CN108682270A - A kind of the true triaxial fracture simulation device and its working method of the laying of simulation proppant - Google Patents

A kind of the true triaxial fracture simulation device and its working method of the laying of simulation proppant Download PDF

Info

Publication number
CN108682270A
CN108682270A CN201810416413.6A CN201810416413A CN108682270A CN 108682270 A CN108682270 A CN 108682270A CN 201810416413 A CN201810416413 A CN 201810416413A CN 108682270 A CN108682270 A CN 108682270A
Authority
CN
China
Prior art keywords
proppant
rock sample
agitator tank
pit shaft
fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810416413.6A
Other languages
Chinese (zh)
Other versions
CN108682270B (en
Inventor
刘欣佳
肖凤朝
张遂安
王洪利
刘玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201810416413.6A priority Critical patent/CN108682270B/en
Publication of CN108682270A publication Critical patent/CN108682270A/en
Application granted granted Critical
Publication of CN108682270B publication Critical patent/CN108682270B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/02Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Fluid Mechanics (AREA)
  • Educational Technology (AREA)
  • Educational Administration (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

A kind of the true triaxial fracture simulation device and its working method of the laying of simulation proppant, belong to oil-gas field development technical field, described device includes the sequentially connected fracturing fluid agitator tank of Trunk Line, fracturing pump, proppant agitator tank, crack extended simulation component and integrated control system.Proppant agitator tank has by-pass line in parallel.It is equipped with pole changer between fracturing pump and proppant agitator tank, controls the connection and cut-out of Trunk Line and proppant agitator tank and by-pass line;Installation has the metal threaded pit shaft centainly deformed inside fracture simulation rock sample.The invention is by increasing individual proppant adding set and pole changer, improve wellbore shape and addition fibrous material, improve the sealing intensity between pit shaft and rock sample contact surface, it is quasi- that in fracture initiation/expansion process plus sand mo(u)ld can be achieved, and the purpose of true triaxial pressure break laboratory experiment success rate is improved, there is important directive significance to the optimization design of research proppant migration rule and pressing crack construction scheme.

