CN109356581A - High-segmentation double-hexagon caving mining method - Google Patents

High-segmentation double-hexagon caving mining method Download PDF

Info

Publication number
CN109356581A
CN109356581A CN201811368522.1A CN201811368522A CN109356581A CN 109356581 A CN109356581 A CN 109356581A CN 201811368522 A CN201811368522 A CN 201811368522A CN 109356581 A CN109356581 A CN 109356581A
Authority
CN
China
Prior art keywords
ore
mine
hole
sublevel
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811368522.1A
Other languages
Chinese (zh)
Inventor
周健强
焦满岱
刘财林
张亭
张海磊
高志荣
张睿
孟慧媚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Research Institute of Mining and Metallurgy
Original Assignee
Northwest Research Institute of Mining and Metallurgy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Research Institute of Mining and Metallurgy filed Critical Northwest Research Institute of Mining and Metallurgy
Priority to CN201811368522.1A priority Critical patent/CN109356581A/en
Publication of CN109356581A publication Critical patent/CN109356581A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Earth Drilling (AREA)

Abstract

The invention belongs to the technical field of mining, and particularly relates to a high-segmentation double-hexagon caving mining method which is carried out according to the following steps: 1. the invention integrates the advantages of a plurality of schemes such as a sill pillar-free sublevel caving method, a sublevel shrinkage method, high end wall ore removal and the like, improves the recovery rate of pure ore and fundamentally solves the problem of overlarge loss and dilution.

Description

A kind of double hexagon caved stopes of high sublevel
Technical field
The invention belongs to mining technique fields, and in particular to a kind of double hexagon avalanche mining methods of high sublevel.
Background technique
With petering out for higher grade deposit, in addition increasingly paying attention to environment and social concern, mining industry will become to get over Come more unattractive, in order to keep the sustainable development of mining industry, mining industry is opened by the steering of large scale mining higher grade deposit Adopt low-grade big reserves mineral deposit.
The recovery method of metalliferous deposit is generally divided into open-stope method, Caving Method with Large Space and method of mining by the way of filling three categories.Production technique item It in the case where part difference, should guarantee that mining safety controls cost again, often use Caving Method with Large Space.It is commonly used at present Sublevel caving method without sill pillar is adopted and cuts that project amount is big, and at high cost, poor loss rate is all higher.Therefore, it is necessary to traditional bottom-column-free sectional Caving Method with Large Space carries out technological innovation, and the double hexagon caved stopes of creative proposition high sublevel realize low-grade large ore deposit with this Safe and efficient back production.
Summary of the invention
For above-mentioned problems of the prior art and deficiency, the present invention provides a kind of double hexagon avalanches of high sublevel and adopts Mine method.
To achieve the above object, the invention provides the following technical scheme:
A kind of double hexagon avalanche mining methods of high sublevel, this method carry out as steps described below:
Step 1: being combined using upper lower burrs and adopt Barebone and carry out adopting quasi- cutting, disk boundary arrangement cutting tunnel, uses along ore body Grooving space is formed after cutting well and cutting tunnel joint kerve;
Step 2: using vertical fan-shaped medium-length hole ore blast, cloth hole is carried out by the big bottom hole pitch principle of island operation, wherein vertical fan-shaped Medium-length hole aperture 60mm, 60 °, array pitch 1.2m, 2.0~2.2m of bottom hole pitch of lateral opening angle, 5~14m of average hole depth;
Step 3: using grooving described in step 1 as the scope of freedom and compensation space, from ore body on disk to lower wall back production fall mine;
Step 4: when falling mine in step 3, the quick-fried detonation mode combined being squeezed using priming bomb hole-bottom blast, " V " type and is carried out Explosion;
Step 5: ore removal.
Further, well is cut between segmentation in the step 1 to be staggeredly arranged, formed using cutting well as scope of freedom blasting in groups Wide 4~5m, the grooving of height 14m.
Further, the kerve blasthole aperture 60mm laid needed for grooving, 60 ° of lateral opening angle, row are formed in the step 1 Away from 1.0m, 1.6~1.8m of bottom hole pitch, 7~12m of average hole depth.
Further, stope falls mine and carries out suddenly in two steps in the step 2, and paragraph mine under upper segmentation is advanced, and first Walking back production is second servo loop and tertiary circuit route, adopts breadth 20m, ore drawing layer height 28m, bottom ore crosscut ore removal, barren rock Coating only contacts at top with broken ore;Second step back production persists studding for what is stayed, with the first circuit and the 4th circuit For route, high sublevel ore caving, high end wall ore removal, ore caving interval is 3~4m.
Further, during the ore removal in the step 5, inequality uniform sequential ore removal and uniform sequential is taken to shovel Mine.
Compared with prior art, the beneficial effects of the present invention are:
The present invention combines the advantages of several schemes such as sublevel caving method without sill pillar, segmentation shrinkage method, high end wall ore removal, purpose It is to improve the rate of recovery of ore, the rate of dilution is reduced, to improve the economic benefit of mining, beneficial effect specifically: adopt With the height of lift of 14m, reduces to adopt and cut project amount 395m, adopting to be cut into originally reduces 2.2 yuan/ton;It is squeezed using " V " type quick-fried It is broken, blasting quality is improved, boulder yield is reduced, improves production capacity of mining field;One step back production uses sublevel shrinkage caving method, Adopt breadth 20m, ore drawing layer height 28m, bottom ore lane ore removal, coating only contacts at top with ore, improves ore drawing item Part avoids the contact of route two sides and front barren rock with ore, to make the contact area of ore and barren rock by 0.246m2/t It is reduced to 0.0255m2/ t, reduces dilution;In crosscut use inequality uniform sequential ore removal, cause broken ore integrally under Drop, avoids barren rock and invades too early, improve the rate of recovery of pure ore, fundamentally solve the problems, such as that loss and dilution is excessive.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the schematic diagram of the section structure in Fig. 1 at B-B.
In figure: 1. broken ores, 2. persist studding, 3. ore removal crosscuts, 4. waste rock overburdens, 5. the 4th circuits, 6. first Circuit, 7. second servo loops, 8. tertiary circuits, 9. kerve blastholes, 10. cut well, 11. cutting tunnels, 12. vertical fan shaped medium length holes, 13. grooving.
Specific embodiment
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
As shown in Figs. 1-2, a kind of double hexagon avalanche mining methods of high sublevel, this method carry out as steps described below:
Step 1: being combined using upper lower burrs and adopt Barebone and adopt quasi- cutting, cutting tunnel 11, disk boundary is arranged along ore body, is adopted 13 space of grooving is formed with cutting well 10 and cutting after kerve is combined in tunnel 11, well 10 is cut between segmentation and is staggeredly arranged, to cut well 10 Wide 4~5m, the grooving 13 of height 14m, required 9 aperture of kerve blasthole laid of grooving 13 are formed for scope of freedom blasting in groups 60mm, 60 °, array pitch 1.0m, 1.6~1.8m of bottom hole pitch of lateral opening angle, 7~12m of average hole depth;
Step 2: mine being fallen using vertical fan shaped medium length hole 12, carries out cloth hole by the big bottom hole pitch principle of island operation, wherein vertical fan 12 aperture 60mm of shape medium-length hole, 60 °, array pitch 1.2m, 2.0~2.2m of bottom hole pitch of lateral opening angle, 5~14m of average hole depth falls mine and is divided to two Step carries out, and paragraph mine under upper segmentation is advanced, and first step back production is 8 route of second servo loop 7 and tertiary circuit, adopts breadth 20m, Ore drawing layer height 28m, 3 ore removal of bottom ore crosscut, waste rock overburden 4 only contact at top with broken ore 1;Second step back production Studding 2 is persisted for what is stayed, with the first circuit 6 and the 4th circuit 5 for route, high sublevel ore caving, high end wall ore removal, ore caving interval For 3~4m;
Step 3: using grooving 13 described in step 1 as the scope of freedom and compensation space, from ore body on disk to lower wall back production fall mine;
Step 4: when falling mine in step 3, the quick-fried detonation mode combined being squeezed using priming bomb hole-bottom blast, " V " type and is carried out Explosion, wherein priming bomb hole-bottom blast is that the priming bomb with TNT is sent into bottom hole with material strip first by every hole, is reloaded into powdery ammonium The cured explosive of pine, implements hole-bottom blast, increases the energy of bottom hole explosion moment, extend detonation wave in the action time of bottom hole; " V " type squeezes quick-fried after being an every separate explosion of step back production, carries out loosening ore removal, therefore ensuing blast becomes squeezing to adjacent loose media Explosion is pressed, using same artillery salvo Delay between holes " V " type explosion, changes the blasting direction of blasthole, explosion becomes double from Single free-face The scope of freedom, after taking above-mentioned blasting technique, stope falls mine boulder yield and is reduced to 8.4%~9.1%;
Step 5: when ore removal, to make ore connect the decline of edged surface level, establishment drawing program table is needed during ore removal, respectively mine mouth out According to plan ore removal, upward disk circuits sequentially ore removal since lower wall goes out mine mouth, until cut-off grade is 0.4%;Or root According to draw theory, to keep ore drawing control development normal, in each ore locations ore removal using uniform sequential shovel dress, specially first It is intermediate behind two sides, it circuits sequentially.

