CN109296067A - Assembly concrete girder and secondary beam dry type connecting node - Google Patents

Assembly concrete girder and secondary beam dry type connecting node Download PDF

Info

Publication number
CN109296067A
CN109296067A CN201811454235.2A CN201811454235A CN109296067A CN 109296067 A CN109296067 A CN 109296067A CN 201811454235 A CN201811454235 A CN 201811454235A CN 109296067 A CN109296067 A CN 109296067A
Authority
CN
China
Prior art keywords
cantilever plate
prefabricated
connection frame
overhanging
concrete girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811454235.2A
Other languages
Chinese (zh)
Inventor
张延年
陈文佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201811454235.2A priority Critical patent/CN109296067A/en
Publication of CN109296067A publication Critical patent/CN109296067A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to assembly concrete girders and secondary beam dry type connecting node, belong to building structure field.The top flange of prefabricated T shape concrete secondary beam is overlapped on the cantilever plate of the precast concrete girder with overhanging beam, the cantilever plate of precast concrete girder with overhanging beam is connect with the top flange of prefabricated stepped concrete girder using arch screw bolt, the interior closing in of precast concrete girder with overhanging beam is connect with the top flange of prefabricated T shape concrete secondary beam using arch screw bolt, and the web of prefabricated T shape concrete secondary beam is connect with the cantilever plate of the precast concrete girder with overhanging beam using arch screw bolt;Vertical seam is filled using sealing material.Effect and advantage of the invention is connection type using dry construction, simplifies construction;Connection is reliable, good integrity, has superior anti-seismic performance, and rigidity is obviously improved, and reduces connector quantity, is obviously improved it and industrializes efficiency, reduce resource and energy consumption, and generalization may be implemented, standardizes.