Description

A kind of the true triaxial fracture simulation device and its working method of the laying of simulation proppant
Technical field
The present invention relates to a kind of true triaxial fracture simulation device that simulation proppant is laid and its working methods, belong to oil gas The technical field of field exploitation.
Background technology
The untraditional reservoir in China is widely distributed, and due to the features such as its low hole, hypotonic, oil, gas are in reservoir matrix Filtrational resistance is very big, generally relies on fracturing yield increasing renovation technique to realize that the economical and effective of low permeability reservoirs is exploited.Hydraulic fracturing It is an extremely complex well production increment reforming technology, using ground high pressure pump group, with the discharge capacity more than formation absorption ability Fracturing fluid is pumped into well, high pressure has been suppressed in shaft bottom, when pump injection pressure power overcomes crustal stress near the borehole wall to reach tensile strength of rock Afterwards, crack is generated in shaft bottom;Continue the mixing liquid for being pumped into fracturing fluid and proppant, long enough can be formed in the earth formation, have one The sand packed fracture for determining flow conductivity provides reservoir fluid seepage channel.
In order to preferably study crack initiation/propagation law of the fracturing fracture in reservoir, laboratory is usually using concrete, water The materials such as mud, sandstone, coal petrography make pressure break rock sample and simulate actual reservoir, install wellbore apparatus inside rock sample, liquid passes through pit shaft It is pumped into rock sample, high pressure has been suppressed inside rock sample, until reaching the fracture pressure of pressure break makes rock sample fracturing.
According to hydraulic fracturing principle, the sealing between pit shaft and rock sample contact surface is the key that experiment success or failure, once sealing is not Sternly, being pumped into the liquid of rock sample will overflow along the interface of pit shaft and rock sample, so that high pressure can not have been suppressed in shaft bottom, cause rock sample without Method fracturing.In order to avoid the above problem, laboratory generally use reduces mineshaft diameter to the method for 3~10mm (1~8mm of internal diameter) Reduce cementation interface to improve the leakproofness of pit shaft and rock sample, so as to cause pit shaft is too thin and is unable to simulation pump and notes proppant Fracturing process.In addition, 20~80MPa of pressure limit needed for rock sample rupture, it is desirable that mating fracturing pump is higher to be capable of providing The high precision apparatus of pressure reduces fracturing pump service life, so not because of the working-blade or piston of proppant particles pump easy to wear It is suitble to pumping proppant material (pressure break is quartz sand or haydite particles that grain size is 0.1~1.5mm with proppant material).
Currently, due to sealing technique problem and high-pressure pump problem easy to wear between pit shaft and rock sample, true triaxial is resulted in Pressure break laboratory experiment success rate is low, and cannot achieve rock sample internal fissure crack initiation/extension and pressure break takes sand process while simulates.
Invention content
In order to solve the above problem of the prior art, the present invention provides a kind of true triaxial pressure break mould that simulation proppant is laid Quasi- device and its working method.
Technical scheme is as follows:
A kind of true triaxial fracture simulation device that simulation proppant is laid, it is characterised in that be connected in turn by Trunk Line Fracturing fluid agitator tank, fracturing pump, proppant agitator tank, crack extended simulation component, wherein the proppant agitator tank is parallel with The bye-pass of controllable connection and cut-out;
Include blender inside the fracturing fluid agitator tank, fracturing fluid feed inlet, side bottom setting discharging is arranged in top Mouth is connected into Trunk Line;
Include blender inside the proppant agitator tank, the fracturing fluid feed inlet being connected with Trunk Line is respectively set in side With mulling liquid discharge port, preferred fracturing fluid gating location is higher than mulling liquid discharge port;
The crack extended simulation component periphery is fracture simulation container, and inside has fracture simulation rock sample, fracture simulation The pit shaft communicated with Trunk Line across the upper cover of fracture simulation container, the pit shaft and the fracture simulation are installed inside rock sample Preforation tunnel is distributed in rock sample contact surface, and the direction of fracture simulation rock sample front, back, left, right, up five is connected separately with thousand Jin top;
It further include integrated control system.
The location of the fracturing fluid liquid level position in tank is observed in the internal face setting of the preferred fracturing fluid agitator tank in real time Instrument;Thread seal can be used in the fracturing fluid feed inlet;The fracturing fluid agitator tank 1~80cm of diameter, 1~80cm of height;Its The discharge port position of side setting is away from 0.1~30cm of tank bottom.
The preferred proppant agitator tank 1~80cm of diameter, 1~80cm of height;The mulling liquid discharge port position of its side It sets apart from 0.1~30cm of proppant stirring pot bottom;Fracturing fluid gating location is 0.1 higher than the difference in height of mulling liquid discharge port ~50cm.
The preferred fracturing pump is plunger pump, lift 0.1~104kPa;The fracturing pump exit is installed by Electromagnetic Flow Meter.
The junction of the preferred by-pass line and Trunk Line is provided with pole changer.