Claims (5)

1. a kind of double hexagon avalanche mining methods of high sublevel, which is characterized in that this method carries out as steps described below:
Step 1: combined using upper lower burrs and adopts Barebone and carry out adopting quasi- cutting, disk boundary arrangement cutting tunnel (11) along ore body, Grooving (13) space is formed using cutting well (10) and cutting after tunnel (11) combine kerve;
Step 2: falling mine using vertical fan shaped medium length hole (12), cloth hole is carried out by the big bottom hole pitch principle of island operation, wherein vertically Fan shaped medium length hole (12) aperture 60mm, 60 °, array pitch 1.2m, 2.0~2.2m of bottom hole pitch of lateral opening angle, 5~14m of average hole depth;
Step 3: using grooving described in step 1 (13) as the scope of freedom and compensation space, from ore body on disk to lower wall back production fall mine;
Step 4: when falling mine in step 3, the quick-fried detonation mode combined being squeezed using priming bomb hole-bottom blast, " V " type and is carried out Explosion;
Step 5: ore removal.
2. the double hexagon avalanche mining methods of a kind of high sublevel as described in claim 1, which is characterized in that the step 1 Well (10) is cut between middle segmentation to be staggeredly arranged, and is that scope of freedom blasting in groups forms wide 4~5m to cut well (10), height 14m's cuts Slot (13).
3. the double hexagon avalanche mining methods of a kind of high sublevel as described in claim 1, which is characterized in that the step 1 Middle kerve blasthole (9) aperture 60mm for forming laying needed for grooving (13), 60 °, array pitch 1.0m of lateral opening angle, bottom hole pitch 1.6~ 1.8m, 7~12m of average hole depth.
4. the double hexagon avalanche mining methods of a kind of high sublevel as described in claim 1, which is characterized in that the step 2 Middle stope falls mine and carries out suddenly in two steps, and paragraph mine under upper segmentation is advanced, and first step back production is second servo loop (7) and tertiary circuit (8) route adopts breadth 20m, ore drawing layer height 28m, bottom ore crosscut (3) ore removal, waste rock overburden (4) and broken ore (1) it is only contacted at top;Second step back production persists studding (2) for what is stayed, with the first circuit (6) and the 4th circuit (5) be into Road, high sublevel ore caving, high end wall ore removal, ore caving interval are 3~4m.
5. the double hexagon avalanche mining methods of a kind of high sublevel as described in claim 1, which is characterized in that the step 5 In ore removal during, take inequality uniform sequential ore removal and uniform sequential to shovel mine.
CN201811368522.1A 2018-11-16 2018-11-16 High-segmentation double-hexagon caving mining method Pending CN109356581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811368522.1A CN109356581A (en) 2018-11-16 2018-11-16 High-segmentation double-hexagon caving mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811368522.1A CN109356581A (en) 2018-11-16 2018-11-16 High-segmentation double-hexagon caving mining method

Publications (1)

Publication Number Publication Date
CN109356581A true CN109356581A (en) 2019-02-19

Family

ID=65345558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811368522.1A Pending CN109356581A (en) 2018-11-16 2018-11-16 High-segmentation double-hexagon caving mining method

Country Status (1)

Country Link
CN (1) CN109356581A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764904A (en) * 2020-06-30 2020-10-13 贵州开磷有限责任公司 Underground mining method
CN111927458A (en) * 2020-07-24 2020-11-13 甘肃酒钢集团宏兴钢铁股份有限公司 Ore drawing method for irregular thin ore body
RU2768251C1 (en) * 2021-10-08 2022-03-23 Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук Method for development of steeply dipping ore bodies with unstable ores

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635356A (en) * 2012-04-26 2012-08-15 中南大学 Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
US20160356157A1 (en) * 2013-03-15 2016-12-08 Solvay Sa Multi-well solution mining exploitation of an evaporite mineral stratum
CN107178367A (en) * 2017-05-23 2017-09-19 西北矿冶研究院 Pressure relief and stoping method for steep medium-thickness ore body by segmented open-field method
CN107829742A (en) * 2017-11-27 2018-03-23 西北矿冶研究院 Caving-filling-open stope-caving mining method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635356A (en) * 2012-04-26 2012-08-15 中南大学 Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
US20160356157A1 (en) * 2013-03-15 2016-12-08 Solvay Sa Multi-well solution mining exploitation of an evaporite mineral stratum
CN107178367A (en) * 2017-05-23 2017-09-19 西北矿冶研究院 Pressure relief and stoping method for steep medium-thickness ore body by segmented open-field method
CN107829742A (en) * 2017-11-27 2018-03-23 西北矿冶研究院 Caving-filling-open stope-caving mining method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡华: "高分段双六边形崩落采矿法在深部铜矿的应用", 《有色金属科学技术进展—中国有色金属学会首届青年学术年会论文集》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764904A (en) * 2020-06-30 2020-10-13 贵州开磷有限责任公司 Underground mining method
CN111764904B (en) * 2020-06-30 2021-12-14 贵州开磷有限责任公司 Underground mining method
CN111927458A (en) * 2020-07-24 2020-11-13 甘肃酒钢集团宏兴钢铁股份有限公司 Ore drawing method for irregular thin ore body
RU2768251C1 (en) * 2021-10-08 2022-03-23 Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук Method for development of steeply dipping ore bodies with unstable ores

Similar Documents

Publication Publication Date Title
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN104806244B (en) Filling mining method for slant middle-thick ore body
CN106121648B (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN102635356B (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN105569659B (en) A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN109236295B (en) Three-step stoping method suitable for deep thick and large ore deposit
CN108252717B (en) A kind of low poor damage sublevel caving of high-dipping middle thickness orebody
CN105019904A (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN110905512B (en) Open stope mining method for gently inclined medium-thickness ore body
CN109356581A (en) High-segmentation double-hexagon caving mining method
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN111894584B (en) Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body
CN102444403B (en) Pillarless sublevel caving method based vertical partitioning and combined ore drawing extraction technology of gently inclined ore bodies
CN112177611A (en) Method for mining inclined or steeply inclined hard thin ore body
CN105735996A (en) Presplitting type wall cutting and filling stoping method for thin ore vein
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN111502664B (en) Narrow ore body high-order section sublevel caving subsequent filling mining method
CN108104816B (en) Upward mining method of steeply inclined thin ore body
CN108150173A (en) A kind of high-dipping medium-thickness broken orebody single route induction caving mining codes
CN102979526A (en) Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining
CN107939402A (en) The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium
CN104153782B (en) Progressive caving mining method
CN106703809B (en) A kind of method that open air trestle multi-branched ore body induction caving forms coating
CN105298493A (en) Nondestructive explosion mining method for underground gently-inclined thin-layered jade mine
CN111119896A (en) Bauxite mining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219