Description

Assembly concrete girder and secondary beam dry type connecting node
Technical field
The present invention relates to assembly concrete girders and secondary beam dry type connecting node, belong to building structure field.
Background technique
Assembly concrete building refers to based on the concrete prefabricated element with the factorial production, passes through site-assembled side The concrete structure class building construction of formula design-build.The assembly method of component pours overlapping layer concrete, steel after generally having scene Sleeve grouting connection, welding, mechanical connection and reserving hole overlap joint can be used in pouring concrete connection etc. after muscle anchoring, reinforcing bar connection The ways such as connection.In the 1980s, in the prefabricated big plate house of China's prevalence, due to structural integrity is poor, leakage, The reasons such as cracks on floor slab, there are many influence structure safety and the hidden danger and defect of normal use, gradually by cast-in-place concrete knot Replaced structure.But it with the application of current emerging prefabricated concrete structure, especially introduces in recent years many external first Into technology, localized prefabricated concrete structure is built new technology and is just gradually formed.
With the quickening of China " building industrialization, housing industrialization " process and constantly subtracting for China's " demographic dividend " Less, the appearance of building trade recruitment famine, the trend of housing industry industrialization are increasingly obvious.The application weight of prefabricated concrete structure Newly become current research hot spot, all parts of the country continue to bring out out new technology, the new model of residential housing prefabricated concrete structure. Precast reinforced concrete structure is one of the important directions of China's building structure development, it is conducive to China's building industrialization Development, raising production efficiency is energy saving, develops Green environmental-protection building, and is conducive to improve and guarantee construction engineering quality. Compared with cast-in-situ construction method, assembled reinforced concrete structure is conducive to green construction, because fabricated construction can more meet green construction Save land, energy conservation, section material, water-saving and environmental protection etc. require, reduce the negative effect to environment, including reduce noise, prevent Fugitive dust reduces environmental pollution, cleans transport, reduce place interference, save resources and the energy such as water, electricity, material, it then follows sustainable The principle of development.Moreover, fabricated construction can continuously complete multiple or whole processes of engineering in order, thus reduce into The engineering machinery type and quantity of field eliminate resting the time for procedure connection, realize interchange operation, reduce construction personnel, To improve work efficiency, reduction supplies consumption, reduce environmental pollution, provided safeguard for green construction.In addition, fabricated construction compared with Building waste (account for about municipal refuse total amount 30% -40%) is reduced in big degree, such as steel scrap muscle, waste iron wire, useless bamboo wood material, is given up Abandon concrete etc..
Assembly concrete building can be divided into full assembly and part assembly two major classes according to assembling degree height.Full assembly Building is generally limited to low layer or the lower tier building of requirements for fortification against earthquake;Part assembly concrete construction main member is general It is connected using prefabricated components, at the scene by cast-in-place concrete, forms the building of cast in place and precast construction.
North America region is mainly main since prefabricated/prestressed concrete association (PCI) studies for a long period of time with America & Canada With popularization pre-cast building, the Specification of precast concrete also improves very much so its assembly concrete Application in Building is non- It is often universal.The pre-cast building of North America mainly includes building prefabrication exterior wall and the big series of structure prefabricated components two, and prefabricated components are total to It is that enlargement and prestressing force combine and can optimize structural reinforcement and connecting structure with feature.Reduce production and installation workload, contracting The short Yi work duration fully demonstrates industrialization, standardization and Technical Economy feature.In 20th century, the pre-cast building of North America is main For the non-antidetonation fortified defence area of low layer.Due to the earthquake effect in California area, antidetonation and on the middle and senior level prefabricated is paid much attention in recent years The engineer application technical research of structure.PCI has published " precast concrete Aseismic Design " book recently, from theory and practice The Aseismic Design problem for analyzing to angle system pre-cast building, the newest section for summarizing many precast construction Aseismic Designs are ground into Fruit has very strong directive significance to instructing precast construction design and engineer application to promote.
Europe is the cradle of pre-cast building, and the road of building industrialization has been begun to early in the 17th century.Second of the world is big After the war, due to human resources shortage, Europe further research and probe building industrialization mode.Either economically developed north Europe, West Europe or Eastern Europe underdeveloped, always all in the design and construction side for actively carrying out prefabrication and assembly construction concrete construction Formula.The design and construction experience for having accumulated many pre-cast buildings forms various special precast building systems and standardized general Pre-manufactured product series, and a series of precast concrete engineering specifications and application manual have been worked out, to promotion precast concrete complete The application in the world plays the role of very important.
Japan and South Korea have used for reference American-European successful experience, on the basis of exploring the standardized designs construction of pre-cast building. In conjunction with oneself requirement.Breakthrough is achieved in terms of precast construction system globality antidetonation and shock design.With representative Property achievement two 58 floor for being Japan 2008 and being built up using prefabrication and assembly construction frame structure Tokyo Tower.Meanwhile it is Japanese pre- Concrete construction System Design processed, production and the standard criterion of construction are also very perfect, and prefabricated specification used at present has " prefabricated mixed Solidifying geotechnique's journey } (JASSl0) and " concrete curtain wall) (JASSl4).
China from five sixties of 20th century begin one's study assembly concrete build design and construction technology, form one Serial assembly concrete building system, more typical building system have assembled single storey industry workshop building system, assembly Formula multistory frame building system, assembled large panel building system etc..The application built to assembly concrete the 1980s Reach the period of full bloom, many places in the whole nation all form the integrated assembly concrete industry of design, production and construction and installation Change architectural mode assembly concrete building and two kinds of most important building bodies are become using the masonry building of prefabricated hollow floor System, application popularization rate is up to 70% or more.Since there are many limitations and deficiency, China for the function and physical property of assembled architecture Assembly concrete architectural design and construction technology R & D Level do not catch up with also social demand and Building technology development variation, To mid-term the 1990s, assembly concrete building is gradually replaced by full cast-in-place concrete building system, at present except dress With formula single storey industry workshop building system using wide outer.The engineer application of other prefabrication systems is few.In advance The globality of earthquake-resistant structure processed and the specialized research of management in design and operation are inadequate, cause its Technical Economy poor.It is to cause The basic reason that precast construction stagnates for a long time.
Summary of the invention
The purpose of the present invention is to provide assembly concrete girders and secondary beam dry type connecting node, mainly solve existing skill There is traditional prefabricated components primary-secondary beam connection in art to be all made of with mechanical sleeves slip casting connection, it is desirable that primary and secondary beam connecting node reinforcing bar Precise alignment is needed, difficulty is larger and there are safe mass hidden danger in practical operation, at traditional prefabricated components primary and secondary beam connecting node Artificial supporting module after-pouring concrete is needed, template support is a great problem at node, time-consuming and difficulty of construction is big, matter Amount, appearance are not guaranteed, and electroplating equipment wielding machine need to be transported to mounting layer by reinforcement welding connection, and the weldquality in welding process is more difficult Control;Bar splicing connection, the assembly concrete girder for wasting reinforcing bar, causing increased costs and difficulty of construction is big, and propose With secondary beam dry type connecting node, China's assembly concrete high residential building industrialized development process is pushed, reduces resource and the energy Consumption.
Technical scheme is as follows:
Assembly concrete girder and secondary beam dry type connecting node, it is mixed including the precast concrete girder with overhanging beam, prefabricated T shape Solidifying soil secondary beam, arch screw bolt, polyethylene foamed rod, building structure marine glue;
The top flange of prefabricated T shape concrete secondary beam is overlapped on two cantilever plates of the precast concrete girder with overhanging beam, on The edge of a wing thickness and width on the edge of a wing is equal with the depth and width of closing in interior on cantilever plate, the web of prefabricated T shape concrete secondary beam It extend into the interior closing in of cantilever plate between two cantilever plates of the precast concrete girder with overhanging beam, the width and length of web Degree and the interior closing in of cantilever plate are equal in magnitude;
Interior closing in is with the top flange of prefabricated T shape concrete secondary beam at top on the cantilever plate of precast concrete girder with overhanging beam It is connected using arch screw bolt, the abdomen of two cantilever plates of the precast concrete girder with overhanging beam and prefabricated T shape concrete secondary beam It closes up in the web side of plate two sides and is connected in bottom using arch screw bolt;Two of precast concrete girder with overhanging beam are overhanging The interior closing in of cantilever plate between plate is connect in bottom using arch screw bolt with the web of prefabricated T shape concrete secondary beam, arc spiral shell Bolt is each passed through the arc installing port on the precast concrete girder with overhanging beam, the arc on prefabricated T shape concrete secondary beam Installing port, and be locked;
Interior closing in and top flange are mutually agreed on cantilever plate, the interior closing on the cantilever plate of the precast concrete girder with overhanging beam There are the gaps of 10mm for connection between the top flange of prefabricated T shape concrete secondary beam, the precast concrete girder with overhanging beam Two cantilever plates between the interior closing in of cantilever plate and the web of prefabricated T shape concrete secondary beam mutually agree with, with overhanging beam The connection of cantilever plate interior closing in and the web of prefabricated T shape concrete secondary beam between two cantilever plates of precast concrete girder It is respectively kept with the gap of 10mm, vertical seam interconnected is filled using sealing material, and sealing material uses polyethylene foamed rod With building structure marine glue, polyethylene foamed rod is located inside, and outside is building structure marine glue.
Further, the precast concrete girder with overhanging beam include interior closing on cantilever plate, cantilever plate, upper connection frame, The interior closing in connection frame of cantilever plate, cantilever plate connection frame, arc installing port, the interior closing in of cantilever plate, overhanging beam;
Precast concrete girder with overhanging beam is integral prefabricated, and overhanging beam is by closing in interior on cantilever plate, two cantilever plates, cantilever plates Interior closing in is constituted, the overhanging 300mm-400mm of cantilever plate;Interior closing in height is deck-molding on cantilever plate~;Interior receipts on cantilever plate The pre-buried upper connection frame in top of the corresponding precast concrete girder with overhanging beam of mouth, cantilever plate are corresponding with the pre- of overhanging beam The pre-buried cantilever plate connection frame in the bottom of concrete girder processed, the interior corresponding precast concrete master with overhanging beam that closes up of cantilever plate The interior closing in connection frame of the pre-buried cantilever plate in the bottom of beam, on the precast concrete girder with overhanging beam with upper connection frame, overhanging Arc installing port is respectively set in the interior closing in connection frame of plate and the corresponding connecting screw hole position of cantilever plate connection frame.
Further, prefabricated T shape concrete secondary beam includes prefabricated top flange, web, top flange connection frame, interior closing in connection Frame, arc installing port, closes up in web side at web connection frame, and the height of top flange is deck-molding~
The position difference corresponding with the connecting screw hole of top flange connection frame and interior closing in connection frame on prefabricated T shape concrete secondary beam Arc installing port is set, and the plane projection of arc installing port is isosceles trapezoid, and the perpendicular of beam is projected as arc;
In the bottom of the corresponding prefabricated T shape concrete secondary beam of web, web connection frame, web connection frame and the band installed are set The interior closing in connection frame of the cantilever plate of the precast concrete girder of overhanging beam is corresponding, closes up and corresponds in the web side of two sides Prefabricated T shape concrete secondary beam bottom be arranged in closing in connection frame, interior closing in connection frame with installed with the pre- of overhanging beam The cantilever plate connection frame of concrete girder processed is corresponding, and top flange is arranged at the top of the corresponding prefabricated T shape concrete secondary beam in the edge of a wing Connection frame, top flange connection frame are corresponding with the upper connection frame of precast concrete girder with overhanging beam installed.
Further, connection frame is made of connection reinforcing bar, junction steel plate, connecting screw hole, and connection reinforcing bar is located at junction steel plate Centre, and be uniformly distributed, junction steel plate is respectively set at the both ends of connection reinforcing bar, connecting screw hole is set on junction steel plate, even It connects reinforcing bar and connecting screw hole is alternately distributed.
Advantages of the present invention with the utility model has the advantages that
Effect and advantage of the invention is connection type using dry construction, simplifies construction;Connection is reliable, good integrity, tool There is superior anti-seismic performance, rigidity is obviously improved, and reduces connector quantity, is obviously improved it and is industrialized efficiency, reduces resource And energy consumption, and generalization may be implemented, it standardizes.
Detailed description of the invention
Fig. 1 is the perspective view of assembly concrete girder and secondary beam;
Fig. 2 is assembly concrete girder of the present invention and secondary beam dry type connecting node elevational schematic view;
Fig. 3 is the girder elevational schematic view of concrete soil zone overhanging beam;
Fig. 4 is the right elevational schematic view of the overhanging beam of the girder of concrete soil zone overhanging beam;
Fig. 5 is prefabricated T shape concrete secondary beam elevational schematic view;
Fig. 6 is prefabricated T shape concrete secondary beam schematic top plan view;
Fig. 7 is prefabricated T shape concrete secondary beam elevational schematic view;
Fig. 8 is top flange connection frame schematic diagram;
Fig. 9 is Fig. 8 A-A diagrammatic cross-section.
In figure, 1 is the precast concrete girder with overhanging beam;2 be prefabricated T shape concrete secondary beam;3 be arch screw bolt;4 are Polyethylene foamed rod;5 be building structure marine glue;
1-1 is interior closing on cantilever plate;1-2 is cantilever plate;1-3 is upper connection frame;1-4 is the interior closing in connection frame of cantilever plate; 1-5 is cantilever plate connection frame;1-6 is arc installing port;1-7 is the interior closing in of cantilever plate;
2-1 is top flange;2-2 is web;2-3 is top flange connection frame;2-4 is interior closing in connection frame;2-5 is web connection Frame;2-6 is arc installing port;2-7 is to close up in web side;
3-1 is connection reinforcing bar;3-2 is junction steel plate, 3-3 is connecting screw hole.
Specific embodiment
In order to further illustrate the present invention, the present invention is described in detail with reference to the accompanying drawings and embodiments, but not They can be interpreted as limiting the scope of the present invention.
Embodiment 1: as shown in Fig. 1 ~ Fig. 9, assembly concrete girder and secondary beam dry type connecting node, including band overhanging beam Precast concrete girder 1, prefabricated T shape concrete secondary beam 2, arch screw bolt 3, polyethylene foamed rod 4, building structure marine glue 5, It is characterized in that,
The top flange 2-1 of prefabricated T shape concrete secondary beam 2 is overlapped on two cantilever plates of the precast concrete girder 1 with overhanging beam On 1-2, the edge of a wing thickness and width of top flange 2-1 is equal with the depth and width of closing in 1-1 interior on cantilever plate, and prefabricated T shape is mixed The web 2-2 of solidifying soil secondary beam 2 is extend between the cantilever plate between two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam In interior closing in 1-7, the interior closing in 1-7 of the width and length and cantilever plate of web 2-2 is equal in magnitude;
The top flange of interior closing in 1-1 and prefabricated T shape concrete secondary beam 2 on the cantilever plate of precast concrete girder 1 with overhanging beam 2-1 is connected at top using arch screw bolt 3, two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam and prefabricated T shape Closing in 2-7 is connected in bottom using arch screw bolt 3 in the web side of the two sides web 2-2 of concrete secondary beam 2;With the pre- of overhanging beam The web of the interior closing in 1-7 of cantilever plate and prefabricated T shape concrete secondary beam 2 between two cantilever plate 1-2 of concrete girder 1 processed 2-2 is connected in bottom using arch screw bolt 3, and arch screw bolt 3 is each passed through the arc on the precast concrete girder 1 with overhanging beam Arc installing port 2-6 on shape installing port 1-6, prefabricated T shape concrete secondary beam 2, and be locked;
Interior closing in 1-1 and top flange 2-1 mutually agree on cantilever plate, in the cantilever plate of the precast concrete girder 1 with overhanging beam There are the gaps of 10mm for connection in upper between the closing in 1-1 and top flange 2-1 of prefabricated T shape concrete secondary beam 2, with overhanging beam The abdomen of the interior closing in 1-7 of cantilever plate and prefabricated T shape concrete secondary beam 2 between two cantilever plate 1-2 of precast concrete girder 1 Plate 2-2 mutually agrees with, the interior closing in 1-7 of cantilever plate between two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam Connection with the web 2-2 of prefabricated T shape concrete secondary beam 2 is respectively kept with the gap of 10mm, and vertical seam interconnected is using close Closure material filling, sealing material use polyethylene foamed rod 4 and building structure marine glue 5, and polyethylene foamed rod 4 is located inside, Outside is building structure marine glue 5.
The precast concrete girder 1 with overhanging beam includes interior closing in 1-1, cantilever plate 1-2, upper connection frame on cantilever plate The interior closing in connection frame 1-4 of 1-3, cantilever plate, cantilever plate connection frame 1-5, arc installing port 1-6, the interior closing in 1-7 of cantilever plate, Overhanging beam 1-8;
Precast concrete girder 1 with overhanging beam is integral prefabricated, and overhanging beam 1-8 is by closing in 1-1 interior on cantilever plate, two cantilever plates The interior closing in 1-7 of 1-2, cantilever plate is constituted, the overhanging 300mm of cantilever plate 1-2;Interior closing in 1-1 height is deck-molding on cantilever plate; The pre-buried upper connection frame 1-3 in top of the corresponding precast concrete girder 1 with overhanging beam of interior closing in 1-1, cantilever plate on cantilever plate The pre-buried cantilever plate connection frame 1-5 in bottom of the corresponding precast concrete girder 1 with overhanging beam of 1-2, the interior closing in 1- of cantilever plate The interior closing in connection frame 1-4 of the pre-buried cantilever plate in bottom of the 7 corresponding precast concrete girders 1 with overhanging beam, in band overhanging beam Precast concrete girder 1 on upper connection frame 1-3, the interior closing in connection frame 1-4 of cantilever plate and cantilever plate connection frame 1-5 phase Arc installing port 1-6 is respectively set in the position corresponding connecting screw hole 3-3.
The prefabricated T shape concrete secondary beam 2 includes prefabricated top flange 2-1, web 2-2, top flange connection frame 2-3, interior receipts Mouthful connection frame 2-4, web connection frame 2-5, arc installing port 2-6, closing in 2-7 in web side, the height of top flange 2-1 is deck-molding 's
On prefabricated T shape concrete secondary beam 2 with 3-3 pairs of connecting screw hole of top flange connection frame 2-3 and interior closing in connection frame 2-4 Arc installing port 2-6 is respectively set in the position answered, and the plane projection of arc installing port 2-6 is isosceles trapezoid, the perpendicular of beam It is projected as arc.
In the bottom of the corresponding prefabricated T shape concrete secondary beam 2 of web 2-2, web connection frame 2-5, web connection frame are set 2-5 is corresponding with the interior closing in connection frame 1-4 of the cantilever plate for the precast concrete girder 1 with overhanging beam installed, in two sides Web side in the corresponding prefabricated T shape concrete secondary beam 2 of closing in 2-7 bottom be arranged in closing in connection frame 2-4, interior closings in company It is corresponding with the cantilever plate connection frame 1-5 of precast concrete girder 1 with overhanging beam installed to meet frame 2-4,2-1 pairs of the edge of a wing At the top of the prefabricated T shape concrete secondary beam 2 answered be arranged top flange connection frame 2-3, top flange connection frame 2-3 with installed with overhanging The upper connection frame 1-3 of the precast concrete girder 1 of beam is corresponding.
The connection frame is made of connection reinforcing bar 3-1, junction steel plate 3-2, connecting screw hole 3-3, and connection reinforcing bar 3-1, which is located at, to be connected It connects among steel plate 3-2, and is uniformly distributed, junction steel plate 3-2 is respectively set at the both ends of connection reinforcing bar 3-1, in junction steel plate 3-2 Upper setting connecting screw hole 3-3, connection reinforcing bar 3-1 and connecting screw hole 3-3 are alternately distributed.
Embodiment 2: as shown in Fig. 1 ~ Fig. 9, assembly concrete girder and secondary beam dry type connecting node, including band overhanging beam Precast concrete girder 1, prefabricated T shape concrete secondary beam 2, arch screw bolt 3, polyethylene foamed rod 4, building structure marine glue 5, It is characterized in that,
The top flange 2-1 of prefabricated T shape concrete secondary beam 2 is overlapped on two cantilever plates of the precast concrete girder 1 with overhanging beam On 1-2, the edge of a wing thickness and width of top flange 2-1 is equal with the depth and width of closing in 1-1 interior on cantilever plate, and prefabricated T shape is mixed The web 2-2 of solidifying soil secondary beam 2 is extend between the cantilever plate between two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam In interior closing in 1-7, the interior closing in 1-7 of the width and length and cantilever plate of web 2-2 is equal in magnitude;
The top flange of interior closing in 1-1 and prefabricated T shape concrete secondary beam 2 on the cantilever plate of precast concrete girder 1 with overhanging beam 2-1 is connected at top using arch screw bolt 3, two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam and prefabricated T shape Closing in 2-7 is connected in bottom using arch screw bolt 3 in the web side of the two sides web 2-2 of concrete secondary beam 2;With the pre- of overhanging beam The web of the interior closing in 1-7 of cantilever plate and prefabricated T shape concrete secondary beam 2 between two cantilever plate 1-2 of concrete girder 1 processed 2-2 is connected in bottom using arch screw bolt 3, and arch screw bolt 3 is each passed through the arc on the precast concrete girder 1 with overhanging beam Arc installing port 2-6 on shape installing port 1-6, prefabricated T shape concrete secondary beam 2, and be locked;
Interior closing in 1-1 and top flange 2-1 mutually agree on cantilever plate, in the cantilever plate of the precast concrete girder 1 with overhanging beam There are the gaps of 10mm for connection in upper between the closing in 1-1 and top flange 2-1 of prefabricated T shape concrete secondary beam 2, with overhanging beam The abdomen of the interior closing in 1-7 of cantilever plate and prefabricated T shape concrete secondary beam 2 between two cantilever plate 1-2 of precast concrete girder 1 Plate 2-2 mutually agrees with, the interior closing in 1-7 of cantilever plate between two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam Connection with the web 2-2 of prefabricated T shape concrete secondary beam 2 is respectively kept with the gap of 10mm, and vertical seam interconnected is using close Closure material filling, sealing material use polyethylene foamed rod 4 and building structure marine glue 5, and polyethylene foamed rod 4 is located inside, Outside is building structure marine glue 5.
The precast concrete girder 1 with overhanging beam includes interior closing in 1-1, cantilever plate 1-2, upper connection frame on cantilever plate The interior closing in connection frame 1-4 of 1-3, cantilever plate, cantilever plate connection frame 1-5, arc installing port 1-6, the interior closing in 1-7 of cantilever plate, Overhanging beam 1-8;
Precast concrete girder 1 with overhanging beam is integral prefabricated, and overhanging beam 1-8 is by closing in 1-1 interior on cantilever plate, two cantilever plates The interior closing in 1-7 of 1-2, cantilever plate is constituted, the overhanging 400mm of cantilever plate 1-2;Interior closing in 1-1 height is deck-molding on cantilever plate; The pre-buried upper connection frame 1-3 in top of the corresponding precast concrete girder 1 with overhanging beam of interior closing in 1-1, cantilever plate on cantilever plate The pre-buried cantilever plate connection frame 1-5 in bottom of the corresponding precast concrete girder 1 with overhanging beam of 1-2, the interior closing in 1- of cantilever plate The interior closing in connection frame 1-4 of the pre-buried cantilever plate in bottom of the 7 corresponding precast concrete girders 1 with overhanging beam, in band overhanging beam Precast concrete girder 1 on upper connection frame 1-3, the interior closing in connection frame 1-4 of cantilever plate and cantilever plate connection frame 1-5 phase Arc installing port 1-6 is respectively set in the position corresponding connecting screw hole 3-3.
The prefabricated T shape concrete secondary beam 2 includes prefabricated top flange 2-1, web 2-2, top flange connection frame 2-3, interior receipts Mouthful connection frame 2-4, web connection frame 2-5, arc installing port 2-6, closing in 2-7 in web side, the height of top flange 2-1 is deck-molding 's
On prefabricated T shape concrete secondary beam 2 with 3-3 pairs of connecting screw hole of top flange connection frame 2-3 and interior closing in connection frame 2-4 Arc installing port 2-6 is respectively set in the position answered, and the plane projection of arc installing port 2-6 is isosceles trapezoid, the perpendicular of beam It is projected as arc.
In the bottom of the corresponding prefabricated T shape concrete secondary beam 2 of web 2-2, web connection frame 2-5, web connection frame are set 2-5 is corresponding with the interior closing in connection frame 1-4 of the cantilever plate for the precast concrete girder 1 with overhanging beam installed, in two sides Web side in the corresponding prefabricated T shape concrete secondary beam 2 of closing in 2-7 bottom be arranged in closing in connection frame 2-4, interior closings in company It is corresponding with the cantilever plate connection frame 1-5 of precast concrete girder 1 with overhanging beam installed to meet frame 2-4,2-1 pairs of the edge of a wing At the top of the prefabricated T shape concrete secondary beam 2 answered be arranged top flange connection frame 2-3, top flange connection frame 2-3 with installed with overhanging The upper connection frame 1-3 of the precast concrete girder 1 of beam is corresponding.
The connection frame is made of connection reinforcing bar 3-1, junction steel plate 3-2, connecting screw hole 3-3, and connection reinforcing bar 3-1, which is located at, to be connected It connects among steel plate 3-2, and is uniformly distributed, junction steel plate 3-2 is respectively set at the both ends of connection reinforcing bar 3-1, in junction steel plate 3-2 Upper setting connecting screw hole 3-3, connection reinforcing bar 3-1 and connecting screw hole 3-3 are alternately distributed.
Embodiment 3: as shown in Fig. 1 ~ Fig. 9, assembly concrete girder and secondary beam dry type connecting node, including band overhanging beam Precast concrete girder 1, prefabricated T shape concrete secondary beam 2, arch screw bolt 3, polyethylene foamed rod 4, building structure marine glue 5, It is characterized in that,
The top flange 2-1 of prefabricated T shape concrete secondary beam 2 is overlapped on two cantilever plates of the precast concrete girder 1 with overhanging beam On 1-2, the edge of a wing thickness and width of top flange 2-1 is equal with the depth and width of closing in 1-1 interior on cantilever plate, and prefabricated T shape is mixed The web 2-2 of solidifying soil secondary beam 2 is extend between the cantilever plate between two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam In interior closing in 1-7, the interior closing in 1-7 of the width and length and cantilever plate of web 2-2 is equal in magnitude;
The top flange of interior closing in 1-1 and prefabricated T shape concrete secondary beam 2 on the cantilever plate of precast concrete girder 1 with overhanging beam 2-1 is connected at top using arch screw bolt 3, two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam and prefabricated T shape Closing in 2-7 is connected in bottom using arch screw bolt 3 in the web side of the two sides web 2-2 of concrete secondary beam 2;With the pre- of overhanging beam The web of the interior closing in 1-7 of cantilever plate and prefabricated T shape concrete secondary beam 2 between two cantilever plate 1-2 of concrete girder 1 processed 2-2 is connected in bottom using arch screw bolt 3, and arch screw bolt 3 is each passed through the arc on the precast concrete girder 1 with overhanging beam Arc installing port 2-6 on shape installing port 1-6, prefabricated T shape concrete secondary beam 2, and be locked;
Interior closing in 1-1 and top flange 2-1 mutually agree on cantilever plate, in the cantilever plate of the precast concrete girder 1 with overhanging beam There are the gaps of 10mm for connection in upper between the closing in 1-1 and top flange 2-1 of prefabricated T shape concrete secondary beam 2, with overhanging beam The abdomen of the interior closing in 1-7 of cantilever plate and prefabricated T shape concrete secondary beam 2 between two cantilever plate 1-2 of precast concrete girder 1 Plate 2-2 mutually agrees with, the interior closing in 1-7 of cantilever plate between two cantilever plate 1-2 of the precast concrete girder 1 with overhanging beam Connection with the web 2-2 of prefabricated T shape concrete secondary beam 2 is respectively kept with the gap of 10mm, and vertical seam interconnected is using close Closure material filling, sealing material use polyethylene foamed rod 4 and building structure marine glue 5, and polyethylene foamed rod 4 is located inside, Outside is building structure marine glue 5.
The precast concrete girder 1 with overhanging beam includes interior closing in 1-1, cantilever plate 1-2, upper connection frame on cantilever plate The interior closing in connection frame 1-4 of 1-3, cantilever plate, cantilever plate connection frame 1-5, arc installing port 1-6, the interior closing in 1-7 of cantilever plate, Overhanging beam 1-8;
Precast concrete girder 1 with overhanging beam is integral prefabricated, and overhanging beam 1-8 is by closing in 1-1 interior on cantilever plate, two cantilever plates The interior closing in 1-7 of 1-2, cantilever plate is constituted, the overhanging 350mm of cantilever plate 1-2;Interior closing in 1-1 height is deck-molding on cantilever plate; The pre-buried upper connection frame 1-3 in top of the corresponding precast concrete girder 1 with overhanging beam of interior closing in 1-1, cantilever plate on cantilever plate The pre-buried cantilever plate connection frame 1-5 in bottom of the corresponding precast concrete girder 1 with overhanging beam of 1-2, the interior closing in 1- of cantilever plate The interior closing in connection frame 1-4 of the pre-buried cantilever plate in bottom of the 7 corresponding precast concrete girders 1 with overhanging beam, in band overhanging beam Precast concrete girder 1 on upper connection frame 1-3, the interior closing in connection frame 1-4 of cantilever plate and cantilever plate connection frame 1-5 phase Arc installing port 1-6 is respectively set in the position corresponding connecting screw hole 3-3.
The prefabricated T shape concrete secondary beam 2 includes prefabricated top flange 2-1, web 2-2, top flange connection frame 2-3, interior receipts Mouthful connection frame 2-4, web connection frame 2-5, arc installing port 2-6, closing in 2-7 in web side, the height of top flange 2-1 is deck-molding 's
On prefabricated T shape concrete secondary beam 2 with 3-3 pairs of connecting screw hole of top flange connection frame 2-3 and interior closing in connection frame 2-4 Arc installing port 2-6 is respectively set in the position answered, and the plane projection of arc installing port 2-6 is isosceles trapezoid, the perpendicular of beam It is projected as arc.
In the bottom of the corresponding prefabricated T shape concrete secondary beam 2 of web 2-2, web connection frame 2-5, web connection frame are set 2-5 is corresponding with the interior closing in connection frame 1-4 of the cantilever plate for the precast concrete girder 1 with overhanging beam installed, in two sides Web side in the corresponding prefabricated T shape concrete secondary beam 2 of closing in 2-7 bottom be arranged in closing in connection frame 2-4, interior closings in company It is corresponding with the cantilever plate connection frame 1-5 of precast concrete girder 1 with overhanging beam installed to meet frame 2-4,2-1 pairs of the edge of a wing At the top of the prefabricated T shape concrete secondary beam 2 answered be arranged top flange connection frame 2-3, top flange connection frame 2-3 with installed with overhanging The upper connection frame 1-3 of the precast concrete girder 1 of beam is corresponding.
The connection frame is made of connection reinforcing bar 3-1, junction steel plate 3-2, connecting screw hole 3-3, and connection reinforcing bar 3-1, which is located at, to be connected It connects among steel plate 3-2, and is uniformly distributed, junction steel plate 3-2 is respectively set at the both ends of connection reinforcing bar 3-1, in junction steel plate 3-2 Upper setting connecting screw hole 3-3, connection reinforcing bar 3-1 and connecting screw hole 3-3 are alternately distributed.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (4)

1. assembly concrete girder and secondary beam dry type connecting node, including the precast concrete girder (1) with overhanging beam, prefabricated T shape concrete secondary beam (2), arch screw bolt (3), polyethylene foamed rod (4), building structure marine glue (5), which is characterized in that
The top flange (2-1) of prefabricated T shape concrete secondary beam (2) is overlapped on two of the precast concrete girder (1) with overhanging beam On cantilever plate (1-2), the depth and width phase of the edge of a wing thickness and width of top flange (2-1) and closing in (1-1) interior on cantilever plate It is overhanging Deng, the web (2-2) of prefabricated T shape concrete secondary beam (2) extend into the precast concrete girder (1) with overhanging beam two In the interior closing in (1-7) of cantilever plate between plate (1-2), the interior closing in (1-7) of the width and length and cantilever plate of web (2-2) is big It is small equal;
Interior close up (1-1) and prefabricated T shape concrete secondary beam (2) on the cantilever plate of precast concrete girder (1) with overhanging beam Top flange (2-1) is connected at top using arch screw bolt (3), two cantilever plates of the precast concrete girder (1) with overhanging beam Closing in (2-7) uses arc spiral shell in bottom in the web side of two sides web (2-2) of (1-2) and prefabricated T shape concrete secondary beam (2) Bolt (3) connection;Interior closing in (the 1- of cantilever plate between two cantilever plates (1-2) of the precast concrete girder (1) with overhanging beam 7) it is connect in bottom using arch screw bolt (3) with the web (2-2) of prefabricated T shape concrete secondary beam (2), arch screw bolt (3) is divided equally Not Chuan Guo arc installing port (1-6) on the precast concrete girder (1) with overhanging beam, on prefabricated T shape concrete secondary beam (2) Arc installing port (2-6), and be locked;
Interior closing in (1-1) and top flange (2-1) mutually agree on cantilever plate, in the precast concrete girder (1) with overhanging beam There are between 10mm for the interior connection closed up (1-1) between the top flange (2-1) of prefabricated T shape concrete secondary beam (2) on cantilever plate Gap, the interior closing in (1-7) of cantilever plate between two cantilever plates (1-2) of the precast concrete girder (1) with overhanging beam and pre- The web (2-2) of T shape concrete secondary beam (2) processed mutually agrees with, two cantilever plates of the precast concrete girder (1) with overhanging beam The interior connection for closing up (1-7) and the web (2-2) of prefabricated T shape concrete secondary beam (2) of cantilever plate between (1-2) is respectively kept with The gap of 10mm, vertical seam interconnected are filled using sealing material, and sealing material is using polyethylene foamed rod (4) and builds Structurally waterproof glue (5), polyethylene foamed rod (4) are located inside, and outside is building structure marine glue (5).
2. assembly concrete girder according to claim 1 and secondary beam dry type connecting node, which is characterized in that with overhanging The precast concrete girder (1) of beam includes interior closing in (1-1), cantilever plate (1-2), upper connection frame (1-3), cantilever plate on cantilever plate It is interior closing in connection frame (1-4), cantilever plate connection frame (1-5), arc installing port (1-6), the interior closing in (1-7) of cantilever plate, outer Beam (1-8);
Precast concrete girder (1) with overhanging beam is integral prefabricated, and overhanging beam (1-8) is by closing in (1-1), two interior on cantilever plate The interior closing in (1-7) of cantilever plate (1-2), cantilever plate is constituted, cantilever plate (1-2) overhanging 300mm-400mm;Interior closing on cantilever plate (1-1) is highly the 1/3 ~ 1/2 of deck-molding;The corresponding precast concrete girder (1) with overhanging beam of interior closing in (1-1) on cantilever plate The pre-buried upper connection frame (1-3) in top, the bottom of the corresponding precast concrete girder (1) with overhanging beam of cantilever plate (1-2) is pre- It buries cantilever plate connection frame (1-5), the bottom of interior (1-7) the corresponding precast concrete girder (1) with overhanging beam that closes up of cantilever plate The interior closing in connection frame (1-4) of the pre-buried cantilever plate in portion, on the precast concrete girder (1) with overhanging beam with upper connection frame (1- 3), the interior closing in connection frame (1-4) of cantilever plate and the corresponding connecting screw hole position (3-3) difference of cantilever plate connection frame (1-5) It is arranged arc installing port (1-6).
3. assembly concrete girder according to claim 1 and secondary beam dry type connecting node, which is characterized in that prefabricated T Shape concrete secondary beam (2) includes prefabricated top flange (2-1), web (2-2), top flange connection frame (2-3), interior closing in connection frame (2-4), web connection frame (2-5), arc installing port (2-6) close up (2-7) in web side, and the height of top flange (2-1) is beam High 1/3 ~ 1/2;
Connecting screw hole on prefabricated T shape concrete secondary beam (2) with top flange connection frame (2-3) and interior closing in connection frame (2-4) The corresponding position (3-3) is respectively set arc installing port (2-6), and the plane projection of arc installing port (2-6) is isosceles trapezoid, beam Perpendicular be projected as arc;
Web connection frame (2-5) is set in the bottom of the corresponding prefabricated T shape concrete secondary beam (2) of web (2-2), web connection The interior closing in connection frame (1-4) of cantilever plate of frame (2-5) and the precast concrete girder (1) with overhanging beam installed is opposite It answers, interior closing in connection frame is arranged in the bottom of (2-7) corresponding prefabricated T shape concrete secondary beam (2) of closing up in the web side of two sides (2-4), the cantilever plate connection frame (1- of interior closing in connection frame (2-4) and the precast concrete girder (1) with overhanging beam installed 5) corresponding, top flange connection frame (2-3) is set at the top of the edge of a wing (2-1) corresponding prefabricated T shape concrete secondary beam (2), upper limb Edge connection frame (2-3) is corresponding with upper connection frame (1-3) of precast concrete girder (1) with overhanging beam installed.
4. assembly concrete girder according to claim 1 and secondary beam dry type connecting node, which is characterized in that connection frame It is made of connection reinforcing bar (3-1), junction steel plate (3-2), connecting screw hole (3-3), connection reinforcing bar (3-1) is located at junction steel plate (3- 2) intermediate, and be uniformly distributed, junction steel plate (3-2) is respectively set at the both ends of connection reinforcing bar (3-1), at junction steel plate (3-2) Upper setting connecting screw hole (3-3), connects reinforcing bar (3-1) and connecting screw hole (3-3) is alternately distributed.
CN201811454235.2A 2018-11-30 2018-11-30 Assembly concrete girder and secondary beam dry type connecting node Withdrawn CN109296067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811454235.2A CN109296067A (en) 2018-11-30 2018-11-30 Assembly concrete girder and secondary beam dry type connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811454235.2A CN109296067A (en) 2018-11-30 2018-11-30 Assembly concrete girder and secondary beam dry type connecting node

Publications (1)

Publication Number Publication Date
CN109296067A true CN109296067A (en) 2019-02-01

Family

ID=65142186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811454235.2A Withdrawn CN109296067A (en) 2018-11-30 2018-11-30 Assembly concrete girder and secondary beam dry type connecting node

Country Status (1)

Country Link
CN (1) CN109296067A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684926A (en) * 2021-09-08 2021-11-23 南通职业大学 Construction process of dry-type fully-assembled industrialized concrete primary and secondary beam joints

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684926A (en) * 2021-09-08 2021-11-23 南通职业大学 Construction process of dry-type fully-assembled industrialized concrete primary and secondary beam joints
CN113684926B (en) * 2021-09-08 2022-07-12 南通职业大学 Construction process of dry-type fully-assembled industrialized concrete primary and secondary beam joints

Similar Documents

Publication Publication Date Title
CN108086693B (en) A kind of assembled steel reinforced concrete frame structure system method of construction of low multilayer
CN106121107B (en) Assemble type concrete slab and its plate dry type connection method
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN109680841A (en) Hybrid prefabricated multi-cavity reinforced concrete wall, underground space structure system and construction method
CN107165271A (en) A kind of assembled Special-Shaped Column concrete frame structure
CN103590486A (en) Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method
CN205976215U (en) Compound box roof beam of assembled concrete
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN108978853A (en) Assemble type concrete slab connecting node
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN107747378A (en) The body composite board processing method of Fast Installation heat insulation decorative load-bearing one
CN111851791A (en) Assembled steel frame-steel sheet shear force wall structure
CN109296067A (en) Assembly concrete girder and secondary beam dry type connecting node
CN206016002U (en) Assembly concrete beam
CN208899692U (en) Beam rigid connection node outside assembly concrete shear wall and face
CN209260898U (en) Assembly concrete girder and secondary beam dry type connecting node
CN108842927A (en) Beam rigid connection node and construction method outside assembly concrete shear wall and face
CN106638956A (en) Concrete wallboard and ribbed slab dry type connection node
CN206408743U (en) A kind of assembly concrete node
CN204530995U (en) A kind of precast plate
CN109296074A (en) A kind of assembly concrete column beam connecting node
CN206616695U (en) A kind of concrete panel and girt strip floor dry type connecting node
CN103541478B (en) Lattice superposed beam and plate and construction method thereof
CN209369023U (en) The connecting node of dry construction bilayer core plate thermal insulation concrete wallboard and floor
CN208293823U (en) A kind of connecting node component for be linked and packed formula compound shear wall and girder steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190201