Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811333806.7A
Other languages
Chinese (zh)
Inventor
季晓丽
陆致皓
李熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Li Yangxin Mstar Technology Ltd
SHANGHAI LIYANG ROAD REINFORCEMENT TECHNOLOGY Co Ltd
Original Assignee
Zhejiang Li Yangxin Mstar Technology Ltd
SHANGHAI LIYANG ROAD REINFORCEMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Li Yangxin Mstar Technology Ltd, SHANGHAI LIYANG ROAD REINFORCEMENT TECHNOLOGY Co Ltd filed Critical Zhejiang Li Yangxin Mstar Technology Ltd
Priority to CN201811333806.7A priority Critical patent/CN109296013A/en
Publication of CN109296013A publication Critical patent/CN109296013A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of grouting consolidation effect imitative experimental appliance, including cement slurry preparing barrel, grouting pump and shaping box, the cement slurry preparing barrel includes ladle body, the rabbling mechanism being set on the ladle body and the pulp valve for being set to the ladle body lower part;The shaping box includes the top plate and bottom plate at the both ends for surrounding the side plate of side wall and being connected to the side plate; more Grouting Pipes are equipped on the top plate; it is provided with multiple detectors on the side plate, the protective plate for protecting the detector is provided on the inside of the side plate;The grouting pump is connected to the pulp valve and the Grouting Pipe respectively by defeated slurry hose.The present invention, convenient for simulation slip casting experiment, to know the parameter that can be used for practical slip casting reference.

Description

Grouting consolidation effect imitative experimental appliance
Technical field
The present invention relates to a kind of imitative experimental appliances, in particular it relates to which a kind of simulation of grouting consolidation effect is real Experiment device.
Background technique
Currently, in the road maintenance engineering in China, the application of grouting reinforcement technique is wherein relatively advanced, effective skill One of art.In recent years, grouting reinforcement technique is due to the advantages that its is easy for construction, technical feasibility, social benefit are good, in road engineering In be widely used.Grouting and reinforcing road can realize no-dig technique, accessible, round-the-clock construction, and efficiency is relatively high, right Surrounding traffic influence is small, and grouting process is mature, and from Technological Economy angle changing rate, cost is greatly reduced, and avoids traditional road Road is dug builds the disadvantages of technology is big to road structure disturbance again, which is applied to various grade road foundations and base is preventative Maintenance and conventional maintenance can carry out reinforcement and strengthening to road structure intensity in time, be worth with high economy and society.
But since Grouting engineering has concealment, it is unable to monitor slurries diffusion and distribution situation, is difficult directly to infuse it It starches effect effectively and intuitively evaluate, lags behind engineer application, especially slip casting skill so as to cause existing grouting theory Mechanism and application of the art in road foundation and basic reinforcement lack more systematic research conclusion, it is difficult to effective guiding construction.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of grouting consolidation effect imitative experimental appliances, can simulate Mortar depositing construction situation, to provide parameter foundation for actual mortar depositing construction.
In order to solve the above-mentioned technical problem, present invention employs following technical solutions: a kind of grouting consolidation effect simulation is real Experiment device comprising cement slurry preparing barrel, grouting pump and shaping box,
The cement slurry preparing barrel includes ladle body, the rabbling mechanism being set on the ladle body and is set to the ladle body lower part Pulp valve;
The shaping box includes the top plate and bottom plate at the both ends for surrounding the side plate of side wall and being connected to the side plate, It is equipped with more Grouting Pipes on the top plate, multiple detectors are provided on the side plate, the inside setting of the side plate is useful In the protective plate for protecting the detector;
The grouting pump is connected to the pulp valve and the Grouting Pipe respectively by defeated slurry hose.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the ladle body is supported on multiple supporting legs, on the ladle body It is provided with feeding port, the rabbling mechanism includes being set to the motor at the top of the ladle body and connecting with the shaft of the motor The agitating shaft connect is provided with stirring blade component on the agitating shaft.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the stirring blade component includes spaced axial-flow type Stirring blade and radial-flow type stirring blade.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the platform that setting is worn for the Grouting Pipe on the top plate Rank hole, the stepped hole include the lower section of upper section and close described bottom plate one end far from described bottom plate one end, the upper section Radial dimension is less than the radial dimension of the lower section, and keyway is arranged in the inner wall of the stepped hole, and the keyway is passed through by the upper section It wears to the lower section, key block is arranged in the outer wall of the Grouting Pipe, and the key block is after passing through the keyway and rotating by the note Slurry pipe is limited in the lower section.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein rubber mat plate, the rubber is arranged in the lower surface of the top plate Through-hole corresponding with the stepped hole is opened up on rubber cushion plate, pressure monitor is arranged far from the side of the top plate in the through-hole, Pressure gauge is set on the grouting pump.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the stepped hole with the through-hole be it is multiple rows of, it is adjacent Equal interlaced arrangement between two rows.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the shaping box be it is rectangular, offered on the side plate more The groove that item extends along side plate short transverse, multiple detector distributions are arranged in the groove.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the cement slurry preparing barrel, grouting pump and shaping box are all set in work On industry platform, the bottom of the shaping box is provided with bracket, and the bottom plate is inscribed in the side plate, also sets on the job platform Set the driving mechanism being connected with the bottom plate, the bottom plate can be along the side plate under the driving of the driving mechanism above and below It is mobile.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the driving mechanism is hydraulic cylinder, the liquid of the hydraulic cylinder Compression bar is connect with the bottom plate.
Above-mentioned grouting consolidation effect imitative experimental appliance, wherein the detector is nonmetallic ultrasonic detector.
The beneficial effects of the present invention are: 1, it can use detector and monitors stream of the slurries under earth's surface effectively in real time Dynamic, infiltration and compacted effect;2, bottom plate is driven by driving mechanism, the road mould of a variety of different structure thickness degree can be simulated Quasi- situation, and can be realized fast demoulding;3, different mortar depositing construction design parameters, grouting pressure and injected hole can be simulated Laying form.By the acquisition of above-mentioned analogue data, it can be convenient in practical slip casting, apply suitable design parameter.
Detailed description of the invention
Fig. 1 is the perspective view of one embodiment of grouting consolidation effect imitative experimental appliance of the invention;
Fig. 2 is the inside local structural graph of cement slurry preparing barrel in Fig. 1;
Fig. 3 is the broken away view of shaping box in Fig. 1;
Fig. 4 is the broken away view of the box portion of shaping box in Fig. 3;
Fig. 5 is the local structural graph of Grouting Pipe and top plate in Fig. 3.
Description of symbols
1- shaping box;101- top plate;1011- stepped hole;10111- keyway;102- backing plate;103- pressure monitor;104- Bracket;105- bottom plate;106- hydraulic cylinder;107- detector;108- side plate;109- protective plate;2- Grouting Pipe;201- key block;3- Grouting pump;301- pressure gauge;4- cement slurry preparing barrel;401- motor;402- feeding port;403- ladle body;404- pulp valve;405- branch Leg;407- agitating shaft;4071- axial-flow type stirring blade;4072- radial-flow type stirring blade;The defeated slurry hose of 5-;6- job platform.
Specific embodiment
Present invention is further described in detail in the following with reference to the drawings and specific embodiments, but not as to limit of the invention It is fixed.
The present invention provides a kind of grouting consolidation effect imitative experimental appliances to be supervised in real time by carrying out simulation laboratory test The mobility status for surveying slurries, has rated stability of the injecting paste material in target road soil property.In combination with theory analysis, optimization Performance indexes can be construction technology and mortar depositing construction design parameter (grouting pressure, injected hole laying shape of slurry injection technique Formula, injected hole away from etc.) effective reference frame is provided.
Shown in referring to Fig.1, a kind of grouting consolidation effect imitative experimental appliance of the invention comprising cement slurry preparing barrel 4, grouting pump 3 and shaping box 1, grouting pump 3 be connected between cement slurry preparing barrel 4 and shaping box 1, for into shaping box 1 supply stirred by cement slurry preparing barrel 4 Mix uniform slurries.Further, cement slurry preparing barrel 4, grouting pump 3 and shaping box 1 are all set on job platform 6, and three is in laterally It is arranged successively, and is fixed on job platform 6.
As shown in fig. 1, geopolymer slurries are prepared by cement slurry preparing barrel 4, and cement slurry preparing barrel 4 includes ladle body 403, is set to Rabbling mechanism on ladle body 403 and the pulp valve 404 for being set to 403 lower part of ladle body.Ladle body 403 is cylindrical, by setting Multiple supporting legs 405 around ladle body 403 are fixed on job platform 6.Feeding port 402 is provided on ladle body 403, so as to object The investment such as material to ladle body 403 carries out subsequent stirring.The region of ladle body 403 close to bottom is cone, can be convenient slurries and passes through Self gravitation effect is converged, and pulp valve 404 is located at the least significant end of the conical lower section of ladle body 403, passes through defeated slurry hose 5 It is connected with the stock inlet of grouting pump 3.Rabbling mechanism include be set to the top of ladle body 403 motor 401 and with motor 401 Shaft connection agitating shaft 407, motor 401 is located at the center of ladle body 403, the end of motor 401 with positioned at ladle body 403 Internal agitating shaft 407 is connected, so that agitating shaft 407 be driven to carry out high-speed stirred operation, is provided with stirring on agitating shaft 407 Blade assembly.
When feed intake stir when, pulp valve 404 is closed in advance, by geopolymer mixture and water by technical requirements into Row configuration, and directly launched by the feeding port 402 for being located at 403 upper end of ladle body, it is uniformly mixed by stirring blade component Afterwards, pulp valve 404 can be opened to be conveyed.
Referring to shown in Fig. 2, mixed thoroughly the time to improve to mix efficiency thoroughly and shorten, stirring blade component includes spaced Axial-flow type stirring blade 4071 and radial-flow type stirring blade 4072, specifically, the two of the axial length for being located at agitating shaft 407 It is provided with axial-flow type stirring blade 4071 at/mono-, radial-flow type paddle is set in the position for being located at the end of agitating shaft 407 Piece 4072.Under the construction, motor 401 drives axial-flow type stirring blade 4071 and radial-flow type stirring blade by agitating shaft 407 4072 carry out high-speed stirred, and the stirring blade of two kinds of forms influences each other, interacts, and stirring efficiency has than normal agitation equipment Significantly improve.The number of axial-flow type stirring blade 4071 and radial-flow type stirring blade 4072 is 3 under the present embodiment, but Also can choose for other, preferably within the scope of 2-6 piece.
Referring to shown in Fig. 3, Fig. 4, Fig. 5, under the present embodiment, shaping box 1 be it is rectangular, certainly, can also optionally select For other shapes.Shaping box 1 includes the top plate for surrounding four blocks of side plates 108 of side wall and being connected to the both ends of side plate 108 101 and bottom plate 105, six blocks of plates surround accommodation space, constitute the Experimental Area of slurries.More slip castings are equipped on top plate 101 Pipe 2, grouting pump 3 is connected to pulp valve 404 and Grouting Pipe 2 respectively by defeated slurry hose 5, so that the slurry in cement slurry preparing barrel 4 Liquid can be transported to shaping box 1.The imitative experimental appliance is operated according to normal site operation step, wherein defeated slurry is soft Pipe 5 can connect any Grouting Pipe 2, be equipped with connecting-disconnecting interface between the two.In operation, according to grouting sequence (generally from one Side slip casting is to the other side, sequence construction), defeated slurry hose 5 is successively connected into corresponding Grouting Pipe 2 and carries out slip casting.Work as slip casting When hole grouting pressure reaches critical value (such as being detected by the subsequent pressure monitor referred to and pressure gauge), it can stop Slip casting disconnects defeated slurry hose 5, and the Grouting Pipe 2 that slip casting is completed is carried out plugging handling with cork.
As shown in the figure, the stepped hole 1011 that setting is worn for Grouting Pipe 2 on top plate 101, the quantity of stepped hole 1011, Depending on detail design parameter (such as injected hole cloth form, injected hole away from require).Under the present embodiment, stepped hole 1011 is in Laterally 7 rows, the form arrangement of longitudinal 7 rows, and equal interlaced arrangement between adjacent two rows (or being referred to as " two rows ") are that is, adjacent Two rows be mutually in staggered distribution, can simulate to form different hole cloth forms, the parameter that different pitch-rows require is for testing point Analysis.Incorporated by reference to Fig. 5, the Grouting Pipe 2 of be inserted into die trial in order to prevent is lifted in recoil with the increase of grouting pressure, stepped hole 1011 include the upper section far from 105 one end of bottom plate and the lower section close to 105 one end of bottom plate, radial dimension/diameter dimension of upper section (when for circle) is less than radial dimension/diameter dimension of lower section, and keyway 10111, keyway is arranged in the inner wall of stepped hole 1011 10111 are through to lower section by upper section, and key block 201 is arranged in the outer wall of Grouting Pipe 2, and key block 201 is inserted into lower section simultaneously along keyway 10111 When rotation, Grouting Pipe 2 is limited in lower section.Specifically, keyway 10111 is a pair, corresponding, is arranged on the outside of Grouting Pipe 2 There is a pair of of key block 201, key block 201 is square.When Grouting Pipe 2 is inserted into, key block 201 gos deep into stepped hole along keyway 10111 Inside 1011, and stepped portions are crossed, Grouting Pipe 2 is subjected to 90 degree of rotations later, key block 201 can resist the platform of stepped hole 1011 Rank component is formed self-locking.This is simple and practical in structure, is readily disassembled, and not only guarantees that Grouting Pipe 2 is not lifted in recoil, and very well Ground solves the problems, such as difficult to tube drawing after grout cures.
Continue such as Fig. 3, the lower surface of top plate 101 and rubber mat plate 102 is set, rubber mat plate 102 can protect top plate 101 not Deformation easy to damage.Through-hole (not indicating in figure) corresponding with stepped hole 1011 is opened up on rubber mat plate 102, consequently facilitating Grouting Pipe 2 pass through.It is influenced for grouting pressure road pavement arch camber can be best understood from, is respectively provided with pressure monitor below corresponding each through-hole 103, as shown in connection with fig. 1, pressure gauge 301 is set, the two cooperation can analyze the slip casting pressure under different road structures on grouting pump 3 The critical value of power, and effective reference frame is provided for mortar depositing construction design scheme.
Further, the bottom of shaping box 1 is provided with bracket 104, and bracket 104 is four, is respectively arranged in shaping box 1 On four longitudinal seamed edges.Bracket 104 is made of angle steel, and section is L-shaped, and bracket 104 is load-supporting part, carries entire shaping box 1 and die trial gross weight, so every bracket 104 is equipped with reinforcing rib and carries out protection reinforcing, and pass through the fixed company of bolt and nut The mode connect is fixed with 6 phase of job platform.
Bottom plate 105 is inscribed in side plate 108, and the driving mechanism being connected with bottom plate 105, bottom plate 105 are also set up on job platform 6 It can be moved up and down along side plate 108 under the driving of driving mechanism.Preferably, driving mechanism is hydraulic cylinder 106, hydraulic cylinder 106 hydraulic stem is connect with bottom plate 105, specifically, its center for being connected to bottom plate 105.In this way, passing through hydraulic stem Stretch the height and position of adjustable bottom plate 105, and the die trial for meeting different road structure thickness degree makes.Due to bottom plate 105 need to carry die trial weight, add so hydraulic stem end (one end for stretching out the cylinder body of hydraulic cylinder at first) also carries out reinforcing rib Gu processing, and for preventing bottom plate 105 since ballast is deformed.In addition, hydraulic stem can push bottom after completing die trial Plate 105 rises to limiting altitude, realizes the fast demoulding of die trial.
Continue as shown in figure 4, being provided with multiple detectors 107 on side plate 108, it is preferable that detector 107 is nonmetallic super Detector of sound.The inside of side plate 108 is provided with the protective plate 109 for protecting detector 107.As a kind of mode, side plate 108 On offer a plurality of groove extended along 108 short transverse of side plate, the distribution of multiple detectors 107 is arranged in the groove, in this way, Detector is located between side plate 108 and protective plate 109, and the adjustable height and position in groove of detector 107 and guarantor It holds.
In order to real-time monitoring slurries in die trial internal flow, infiltration and compacted effect, according to die trial size cases, Establish corresponding measurement point arrangement network, i.e. X-Y-Z three-axis reference point layout.Measuring point should meet: on 1. same surveys line Measuring point should be evenly distributed, and spacing is identical;2. being measured due to using to survey method, so the measuring point distribution in opposite two faces has been answered It is exactly the same;3. the corresponding measuring point of each detector 107.Detector 107 belongs to nonmetallic supersonic sounding instrument, can to die trial into Row lossless detection, and grout distribution situation can be drawn respectively according to different time nodes.Due to detector 107 cannot with die trial into Row contact (if contacted, will lead to the damage of detector 107), so detector 107 is set between side plate 108 and protective plate 109, And it is embedded in side plate 108 and surveys in vertical groove.
In this example, the point layout of every one side is laterally (X-~X+ or Y-~Y+) 8, vertically (Z-~Z+) 8, totally 64 measuring points.Before carrying out grouting monitoring experiment, first it can require to survey needed for adjustment according to the industrial grade of simulated experiment (if industrial grade requirement is lower, measuring point is without gathering, then the measuring point applied can be reduced in right amount, not used measuring point for the quantity of point Standby mode can be entered.Conversely, then increasing measuring point (i.e. detector 107) quantity, or survey all measuring points at full capacity Amount), and draw out structure measuring point figure.During slip casting then, there is significant change since slurries fill areal concentration, it can By full region with shade sketch out come, and be subject to different colours differentiation, to obtain more intuitive slurries filling process figure. In the process, the detection frequency of measuring point can be set according to demand, draw different time nodes slurries filling process figure.
The present invention can use supersonic sounding and monitor flowing, infiltration and compacted effect of the slurries under earth's surface effectively in real time Fruit;The road analogy situation of a variety of different structure thickness degree is simulated by displaceable bottom plate, and realizes fast demoulding;It can mould Intend different mortar depositing construction design parameters, grouting pressure, injected hole lay form.Experimental provision of the invention can be practical note Parameter designing when slurry provides good foundation.
Above embodiments are only exemplary embodiment of the present invention, are not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalent replacement, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (10)

1. a kind of grouting consolidation effect imitative experimental appliance, which is characterized in that including cement slurry preparing barrel, grouting pump and shaping box,
The cement slurry preparing barrel includes ladle body, the rabbling mechanism being set on the ladle body and the pulp for being set to the ladle body lower part Valve;
The shaping box includes the top plate and bottom plate at the both ends for surrounding the side plate of side wall and being connected to the side plate, described It is equipped with more Grouting Pipes on top plate, multiple detectors are provided on the side plate, are provided on the inside of the side plate for protecting Protect the protective plate of the detector;
The grouting pump is connected to the pulp valve and the Grouting Pipe respectively by defeated slurry hose.
2. grouting consolidation effect imitative experimental appliance according to claim 1, which is characterized in that the ladle body is supported in more On a supporting leg, be provided with feeding port on the ladle body, the rabbling mechanism include be set to the motor at the top of the ladle body with And the agitating shaft being connect with the shaft of the motor, stirring blade component is provided on the agitating shaft.
3. grouting consolidation effect imitative experimental appliance according to claim 2, which is characterized in that the stirring blade component Including spaced axial-flow type stirring blade and radial-flow type stirring blade.
4. grouting consolidation effect imitative experimental appliance according to claim 1, which is characterized in that be arranged on the top plate and use In the stepped hole that the Grouting Pipe is worn, the stepped hole includes upper section and the close bottom plate one far from described bottom plate one end The lower section at end, the radial dimension of the upper section are less than the radial dimension of the lower section, and keyway, institute is arranged in the inner wall of the stepped hole It states keyway and the lower section is through to by the upper section, key block is arranged in the outer wall of the Grouting Pipe, and the key block is passing through the key The Grouting Pipe is limited in the lower section after slot and rotation.
5. grouting consolidation effect imitative experimental appliance according to claim 4, which is characterized in that the lower surface of the top plate Rubber mat plate is set, opens up through-hole corresponding with the stepped hole on the rubber mat plate, the through-hole is far from the top plate Pressure monitor is arranged in side, and pressure gauge is arranged on the grouting pump.
6. grouting consolidation effect imitative experimental appliance according to claim 5, which is characterized in that the stepped hole with it is described Through-hole is equal interlaced arrangement between multiple rows of, adjacent two rows.
7. grouting consolidation effect imitative experimental appliance according to claim 1, which is characterized in that the shaping box is side Shape, a plurality of groove extended along side plate short transverse is offered on the side plate, and multiple detectors distributions are set to institute It states in groove.
8. grouting consolidation effect imitative experimental appliance according to claim 1, which is characterized in that the cement slurry preparing barrel, slip casting Pump and shaping box are all set on job platform, and the bottom of the shaping box is provided with bracket, and the bottom plate is inscribed in the side Plate also sets up the driving mechanism being connected with the bottom plate, driving of the bottom plate in the driving mechanism on the job platform Under can be moved up and down along the side plate.
9. grouting consolidation effect imitative experimental appliance according to claim 8, which is characterized in that the driving mechanism is liquid Cylinder pressure, the hydraulic stem of the hydraulic cylinder are connect with the bottom plate.
10. grouting consolidation effect imitative experimental appliance according to claim 1, which is characterized in that the detector is non- Metal ultrasonic detector.
CN201811333806.7A 2018-11-09 2018-11-09 Grouting consolidation effect imitative experimental appliance Pending CN109296013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811333806.7A CN109296013A (en) 2018-11-09 2018-11-09 Grouting consolidation effect imitative experimental appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811333806.7A CN109296013A (en) 2018-11-09 2018-11-09 Grouting consolidation effect imitative experimental appliance

Publications (1)

Publication Number Publication Date
CN109296013A true CN109296013A (en) 2019-02-01

Family

ID=65145605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811333806.7A Pending CN109296013A (en) 2018-11-09 2018-11-09 Grouting consolidation effect imitative experimental appliance

Country Status (1)

Country Link
CN (1) CN109296013A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111257203A (en) * 2020-04-13 2020-06-09 安徽理工大学 Simulation test device and test method considering effective overlapping circles for grouting reinforcement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105954499A (en) * 2016-06-26 2016-09-21 兰州理工大学 Method and device for evaluating collapsible site after carrying out fracturing grouting reinforcement on collapsible loess site
CN106571099A (en) * 2016-10-19 2017-04-19 长安大学 Indoor simulation device for road base or roadbed grouting reinforcement effects
CN206671077U (en) * 2017-02-21 2017-11-24 湖北工业大学 A kind of rock triaxial compressions ultrasound real time scan device
CN209099411U (en) * 2018-11-09 2019-07-12 上海力阳道路加固科技股份有限公司 Grouting consolidation effect imitative experimental appliance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105954499A (en) * 2016-06-26 2016-09-21 兰州理工大学 Method and device for evaluating collapsible site after carrying out fracturing grouting reinforcement on collapsible loess site
CN106571099A (en) * 2016-10-19 2017-04-19 长安大学 Indoor simulation device for road base or roadbed grouting reinforcement effects
CN206671077U (en) * 2017-02-21 2017-11-24 湖北工业大学 A kind of rock triaxial compressions ultrasound real time scan device
CN209099411U (en) * 2018-11-09 2019-07-12 上海力阳道路加固科技股份有限公司 Grouting consolidation effect imitative experimental appliance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111257203A (en) * 2020-04-13 2020-06-09 安徽理工大学 Simulation test device and test method considering effective overlapping circles for grouting reinforcement
CN111257203B (en) * 2020-04-13 2022-06-14 安徽理工大学 Simulation test device and test method considering effective overlapping circles for grouting reinforcement

Similar Documents

Publication Publication Date Title
CN201464456U (en) High-pressure crack grouting simulation test bed
CN202433536U (en) Physical model testing system for tunnel-penetrated ground crack zone
CN108682270A (en) A kind of the true triaxial fracture simulation device and its working method of the laying of simulation proppant
CN111553065B (en) Experiment table and experiment method for simulating proppant transportation and laying in reservoir fracturing fracture
CN113586069A (en) Indoor test device for simulating shield water-rich stratum synchronous grouting construction technology and using method thereof
CN109868850A (en) Detection of construction quality system, reinforcing construction technique and reinforcing construction device
CN209099411U (en) Grouting consolidation effect imitative experimental appliance
CN103290836A (en) Vacuum decompression compacting and consolidating construction method for soft foundation treatment
CN105805414A (en) Stirring and polishing tension device for large-aperture flexible socket concrete pipes and using method of stirring and polishing tension device
CN107604902B (en) Grouting behind shaft or drift lining bored concrete pile and its construction technology
CN110186814B (en) Three-dimensional grouting diffusion mechanism test device and test method
CN109296013A (en) Grouting consolidation effect imitative experimental appliance
CN109632606B (en) Excavation surface seepage test system for river bottom shield tunnel construction under tidal load effect
CN215253055U (en) Asymmetric lattice load box
CN107728492B (en) Deformable karst cave filling automatic simulation system
CN207245717U (en) A kind of device that tunnel deformation is repaired using confined pressure and internal tensioning
CN115949099B (en) Offshore wind turbine foundation scouring disaster grouting protection model test device and test method
CN216284809U (en) Tunnel secondary grouting model test device for simulating coupling of ground stress and underground seepage field
CN206220137U (en) A kind of experimental provision for measuring and analyzing banket steel-pipe pile sedimentation and emergent property
CN108118693A (en) The constructing device of cast-in-place concrete core cement soil stirring pile
Hao et al. Ultimate uplift capacity of transmission tower foundation in undisturbed excavated soil
CN109339126B (en) Pile forming simulation device for indoor solidified pile body
CN210322680U (en) Simulation test device for grouting diffusion shape of horizontal grouting port
CN111827890A (en) Blasting drilling control construction equipment and construction method thereof
CN207408245U (en) A kind of pilot system for testing tunnel initial stage bolt-spary supports load-carrying properties

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination