China
Prior art keywords
pipe
fluid
pipe unit
tube body
elastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811278137.8A
Other languages
Chinese (zh)
Inventor
陆挚译
张新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811278137.8A priority Critical patent/CN109351723A/en
Publication of CN109351723A publication Critical patent/CN109351723A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/043Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes
    • B08B9/0436Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes provided with mechanical cleaning tools, e.g. scrapers, with or without additional fluid jets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)

Abstract

The invention belongs to pipeline cleaning technical fields, specifically a kind of fluid line cleaning method, the fluid-transporting tubing cleaned in this method includes pipe connections, No.1 pipe unit, No.1 spring pocket, tube valve and tube body cleaning part, it is cooperatively connected between No.1 pipe unit by pipe connections, in axial direction uniformly distributed in the inner wall of No.1 pipe unit there are three cylindric and closed inflatable chambers;The both ends of inflatable chamber are provided with port;No.1 air drain is communicated between inflatable chamber;Tube valve is installed between the adjacent No.1 pipe unit in part, is connected between tube valve and No.1 pipe unit by pipe connections;The No.1 pipe unit cleaning that tube body cleaning part is used to be removed;No.1 spring pocket is set in No.1 pipe unit outer surface;Operation of the present invention is simple, and cleaning efficiency is high, can quickly remove the egg white in fluid-transporting tubing, meanwhile, it can avoid fluid-transporting tubing because of problem smelly after long-time residual egg white.

Description

A kind of fluid line cleaning method
Technical field
The invention belongs to pipeline cleaning technical field, specifically a kind of fluid line cleaning method.
Background technique
Most biofluids belong to defined non-newtonian fluid now.Blood, lymph, cyst fluid etc. on the person A variety of body fluid, and as cytoplasm " semifluid " belong to non-newtonian fluid.The concentrated solution of high molecular polymer and outstanding Supernatant liquid etc. is generally non-newtonian fluid.Tomato juice, starch fluid, egg white, apple pulp, concentrated sugar water, soy sauce, fruit in food industry The various rotten shape food materials such as sauce, condensed milk, agar, potato slurry, fusing chocolate, dough, rice flour mash and minced fillet, meat gruel It is all non-newtonian fluid.Albumen equally plays the role of shockproof, moisturizing and protection just as mammiferous amniotic fluid.Egg white has very high Nutritive value, egg white is all used in numerous food product process as ingredient.
In food processing factory's automatic assembly line processed food, fluid-transporting tubing, general fluid conveying can be used Pipeline after using, not easy cleaning, so that part egg white will be adhered on fluid-transporting tubing inner wall, do not clean by several days time Fluid-transporting tubing, the egg white in fluid-transporting tubing will go bad it is smelly, if using smelly fluid-transporting tubing, will be tight Ghost image rings the food hygiene of food processing factory, after the food processed is eaten by consumer, by harmful consumer's health, Therefore, the cleaning problems it is important to note that egg white delivery pipe are answered.
Meanwhile general fluid-transporting tubing, when conveying egg white, efficiency is all lower, therefore, generally requires to keep as far as possible Fluid-transporting tubing is straight tube, to improve the transfer efficiency of egg white.
Summary of the invention
In order to make up for the deficiencies of the prior art, a kind of fluid line cleaning method proposed by the present invention, operation of the present invention letter Single, cleaning efficiency is high, can quickly remove the egg white in fluid-transporting tubing, meanwhile, solve fluid-transporting tubing because not cleaning Completely remain egg white and smelly problem for a long time.
The technical solution adopted by the present invention to solve the technical problems is: a kind of fluid line cleaning side of the present invention Method, this method comprises the following steps:
S1, first the clear water by temperature lower than 10 DEG C or salt water are passed through in fluid-transporting tubing, will be residual in fluid-transporting tubing Recycling egg white raffinate is stayed to develop and collect;
It is passed through the hot water that temperature is higher than 80 DEG C in S2, then the fluid-transporting tubing that cleaned into S1, makes fluid with hot water Egg white agglomeration in conveyance conduit;
The magnesium of cleaning solution and dry ice package is added after being passed through ten minutes hot water to S2 in S3 in the hot water being passed through Grain generates gas with the hot water reaction washed in fluid-transporting tubing using magnesium granules come the inner wall of impact fluid conveyance conduit, makes The egg white agglomeration bonded on fluid-transporting tubing inner wall falls off;The carbon dioxide that dry ice gasification generates can drive oxygen, clean Liquid bubble can keep the carbon dioxide that dry ice gasification generates here, and magnesium granules are reacted with water can produce heat, to keep fluid defeated The water temperature in pipeline is sent, the initial water temperature being passed through can be adjusted as needed;
Each component of fluid-transporting tubing in S3 is removed Rapid Cleaning, by the egg white knot at position not easy to clean by S4 After block is washed off, fluid-transporting tubing is connected again;
S5 repeatedly rinses the fluid-transporting tubing connected in S4 with warm water of the temperature between 30 DEG C~50 DEG C, completes Cleaning;
Wash fluid-transporting tubing of the S1 into S5 includes pipe connections, No.1 pipe unit, No.1 spring pocket, tube valve With tube body cleaning part, it is cooperatively connected between the No.1 pipe unit by pipe connections, two end curved surfaces of No.1 pipe unit are provided with Multiple annular grooves, No.1 pipe unit are plastic flexible pipe, and in axial direction uniformly distributed in the inner wall of No.1 pipe unit there are three cylinders Shape and closed inflatable chamber;The both ends of the inflatable chamber are provided with port;The port is only placed at one of inflatable chamber Both ends, be communicated with No.1 air drain between inflatable chamber, one end of No.1 air drain is connected to the port of a No.1 pipe unit one end, The other end of No.1 air drain is connected to the port of adjacent No.1 pipe unit one end, and is detachable between No.1 air drain and port Formula connection;The tube valve is installed between the adjacent No.1 pipe unit in part, passes through Guan Lian between tube valve and No.1 pipe unit Fitting connection;The No.1 pipe unit cleaning that the tube body cleaning part is used to be removed;The No.1 spring pocket be plastic material, one Number spring pocket is set in No.1 pipe unit outer surface;
Wherein, the pipe connections include connector, cock and elastic internal bladder;The connector is T-shaped or cross; The connector includes being provided with calm the anger portion and at least two pipe jointing parts;The pipe jointing part is interconnected, pipe connection Portion with the end of No.1 pipe unit or No. two pipe units for connecting;The elastic internal bladder is attached on the inner wall of connector, bullet Property liner inside be No.1 cavity, elastic internal bladder is provided with annular convex rib and annular convex rib and annular groove at pipe jointing part It is adapted;The No.1 cavity is connected to the portion of calming the anger of tube body;The cock is adapted with the portion of calming the anger, and cock is shifted in the portion of calming the anger Portion can be such that the No.1 cavity air pressure of elastic internal bladder increases, and realize the surface of elastic internal bladder and No.1 pipe unit surfaces mate Sealing;
The tube valve includes valve and No. two pipe units identical with No.1 pipe unit structure;The valve is located at No. two In the middle part of pipe unit, valve is connected to No. two pipe units;No. two pipe units are considerably shorter than No.1 pipe unit;The valve is cut-off Valve or regulating valve prevent adverse current or or one or more of overflow pressure relief valve.It, will be adjacent by pipe connections when work The connection of No.1 pipe unit, while tube valve being arranged between the No.1 pipe unit of needs, and is connected with pipe connections, under Pressure screws in cock, is compressed to the gas in the portion of calming the anger in the No.1 cavity of elastic internal bladder, squeezes annular convex rib and annular groove Compress it is close, thus by egg white delivery pipe conveying egg white part connect complete, No.1 pipe unit can control by valve, make After being finished the part of egg white delivery pipe conveying egg white, inflated by the port into an inflatable chamber, it, can when air pressure is sufficiently large No.1 pipe unit is set to become rigid straight tube, on the one hand, straight No.1 pipe unit can reduce the number of fluid-transporting tubing turning, Keep fluid-transporting tubing more unobstructed, be conducive to the transfer efficiency for improving fluid-transporting tubing, on the other hand, is changed by interval Air pressure in inflatable chamber changes No.1 pipe unit between rigidity and flexibility, can reduce the inner wall and egg white of No.1 pipe unit Between adhesiveness, reduce fluid-transporting tubing in chocking-up degree, again, straight No.1 pipe unit can facilitate to be cleaned with tube body Part cleaning, improves cleaning efficiency;At the same time it can also which into inflatable chamber, injection is for hot water, with hot water to the conveying of No.1 pipe unit Egg white heating;And No.1 spring pocket can avoid No.1 pipe unit directly with ground face contact and generate abrasion, be conducive to improve flow The service life of body conveyance conduit, meanwhile, avoid fluid-transporting tubing from knotting.
