjustable free end support shuttering early removing system of lattice flatrack and construction method
CN207920085U (en) A kind of one side formwork adjustable bolt fastener
CN207296402U (en) A kind of detachable mounting kit applied to aluminum alloy mould plate built-in fitting
CN201103240Y (en) Expansion type drawknot screw
CN105239770B (en) Integrated casting steel framework plastic building template system
CN106401172B (en) Exempt from plastering typified form component, exempt from plaster typified form component application method and construction method
CN209369324U (en) Side form reinforcing apparatus of shear force wall
CN211949129U (en) Hollow mould box for dense rib beam floor system
CN213330014U (en) Post-pouring strip template supporting system with function of back jacking after disassembly

Legal Events

Date Code Title Description