The raw material of the preferred fracture simulation rock sample include fiber, the 0.1~10cm of fibre length, fiber content It is 1~60%.
The preferred pit shaft has threaded metal pit shaft for surface, and pit shaft cross section is round or axial with distortion Ellipse, axial twist angle be 0~360 °;Sealing cover is arranged in pit shaft end;The circular cross section wellbore radius 1~ 150mm;The oval cross section pit shaft 1~75mm of short radius, long axis and short axle ratio 1~2;The major diameter of well bore face screw thread 0.1~5cm of difference of D and path d, 0.1~15cm of thread pitch;The pit shaft quantity 1~5, pit shaft type are vertical well Cylinder and/or horizontal wellbore, 5~400cm of pit shaft length.
The preferred well bore face is uniformly or sub-clustering is distributed preforation tunnel, 1~20mm of eye diameter, and eyelet phase 0~ 180 °, 8~96/m of perforation density, come adjustment holes quantity by way of nut seal.
The power switch of the preferred integrated control system control fracturing pump, electric blender, jack device;It is described The frequency regulation button, the pressure adjustment button of jack, row of fracturing pump are set on the system control panel of integrated control system Measure display and pressure display unit.
The aforementioned working method for stating simulator, it is characterised in that include the following steps:
(1) wellbore apparatus is assembled, end seal lid is installed, determines perforation density;Preferably use the extra hole of nut seal Eye, while crossover sub being installed at the top of pit shaft;
(2) prepare to include the raw material needed for the rock sample making of fiber and cement and/or concrete and/or coal petrography, with Pit shaft consolidates together makes reservoir simulation rock sample, dries state needed for rock sample to experiment;
(3) installation rock sample and pit shaft be to the inside of fracture simulation container, and it is fixed it is very heavy peak at rock sample front, rear, left and right, Upper 5 wall surfaces;
(4) preparation experiment fracturing fluid system prepares pressure break proppant material;
(5) arrange that laboratory, mobile experimental facilities connect all experiment pipelines of the equipment to suitable position, and Check the leakproofness of pipeline;
(6) fracturing fluid material is poured into fracturing fluid agitator tank, liquid volume is made to account for the 80~90% of tank volume;By proppant Material is packed into proppant agitator tank, and proppant volume is made to account for the 3~25% of tank volume;
(7) start jack device, around setting with the confining pressure size of upper and lower directions;
(8) connection for cutting off Trunk Line and proppant agitator tank, is connected to by-pass line, starts fracturing fluid electric blender;
(9) start fracturing pump and adjust frequency to required discharge capacity, fracturing fluid is pumped into pit shaft through fracturing pump, is suppressed inside rock sample Playing high pressure makes rock sample fracturing;
(10) observe integrated control display interface rock sample pressure history, according to curve judge rock sample whether fracturing;
(11) after rock sample pressure break, start proppant electric blender;
(12) it is connected to proppant agitator tank, closes by-pass line, fracturing fluid enters proppant agitator tank, with mixed with proppants shape After mulling liquid, converted connector flows into pit shaft, into the man-made fracture in rock sample;
(13) step (8~12), the practical fracturing process in simulation scene are repeated;
(14) experiment terminates, and closes fracturing pump, electric blender, unloading jack pressure;
(15) it preserves experimental data and copies, close integrated control system;
(16) simulation rock sample is taken out, fracturing fracture expanded configuration is observed, laying rule of the analysis proppant in crack is whole Laboratory apparatus and material are managed, laboratory is swept in cleaning.
The effect of the present invention is as follows:
(1) by-pass line that the present invention increases individual proppant adding set and can be controlled by pole changer, can be with Control the connection and cut-out of Trunk Line and proppant agitator tank;When Trunk Line is connected to proppant agitator tank, fracturing fluid flows into After the proppant agitator tank forms load fluid with mixed with proppants, it is pumped to pit shaft together, flows into the people formed inside rock sample Work crack;Conversely, fracturing fluid, which is individually pumped into pit shaft, presses off crack.It can realize during true triaxial fracturing experiments and be split inside rock sample It is simulated while seam crack initiation/extension takes sand process with pressure break, proppant is laid, and the pressure break that can simulate Proppant Slugs is applied Work process.
(2) experimental provision of the invention (has been modified to certain rotation by improving wellbore shape by smooth cylinder pit shaft The screw thread elliptic cylindrical of angle) and fibrous material is added in rock sample, the sealing of pit shaft and rock sample interface can be effectively improved Intensity improves the success rate of true triaxial pressure break laboratory experiment.It is viscous between metal bar and concrete according to classical anchorage theory It includes four classes to tie power mainly, and the metal bar stress with different surfaces feature is different, smooth metal stick by chemical bond power with rub Wipe power, threaded metal stick is because surface irregularity and concrete generate snap-in force, and cold rolled reinforcing bar is in addition to above-mentioned 3 kinds of power, because of table Face protrusion, distortion or cross-sectional geometry change and generate mechanical anchoring force, therefore cold-rolled steel can significantly increase and concrete Adhesion strength;In addition, the fiber of dispersion is randomly uniformly mixed cement or concrete using modes such as machinery, air pressure or hydraulic pressure In, fiber is in net distribution in mixture, and the drawing that effectively can bear to generate because xial feed acts on inside test specimen is answered Power and the lateral deformation for preventing structure, to improve the sealing effect between metal bar and concrete.
(3) experimental provision of the invention is, it can be achieved that facility switching, parameter regulation, data are shown and the integrated control of data processing System improves experimental implementation safety.
(4) experimental provision of the invention can be real by installing the pit shaft of different type (horizontal or vertical), different number Existing " well factory " fracturing technology simulation is better understood from laying migration of the proppant in fracturing fracture (especially complicated seam net) Rule has important directive significance to the optimization design of live pressing crack construction scheme.
Description of the drawings
Fig. 1 is the overall structure diagram of equipment of the present invention;
Each label lists as follows in figure:
1 fracturing fluid agitator tank;2 electric blender;3 location meters;4 fracturing fluid feed inlets;5 fracturing pumps;6 electromagnetic flowmeters;7 Proppant agitator tank;8 proppant feed inlets;9 Trunk Lines;10 pole changers;11 by-pass lines;12 crossover subs;13 fracture simulations Container;14 fracture simulation rock samples;15 jack;16 pit shafts;17 sealing nuts;18 universal wheels;19 integrated control systems.
Specific implementation mode
The present invention is described in detail with reference to embodiment and Figure of description.
Embodiment 1
The true triaxial fracture simulation device that a kind of simulation proppant of the present embodiment is laid, as shown in Figure 1, passing through Trunk Line 9 are connected with fracturing fluid agitator tank 1, fracturing pump 5, proppant agitator tank 7, crack extended simulation component in turn, wherein the support Agent agitator tank is parallel with bye-pass, is pole changer 10 at parallel interface;The top of the fracturing fluid agitator tank 1 setting fracturing fluid into Material mouth 4, side bottom setting discharge port are connected into Trunk Line 9;7 inside of the proppant agitator tank includes blender 2, axial sides The fracturing fluid feed inlet being connected with Trunk Line and mulling liquid discharge port is respectively set, and fracturing fluid gating location is higher than mulling liquid Discharge port, top have proppant feed inlet 8;The crack extended simulation component periphery is fracture simulation container 13, inside tool There is fracture simulation rock sample 14, the upper cover being equipped with inside fracture simulation rock sample 14 across fracture simulation container is communicated with Trunk Line 9 Pit shaft 16, preforation tunnel, the fracture simulation rock is distributed in the pit shaft 16 and 14 contact surface of fracture simulation rock sample Sample 14 front, back, left, right, up five direction is connected separately with jack 15;It further include integrated control system 19.
16 surface of pit shaft is distributed screw thread, and wellbore section is ellipse, is axially applying 120 ° of torsion resistances, is making its increasing Add cementing strength.
It, can be effective with improvement 16 shape of pit shaft by increasing individual proppant adding set 7 and pipeline pole changer 10 Ground improves the sealing intensity of pit shaft and rock sample interface, while realizing that sand process is taken in rock sample internal fissure crack initiation/extension and pressure break Simulation and the purpose for improving true triaxial pressure break laboratory experiment success rate.
The fracturing fluid agitator tank 1 installs electric blender 2 with 7 inside center of proppant agitator tank, is set close to internal face Set the fracturing fluid liquid level position in the real-time observation tank of direction finder 3;According to the present embodiment, institute is preferred, fracturing fluid agitator tank 1 and branch Support the diameter 40cm, height 60cm of agent agitator tank 7;The discharge port position of its side setting is away from tank bottom 10cm, proppant agitator tank The fracturing fluid gating location of side is higher than mulling liquid discharge port, difference in height 10cm.
The fracturing pump 5 is high precision piston pump, lift 0.1~104Electromagnetic flowmeter 6 is installed in kPa, exit;It is described It is provided with pipeline pole changer 10 between fracturing pump 5 and proppant agitator tank 7 and is responsible for proppant agitator tank 7 with controlling by-pass line The connection and cut-out of line;When Trunk Line 9 is connected to proppant agitator tank 7, fracturing fluid flows into proppant agitator tank 7 and proppant After being mixed to form mulling liquid, it is pumped into pit shaft 16, flows into the man-made fracture formed inside rock sample;Conversely, fracturing fluid is individually pumped into well Cylinder presses off crack.
The fracture simulation container 13 is cuboid container, and babinet is connect with upper cover using nut 17, the nut quantity It is 4-8, preferably 6;The fracture simulation container length 200cm, width 100cm, height 200cm;Container bottom installs 4 Universal wheel 18 facilitates the movement and transport of equipment.
14 shape of fracture simulation rock sample is cuboid, length 80cm, width range 60cm, height 80cm;It is installed on The inside of fracture simulation container 13, the direction of front, back, left, right, up five are separately connected 15 device of jack, utilize jack Device for reservoir provides confining pressure to simulate subsurface reservoir stress, nonessential identical as the confining pressure of upper and lower directions around. The fracture simulation rock sample can be by concrete, portland-type cement, aluminate class cement, gravel, sandstone, coal petrography etc. material One or more material mating fibers be made, simulate the reservoir of different lithology or heterogeneous different kinds of rocks respectively.
Wellbore apparatus is installed in 14 inside of the fracture simulation rock sample, and the pit shaft is metal threaded pit shaft 16, axial twist Angle is 0~360 °;The pit shaft cross section is ellipse, and sealing cover is arranged to adjust the flow of preforation tunnel in pit shaft end.
According to the present embodiment, institute is preferred, the difference 3cm of the major diameter D and path d of 16 thread surface of the pit shaft, screw thread spiral shell Away from 10cm;The pit shaft cross section short radius 50mm, long axis and short axle ratio 1.5;The pit shaft quantity 1, pit shaft type are Vertical bore, pit shaft length 200cm.
According to the present embodiment, institute is preferred, and 16 surface of the pit shaft is uniformly distributed preforation tunnel, eye diameter 5mm, eyelet 0~180 ° of phase, 20/m of perforation density, and can be by way of nut seal come adjustment holes quantity.
Crossover sub 12 is installed, one end cross section that the crossover sub 12 is connected with pit shaft is at the top of the wellbore apparatus Ellipse is used with pit shaft and is threadedly coupled;One end cross section that the crossover sub is connected with Trunk Line is circle, is adopted with pipeline It is threadedly coupled;
The power switch of the control of the integrated control system 19 fracturing pump 5, electric blender 2, jack device 15;It is described Frequency regulation button, discharge capacity display and the variation of rock sample internal pressure that fracturing pump is arranged on integrated control system control panel are aobvious Show device;The pressure adjustment button and pressure display unit of jack are set on the integrated control system control panel.
Embodiment 2
The present embodiment is the working method of above equipment, including steps are as follows:
(1) wellbore apparatus 16 is assembled, end seal lid is installed, determines perforation density ,if needed is more using nut seal Remaining eyelet, while crossover sub 12 being installed at the top of pit shaft;
(2) prepare the rock samples such as cement, concrete, coal petrography, fiber and make required raw material, making is consolidated together with pit shaft The reservoir simulation rock sample 14 of certain size dries state needed for rock sample to experiment;
(3) installation rock sample 14 and pit shaft 16 be to the inside of fracture simulation container 13, and fixed jack 15 before rock sample, Afterwards, left and right, upper 5 wall surfaces;
(4) preparation experiment fracturing fluid system prepares pressure break proppant material;
(5) arrange that laboratory, mobile experimental facilities connect all experiment pipelines 9 of the equipment to suitable position, and Check the leakproofness of pipeline;
(6) fracturing fluid material is poured into fracturing fluid agitator tank 1, liquid volume is made to account for the 80~90% of tank volume;It will support Agent material is packed into proppant agitator tank 7, and proppant volume is made to account for the 3~25% of tank volume;
(7) start jack device 15, around setting with the confining pressure size of upper and lower directions;
(8) rotation pipeline pole changer 10, cuts off the connection of Trunk Line and proppant agitator tank, starts fracturing fluid electric mixing Mix machine 2;
(9) start fracturing pump 5 and adjust frequency to required discharge capacity, start electromagnetic flowmeter 6, fracturing fluid is pumped through fracturing pump and noted High pressure has been suppressed inside rock sample into pit shaft 16 makes rock sample fracturing;
(10) the rock sample pressure history for observing 19 display interface of integrated control, judges whether rock sample causes according to curve It splits;
(11) after rock sample pressure break, start proppant electric blender 2;
(12) rotation pipeline pole changer 10, connecting pipeline and proppant agitator tank, fracturing fluid enter proppant agitator tank, After forming mulling liquid with mixed with proppants, converted connector 12 flows into pit shaft 16, into the man-made fracture in rock sample;
(13) step (8~12), the practical fracturing process in simulation scene are repeated;
(14) experiment terminates, and closes fracturing pump 5, electric blender 2, unloading 15 pressure of jack successively;
(15) it preserves experimental data and copies, close integrated control system 19;
(16) simulation rock sample is taken out, fracturing fracture expanded configuration is observed, laying rule of the analysis proppant in crack is whole Laboratory apparatus and material are managed, laboratory is swept in cleaning.
It is merely illustrative about size, material etc. in above example, however it is not limited to this.It can be further in following ranges Further preferably, the effect of the present invention can be achieved:Fracturing fluid agitator tank 30~80cm of diameter, 30~80cm of height;Its side The discharge port position of setting is away from 0.1~30cm of tank bottom;The preferred proppant agitator tank 30~80cm of diameter, height 30~ 80cm;The mulling liquid discharge port position of its side is apart from 0.1~30cm of proppant stirring pot bottom;Fracturing fluid gating location is high In mulling liquid discharge port difference in height be 5~50cm;Selected crack extension container, 30~300cm of three-dimensional dimension;It is used Crack extended simulation rock sample, 5~100cm of three-dimensional dimension;Wellbore apparatus used is metal threaded pit shaft, axial twist angle It is 0~360 °;Pit shaft cross section 1~75mm of short radius, long axis and short axle ratio 1~2;Well bore face sub-clustering or uniform perforation, 1~20mm of eye diameter, 16~48/m of perforation density, 0~90 ° of eyelet phase;The pit shaft quantity 1~5, pit shaft type For vertical bore or horizontal wellbore, 5~400cm of pit shaft length;20~100 mesh of proppant grain size used;Fracturing fluid is using activity Water fracturing fluid etc..

Claims (10)

1. a kind of true triaxial fracture simulation device that simulation proppant is laid, it is characterised in that be connected with pressure in turn by Trunk Line Liquid agitator tank, fracturing pump, proppant agitator tank, crack extended simulation component are split, wherein be parallel with can for the proppant agitator tank The bye-pass of control connection and cut-out;
Include blender inside the fracturing fluid agitator tank, fracturing fluid feed inlet is arranged in top, and side bottom is arranged discharge port and connects Enter Trunk Line;
Include blender inside the proppant agitator tank, side is respectively set the fracturing fluid feed inlet being connected with Trunk Line and mixes Sand liquid discharge port;
The crack extended simulation component periphery is fracture simulation container, and inside has fracture simulation rock sample, fracture simulation rock sample Inside is equipped with the pit shaft communicated with Trunk Line across the upper cover of fracture simulation container, the pit shaft and the fracture simulation rock sample Preforation tunnel is distributed in contact surface, and the direction of fracture simulation rock sample front, back, left, right, up five is connected separately with very heavy Top;
It further include integrated control system.
2. simulator according to claim 1, it is characterised in that the internal face setting of the fracturing fluid agitator tank is real-time Observe the direction finder of the fracturing fluid liquid level position in tank;The fracturing fluid agitator tank 1~80cm of diameter, 1~80cm of height;Its side The discharge port position of face setting is away from 0.1~30cm of tank bottom.
3. simulator according to claim 1, it is characterised in that the proppant agitator tank 1~80cm of diameter, height 1 ~80cm;The mulling liquid discharge port position of its side is apart from 0.1~30cm of proppant stirring pot bottom;Fracturing fluid gating location Difference in height higher than mulling liquid discharge port is 0.1~50cm.
4. simulator according to claim 1, it is characterised in that the fracturing pump be plunger pump, lift 0.1~ 104kPa;The fracturing pump exit is installed by electromagnetic flowmeter.
5. simulator according to claim 1, it is characterised in that the junction of the by-pass line and Trunk Line is provided with Pole changer.
6. simulator according to claim 1, it is characterised in that the raw material of the fracture simulation rock sample include fiber, 0.1~the 10cm of fibre length, fiber content 1~60%.
7. simulator according to claim 1, it is characterised in that the pit shaft is that surface has threaded metal pit shaft, Pit shaft cross section is the round or axial ellipse with distortion, and axial twist angle is 0~360 °;The setting sealing of pit shaft end Lid;1~150mm of the circular cross section wellbore radius;The oval cross section pit shaft 1~75mm of short radius, long axis with it is short Axis ratio 1~2;0.1~the 5cm of difference, 0.1~15cm of thread pitch of the major diameter D and path d of well bore face screw thread;The well Cylinder quantity 1~5, pit shaft type are vertical bore and/or horizontal wellbore, 5~400cm of pit shaft length.
8. simulator according to claim 7, it is characterised in that the well bore face is uniformly or sub-clustering is distributed Perforation Eye, 1~20mm of eye diameter, 0~180 ° of eyelet phase, 8~96/m of perforation density are adjusted by way of nut seal Eyelet quantity.
9. simulator according to claim 1, it is characterised in that the integrated control system control fracturing pump, electric mixing Mix the power switch of machine, jack device;The frequency tune of fracturing pump is set on the system control panel of the integrated control system Save button, the pressure adjustment button of jack, discharge capacity display and pressure display unit.
10. according to the working method of simulator described in claim 1-9 any one, it is characterised in that include the following steps:
(1) wellbore apparatus is assembled, end seal lid is installed, determines perforation density;
(2) prepare to include the raw material needed for the rock sample making of fiber, consolidation makes reservoir simulation rock sample together with pit shaft, dries State needed for rock sample to experiment;
(3) installation rock sample and pit shaft be to the inside of fracture simulation container, and fixed very heavy peaks at rock sample front, back, left, right, up 5 Wall surface;
(4) preparation experiment fracturing fluid system prepares pressure break proppant material;
(5) arrange that laboratory, mobile experimental facilities connect all experiment pipelines of the equipment, and check to suitable position The leakproofness of pipeline;
(6) fracturing fluid material is poured into fracturing fluid agitator tank, liquid volume is made to account for the 80~90% of tank volume;By proppant material It is packed into proppant agitator tank, proppant volume is made to account for the 3~25% of tank volume;
(7) start jack device, around setting with the confining pressure size of upper and lower directions;
(8) connection for cutting off Trunk Line and proppant agitator tank, is connected to by-pass line, starts fracturing fluid electric blender;
(9) start fracturing pump and adjust frequency to required discharge capacity, fracturing fluid is pumped into pit shaft through fracturing pump, and height has been suppressed inside rock sample Pressure makes rock sample fracturing;
(10) observe integrated control display interface rock sample pressure history, according to curve judge rock sample whether fracturing;
(11) after rock sample pressure break, start proppant electric blender;
(12) it is connected to proppant agitator tank, closes by-pass line, fracturing fluid enters proppant agitator tank, formed with mixed with proppants mixed After sand liquid, converted connector flows into pit shaft, into the man-made fracture in rock sample;
(13) step (8~12), the practical fracturing process in simulation scene are repeated;
(14) experiment terminates, and closes fracturing pump, electric blender, unloading jack pressure;
(15) it preserves experimental data and copies, close integrated control system;
(16) simulation rock sample is taken out, fracturing fracture expanded configuration is observed, laying rule of the analysis proppant in crack arranges real Instrument and material are tested, laboratory is swept in cleaning.
CN201810416413.6A 2018-05-03 2018-05-03 True triaxial fracturing simulation device for simulating proppant laying and working method thereof Expired - Fee Related CN108682270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810416413.6A CN108682270B (en) 2018-05-03 2018-05-03 True triaxial fracturing simulation device for simulating proppant laying and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810416413.6A CN108682270B (en) 2018-05-03 2018-05-03 True triaxial fracturing simulation device for simulating proppant laying and working method thereof

Publications (2)

Publication Number Publication Date
CN108682270A true CN108682270A (en) 2018-10-19
CN108682270B CN108682270B (en) 2020-02-14

Family

ID=63802855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810416413.6A Expired - Fee Related CN108682270B (en) 2018-05-03 2018-05-03 True triaxial fracturing simulation device for simulating proppant laying and working method thereof

Country Status (1)

Country Link
CN (1) CN108682270B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109297830A (en) * 2018-11-27 2019-02-01 山东大学 A kind of refracturing laboratory testing rig and its operating method
CN110331970A (en) * 2019-07-02 2019-10-15 中国石油天然气股份有限公司 A kind of multistage fracture simulation experimental provision
CN110685660A (en) * 2019-11-01 2020-01-14 西南石油大学 Device and method for realizing accurate control of concentration of sand-carrying liquid in proppant conveying experiment
CN111734376A (en) * 2020-06-05 2020-10-02 西安科技大学 Downhole high pressure liquid CO2Fracturing permeability-increasing coal rock complete equipment design method
CN111980645A (en) * 2019-05-23 2020-11-24 中国石油天然气股份有限公司 Seam making device, and system and process for simulating sand filling model displacement experiment process
CN112943233A (en) * 2021-04-23 2021-06-11 重庆大学 Method for simulating proppant transmission under reservoir conditions
CN113550725A (en) * 2020-04-26 2021-10-26 四川宏华石油设备有限公司 Electric fracturing operation system
CN113624583A (en) * 2021-08-02 2021-11-09 中海石油(中国)有限公司 Experimental device for loose sandstone sample preparation and fracturing simulation integration
CN114062144A (en) * 2020-08-03 2022-02-18 中国石油天然气股份有限公司 Hydraulic sand fracturing experiment system and method
CN114320261A (en) * 2022-01-17 2022-04-12 中国科学院武汉岩土力学研究所 Migration simulation method for proppant in fracture under true triaxial condition
CN114607331A (en) * 2020-11-24 2022-06-10 中国石油天然气股份有限公司 Horizontal well subsection volume fracturing simulation test device and method
CN115639083A (en) * 2022-12-06 2023-01-24 新疆斐德莱布能源科技有限公司 True triaxial hydraulic fracturing simulation experiment method and device for mine field level
CN117569788A (en) * 2024-01-15 2024-02-20 中国矿业大学 Deep thermal storage fracturing, seepage and displacement integrated testing device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7096945B2 (en) * 2002-01-25 2006-08-29 Halliburton Energy Services, Inc. Sand control screen assembly and treatment method using the same
US7874365B2 (en) * 2006-06-09 2011-01-25 Halliburton Energy Services Inc. Methods and devices for treating multiple-interval well bores
CN102590888A (en) * 2012-02-20 2012-07-18 中国石油大学(华东) Experimental device for simulating spreading of propping agent in crack and application thereof
CN203702118U (en) * 2014-03-03 2014-07-09 中国石油化工股份有限公司 Experimental device for simulating propping agent sedimentation and paving inside fracturing cracks
CN104847326A (en) * 2015-05-30 2015-08-19 重庆地质矿产研究院 Blocking type hydraulic pulse generation device and method
CN105781480A (en) * 2016-04-28 2016-07-20 天鼎联创密封技术(北京)有限公司 Rubber cylinder with inner cores provided with spiral packing, packer and bridge plug
CN106501488A (en) * 2016-11-29 2017-03-15 中国石油大学(北京) True triaxial sand fracturing testing machine and its test method
CN107288603A (en) * 2017-06-13 2017-10-24 北京大学 A kind of experimental provision of simulation fracture turnaround fracture and its application

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7096945B2 (en) * 2002-01-25 2006-08-29 Halliburton Energy Services, Inc. Sand control screen assembly and treatment method using the same
US7874365B2 (en) * 2006-06-09 2011-01-25 Halliburton Energy Services Inc. Methods and devices for treating multiple-interval well bores
CN102590888A (en) * 2012-02-20 2012-07-18 中国石油大学(华东) Experimental device for simulating spreading of propping agent in crack and application thereof
CN203702118U (en) * 2014-03-03 2014-07-09 中国石油化工股份有限公司 Experimental device for simulating propping agent sedimentation and paving inside fracturing cracks
CN104847326A (en) * 2015-05-30 2015-08-19 重庆地质矿产研究院 Blocking type hydraulic pulse generation device and method
CN105781480A (en) * 2016-04-28 2016-07-20 天鼎联创密封技术(北京)有限公司 Rubber cylinder with inner cores provided with spiral packing, packer and bridge plug
CN106501488A (en) * 2016-11-29 2017-03-15 中国石油大学(北京) True triaxial sand fracturing testing machine and its test method
CN107288603A (en) * 2017-06-13 2017-10-24 北京大学 A kind of experimental provision of simulation fracture turnaround fracture and its application

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109297830A (en) * 2018-11-27 2019-02-01 山东大学 A kind of refracturing laboratory testing rig and its operating method
CN111980645A (en) * 2019-05-23 2020-11-24 中国石油天然气股份有限公司 Seam making device, and system and process for simulating sand filling model displacement experiment process
CN110331970A (en) * 2019-07-02 2019-10-15 中国石油天然气股份有限公司 A kind of multistage fracture simulation experimental provision
CN110685660A (en) * 2019-11-01 2020-01-14 西南石油大学 Device and method for realizing accurate control of concentration of sand-carrying liquid in proppant conveying experiment
CN110685660B (en) * 2019-11-01 2024-04-16 西南石油大学 Device and method for realizing accurate control of concentration of sand-carrying fluid in proppant conveying experiment
CN113550725A (en) * 2020-04-26 2021-10-26 四川宏华石油设备有限公司 Electric fracturing operation system
CN113550725B (en) * 2020-04-26 2024-04-09 四川宏华石油设备有限公司 Electric fracturing operation system
CN111734376A (en) * 2020-06-05 2020-10-02 西安科技大学 Downhole high pressure liquid CO2Fracturing permeability-increasing coal rock complete equipment design method
CN114062144A (en) * 2020-08-03 2022-02-18 中国石油天然气股份有限公司 Hydraulic sand fracturing experiment system and method
CN114607331B (en) * 2020-11-24 2023-09-26 中国石油天然气股份有限公司 Horizontal well sectional volume fracturing simulation test device and method
CN114607331A (en) * 2020-11-24 2022-06-10 中国石油天然气股份有限公司 Horizontal well subsection volume fracturing simulation test device and method
CN112943233A (en) * 2021-04-23 2021-06-11 重庆大学 Method for simulating proppant transmission under reservoir conditions
CN112943233B (en) * 2021-04-23 2023-10-20 重庆大学 Method for simulating proppant transport under reservoir conditions
CN113624583B (en) * 2021-08-02 2023-10-20 中海石油(中国)有限公司 Experimental device for loose sandstone sample preparation and fracturing simulation integration
CN113624583A (en) * 2021-08-02 2021-11-09 中海石油(中国)有限公司 Experimental device for loose sandstone sample preparation and fracturing simulation integration
CN114320261B (en) * 2022-01-17 2023-03-14 中国科学院武汉岩土力学研究所 Migration simulation method of proppant in fracturing under true triaxial condition
CN114320261A (en) * 2022-01-17 2022-04-12 中国科学院武汉岩土力学研究所 Migration simulation method for proppant in fracture under true triaxial condition
CN115639083A (en) * 2022-12-06 2023-01-24 新疆斐德莱布能源科技有限公司 True triaxial hydraulic fracturing simulation experiment method and device for mine field level
CN117569788A (en) * 2024-01-15 2024-02-20 中国矿业大学 Deep thermal storage fracturing, seepage and displacement integrated testing device and method
CN117569788B (en) * 2024-01-15 2024-03-29 中国矿业大学 Deep thermal storage fracturing, seepage and displacement integrated testing device and method

Also Published As

Publication number Publication date
CN108682270B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
CN108682270A (en) A kind of the true triaxial fracture simulation device and its working method of the laying of simulation proppant
CN201464456U (en) High-pressure crack grouting simulation test bed
Wang et al. Experimental investigation of pressure grouting in sand
CN108386177A (en) The 3-dimensional multi-layered more well pressure break supporting cracks of one kind monitoring experimental system and method in real time
Axelsson et al. Stop mechanism for cementitious grouts at different water-to-cement ratios
Chen et al. Experimental investigation of the influence of pulsating hydraulic fracturing on pre-existing fractures propagation in coal
CN105134186A (en) Shale gas hydraulic fracturing physical simulation test system
CN203702118U (en) Experimental device for simulating propping agent sedimentation and paving inside fracturing cracks
CN107525541B (en) Low-permeability coal-rock mass splitting permeation coupling grouting test device and method
CN105275444B (en) A kind of apparatus and method of the single seam inner support agent settlement law of visual Simulation dynamic
CN112240191A (en) Shale gas fracturing sand adding method
CN111553065B (en) Experiment table and experiment method for simulating proppant transportation and laying in reservoir fracturing fracture
CN107795303A (en) Hydrate recovery well cased hole gravel packing analogue system and method
CN106680467B (en) A kind of buried stratum high-pressure slip-casting simulation test device and test method
CN105043938A (en) Reusable saturated sand layer permeation grouting test model and applications thereof
Li et al. Effects of fluid and proppant properties on proppant transport and distribution in horizontal hydraulic fractures of coal under true-triaxial stresses
CN111364453A (en) Method for reinforcing deep soft soil foundation by light cement soil long spiral cast-in-place pile
CN108169451B (en) Test device and method for detecting motion law of mine filling slurry in pipeline
CN111505237A (en) Residual coal re-mining broken coal rock mass grouting modification test device and test method
Abraham et al. Strength improvement of loose sandy soils through cement grouting
CN112943233B (en) Method for simulating proppant transport under reservoir conditions
CN107831052A (en) A kind of special major diameter sandpack column device and method of physical simulation experiment
Malinin et al. Experimental research of jet-grouting parameters in different soil conditions
KR101561214B1 (en) Underground filling apparatus
CN211784849U (en) Hydraulic fracturing simulation test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214

Termination date: 20210503

CF01 Termination of patent right due to non-payment of annual fee