It is provided between in the middle part of calm the anger portion and the elastic internal bladder and prevents sticking up component;The anti-component that sticks up includes and elastic internal bladder The compatible pressing plate of appearance, arch shrapnel and X-shaped hinge bar;The upper surface of the pressing plate is the curved surface of indent, the lower end of pressing plate It is Nian Jie with the middle part surface of elastic internal bladder;The handstand of the arch shrapnel is arranged at the concave surface of pressing plate, arch shrapnel Both ends are provided with convex ribs;The X-shaped hinge bar is the hinged bar in two middle and lower parts, and the lower end of X-shaped hinge bar is resisted against The upper end of arch shrapnel, and the lower end of X-shaped hinge bar only slided between two convex ribs on arch shrapnel, X-shaped hinge bar it is upper End is located at immediately below cock.When work, passed through upon connection between adjacent No.1 pipe unit or between No.1 pipe unit and tube valve Often will appear warpage, on the one hand, warpage can make can not be between adjacent No.1 pipe unit or between No.1 pipe unit and tube valve Straight line connection, can not linear state fluid-transporting tubing conveying egg white low efficiency, with tube body cleaning part clean more fiber crops Tired, the degree of adhesion between fluid-transporting tubing inner wall and egg white increases;Therefore, in the middle part of the portion of calming the anger and elastic internal bladder between be arranged Have it is anti-stick up component, in the middle part of elastic internal bladder between adjacent No.1 pipe unit or the junction between No.1 pipe unit and tube valve, When pushed with cock and screw in calm the anger portion after, the cock of pushing will squeeze X-shaped hinge bar upper end, on the one hand, X-shaped hinge bar is pressurized Power concentration is transmitted to the lofty place in arch shrapnel lower end afterwards, pressure concentration is transmitted on pressing plate, elasticity of the pressing plate by warpage is made In the middle part of liner, makes between adjacent No.1 pipe unit or junction warpage reduces between No.1 pipe unit and tube valve or warpage disappears It loses, when X-shaped hinge bar stress is larger, increases the angle between two bar of lower end of X-shaped hinge bar, X-shaped hinge bar lower end two Bar slides at convex ribs, and arch shrapnel both sides are pressed, and arch shrapnel becomes flat, so that pressing plate becomes face stress from a stress, by bullet It is depressed at property liner warpage, straightens fluid-transporting tubing.
Elastic string is connected between two bar of top of the X-shaped hinge bar.When work, after cock is unscrewed upwards, Under the action of elastic string, by reducing greatly, the rising of X-shaped hinge bar height will be against the angle between two hinge bars of X-shaped hinge bar Cock lower end simultaneously squeezes cock lower end, even if so that cock when unscrewing, the upper end of X-shaped hinge bar within the scope of finite motion, Still upper end is resisted against cock lower end, and lower end is resisted against on arch shrapnel, and arch shrapnel stress can be made to reduce.
The tube body cleaning part includes the elastic hollow tube body of stopple and one end sealing, is spaced on the elastic hollow tube body It is disposed with elastic scraper, multiple holes one, the end of elastic hollow tube body are intervally distributed on the curved surface tube wall of elastic hollow tube body Be provided with water filling or inflation is filled with end;Screw thread is disposed on the inner wall in the hole one;The stopple be rubber material, stopple with The connection of one spiral of hole.When work, turn cock disassembles No.1 pipe unit from fluid-transporting tubing, and to No.1 pipe The inflatable chamber of unit is inflated, and so that No.1 pipe unit is become rigid straight tube, then stopple is filled on elastic hollow tube body Sealing hole one on hole one, elastic hollow tube body is put into No.1 pipe unit, and makes flexible hollow tube body external gas source, makes elasticity Hollow body is bulged, and is rotated elastic hollow tube body, will be adhered on No.1 pipe unit with the elastic scraper on elastic hollow tube body Egg white strike off, by change external gas source to the pressure of elastic hollow tube body, so that elastic hollow tube body intermittent expansion is struck off one The egg white adhered on number pipe unit, is conducive to improve tube body cleaning part to the cleaning dynamics of No.1 pipe unit, again, will elasticity it is empty Cock on heart tube body is pulled out, and is filled the water and is rotated in flexible hollow tube body, improves tube body cleaning part to the clear of No.1 pipe unit Dynamics is washed, can clean fluid-transporting tubing is more clean.
No. two spring pockets are arranged on the tube body cleaning part;The outer diameter size of No. two spring pockets is flexible hollow tube The sum of the length of external diameter and an elastic scraper, the end of No. two spring pockets extend to elastic hollow tube body and seal the outer of one end Side.When work, by being arranged No. two spring pockets on the elastic hollow tube body of tube body cleaning part, make in cleaning No.1 pipe unit When, the end of No. two spring pockets is against on wall, makes No. two spring pockets interval is lofty be squeezed, so that elastic scraper is frequently Be extruded and be bent it is then lofty loosen, change the position that contacts with No.1 pipe unit of elastic scraper, elastic scraper can be made more preferable The remaining egg white on No.1 pipe unit inner wall that will be adhered to remove.
Card slot is provided on the same side of the elastic scraper;The card slot is to concave curved in the middle part of elastic hollow tube body Arc shape;And the diameter of a circle of multiple card slots formation is less than the spring coil internal diameter of No. two spring pockets.When work, to No. two spring pockets Compression makes the spring coil of No. two spring pockets squeeze elastic scraper, and elastic scraper is extruded inclination, so that the spring coil quilt of No. two spring pockets It is caught in card slot, when decontroling No. two spring pockets suddenly, elastic scraper will quickly rebound, and strike off remaining egg on No.1 pipe unit Clearly, be conducive to preferably clean up fluid-transporting tubing, improve cleaning effect.
Beneficial effects of the present invention are as follows:
1. method of the invention is easy to operate, cleaning efficiency is high, can quickly remove the egg white in fluid-transporting tubing, together When, solve the problems, such as that fluid-transporting tubing remains egg white and smelly for a long time due to not cleaning up;Meanwhile stream of the invention Body conveyance conduit can convert on demand between the straight tube and hose of rigidity, and when this pipeline is rigid straight pipe, egg white can be improved Transfer efficiency is suitable for egg white conveying and turns round when this pipeline is hose;Fluid-transporting tubing of the invention is that multistage is detachable Connection, it can be achieved that Quick Release and connect fastly.
2. the present invention is by successively cleaning to washing egg white and convey effective hot water or cold water, and be added in the hot water cleaning solution and The magnesium granules of dry ice package generate gas with the hot water reaction washed in fluid-transporting tubing using magnesium granules come impact fluid conveying The inner wall of pipeline makes the egg white bonded on fluid-transporting tubing inner wall agglomeration fall off, realizes the cleaning for washing egg white delivery pipe.
3. the present invention by be provided between in the middle part of the portion of calming the anger and elastic internal bladder it is anti-stick up component, stick up component by anti-and can have Effect inhibits between adjacent No.1 pipe unit or between No.1 pipe unit and tube valve the problem of the warpage of junction, makes fluid delivery tube Road straightens, and improves the transfer efficiency of egg white.
4. the present invention is inflated by the inflatable chamber to No.1 pipe unit, No.1 pipe unit is made to become rigid straight tube, Sealing hole one again makes flexible hollow tube body external gas source, elastic hollow tube body is made to be bulged, and rotates elastic hollow tube body, uses bullet Property scraper plate the egg white adhered on No.1 pipe unit is struck off, by change external gas source to the pressure of elastic hollow tube body, make bullet Property hollow body intermittent expansion strike off the egg white adhered on No.1 pipe unit, be conducive to improve tube body cleaning part to No.1 pipe unit Cleaning dynamics the cock on elastic hollow tube body is pulled out again, fill the water and rotate in flexible hollow tube body, improve pipe For body cleaning part to the cleaning dynamics of No.1 pipe unit, can clean fluid-transporting tubing is more clean.
Detailed description of the invention
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is fluid-transporting tubing structural schematic diagram of the invention;
Fig. 3 is No.1 pipe unit structural schematic diagram of the invention;
Fig. 4 is the A-A cross-sectional view about Fig. 3;
Fig. 5 is tube valve structural schematic diagram of the invention;
Fig. 6 is tube body cleaning part cross-sectional view of the invention;
Fig. 7 is tube body cleaning part and No. two spring pocket location diagrams of the invention;
Fig. 8 is the B-B cross-sectional view about Fig. 7;
In figure: pipe connections 1, connector 11, portion 111 of calming the anger, pipe jointing part 112, cock 12, elastic internal bladder 13, No.1 Cavity 131, No.1 pipe unit 2, inflatable chamber 21, port 22, No.1 air drain 23, No.1 spring pocket 24, tube valve 3, valve 31, two Number pipe unit 32, tube body cleaning part 4, stopple 41, elastic hollow tube body 42,43, No. two spring pockets 44 of elastic scraper, card slot 441, It is anti-to stick up component 5, pressing plate 51, arch shrapnel 52, X-shaped hinge bar 53, elastic string 54.
Specific embodiment
A kind of fluid line cleaning method of the invention is carried out using Fig. 1 to Fig. 8 as described below.
As shown in Figures 1 to 8, a kind of fluid line cleaning method of the present invention, this method comprises the following steps:
S1, first the clear water by temperature lower than 10 DEG C or salt water are passed through in fluid-transporting tubing, will be residual in fluid-transporting tubing Recycling egg white raffinate is stayed to develop and collect;
It is passed through the hot water that temperature is higher than 80 DEG C in S2, then the fluid-transporting tubing that cleaned into S1, makes fluid with hot water Egg white agglomeration in conveyance conduit;
The magnesium of cleaning solution and dry ice package is added after being passed through ten minutes hot water to S2 in S3 in the hot water being passed through Grain generates gas with the hot water reaction washed in fluid-transporting tubing using magnesium granules come the inner wall of impact fluid conveyance conduit, makes The egg white agglomeration bonded on fluid-transporting tubing inner wall falls off;The carbon dioxide that dry ice gasification generates can drive oxygen, clean Liquid bubble can keep the carbon dioxide that dry ice gasification generates here, and magnesium granules are reacted with water can produce heat, to keep fluid defeated The water temperature in pipeline is sent, the initial water temperature being passed through can be adjusted as needed;
Each component of fluid-transporting tubing in S3 is removed Rapid Cleaning, by the egg white knot at position not easy to clean by S4 After block is washed off, fluid-transporting tubing is connected again;
S5 repeatedly rinses the fluid-transporting tubing connected in S4 with warm water of the temperature between 30 DEG C~50 DEG C, completes Cleaning;
Wash fluid-transporting tubing of the S1 into S5 includes pipe connections 1, No.1 pipe unit 2, No.1 spring pocket 24, pipe Valve 3 and tube body cleaning part 4 are cooperatively connected between the No.1 pipe unit 2 by pipe connections 1, and the both ends of No.1 pipe unit 2 are bent Face is provided with multiple annular grooves, and No.1 pipe unit 2 is plastic flexible pipe, is in axial direction evenly distributed in the inner wall of No.1 pipe unit 2 There are three cylindric and closed inflatable chambers 21;The both ends of the inflatable chamber 21 are provided with port 22;22 cloth of the port It sets and is communicated with No.1 air drain 23, one end of No.1 air drain 23 and one between the both ends of a wherein inflatable chamber 21, inflatable chamber 21 The port 22 of a 2 one end of No.1 pipe unit is connected to, the port of the other end of No.1 air drain 23 and adjacent 2 one end of No.1 pipe unit 22 connections, and be detachable connection between No.1 air drain 23 and port 22;The tube valve 3 is installed on the adjacent No.1 pipe in part Between unit 2, connected between tube valve 3 and No.1 pipe unit 2 by pipe connections 1;The tube body cleaning part 4 is for being removed No.1 pipe unit 2 clean;The No.1 spring pocket 24 is plastic material, and No.1 spring pocket 24 is set in outside No.1 pipe unit 2 Surface;
Wherein, the pipe connections 1 include connector 11, cock 12 and elastic internal bladder 13;The connector 11 is T-shaped Or cross;The connector 11 includes being provided with calm the anger portion 111 and at least two pipe jointing parts 112;The pipe connection Portion 112 is interconnected, and pipe jointing part 112 with the end of No.1 pipe unit 2 or No. two pipe units 32 for connecting;In the elasticity Gallbladder 13 is attached on the inner wall of connector 11, and the inside of elastic internal bladder 13 is No.1 cavity 131, and elastic internal bladder 13 is in pipe jointing part It is provided with annular convex rib at 112 and annular convex rib is adapted with annular groove;The portion of calming the anger of the No.1 cavity 131 and tube body 111 connections;The cock 12 is adapted with the portion of calming the anger 111, and cock 12, which is shifted to, can make the one of elastic internal bladder 13 inside the portion of calming the anger 111 Number 131 air pressure of cavity increases, and realizes the surface of elastic internal bladder 13 and 2 surfaces mate of No.1 pipe unit and seals;
The tube valve 3 includes valve 31 and No. two pipe units 32 identical with 2 structure of No.1 pipe unit;The valve 31 Positioned at No. two 32 middle parts of pipe unit, valve 31 is connected to No. two pipe units 32;No. two pipe units 32 are considerably shorter than No.1 Guan Dan Member 2;The valve 31 is shut-off valve or regulating valve or prevents adverse current or or one or more of overflow pressure relief valve.When work, Adjacent No.1 pipe unit 2 is connected by pipe connections 1, at the same by tube valve 3 be arranged in needs No.1 pipe unit 2 it Between, and connected with pipe connections 1, cock 12 is screwed in by pushing, the gas in the portion of calming the anger 111 is made to be compressed to elastic internal bladder 13 In No.1 cavity 131, squeeze annular convex rib and annular groove close, so that the part of egg white delivery pipe conveying egg white be connected Complete, No.1 pipe unit 2 can control by valve 31, after the part using finished clear delivery pipe conveying egg white, pass through to Port 22 in one inflatable chamber 21 is inflated, and when air pressure is sufficiently large, No.1 pipe unit 2 can be made to become rigid straight tube, a side Face, straight No.1 pipe unit 2 can reduce the number of fluid-transporting tubing turning, keep fluid-transporting tubing more unobstructed, be conducive to The transfer efficiency of fluid-transporting tubing is improved, on the other hand, the air pressure in inflatable chamber 21 is changed by interval, makes No.1 pipe unit 2 change between rigidity and flexibility, can reduce the adhesiveness between the inner wall and egg white of No.1 pipe unit 2, reduce fluid conveying Chocking-up degree in pipeline, again, straight No.1 pipe unit 2 can facilitate to be cleaned with tube body cleaning part 4, improves cleaning efficiency;Together When, it can also inject into inflatable chamber 21 for hot water, the egg white that No.1 pipe unit 2 conveys is heated with hot water;And No.1 bullet Spring cover 24 avoidable No.1 pipe units 2 directly with ground face contact and generate abrasion, be conducive to raising fluid-transporting tubing use Service life, meanwhile, avoid fluid-transporting tubing from knotting.
It is provided between 13 middle part of portion 111 and elastic internal bladder of calming the anger and prevents sticking up component 5;It is described it is anti-stick up component 5 include with The compatible pressing plate 51 of 13 appearance of elastic internal bladder, arch shrapnel 52 and X-shaped hinge bar 53;The upper surface of the pressing plate 51 is indent Curved surface, the lower end of pressing plate 51 is Nian Jie with the middle part surface of elastic internal bladder 13;The handstand of the arch shrapnel 52 is arranged in pressing plate At 51 concave surface, the both ends of arch shrapnel 52 are provided with convex ribs;The X-shaped hinge bar 53 is that two middle and lower parts are hinged on one The bar risen, the lower end of X-shaped hinge bar 53 is resisted against the upper end of arch shrapnel 52, and the lower end of X-shaped hinge bar 53 is only in arch bullet It is slided between two convex ribs on piece 52, the upper end of X-shaped hinge bar 53 is located at immediately below cock 12.When work, adjacent No.1 Guan Dan It often will appear warpage upon connection between member 2 or between No.1 pipe unit 2 and tube valve 3, on the one hand, warpage can make adjacent one Can not linearly be connected between number pipe unit 2 or between No.1 pipe unit 2 and tube valve 3, can not linear state fluid it is defeated The low efficiency for sending pipeline egg white is more troublesome, between fluid-transporting tubing inner wall and egg white with the cleaning of tube body cleaning part 4 Degree of adhesion increases;Therefore, it is provided between 13 middle part of the portion of calming the anger 111 and elastic internal bladder and prevents sticking up component 5,13 middle part of elastic internal bladder Junction between adjacent No.1 pipe unit 2 or between No.1 pipe unit 2 and tube valve 3, when with cock 12 push and screw in It calms the anger behind portion 111, the cock 12 of pushing will squeeze 53 upper end of X-shaped hinge bar, on the one hand, by power collection after the compression of X-shaped hinge bar 53 In be transmitted to the lofty place in 52 lower end of arch shrapnel, by pressure concentration be transmitted on pressing plate 51, make pressing plate 51 will be in the elasticity of warpage The middle part of gallbladder 13, makes between adjacent No.1 pipe unit 2 or junction warpage reduces or warpage between No.1 pipe unit 2 and tube valve 3 It disappears, when 53 stress of X-shaped hinge bar is larger, increases the angle between two bar of lower end of X-shaped hinge bar 53, X-shaped hinge bar 53 lower end, two bar slides at convex ribs, and 52 both sides of arch shrapnel are pressed, and arch shrapnel 52 becomes flat, so that pressing plate 51 is become by stress For face stress, it will be depressed at 13 warpage of elastic internal bladder, straighten fluid-transporting tubing.
Elastic string 54 is connected between two bar of top of the X-shaped hinge bar 53.When work, unscrewed upwards by cock 12 Afterwards, under the action of elastic string 54, the angle between two hinge bars of X-shaped hinge bar 53 is by reducing greatly, 53 height of X-shaped hinge bar Rising will be against 12 lower end of cock and squeeze 12 lower end of cock, even if so that cock 12 when unscrewing, the upper end of X-shaped hinge bar 53 Within the scope of finite motion, still upper end is resisted against 12 lower end of cock, and lower end is resisted against on arch shrapnel 52, can make arch shrapnel 52 stress reduce.
The tube body cleaning part 4 includes stopple 41 and the elastic hollow tube body 42 that one end seals, the elastic hollow tube body The flexible scraper plate 43 of arranged for interval on 42, multiple holes one are intervally distributed on the curved surface tube wall of elastic hollow tube body 42, and elasticity is empty What the end of heart tube body 42 was provided with water filling or inflation is filled with end;Screw thread is disposed on the inner wall in the hole one;The stopple 41 For rubber material, stopple 41 is connect with one spiral of hole.When work, turn cock 12, by No.1 pipe unit 2 from fluid-transporting tubing On disassemble, and the inflatable chamber of No.1 pipe unit 2 21 is inflated, so that No.1 pipe unit 2 is become rigid straight tube, then will Stopple 41 fills in sealing hole one on the hole one on elastic hollow tube body 42, and elastic hollow tube body 42 is put into No.1 pipe unit 2, And make 42 external gas source of elastic hollow tube body, so that elastic hollow tube body 42 is bulged, rotate elastic hollow tube body 42, with elastic sky Elastic scraper 43 on heart tube body 42 strikes off the egg white adhered on No.1 pipe unit 2, by changing external gas source to elastic empty The pressure of heart tube body 42 makes 42 intermittent expansion of elastic hollow tube body strike off the egg white adhered on No.1 pipe unit 2, is conducive to improve The cleaning dynamics of No.1 pipe unit 2 are pulled out, to elasticity in cock 12 on elastic hollow tube body 42 by tube body cleaning part 4 again It fills the water and rotates in hollow body 42, raising tube body cleaning part 4, can be by fluid delivery tube to the cleaning dynamics of No.1 pipe unit 2 Road cleans more clean.
No. two spring pockets 44 are arranged on the tube body cleaning part 4;The outer diameter size of No. two spring pockets 44 is elasticity The sum of the length of 42 outer diameter of hollow body and an elastic scraper 43, the end of No. two spring pockets 44 extend to elastic hollow tube body The outside of 42 sealing one end.When work, by being arranged No. two spring pockets 44 on the elastic hollow tube body 42 of tube body cleaning part 4, Make when cleaning No.1 pipe unit 2, the end of No. two spring pockets 44 is against on wall, keep the interval of No. two spring pockets 44 lofty by Squeeze so that elastic scraper 43 frequently be extruded and be bent it is then lofty loosen, change elastic scraper 43 and No.1 pipe unit 2 The position of contact, can make elastic scraper 43 preferably will be adhered to remaining egg white removing on 2 inner wall of No.1 pipe unit.
Card slot 441 is provided on the same side of the elastic scraper 43;The card slot 441 is to elastic hollow tube body The arc shape of 42 middle part concave curveds;And the diameter of a circle of multiple formation of card slots 441 is less than the spring coil internal diameter of No. two spring pockets 44.Work When, No. two spring pockets 44 are compressed, so that the spring coil of No. two spring pockets 44 is squeezed elastic scraper 43, elastic scraper 43, which is extruded, to incline Tiltedly, so that the spring coil of No. two spring pockets 44 is snapped into card slot 441, when decontroling No. two spring pockets 44 suddenly, elastic scraper 43 It will quickly rebound, and strike off remaining egg white on No.1 pipe unit 2, and be conducive to preferably clean up fluid-transporting tubing, mention High cleaning effect.
Specifically used process is as follows:
In use, adjacent No.1 pipe unit 2 is connected by pipe connections 1, while tube valve 3 is arranged in needs It between No.1 pipe unit 2, and is connected with pipe connections 1, screws in cock 12 by pushing, compress the gas in the portion of calming the anger 111 Into the No.1 cavity 131 of elastic internal bladder 13, squeeze annular convex rib and annular groove close, so that egg white delivery pipe be conveyed The part of egg white, which connects, completes, and can control No.1 pipe unit 2 by valve 31, is using finished clear delivery pipe conveying egg white Behind part, is inflated by the port 22 into an inflatable chamber 21, when air pressure is sufficiently large, No.1 pipe unit 2 can be made to become rigid The straight tube of property;It is provided between 13 middle part of the portion of calming the anger 111 and elastic internal bladder and prevents sticking up component 5, be adjacent in the middle part of elastic internal bladder 13 Junction between No.1 pipe unit 2 or between No.1 pipe unit 2 and tube valve 3, when with cock 12 push and screw in the portion of calming the anger After 111, the cock 12 of pushing will squeeze 53 upper end of X-shaped hinge bar, and power is concentrated after being pressurized and is transmitted to arch bullet by X-shaped hinge bar 53 Pressure concentration is transmitted on pressing plate 51 by the lofty place in 52 lower end of piece, is made elastic internal bladder 13 middle part of the pressing plate 51 by warpage, is made adjacent Between No.1 pipe unit 2 or junction warpage reduces between No.1 pipe unit 2 and tube valve 3 or warpage disappears;And by cock After 12 unscrew upwards, under the action of elastic string 54, the angle between two hinge bars of X-shaped hinge bar 53 is by reducing greatly, X-shaped hinge Extension bar 53, which highly rises, will be against 12 lower end of cock and squeeze 12 lower end of cock, even if X-shaped is hinged so that cock 12 is when unscrewing The upper end of bar 53 is within the scope of finite motion, and still upper end is resisted against 12 lower end of cock, and lower end is resisted against on arch shrapnel 52, can Reduce 52 stress of arch shrapnel;
When cleaning the main component of fluid-transporting tubing, turn cock 12, by No.1 pipe unit 2 from fluid-transporting tubing On disassemble, and the inflatable chamber of No.1 pipe unit 2 21 is inflated, so that No.1 pipe unit 2 is become rigid straight tube, then will Stopple 41 fills in sealing hole one on the hole one on elastic hollow tube body 42, and elastic hollow tube body 42 is put into No.1 pipe unit 2, And make 42 external gas source of elastic hollow tube body, so that elastic hollow tube body 42 is bulged, rotate elastic hollow tube body 42, with elastic sky Elastic scraper 43 on heart tube body 42 strikes off the egg white adhered on No.1 pipe unit 2, by changing external gas source to elastic empty The pressure of heart tube body 42 makes 42 intermittent expansion of elastic hollow tube body strike off the egg white adhered on No.1 pipe unit 2, is conducive to improve The cleaning dynamics of No.1 pipe unit 2 are pulled out, to elasticity in cock 12 on elastic hollow tube body 42 by tube body cleaning part 4 again It fills the water and rotates in hollow body 42, raising tube body cleaning part 4, can be by fluid delivery tube to the cleaning dynamics of No.1 pipe unit 2 Road cleans more clean;
It is arranged No. two spring pockets 44 on the elastic hollow tube body 42 of tube body cleaning part 4, makes in cleaning No.1 pipe unit 2 When, the end of No. two spring pockets 44 is against on wall, makes 44 interval of No. two spring pockets is lofty to be squeezed, so that elastic scraper 43 Frequently be extruded and be bent it is then lofty loosen, change the position that contacts with No.1 pipe unit 2 of elastic scraper 43, elasticity can be made Scraper plate 43 will preferably be adhered to remaining egg white on 2 inner wall of No.1 pipe unit and remove;Meanwhile it being pressed to No. two spring pockets 44 Contracting makes the spring coil of No. two spring pockets 44 squeeze elastic scraper 43, and elastic scraper 43 is extruded inclination, so that No. two spring pockets 44 Spring coil is snapped into card slot 441, and when decontroling No. two spring pockets 44 suddenly, elastic scraper 43 will quickly rebound, and strike off No.1 pipe Remaining egg white on unit 2 is conducive to preferably clean up fluid-transporting tubing, improves cleaning effect.
More than, it is illustrated about one embodiment of the present invention, but the present invention is not limited to the above embodiments, not Various changes are able to carry out in the range of disengaging present subject matter.
Industrial applicibility
According to the present invention, to clean fluid-transporting tubing with this method high-efficient, can quickly remove in fluid-transporting tubing Egg white, meanwhile, solve the problems, such as that fluid-transporting tubing remains egg white and smelly for a long time due to not cleaning up;Therefore the stream Body pipeline cleaning method is useful in pipeline cleaning technical field.

Claims (6)

1. a kind of fluid line cleaning method, which is characterized in that this method comprises the following steps:
S1, first the clear water by temperature lower than 10 DEG C or salt water are passed through in fluid-transporting tubing, can by residual in fluid-transporting tubing The egg white raffinate of recycling is developed and is collected;
It is passed through the hot water that temperature is higher than 80 DEG C in S2, then the fluid-transporting tubing that cleaned into S1, makes fluid conveying with hot water Egg white agglomeration in pipeline;
The magnesium granules of cleaning solution and dry ice package, benefit is added after being passed through ten minutes hot water to S2 in S3 in the hot water being passed through Gas is generated come the inner wall of impact fluid conveyance conduit with the hot water reaction washed in fluid-transporting tubing with magnesium granules, keeps fluid defeated The egg white bonded in inner wall of the pipe agglomeration is sent to fall off;The carbon dioxide that dry ice gasification generates can drive oxygen, and cleaning solution plays gas Bubble can keep the carbon dioxide that dry ice gasification generates here, and magnesium granules are reacted with water can produce heat, to keep fluid-transporting tubing Interior water temperature, the initial water temperature being passed through can be adjusted as needed;
Each component of fluid-transporting tubing in S3 is removed Rapid Cleaning by S4, and the egg white agglomeration at position not easy to clean is washed After falling, fluid-transporting tubing is connected again;
S5 repeatedly rinses the fluid-transporting tubing connected in S4 with warm water of the temperature between 30 DEG C~50 DEG C, completes cleaning;
The S1 into S5 wash fluid-transporting tubing include pipe connections (1), No.1 pipe unit (2), No.1 spring pocket (24), Tube valve (3) and tube body cleaning part (4) are cooperatively connected between the No.1 pipe unit (2) by pipe connections (1), No.1 Guan Dan Two end curved surfaces of first (2) are provided with multiple annular grooves, and No.1 pipe unit (2) is plastic flexible pipe, the inner wall of No.1 pipe unit (2) In in axial direction uniformly distributed there are three cylindric and closed inflatable chambers (21);The both ends of the inflatable chamber (21) are provided with gas Mouth (22);The port (22) is only placed at the both ends of one of inflatable chamber (21), and inflatable chamber is communicated with No.1 between (21) Air drain (23);The tube valve (3) is installed between the adjacent No.1 pipe unit (2) in part, tube valve (3) and No.1 pipe unit (2) it is connected between by pipe connections (1);No.1 pipe unit (2) cleaning that the tube body cleaning part (4) is used to be removed;Institute Stating No.1 spring pocket (24) is plastic material, and No.1 spring pocket (24) is set in No.1 pipe unit (2) outer surface;
Wherein, the pipe connections (1) include connector (11), cock (12) and elastic internal bladder (13);The connector (11) For T-shaped or cross;The connector (11) includes being provided with a portion of calming the anger (111) and at least two pipe jointing parts (112);The pipe jointing part (112) is interconnected, and pipe jointing part (112) is used for and No.1 pipe unit (2) or No. two pipe units (32) end connection;The elastic internal bladder (13) is attached on the inner wall of connector (11), and the inside of elastic internal bladder (13) is No.1 cavity (131), elastic internal bladder (13) are provided with annular convex rib at pipe jointing part (112);The No.1 cavity (131) with The portion of calming the anger (111) of tube body is connected to;The cock (12) is adapted with the portion of calming the anger (111), and the portion of calming the anger (111) are shifted in cock (12) Inside can be such that No.1 cavity (131) air pressure of elastic internal bladder (13) increases, and make surface and the No.1 pipe unit of elastic internal bladder (13) (2) surfaces mate realizes sealing;
The tube valve (3) includes valve (31) and No. two pipe units (32) identical with No.1 pipe unit (2) structure;The valve Door (31) is located in the middle part of No. two pipe units (32), and valve (31) is connected to No. two pipe units (32);No. two pipe units (32) Considerably shorter than No.1 pipe unit (2).
2. a kind of fluid line cleaning method according to claim 1, it is characterised in that: the portion of calming the anger (111) and bullet Property liner (13) in the middle part of between be provided with and anti-stick up component (5);It is described to prevent that sticking up component (5) includes mutually fitting with elastic internal bladder (13) appearance Pressing plate (51), arch shrapnel (52) and the X-shaped hinge bar (53) matched;The upper surface of the pressing plate (51) is the curved surface of indent, pressure The lower end of plate (51) is Nian Jie with the middle part surface of elastic internal bladder (13);The handstand of the arch shrapnel (52) is arranged in pressing plate (51) Concave surface at, the both ends of arch shrapnel (52) are provided with convex ribs;The X-shaped hinge bar (53) is that two middle and lower parts are hinged on Bar together, the lower end of X-shaped hinge bar (53) is resisted against the upper end of arch shrapnel (52), and the lower end of X-shaped hinge bar (53) is only It is slided between upper two convex ribs of arch shrapnel (52), the upper end of X-shaped hinge bar (53) is located at immediately below cock (12).
3. a kind of fluid line cleaning method according to claim 2, it is characterised in that: the X-shaped hinge bar (53) Elastic string (54) are connected between two bar of top.
4. a kind of fluid line cleaning method according to claim 1, it is characterised in that: tube body cleaning part (4) packet The elastic hollow tube body (42) of stopple (41) and one end sealing is included, arranged for interval is flexible on the elastic hollow tube body (42) scrapes Plate (43) is intervally distributed with multiple holes one, the end of elastic hollow tube body (42) on the curved surface tube wall of elastic hollow tube body (42) Be provided with water filling or inflation is filled with end;Screw thread is disposed on the inner wall in the hole one;The stopple (41) is rubber material, hole Plug (41) is connect with one spiral of hole.
5. a kind of fluid line cleaning method according to claim 4, it is characterised in that: on the tube body cleaning part (4) It is arranged with No. two spring pockets (44);The outer diameter size of No. two spring pockets (44) is elastic hollow tube body (42) outer diameter and one The sum of the length of elastic scraper (43), the end of No. two spring pockets (44) extend to the outer of elastic hollow tube body (42) sealing one end Side.
6. a kind of fluid line cleaning method according to claim 5, it is characterised in that: the elastic scraper (43) it is same Card slot (441) are provided on one side;The card slot (441) is the arc shape to concave curved in the middle part of elastic hollow tube body (42); And the spring coil internal diameter of less than No. two spring pockets (44) of diameter of a circle of multiple card slots (441) formation.
CN201811278137.8A 2018-10-30 2018-10-30 A kind of fluid line cleaning method Withdrawn CN109351723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811278137.8A CN109351723A (en) 2018-10-30 2018-10-30 A kind of fluid line cleaning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811278137.8A CN109351723A (en) 2018-10-30 2018-10-30 A kind of fluid line cleaning method

Publications (1)

Publication Number Publication Date
CN109351723A true CN109351723A (en) 2019-02-19

Family

ID=65347288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811278137.8A Withdrawn CN109351723A (en) 2018-10-30 2018-10-30 A kind of fluid line cleaning method

Country Status (1)

Country Link
CN (1) CN109351723A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114144281A (en) * 2019-06-07 2022-03-04 赛峰飞机发动机公司 Blasting medium and surface treatment method using the same

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3910796A1 (en) * 1989-04-04 1990-10-11 Fischbach Manfred Dipl Ing Conveying hose for building materials with an easy-to-operate cleaning device
US5333916A (en) * 1993-03-30 1994-08-02 Burkit William A External pipe coupling system with inflatable gasket
CN102794282A (en) * 2012-08-31 2012-11-28 富威科技(吴江)有限公司 Isobaric inflatable seal joint device for cleaning internal wall of tube
CN205966590U (en) * 2016-08-18 2017-02-22 北冰洋(北京)饮料食品有限公司 Cip cleaning system
CN107185894A (en) * 2016-03-14 2017-09-22 内蒙古伊利实业集团股份有限公司 A kind of application electrolyzed oxidizing water carries out the system and device and method of situ cleaning to dairy products production equipment
CN207109962U (en) * 2017-08-31 2018-03-16 广州市龙能物业管理发展有限公司 A kind of sewer pipe sewage disposal apparatus
CN207641955U (en) * 2017-11-27 2018-07-24 安徽菁硕科技有限公司 A kind of blood processing line CIP cleaning systems
CN108359534A (en) * 2018-02-10 2018-08-03 汪逸凡 A kind of special dredging agent of plastic sewer pipe

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3910796A1 (en) * 1989-04-04 1990-10-11 Fischbach Manfred Dipl Ing Conveying hose for building materials with an easy-to-operate cleaning device
US5333916A (en) * 1993-03-30 1994-08-02 Burkit William A External pipe coupling system with inflatable gasket
CN102794282A (en) * 2012-08-31 2012-11-28 富威科技(吴江)有限公司 Isobaric inflatable seal joint device for cleaning internal wall of tube
CN107185894A (en) * 2016-03-14 2017-09-22 内蒙古伊利实业集团股份有限公司 A kind of application electrolyzed oxidizing water carries out the system and device and method of situ cleaning to dairy products production equipment
CN205966590U (en) * 2016-08-18 2017-02-22 北冰洋(北京)饮料食品有限公司 Cip cleaning system
CN207109962U (en) * 2017-08-31 2018-03-16 广州市龙能物业管理发展有限公司 A kind of sewer pipe sewage disposal apparatus
CN207641955U (en) * 2017-11-27 2018-07-24 安徽菁硕科技有限公司 A kind of blood processing line CIP cleaning systems
CN108359534A (en) * 2018-02-10 2018-08-03 汪逸凡 A kind of special dredging agent of plastic sewer pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
实用技工技术教材编写组: "《实用清洗技术》", 31 December 2007 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114144281A (en) * 2019-06-07 2022-03-04 赛峰飞机发动机公司 Blasting medium and surface treatment method using the same

Similar Documents

Publication Publication Date Title
CN109488821A (en) A kind of fluid-transporting tubing
CN109351723A (en) A kind of fluid line cleaning method
CN208510027U (en) A kind of washboard-type black garlic divides valve peeling machine
GB2054057A (en) Peristaltic pump
CN207266872U (en) A kind of flesh of fish stripping and slicing disintegrating mechanism
CN105395024B (en) Juice extractor and juice extractor accessory
CN109771674B (en) Canned fruit processing early-stage disinfection steam device
US8210827B2 (en) Sanitary pump assembly
CN108782703B (en) Processing equipment for sausage
CN209454231U (en) A kind of squeezing grease device being convenient to clean
CN207754519U (en) A kind of fillings molding machine
CN105011731A (en) Juice extractor with condensing system
CN206403181U (en) A kind of edible mushroom sauce preparation facilities
CN209171355U (en) A kind of Temperature Control Type machine for processing rice noodle
NL2024419B1 (en) Macaron Cake Extrusion Device
CN108937094A (en) A kind of multifunctional all toothpaste toothbrush
CN206809220U (en) A kind of toothpaste dosed expelling device
CN209106214U (en) Capsicum is pickled curing means
CN206481999U (en) A kind of low temperature pressure difference extrusion equipment
CN213045051U (en) Processing lines of potato production crude protein
CN205492443U (en) Popped system of soft ice cream machine
CN208123546U (en) A kind of exhaust hot and cold water tap
CN108402491A (en) The vertical lotus rhizome washing device promoted based on multi-shaft interlocked staged regular movements
CN208956953U (en) The vertical lotus rhizome washing device promoted based on multi-shaft interlocked staged regular movements
CN210214112U (en) Rice noodle production is with intraductal pressurization rice feeder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication