CN109322313B - Foundation pit enclosure structure system and its construction method - Google Patents

Foundation pit enclosure structure system and its construction method Download PDF

Info

Publication number
CN109322313B
CN109322313B CN201910004095.7A CN201910004095A CN109322313B CN 109322313 B CN109322313 B CN 109322313B CN 201910004095 A CN201910004095 A CN 201910004095A CN 109322313 B CN109322313 B CN 109322313B
Authority
CN
China
Prior art keywords
concrete pile
foundation pit
bored concrete
biting connecions
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910004095.7A
Other languages
Chinese (zh)
Other versions
CN109322313A (en
Inventor
龚剑
颜超
张竹庭
周婉
钟铮
林巧
颜正红
王新新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Publication of CN109322313A publication Critical patent/CN109322313A/en
Application granted granted Critical
Publication of CN109322313B publication Critical patent/CN109322313B/en
Priority to PCT/CN2019/092630 priority Critical patent/WO2020140405A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of foundation pit enclosure structure system and its construction methods, the system includes diaphram wall, biting connecions bored concrete pile positioned at the diaphram wall side, the depth of the biting connecions bored concrete pile is greater than the depth of the diaphram wall, and the compaction grouting layer between the diaphram wall and biting connecions bored concrete pile in gap;The second capping beam is provided at the top of the biting connecions bored concrete pile, the both ends of second capping beam are respectively arranged with the first reserved steel bar and the second reserved steel bar, second capping beam, which is anchored by the first reserved steel bar with the diaphram wall, to be connect, and second capping beam anchors into connection by the corresponding layer of the second reserved steel bar piling strtucture plate to be formed.The present invention has the effect of that low short construction period, project cost, high reliablity and stability are good.

Description

Foundation pit enclosure structure system and its construction method
Technical field
The present invention relates to technical field of building construction, in particular to a kind of foundation pit enclosure structure system and its construction method.
Background technique
In recent years, with the continuous quickening of Chinese Urbanization planning and deep, along with the increasingly in short supply of land resource, The design and construction of underground structure are increased in building newly developed.The underground structure of traditional building newly developed is general Only with the foundation pit enclosure structure of diaphram wall, there are long construction period, project cost is high, reliability and stability are poor Defect.For the existing buildings such as ancient building, old building protection construction in, due to the foundation pit enclosure structure of existing building Generally only with diaphram wall, thus when the underground space to existing building is transformed, the depth to foundation pit is needed Further intensification processing, when foundation depth is deepened, the insertion depth of the foundation pit enclosure structure of original diaphram wall mode is just It cannot be guaranteed that deep pit monitor excavates with underground structure safe construction and not can guarantee the safety of superstructure in transformation process Property, according to new diaphram wall as the building enclosure that foundation pit is transformed will bring cost it is high, it is long in time limit etc. it is unfavorable because Element, and original building enclosure can not be made full use of, therefore how to study a kind of foundation pit that can solve in such architectural engineering The technical issues of structural protective system and construction method are those skilled in the art's urgent need to resolve.
Summary of the invention
The object of the present invention is to provide a kind of foundation pit enclosure structure system and its construction methods, to solve construction period Technical problem long, project cost is high, reliability and stability are poor.
In order to solve the above technical problem, the present invention provides a kind of foundation pit enclosure structure system, including diaphram wall, positions The depth of biting connecions bored concrete pile in the diaphram wall side, the biting connecions bored concrete pile is greater than the diaphram wall Depth, and the compaction grouting layer between the diaphram wall and biting connecions bored concrete pile in gap;The biting connecions fill The second capping beam is provided at the top of note stake, the both ends of second capping beam are respectively arranged with the first reserved steel bar and second in advance Reinforcing bar is stayed, second capping beam, which is anchored by the first reserved steel bar with the diaphram wall, to be connect, second capping beam Connection is anchored by the corresponding layer of the second reserved steel bar piling strtucture plate to be formed.
Further, foundation pit enclosure structure system provided by the invention, including the wall between the diaphram wall Based structures plate.
Further, foundation pit enclosure structure system provided by the invention, the wall base structural slab include at least the B0 layers of wall base Structural slab and B1 layers of wall base structural slab.
Further, foundation pit enclosure structure system provided by the invention is provided with first at the top of the diaphram wall Capping beam, the B0 layers of wall base structural slab are arranged on first capping beam.
Further, foundation pit enclosure structure system provided by the invention, including between the biting connecions bored concrete pile Piling strtucture plate.
Further, foundation pit enclosure structure system provided by the invention, the piling strtucture plate include at least B2 layers of pile foundation Structural slab, B3 layers of piling strtucture plate and bottom piling strtucture plate.
Further, foundation pit enclosure structure system provided by the invention, the B2 layers of piling strtucture plate are located at described second On capping beam, the B2 layers of piling strtucture plate is the second capping beam respective layer piling strtucture plate to be formed.
Further, foundation pit enclosure structure system provided by the invention, the bottom piling strtucture plate lower section are provided with vertical Stanchion.
Further, foundation pit enclosure structure system provided by the invention, the biting connecions bored concrete pile include more bored concrete piles, Adjacent two bored concrete piles partially overlap setting.
In order to solve the above-mentioned technical problem, construction method of the present invention also for a kind of foundation pit enclosure structure system,
In the side of diaphram wall construction biting connecions bored concrete pile, it is greater than the depth of the biting connecions bored concrete pile describedly The depth of lower diaphragm wall, and make the biting connecions bored concrete pile formation positioned at the plain concrete perfusion pile cutoff of upper part and under being located at Partial deposited reinforced concrete pile section, the length of the deposited reinforced concrete pile section are greater than plain concrete and pile cutoff are perfused;
Gap between diaphram wall and biting connecions bored concrete pile forms compaction grouting layer;
The plain concrete perfusion pile cutoff in the biting connecions bored concrete pile is removed, is filled in the armored concrete of biting connecions bored concrete pile The second capping beam of top construction for infusing pile cutoff makes the both ends of the second capping beam be respectively arranged with the first reserved steel bar and second and reserves Reinforcing bar anchors into the second capping beam with diaphram wall by the first reserved steel bar and connect.
Further, the construction method of foundation pit enclosure structure system provided by the invention, during excavation, Gradually remove the plain concrete perfusion pile cutoff in the biting connecions bored concrete pile, wall base structure of constructing between the diaphram wall Plate;
The construction piling strtucture plate between the biting connecions bored concrete pile with deposited reinforced concrete pile section;
Connection is anchored by the piling strtucture plate that the second reserved steel bar forms the corresponding layer of second capping beam.
Further, the construction method of foundation pit enclosure structure system provided by the invention, during excavation, Gradually remove the plain concrete perfusion pile cutoff in the biting connecions bored concrete pile;
The construction piling strtucture plate between the biting connecions bored concrete pile with deposited reinforced concrete pile section;
Connection is anchored by the piling strtucture plate that the second reserved steel bar forms the corresponding layer of second capping beam.
Foundation pit enclosure structure system and its construction method provided by the invention, by diaphram wall, compaction grouting layer and sting The superposition mode that box-like bored concrete pile is constituted, the strength and stability of the foundation pit enclosure structure system of the superposition mode, much The foundation pit enclosure structure single greater than diaphram wall etc..Biting connecions bored concrete pile provided by the invention has safe and reliable, stable And short construction period, project cost are low and small advantage is influenced by foundation pit soil property.The present invention passes through diaphram wall and occlusion Formula bored concrete pile combination is effectively utilized the big advantage of existing diaphram wall rigidity, and biting connecions bored concrete pile is utilized The advantages of quick construction, has good earth-retaining and water-stagnating effect;Simultaneously in the existing insufficient feelings of diaphram wall insertion depth Under condition, it is effectively controlled foundation pit deformation, technical measures expense is reduced, speeds up the work.The present invention passes through the second capping beam First reserved steel bar anchors into diaphram wall, in the prior art use brace connect foundation pit enclosure structure and layer to be formed The mode of structural slab is compared, and ensure that continuity, overall stability and safety that foundation pit enclosure structure system is transmitted in stress, Foundation pit deformation can effectively be controlled.The present invention is by compaction grouting layer to the gap between diaphram wall and biting connecions bored concrete pile Compaction grouting filling is carried out, the reliability and stability of foundation pit enclosure structure system is ensure that, avoids the underground in gap continuous The case where wall and biting connecions bored concrete pile phase enantiotropy, and compaction grouting layer be not necessarily to diaphram wall and biting connecions bored concrete pile it Between carry out bore process, when can overcome high-pressure rotary jet grouting pile slip casting the structure caused by diaphram wall and bored concrete pile destroy, because This, stability of the invention is higher.The present invention is greater than the biting connecions bored concrete pile of diaphram wall by depth, to extend both There is the insertion depth of underground continuous wall-enclosure structure single in building, to ensure the safety and over the ground of superstructure Flowering structure is constructed, to ensure the safety of the excavation of foundation pit and construction operation of underground construction.The present invention is suitable for newly opening The building underground structure of hair is also applied for the underground structure rebuilding construction of existing building.It is tied in the underground of existing building In structure rebuilding construction, the recycling of the original foundation pit enclosure structure single to diaphram wall etc. is reduced to surrounding enviroment Disturbance, realizes the purpose of environmentally protective recycling.
Detailed description of the invention
Fig. 1 is the foundation pit enclosure structure system of one embodiment of the invention and the schematic diagram of underground structure;
Fig. 2 is the foundation pit enclosure structure system of one embodiment of the invention and the partial structural diagram of underground structure;
Fig. 3 is the profile in Fig. 2 at C-C;
Fig. 4 is the structural schematic diagram of the foundation pit enclosure structure system of one embodiment of the invention;
Fig. 5 is profile of the biting connecions bored concrete pile along A-A in Fig. 4;
Fig. 6 is profile of the biting connecions bored concrete pile along B-B in Fig. 4;
Fig. 7 to Fig. 8 is the work progress schematic diagram of the underground structure of one embodiment of the invention.
It is as shown in the figure: 100, foundation pit enclosure structure system, 110, diaphram wall, 120, biting connecions bored concrete pile, 130, pressure Close grouting layer, the 140, second capping beam, the 141, first reserved steel bar, the 142, second reserved steel bar, 150, wall base structural slab, 151, B0 layers of wall base structural slab, 152, B1 layers of wall base structural slab, the 160, first capping beam, 170, piling strtucture plate, 171, B2 layers of pile foundation Structural slab, 172, B3 layers of piling strtucture plate, 173, bottom piling strtucture plate, 180, stand column pile, 190 support columns, 200, ground level.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
Fig. 1 to Fig. 8 is please referred to, the embodiment of the present invention provides a kind of foundation pit enclosure structure system 100, including diaphram wall 110, the biting connecions bored concrete pile 120 positioned at 110 side of diaphram wall, the depth of the biting connecions bored concrete pile 120 is greater than The depth of the diaphram wall 110, and between the diaphram wall 110 and biting connecions bored concrete pile 120 in gap Compaction grouting layer 130;The top of the biting connecions bored concrete pile 120 is provided with the second capping beam 140, second capping beam 140 both ends are respectively arranged with the first reserved steel bar 141 and the second reserved steel bar 142, and second capping beam 140 passes through first Reserved steel bar 141 is anchored into the diaphram wall 110 and is connect, second capping beam 140 by the second reserved steel bar 142 with Its respective layer piling strtucture plate to be formed anchors into connection.
The foundation pit enclosure structure system 100 of the embodiment of the present invention is by diaphram wall 110, compaction grouting layer 130 and to sting The superposition mode that box-like bored concrete pile 120 is constituted, strength and stability are far longer than the single foundation pit such as diaphram wall and enclose Protection structure.Biting connecions bored concrete pile 120 provided in an embodiment of the present invention has safe and reliable, stable and short construction period, engineering Low cost and small advantage is influenced by foundation pit soil property.The present invention passes through 120 side of combination of diaphram wall 110 and biting connecions bored concrete pile Formula is effectively utilized the big advantage of existing diaphram wall rigidity, and the excellent of 120 quick construction of biting connecions bored concrete pile is utilized Point has good earth-retaining and water-stagnating effect;Simultaneously in the insufficient situation of existing 110 insertion depth of diaphram wall, effectively Control foundation pit deformation, reduce technical measures expense, speed up the work.The embodiment of the present invention passes through the second capping beam 140 First reserved steel bar 141 anchors into diaphram wall 110, and uses brace connect foundation pit enclosure structure and to shape in the prior art At the mode of layer structural slab compare, ensure that continuity, overall stability that foundation pit enclosure structure system transmits in stress and Safety can effectively control foundation pit deformation.The embodiment of the present invention is by 130 pairs of diaphram wall 110 of compaction grouting layer and stings Gap between box-like bored concrete pile 120 carries out compaction grouting compacting filling, ensure that foundation pit enclosure structure system reliability and Stability, the case where avoiding the 120 phase enantiotropy of diaphram wall 110 and biting connecions bored concrete pile in gap, and compaction grouting Layer 130 can overcome high-pressure rotary jet grouting pile without carrying out bore process between diaphram wall 110 and biting connecions bored concrete pile 120 The structure caused by diaphram wall and bored concrete pile is destroyed when slip casting, and therefore, stability of the invention is higher.The embodiment of the present invention It is greater than the biting connecions bored concrete pile of diaphram wall by depth, is enclosed to extend diaphram wall single in existing building The insertion depth of protection structure, to ensure the safety of superstructure and construct to underground structure, to ensure that underground is applied The safety of the excavation of foundation pit and construction operation of work.Wherein the interface of superstructure and underground structure is ginseng with ground level 200 It examines.The present invention is suitable for building underground structure newly developed, is also applied for the underground structure rebuilding construction of existing building. In the underground structure rebuilding construction of existing building, the benefit again of the original foundation pit enclosure structure single to diaphram wall etc. With reducing the disturbance to surrounding enviroment, realize the purpose of environmentally protective recycling.
Fig. 1, Fig. 7 are please referred to Fig. 8, foundation pit enclosure structure system 100 provided in an embodiment of the present invention, including be located at described Wall base structural slab 150 between diaphram wall 110, the wall base structural slab 150 include at least B0 layers of 151 He of wall base structural slab B1 layers of wall base structural slab 152.The top of the diaphram wall 110 is provided with the first capping beam 160, the B0 layers of wall base structure Plate 151 is arranged on first capping beam 160.
Referring to FIG. 1, foundation pit enclosure structure system 100 provided in an embodiment of the present invention, including be located at the biting connecions and fill Infuse the piling strtucture plate 170 between stake 120.The piling strtucture plate 170 includes at least B2 layers of piling strtucture plate 171, B3 layers of stake Based structures plate 172 and bottom piling strtucture plate 173.The B2 layers of piling strtucture plate 171 is located on second capping beam 140, The B2 layers of piling strtucture plate 171 is 140 respective layer of the second capping beam piling strtucture plate to be formed.The B3 layers of pile foundation Structural slab 172 and the bottom piling strtucture plate 173 are respectively positioned between the biting connecions bored concrete pile 120.The embodiment of the present invention Underground structure includes but is not limited to 4 layers, including by B0 layers of wall base structural slab 151, B1 layers of wall base structural slab 152 and B2 layers of pile foundation knot Structure plate 171 constitute 2 layers of wall base underground structure and by B2 layers of piling strtucture plate 171, B3 layers of piling strtucture plate 172 and bottom pile foundation 2 layers of pile foundation underground structure that structural slab 173 is constituted.It, can be according to tool in new construction or existing building development Body demand has geographical environment appropriate adjustment.
Referring to FIG. 1, foundation pit enclosure structure system 100 provided in an embodiment of the present invention, the bottom piling strtucture plate 173 Lower section is provided with stand column pile 180.Between the wall base structural slab 150, between piling strtucture plate 170 and wall base structural slab 150 Average mark is furnished with support column 190 between piling strtucture plate 170.Stand column pile 180 is used to guarantee the stability of underground structure.Support Column 190 is used to protect the stability between each layer structural slab.
Please refer to fig. 4 to fig. 6, foundation pit enclosure structure system 100 provided in an embodiment of the present invention, the biting connecions bored concrete pile 120 include more bored concrete piles, and adjacent two bored concrete piles partially overlap setting, to form biting connecions bored concrete pile 120.
Fig. 1-8 is please referred to, the embodiment of the present invention also provides a kind of construction method of foundation pit enclosure structure system 100, including Following steps:
Step 1, in the side of diaphram wall 110 construction biting connecions bored concrete pile 120, make the biting connecions bored concrete pile 120 Depth be greater than the depth of the diaphram wall 110, and the biting connecions bored concrete pile 120 is made to form the element for being located at upper part Filling concrete pile cutoff 121 and deposited reinforced concrete pile section 122 positioned at lower part, the deposited reinforced concrete pile section 122 length is greater than plain concrete and pile cutoff 121 is perfused;Biting connecions bored concrete pile 120 can be formed in the inside of diaphram wall 110 Or outside, the embodiment of the present invention preferably use inside, to make the piling strtucture plate 170 to be formed relative to wall base structural slab 150 be tightening structure, to guarantee the stability of foundation pit enclosure structure system and underground structure.In order to guarantee the stabilization of foundation pit Property, the deficiency of building enclosure insertion depth is made up, is filled in biting connecions of constructing at 300mm to 400mm on the inside of diaphram wall Stake 120 is infused, it is pre-buried using the internal diameter steel pile casting progress to 200mm 100mm bigger than grout pile diameter before drilling.Wherein, it please refers to Fig. 5, it is more bored concrete piles that pile cutoff 121, which is perfused, in plain concrete, and adjacent two bored concrete piles partially overlap setting.Referring to FIG. 6, reinforcing bar Filling concrete pile cutoff 122 is formed between two neighboring plain concrete perfusion pile cutoff 121, to form biting connecions structure.Its Middle deposited reinforced concrete pile section 122 is that concrete 1222 and reinforcing bar 1221 are constituted.Referring to FIG. 4, pile cutoff is perfused in plain concrete 121 and deposited reinforced concrete pile section 122 divided by line of demarcation 123.
Step 2, the gap between diaphram wall 110 and biting connecions bored concrete pile 120 forms compaction grouting layer 130.Its Purpose be it is closely knit in order to fill, to ensure what stress between 120 composite structure of diaphram wall 110 and biting connecions bored concrete pile was transmitted Continuity gives full play to superposed type building enclosure group effect.
Step 3, please refer to figs. 1 to 4, removes the plain concrete perfusion pile cutoff 121 in the biting connecions bored concrete pile 120, In the second capping beam 140 of top construction of the deposited reinforced concrete pile section 122 of biting connecions bored concrete pile 120, make the second capping beam 140 both ends are respectively arranged with the first reserved steel bar 141 and the second reserved steel bar 142, make second by the first reserved steel bar 141 Capping beam 140 is anchored into diaphram wall 110 and is connect.Such as second reserved steel bar be 3 × 3 Φ, 16@200, anchor into ground-connecting-wall simultaneously Hole is reinforced with the Concrete Filled of HILTI RE-500 model, makes diaphram wall 110 and biting connecions bored concrete pile 120 formation One complete linkage system.
As preferable embodiment, the construction method of foundation pit enclosure structure system 100 provided in an embodiment of the present invention, also Include:
Step 4, Fig. 4, Fig. 7 are please referred to and gradually removes the biting connecions perfusion during excavation to Fig. 8 Pile cutoff 121 is perfused in plain concrete in stake 120, wall base structural slab 150 of constructing between the diaphram wall 110.Specifically apply Work step is rapid, and can construct B0 layers of wall base structural slab 151 in excavation of foundation pit to B1 layers of 152 or less 1.5m of wall base structural slab or so, The lateral pressure that foundation pit enclosure structure system transmits is resisted by B0 layers of wall base structural slab 151;It is applied on the first capping beam 160 B0 layers of wall base structural slab 151 of work control the top displacement of diaphram wall 110 to guarantee its stabilization.
Step 5, Fig. 1 to Fig. 3 is please referred to, between the biting connecions bored concrete pile 120 with deposited reinforced concrete pile section 122 Construction piling strtucture plate 170;The pile foundation for forming the corresponding layer of second capping beam 140 by the second reserved steel bar 142 Structural slab anchors into connection.I.e. the second capping beam 140 is anchored into B2 layers of piling strtucture plate by the second reserved steel bar 142 and is connect.Its Purpose is the foundation pit enclosure structure system for increasing diaphram wall 110, biting connecions bored concrete pile 120 and compaction grouting layer 130 and being formed Stability.Embodiment of the step 4 to step 5, foundation pit enclosure structure system suitable for new construction.
As preferable embodiment, the construction method of foundation pit enclosure structure system 100 provided in an embodiment of the present invention, also Including
Step 4 ', during excavation, the plain concrete gradually removed in the biting connecions bored concrete pile 120 is filled Infuse pile cutoff 121;
Step 5 ', piling strtucture plate of constructing between the biting connecions bored concrete pile 120 with deposited reinforced concrete pile section 122 170;Connection is anchored by the piling strtucture plate that the second reserved steel bar 142 forms the corresponding layer of second capping beam 140. I.e. the second capping beam 140 is anchored into B2 layers of piling strtucture plate by the second reserved steel bar 142 and is connect.The purpose is to increase underground to connect The stability for the foundation pit enclosure structure system that continuous wall 110, biting connecions bored concrete pile 120 and compaction grouting layer 130 are formed.Such step 4 are suitable for the foundation pit enclosure structure system of new construction to step 5.The embodiment of step 4 ' and step 5 ' is suitable for both There is building underground structure improvement project.
In the embodiment of the present invention, second capping beam 140 passes through the first reserved steel bar 141 and the diaphram wall 110 anchor into connection, the second capping beam 140 piling strtucture plate to be formed by the corresponding layer of the second reserved steel bar 142 Anchor into connection.By being connect and piling strtucture plate to be formed anchors into connection with anchoring into for diaphram wall 140, to enhance The reliability and stability of foundation pit enclosure structure system.The first preferential reserved steel bar 141 is three, but is not limited to three.
The foundation pit enclosure structure system of the embodiment of the present invention is combined with underground structure " contrary sequence method " construction, without setting interior branch Mechanization rapid construction is convenient in support, does not influence the construction of next process, saves the duration, and explosion is avoided to tear support etc. open to environment band The influence come, realizes green construction.
Core of the invention is: using the laminated form of diaphram wall, biting connecions bored concrete pile and compaction grouting three, In conjunction with the construction of earth excavation, underground structure, the system of a superposed type building enclosure and underground structure synergy is formed.Wound Solve the problems, such as to the property made in existing building enclosure insertion depth deficiency situation that caused foundation pit is unstable, deformation is big and The problem that duration is nervous, cost is high, it is ensured that the safety in Excavation Process effectively raises construction efficiency, reduces Engineering cost ensures architecture quality, realizes green construction.
It is insufficient folded that the embodiment of the present invention is that one kind can solve the existing building enclosure insertion depth in deep, big base pit engineering Box-like building enclosure is to combine diaphram wall, biting connecions bored concrete pile and compaction grouting, and pass through step excavation, substep Constructing structure layer makes entire building enclosure form a kind of complete stabilising system, solves the foundation pit in deep, big foundation pit transformation The problems such as stability is insufficient, the duration is nervous.
The embodiment of the present invention especially suitable for using original diaphram wall foundation pit improvement project, have it is environmentally protective, The advantages of available, easy for construction, stress clear reliable, saving construction cost, stablize to foundation pit in deep, big foundation pit improvement project is solved Property insufficient, Deformation control require high, duration nervous and the problems such as underground structure quality requirement height have Practical significance.
The present invention is not limited to above-mentioned specific embodiment, all made various changes within the spirit and scope of the present invention And retouching, it is within the scope of the present invention.

Claims (12)

1. a kind of foundation pit enclosure structure system, which is characterized in that including diaphram wall, positioned at the diaphram wall side Biting connecions bored concrete pile, the depth of the biting connecions bored concrete pile is greater than the depth of the diaphram wall, and is located at the underground Compaction grouting layer between diaphragm wall and biting connecions bored concrete pile in gap;The second pressure is provided at the top of the biting connecions bored concrete pile Top beam, the both ends of second capping beam are respectively arranged with the first reserved steel bar and the second reserved steel bar, second capping beam It is anchored into and is connect with the diaphram wall by the first reserved steel bar, second capping beam is right with it by the second reserved steel bar The piling strtucture plate for answering layer to be formed anchors into connection.
2. foundation pit enclosure structure system as described in claim 1, which is characterized in that including between the diaphram wall Wall base structural slab.
3. foundation pit enclosure structure system as claimed in claim 2, which is characterized in that the wall base structural slab includes at least B0 layers Wall base structural slab and B1 layers of wall base structural slab.
4. foundation pit enclosure structure system as claimed in claim 3, which is characterized in that be provided at the top of the diaphram wall First capping beam, the B0 layers of wall base structural slab are arranged on first capping beam.
5. foundation pit enclosure structure system as described in claim 1, which is characterized in that including be located at the biting connecions bored concrete pile it Between piling strtucture plate.
6. foundation pit enclosure structure system as claimed in claim 5, which is characterized in that the piling strtucture plate includes at least B2 layers Piling strtucture plate, B3 layers of piling strtucture plate and bottom piling strtucture plate.
7. foundation pit enclosure structure system as claimed in claim 6, which is characterized in that the B2 layers of piling strtucture plate is located at described On second capping beam, the B2 layers of piling strtucture plate is the second capping beam respective layer piling strtucture plate to be formed.
8. foundation pit enclosure structure system as claimed in claim 6, which is characterized in that setting below the bottom piling strtucture plate There is stand column pile.
9. foundation pit enclosure structure system as described in claim 1, which is characterized in that the biting connecions bored concrete pile includes more fillings Stake is infused, adjacent two bored concrete piles partially overlap setting.
10. a kind of construction method of foundation pit enclosure structure system, which is characterized in that
In the side of diaphram wall construction biting connecions bored concrete pile, connect the depth of the biting connecions bored concrete pile greater than the underground The depth of continuous wall, and the biting connecions bored concrete pile is made to form the plain concrete perfusion pile cutoff for being located at upper part and be located at lower part Deposited reinforced concrete pile section, the length of the deposited reinforced concrete pile section is greater than plain concrete and pile cutoff is perfused;
Gap between diaphram wall and biting connecions bored concrete pile forms compaction grouting layer;
The plain concrete perfusion pile cutoff in the biting connecions bored concrete pile is removed, in the deposited reinforced concrete pile of biting connecions bored concrete pile The second capping beam of top construction of section, makes the both ends of the second capping beam be respectively arranged with the first reserved steel bar and the second reserved steel Muscle anchors into the second capping beam with diaphram wall by the first reserved steel bar and connect.
11. the construction method of foundation pit enclosure structure system as claimed in claim 10, which is characterized in that in excavation In the process, the plain concrete perfusion pile cutoff in the biting connecions bored concrete pile is gradually removed, is constructed between the diaphram wall Wall base structural slab;
The construction piling strtucture plate between the biting connecions bored concrete pile with deposited reinforced concrete pile section;
Connection is anchored by the piling strtucture plate that the second reserved steel bar forms the corresponding layer of second capping beam.
12. the construction method of foundation pit enclosure structure system as claimed in claim 10, which is characterized in that in excavation In the process, the plain concrete perfusion pile cutoff in the biting connecions bored concrete pile is gradually removed;
The construction piling strtucture plate between the biting connecions bored concrete pile with deposited reinforced concrete pile section;
Connection is anchored by the piling strtucture plate that the second reserved steel bar forms the corresponding layer of second capping beam.
CN201910004095.7A 2018-11-12 2019-01-03 Foundation pit enclosure structure system and its construction method Active CN109322313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2019/092630 WO2020140405A1 (en) 2018-11-12 2019-06-25 Foundation pit retaining structure system and construction method therefor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201811338502 2018-11-12
CN201811338502X 2018-11-12

Publications (2)

Publication Number Publication Date
CN109322313A CN109322313A (en) 2019-02-12
CN109322313B true CN109322313B (en) 2019-03-29

Family

ID=65257094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910004095.7A Active CN109322313B (en) 2018-11-12 2019-01-03 Foundation pit enclosure structure system and its construction method

Country Status (2)

Country Link
CN (1) CN109322313B (en)
WO (1) WO2020140405A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322313B (en) * 2018-11-12 2019-03-29 上海建工集团股份有限公司 Foundation pit enclosure structure system and its construction method
CN109701984A (en) * 2019-02-27 2019-05-03 中交路桥建设有限公司 A kind of environment-friendly type dregs hole mud retaining net
CN112900468A (en) * 2021-02-02 2021-06-04 中铁八局集团有限公司 Bridge foundation construction method suitable for complex geological conditions

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8913882D0 (en) * 1989-06-16 1989-08-02 Fondedile Foundations Ltd Mini-piled retaining wall and a method for its construction
JPH10159094A (en) * 1996-11-30 1998-06-16 Kumagai Gumi Co Ltd Timbering structure of earth retaining wall
CN101463605A (en) * 2007-12-18 2009-06-24 上海市第五建筑有限公司 New and old enclosures combined foundation pit enclosure method
CN201627207U (en) * 2010-03-10 2010-11-10 浙江金典建设有限公司 Supporting structure of pine pile of foundation pit of elevator shaft
CN103321231B (en) * 2013-06-10 2015-11-25 叶长青 Base pit stand construction
CN105178327A (en) * 2015-07-17 2015-12-23 上海建工七建集团有限公司 Composite retaining structure of foundation pit project and construction method thereof
CN105421488B (en) * 2015-09-14 2017-07-14 上海建工七建集团有限公司 The construction method of sole plate support replacement in the combined fender construction system of underground
CN105735325B (en) * 2016-04-20 2018-01-23 山东大学 A kind of intensive permanent support assembled basement structure system and construction method
CN106522241B (en) * 2016-12-14 2019-04-12 上海建工一建集团有限公司 The method for supporting deep foundation pit of the high basement structure of super large layer
KR102009077B1 (en) * 2017-06-07 2019-08-08 신승혜 Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
CN207512750U (en) * 2017-10-23 2018-06-19 上海市城市建设设计研究总院(集团)有限公司 Along depth direction is multi-form, variable cross-section supporting construction
CN108951640A (en) * 2018-07-02 2018-12-07 上海建工集团股份有限公司 A kind of Extra-Deep Foundation Pit construction method
CN109322313B (en) * 2018-11-12 2019-03-29 上海建工集团股份有限公司 Foundation pit enclosure structure system and its construction method

Also Published As

Publication number Publication date
CN109322313A (en) 2019-02-12
WO2020140405A1 (en) 2020-07-09

Similar Documents

Publication Publication Date Title
CN109322313B (en) Foundation pit enclosure structure system and its construction method
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN104675403A (en) Underground space construction method and supporting structure
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN203905018U (en) Supporting and protecting system with combined double-row piles in combination with oblique anchors
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN108589771A (en) One kind having runed underground station increasing layer transfer node construction method
CN105804760A (en) Super-large section tunnel drilling and blasting method in-situ expansion construction structure and construction method
CN105525627A (en) Two-way anchorage plate retaining wall and construction method thereof
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN205778879U (en) Super large section tunnel bores and explodes method normal position enlargement construction structures
CN109056790A (en) Stake three layers of retaining wall structure of support and construction method
CN108343068A (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction and construction method
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN107489106B (en) A kind of rocky bed subaqueous bearing platform construction method
CN106758890B (en) Campshed box culvert structure and its construction method
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN204492847U (en) A kind of supporting and protection structure of underground space reverse construction
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant