CN109268011A - Joint filling mining method - Google Patents

Joint filling mining method Download PDF

Info

Publication number
CN109268011A
CN109268011A CN201811462124.6A CN201811462124A CN109268011A CN 109268011 A CN109268011 A CN 109268011A CN 201811462124 A CN201811462124 A CN 201811462124A CN 109268011 A CN109268011 A CN 109268011A
Authority
CN
China
Prior art keywords
mining
mining area
ore bed
studding
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811462124.6A
Other languages
Chinese (zh)
Other versions
CN109268011B (en
Inventor
张明峰
许洪亮
李晓斌
李新成
张建勇
周士霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shen Kan Qinhuangdao General Engineering Design and Research Institute Corp of MCC
Original Assignee
Shen Kan Qinhuangdao General Engineering Design and Research Institute Corp of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shen Kan Qinhuangdao General Engineering Design and Research Institute Corp of MCC filed Critical Shen Kan Qinhuangdao General Engineering Design and Research Institute Corp of MCC
Priority to CN201811462124.6A priority Critical patent/CN109268011B/en
Publication of CN109268011A publication Critical patent/CN109268011A/en
Application granted granted Critical
Publication of CN109268011B publication Critical patent/CN109268011B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of joint filling mining method, which sets the run in mining area as length direction X first, sets the horizontal breadth direction in mining area as width direction Y, sets the vertical thickness direction in mining area as short transverse Z;It specifically includes: mining area blocking step, nugget stratification step and coal mining step.The joint filling mining method be particularly suitable for ore-rock built on the sand under the conditions of the level of more difficult exploitation, low-angle dip and middle thickness underground ore bodies, by the way that mining area is divided into multiple nuggets, nugget is divided into multiple ore beds, and the different mining areas of each ore bed are successively exploited, mining area is integrally used to access back-filling method or compared with integrally using Desending slicing filling mining method to mining area in the prior art, joint filling mining method provided by the invention can significantly improve mining area production capacity.

Description

Joint filling mining method
Technical field
The present invention relates to mining technique fields in mine, more particularly, to a kind of joint filling mining method.
Background technique
For ore-rock built on the sand under the conditions of level, low-angle dip, middle thickness orebody be underground mine uneasily mining orebody, for The above ore body two classes method commonly used in the prior art:
(1) to access back-filling method on, this kind of mining methods be it is a kind of from bottom to top, back production is simultaneously in a manner of the route of tunnel The mining methods of filling, using shallow bore hole rock drilling, the operation in route of personnel, equipment, under the conditions of ore is unsteady, top plate is needed A large amount of supportings are carried out to guarantee safety, supporting amount is larger, and production efficiency is low, and mining cost is high;
(2) Desending slicing filling mining method, this kind of mining methods are that one kind from top to bottom fill by sequence slicing, layering It fills out, the stoping method of operation is carried out under the Man-made False protection of layering in a manner of the route of tunnel, using shallow bore hole rock drilling, Ren Yuan Man-made False protects lower operation, and safety is preferable, but production efficiency is low, and link is more, and Man-made False desired strength is high, production cost It is high.
The information disclosed in the background technology section is intended only to deepen the understanding to general background technology of the present invention, without It should be considered as recognizing or implying in any form that the information constitutes the prior art known in those skilled in the art.
Summary of the invention
Present invention has been made in view of the above problems, and its purpose is to provide a kind of joint filling mining methods.
The joint filling mining method has and can improve mining area production capacity, save a large amount of supportings, reduce mining cost and mention The advantages of high back production safety.
The following technical scheme is adopted to achieve the purpose of the present invention:
The invention of first technical solution is a kind of joint filling mining method, sets the run in mining area as length direction X sets the horizontal breadth direction in the mining area as width direction Y, sets the vertical thickness direction in the mining area as short transverse Z;
The joint filling mining method includes:
Mining area blocking step, selects panel in mining area, and the panel is divided along the short transverse Z for multiple segmentations, And X divides for multiple nuggets along its length by each segmentation;
Nugget stratification step, it is four ore beds, four ore bed packets that each nugget is divided along the short transverse Z Include the 4th ore bed, third ore bed, the second ore bed and the first ore bed stacked gradually from bottom to top along the short transverse Z, and institute The first ore bed is stated to be made of route mining area, second ore bed by along the width direction Y successively adjacent single layer mining area, The upper layer of the double-deck mining area and the upper layer for being segmented mining area are constituted, and the third ore bed is by along the width direction Y successively phase The lower layer of the middle layer of the adjacent segmentation mining area and the double-deck mining area is constituted, and the 4th ore bed is exploited by the segmentation The lower layer in area is constituted;
And coal mining step, successively to the route mining area, the single layer mining area, by the double-deck mining area Upper layer and the double-deck mining area the double-deck mining area that constitutes of lower layer and by the segmentation mining area upper layer, The segmentation mining area that the lower layer of the middle layer of the segmentation mining area and the segmentation mining area is constituted is exploited.
In addition, the joint filling mining method of the second technical solution, in the joint filling mining method of the first technical solution On the basis of, it along the short transverse Z point is three segmentations by the panel in the mining area blocking step, and by each institute It is three nuggets that segmentation, which is stated, along the length direction X points.
In addition, the joint filling mining method of third technical solution, in the joint filling mining method of the first technical solution On the basis of, carrying out exploitation to the route mining area includes:
First bed top construction step marks off top plate at the top of first ore bed and builds area, and by the top Plate build zoning be divided into it is a plurality of along the length direction X arrange and along the width direction Y extend Strike drift, dig dig simultaneously fills The a plurality of Strike drift is filled out, the Strike drift after making a plurality of filling is configured to the first bed top;
First ore bed studding construction step, the both ends on the length direction X of the bottom of first bed top The first studding is respectively divided out and builds area, and by each first studding build area be divided into it is a plurality of along the height side It is arranged to Z and first along width direction Y extension wears arteries and veins route, dug to dig and fill a plurality of described first and wears arteries and veins route, make Described first after a plurality of filling, which wears arteries and veins route, is configured to the first ore bed studding;
And route mining area stages of mining, Desending slicing glue is used to the route mining area in first ore bed Knot filling method is exploited.
In addition, the joint filling mining method of the 4th technical solution, in the joint filling mining method of third technical solution On the basis of, carrying out exploitation to the single layer mining area includes:
Second ore bed studding construction step is drawn at the position corresponding with the first ore bed studding of second ore bed It separates the second studding and builds area, and second studding construction zoning is divided into a plurality of arrange along the short transverse Z and along institute State the width direction Y extension in panel second wears arteries and veins route, digs to dig and fill a plurality of described second and wears arteries and veins route, makes a plurality of filling Described second afterwards wears arteries and veins route and is configured to the second ore bed studding;
And single layer mining area stages of mining, the single layer mining area in second ore bed is filled using lower to route Back production method is filled out to be exploited.
In addition, the joint filling mining method of the 5th technical solution, in the joint filling mining method of the 4th technical solution On the basis of, the double-deck mining area being made of the lower layer on the upper layer of the double-deck mining area and the double-deck mining area is carried out Exploitation includes:
Third ore bed studding construction step is drawn at the position corresponding with the second ore bed studding of the third ore bed It separates third studding and builds area, and third studding construction zoning is divided into a plurality of arrange along the short transverse Z and along institute The third for stating width direction Y extension wears arteries and veins route, digs to dig and fill a plurality of third and wears arteries and veins route, the institute after making a plurality of filling It states third and wears arteries and veins route and be configured to third ore bed studding;
And double-deck mining area stages of mining, to the double-deck mining area in the third ore bed and second ore bed It is exploited using slicing and filling back production method.
In addition, the joint filling mining method of the 6th technical solution, in the joint filling mining method of the 5th technical solution On the basis of,
The lower layer in middle layer and the segmentation mining area to upper layer, the segmentation mining area by the segmentation mining area The segmentation mining area constituted carries out exploitation
4th ore bed studding construction step is drawn at the position corresponding with the third ore bed studding of the 4th ore bed It separates the 4th studding and builds area, and the 4th studding construction zoning is divided into a plurality of arrange along the short transverse Z and along institute State width direction Y extension the 4th wears arteries and veins route, digs to dig and fill a plurality of described 4th and wears arteries and veins route, the institute after making a plurality of filling It states the 4th and wears arteries and veins route and be configured to the 4th ore bed studding;
4th ore bed Pre-control roof construction step digs one article of rock drilling lane of chisel along the width direction Y in the 4th ore bed Road, and the top plate of construction slot raise to first ore bed is tilted upward, then with the slot raise freely towards two Side is expanded at side to the first ore bed studding;
And segmentation mining area's stages of mining, described in the 4th ore bed, third ore bed and second ore bed Segmentation mining area is exploited using sublevel drilling segmentation ore removal mining methods.
In addition, the joint filling mining method of the 7th technical solution, in the joint filling mining method of the 6th technical solution On the basis of, first bed top, first studding, second studding, the third studding and the 4th studding Respective reinforcing bar network framework is respectively included, pours filling material filled with classified tailings in the steel mesh skeletal internal.
In addition, the joint filling mining method of the 8th technical solution, in the joint filling mining method of third technical solution On the basis of,
In the first bed top construction step, by the way of digging one at interval of three diggings to it is a plurality of it is described along the pulse into Road carries out back production.
In addition, the joint filling mining method of the 9th technical solution, in the joint filling mining method of the first technical solution On the basis of,
One is respectively set along the layering drift that the length direction X extends in each ore bed, and each One stope connection roadway of the subsection setup, the stope connection roadway connect the layering drift and segmentation drift It is logical.
In addition, the joint filling mining method of the tenth technical solution, in the joint filling mining method of the 9th technical solution On the basis of,
Classified tailings are laid on the bottom surface corresponding with the layering drift of the 4th ore bed of the third ore bed Pour filling material reinforcing bar enhancement layer.
In conjunction with above technical scheme, bring beneficial effect of the present invention is analyzed as follows:
A kind of joint filling mining method sets the run in mining area as length direction X, sets the horizontal breadth in mining area Direction is width direction Y, sets the vertical thickness direction in mining area as short transverse Z;
Joint filling mining method includes:
Mining area blocking step, selects panel in mining area, panel is divided along short transverse Z for multiple segmentations, and will be each X divides for multiple nuggets along its length for segmentation;
Nugget stratification step, it is four ore beds that each nugget is divided along short transverse Z, and four ore beds include along short transverse The 4th ore bed, third ore bed, the second ore bed and the first ore bed that Z is stacked gradually from bottom to top, and the first ore bed is exploited by route Area is constituted, and the second ore bed by Y in the width direction, successively exploit by adjacent single layer mining area, the upper layer of the double-deck mining area and segmentation The upper layer in area is constituted, and third ore bed is by under the Y in the width direction successively middle layer and the double-deck mining area of adjacent segmentation mining area Layer is constituted, and the 4th ore bed is made of the lower layer for being segmented mining area;
And coal mining step, successively to route mining area, single layer mining area, the upper layer by the double-deck mining area and bilayer The double-deck mining area and the upper layer by being segmented mining area, the middle layer of segmentation mining area and segmentation that the lower layer of mining area is constituted The segmentation mining area that the lower layer of mining area is constituted is exploited.
Above-mentioned joint filling mining method be particularly suitable for ore-rock built on the sand under the conditions of more difficult exploitation it is horizontal, slow Nugget is divided into multiple ore beds, and to each mine by the way that mining area is divided into multiple nuggets by the underground ore bodies of inclination and middle thickness The different mining areas of layer are successively exploited, and are integrally used to mining area in the prior art to access back-filling method or right Mining area integrally uses Desending slicing filling mining method to compare, and joint filling mining method provided by the invention can significantly improve mine Area's production capacity.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention are in specification, claims And structure specifically noted by attached drawing is achieved and obtained.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is flow chart of the invention;
Fig. 2 is panel piecemeal provided by the invention and the schematic diagram that direction is set;
Fig. 3 is cross-sectional view of the nugget provided by the invention layering along YZ plane;
Fig. 4 cuts open intention along XZ plane for the first ore bed provided by the invention.
Icon: 100- route mining area;110- Strike drift;120- first wears arteries and veins route;200- single layer mining area;300- The double-deck mining area;400- is segmented mining area;The mining area S1- blocking step;S2- nugget stratification step;S3- coal mining step; S31- route mining area is exploited;S32- single layer mining area is exploited;S33- bilayer mining area is exploited;S34- segmentation Mining area is exploited.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Below according to joint filling mining method provided by the invention, its specific embodiment is illustrated.
Fig. 1 is flow chart of the invention;Fig. 2 is panel piecemeal provided by the invention and the schematic diagram that direction is set;Fig. 3 is Cross-sectional view of the nugget layering provided by the invention along YZ plane;Fig. 4 cuts open meaning along XZ plane for the first ore bed provided by the invention Figure.
As shown in Figures 1 to 4, a kind of joint filling mining method is present embodiments provided, the run in mining area is set For length direction X, the horizontal breadth direction in mining area is set as width direction Y, sets the vertical thickness direction in mining area as height side To Z;
Joint filling mining method includes:
Mining area blocking step S1, selects panel in mining area, panel is divided along short transverse Z for multiple segmentations, and will be every X divides for multiple nuggets along its length for a segmentation;
Nugget stratification step S2, it is four ore beds that each nugget is divided along short transverse Z, and four ore beds include along height side The 4th ore bed, third ore bed, the second ore bed and the first ore bed stacked gradually from bottom to top to Z, and the first ore bed is opened by route Exploiting field 100 is constituted, the second ore bed by Y in the width direction successively adjacent single layer mining area 200, the double-deck mining area 300 upper layer And the upper layer of segmentation mining area 400 is constituted, third ore bed is by Y in the width direction successively adjacent segmentation mining area 400 The lower layer of layer and the double-deck mining area 300 is constituted, and the 4th ore bed is made of the lower layer for being segmented mining area 400;
And coal mining step S3, successively to route mining area 100, single layer mining area 200, by the double-deck mining area 300 Upper layer and the double-deck mining area 300 the double-deck mining area 300 that constitutes of lower layer and the upper layer by being segmented mining area 400, segmentation The segmentation mining area 400 that the middle layer of mining area 400 and the lower layer for being segmented mining area 400 are constituted is exploited.
Above-mentioned joint filling mining method be particularly suitable for ore-rock built on the sand under the conditions of more difficult exploitation it is horizontal, slow Nugget is divided into multiple ore beds, and to each mine by the way that mining area is divided into multiple nuggets by the underground ore bodies of inclination and middle thickness The different mining areas of layer are successively exploited, and are integrally used to mining area in the prior art to access back-filling method or right Mining area integrally uses Desending slicing filling mining method to compare, and joint filling mining method provided by the invention can significantly improve mine Area's production capacity.
In addition, more preferred in the optinal plan of the present embodiment:
In the blocking step S1 of mining area, panel is segmented along short transverse Z points for three, and by each segmentation along length side It is three nuggets to X points.
When actually choosing is drawn, according to actual production operation experience, panel is settable but is not limited to the length of length direction X in panel For 60m, the wide of a height of 50m of short transverse Z, width direction Y is arranged according to the real standard thickness change of mineral ore, and above-mentioned three A segmentation is preferable to provide as equal length when dividing, three above-mentioned nuggets be preferable to provide when dividing for height it is equal, this Sample is conducive to the mechanical equipment in later period in mining operations, and progress is consistent.
In addition, more preferred in the optinal plan of the present embodiment:
Carrying out exploitation S31 to route mining area includes:
First bed top construction step marks off top plate at the top of the first ore bed and builds area, and top plate is built area Be divided into a plurality of X along its length arrangement and Y extends in the width direction Strike drift 110, dig dig and fill it is a plurality of along the pulse into Road 110, the Strike drift 110 after making a plurality of filling are configured to the first bed top;
First ore bed studding construction step, the both ends on the length direction X of the bottom of the first bed top are respectively divided The first studding builds area out, and each first studding construction area is divided into a plurality of arrange along short transverse Z and along width The first of direction Y extension wears arteries and veins route 120, digs to dig and fill a plurality of first and wears arteries and veins route 120, first after making a plurality of filling is worn Arteries and veins route 120 is configured to the first ore bed studding;
And route mining area stages of mining, the route mining area 100 in the first ore bed is filled using Desending slicing is cementing The method of filling out is exploited.
The first above-mentioned bed top and the first above-mentioned ore bed studding are arranged to route mining area 100 in the first ore bed The usage amount of support bracket when exploiting to route mining area 100 can be greatly decreased, save production cost, improve and route is exploited The safety that area 100 is exploited.
In addition, more preferred in the optinal plan of the present embodiment:
Carrying out exploitation S32 to single layer mining area includes:
Second ore bed studding construction step marks off second at the position corresponding with the first ore bed studding of the second ore bed Studding builds area, and the second studding construction zoning is divided into a plurality of arrange along short transverse Z and along the width direction Y in panel extension Second wear arteries and veins route, dig to dig and fill a plurality of second and wear arteries and veins route, second after making a plurality of filling wears arteries and veins route and be configured to the Two ore bed studdings;
And single layer mining area stages of mining, the single layer mining area 200 in the second ore bed is returned using lower to admission passage filling The method of adopting is exploited.
The second above-mentioned ore bed studding is set in the single layer mining area 200 of the second ore bed, and by first after consolidated fill Equally branch when exploiting to single layer mining area 200 can be greatly decreased in protection top when ore bed is exploited as single layer mining area 200 The usage amount of retaining frame saves production cost, improves the safety exploited to single layer mining area 200.
In addition, more preferred in the optinal plan of the present embodiment:
The double-deck mining area being made of the lower layer on the upper layer of the double-deck mining area 300 and the double-deck mining area 300 is exploited S33 includes:
Third ore bed studding construction step marks off third at the position corresponding with the second ore bed studding of third ore bed Studding builds area, and third studding construction zoning is divided into a plurality of third arranged along short transverse Z and Y extends in the width direction Arteries and veins route is worn, digs to dig and fill a plurality of third and wears arteries and veins route, the third after making a plurality of filling wears arteries and veins route and is configured to third ore bed Studding;
And double-deck mining area stages of mining, to the double-deck mining area 300 in third ore bed and the second ore bed using layering Stoping-and-filling method is exploited.
Above-mentioned third ore bed studding is arranged in the double-deck mining area 300 in the second ore bed and third ore bed, and will exploitation Protection top when the second ore bed after backfill is exploited as the double-deck mining area 300 can equally be greatly decreased to the double-deck mining area The usage amount of support bracket when 300 exploitation saves production cost, improves the safety exploited to the double-deck mining area 300.
In addition, more preferred in the optinal plan of the present embodiment:
To lower layer's structure on upper layer, the middle layer and segmentation mining area 400 that are segmented mining area 400 by being segmented mining area 400 At segmentation mining area carry out exploitation S34 include:
4th ore bed studding construction step marks off the 4th at the position corresponding with third ore bed studding of the 4th ore bed Studding builds area, and the 4th studding construction zoning is divided into a plurality of the 4th extended along short transverse Z arrangement and in the width direction Y Arteries and veins route is worn, digs to dig and fill a plurality of 4th and wears arteries and veins route, the 4th after making a plurality of filling wears arteries and veins route and be configured to the 4th ore bed Studding;
4th ore bed Pre-control roof construction step, Y digs one article of drilling drift of chisel in the width direction in the 4th ore bed, and tilts Upwards then construction slot raise freely expands side between the first ore bed towards two sides with slot raise to the top plate of the first ore bed At column;
And segmentation mining area's stages of mining, to the segmentation mining area 400 in the 4th ore bed, third ore bed and the second ore bed It is exploited using sublevel drilling segmentation ore removal mining methods.
The 4th above-mentioned ore bed studding is arranged in segmentation mining area 400 in the second ore bed, third ore bed and the 4th ore bed, And will exploitation backfill after third ore bed as segmentation mining area 400 exploit when protection top, equally, can be greatly decreased to divide The usage amount of support bracket when section mining area 400 exploits saves production cost, improves the safety exploited to segmentation mining area 400 Property.
Moreover, because the height of segmentation mining area 400 is larger, in order to further increase when segmentation mining area 400 exploits Safety adds Pre-control roof in the top layer of segmentation mining area 400 and the abutting of the first ore bed, starts Pre-control roof engineering of constructing.It is first First with layering drift from disk on mineral building intermediate vertical orebody trend one back production drilling drift to ore body of construction, along ore body Upper disk ore-rock boundary oblique constructs slot raise to the artificial roof of first layer upwards, then with slot raise be freely towards Two sides expand side until artificial intervening pillar position.Supporting is carried out to upper armor rock in time with the driving in tunnel in work progress.Root According to the degree of crushing of upper armor rock, steel mesh supporting can be added using anchor and spray net or anchor cable.Pass through Pre-control roof work of constructing in advance Journey can guarantee not occurrence of large-area slump during being segmented ore removal of upper armor rock, and two sides and top plate have artificial intervening pillar respectively With the protection of artificial roof, and be based on above-mentioned condition, design determine segmentation mining area 400 using sublevel drilling segmentation ore removal mining Method.Dead zone is filled immediately after back production, avoids the too long generation country rock slump of armor rock exposure duration.
In addition, more preferred in the optinal plan of the present embodiment:
First bed top, the first studding, the second studding, third studding and the 4th studding respectively include respective steel mesh Skeleton pours filling material filled with classified tailings in steel mesh skeletal internal.
The construction that reinforcing bar network framework bonus point grade tailings pours, under the precondition that not only can guarantee its supporting intensity, moreover it is possible to Reduce the economic cost of manufacture of the first bed top, the first studding, the second studding, third studding and the 4th studding.
In addition, more preferred in the optinal plan of the present embodiment:
In the first bed top construction step, to a plurality of Strike drift by the way of digging one at interval of three diggings 110 carry out back production.
It can avoid in this way when carrying out back production the first bed top of construction to Strike drift 110 because ore shakiness is to edge 110 two sides of arteries and veins route carry out explosion bring vibration influence simultaneously.
In addition, more preferred in the optinal plan of the present embodiment:
The layering drift that X extends along its length is respectively set in each ore bed, and in each subsection setup One stope connection roadway, stope connection roadway will be layered drift and be connected to segmentation drift.Each ore bed has one point Layer drift and by the connection of stope connection roadway, the mineral products of such structure not only each ore bed of convenient transportation, but also Ore removal route can also be simplified.
In addition, more preferred in the optinal plan of the present embodiment:
It is laid with classified tailings on the bottom surface corresponding with the layering drift of the 4th ore bed of third ore bed and pours filling Expect reinforcing bar enhancement layer.
Since the layering drift of the 4th ore bed is located at the underface of the double-deck mining area 300, double-deck 300 height of mining area It is relatively large, and the layering drift sequence of construction of the 4th ore bed is later than the filling of third layering drift again, in order to protect The safety for demonstrate,proving the 4th layering drift, corresponding position is laid with steel mesh above the 4th layering drift.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of joint filling mining method, which is characterized in that set the run in mining area as length direction X, described in setting The horizontal breadth direction in mining area is width direction Y, sets the vertical thickness direction in the mining area as short transverse Z;
The joint filling mining method includes:
Mining area blocking step, selects panel in mining area, the panel is divided along the short transverse Z for multiple segmentations, and will X divides for multiple nuggets along its length for each segmentation;
Nugget stratification step, it is four ore beds that each nugget is divided along the short transverse Z, and four ore beds include edge The 4th ore bed, third ore bed, the second ore bed and the first ore bed that the short transverse Z is stacked gradually from bottom to top, and described One ore bed is made of route mining area, and second ore bed is by along the width direction Y successively adjacent single layer mining area, bilayer The upper layer of mining area and the upper layer for being segmented mining area are constituted, and the third ore bed is by successively adjacent along the width direction Y The lower layer of the middle layer of the segmentation mining area and the double-deck mining area is constituted, and the 4th ore bed is by the segmentation mining area Lower layer is constituted;
And coal mining step, successively to the route mining area, the single layer mining area, by the upper of the double-deck mining area The double-deck mining area that the lower layer of layer and the double-deck mining area is constituted and upper layer, described by the segmentation mining area The segmentation mining area that the lower layer in the middle layer and the segmentation mining area that are segmented mining area is constituted is exploited.
2. joint filling mining method according to claim 1, which is characterized in that
In the mining area blocking step, the panel is segmented along the short transverse Z points for three, and will be described point each Section is three nuggets along the length direction X points.
3. joint filling mining method according to claim 1, which is characterized in that
Carrying out exploitation to the route mining area includes:
First bed top construction step marks off top plate at the top of first ore bed and builds area, and the top plate is built Make zoning be divided into it is a plurality of along the length direction X arrange and along the width direction Y extend Strike drift, dig dig simultaneously fills more Strike drift described in item, the Strike drift after making a plurality of filling are configured to the first bed top;
First ore bed studding construction step, the both ends difference on the length direction X of the bottom of first bed top Mark off the first studding and build area, and by each first studding build area be divided into it is a plurality of along the short transverse Z It arranges and first along width direction Y extension wears arteries and veins route, dig to dig and fill a plurality of described first and wears arteries and veins route, make a plurality of Described first after filling, which wears arteries and veins route, is configured to the first ore bed studding;
And route mining area stages of mining, the route mining area in first ore bed is filled using Desending slicing is cementing The method of filling out is exploited.
4. joint filling mining method according to claim 3, which is characterized in that
Carrying out exploitation to the single layer mining area includes:
Second ore bed studding construction step marks off at the position corresponding with the first ore bed studding of second ore bed Second studding builds area, and second studding construction zoning is divided into a plurality of arrange along the short transverse Z and along the disk The second of the width direction Y extension in area wears arteries and veins route, digs to dig and fill a plurality of described second and wears arteries and veins route, after making a plurality of filling Described second, which wears arteries and veins route, is configured to the second ore bed studding;
And single layer mining area stages of mining, the single layer mining area in second ore bed is returned using lower to admission passage filling The method of adopting is exploited.
5. joint filling mining method according to claim 4, which is characterized in that
The double-deck mining area being made of the lower layer on the upper layer of the double-deck mining area and the double-deck mining area is opened It adopts and includes:
Third ore bed studding construction step marks off at the position corresponding with the second ore bed studding of the third ore bed Third studding builds area, and third studding construction zoning is divided into a plurality of arrange along the short transverse Z and along the width The third that degree direction Y extends wears arteries and veins route, digs to dig and fill a plurality of third and wears arteries and veins route, and described the after making a plurality of filling Three, which wear arteries and veins route, is configured to third ore bed studding;
And double-deck mining area stages of mining, the double-deck mining area in the third ore bed and second ore bed is used Slicing and filling back production method is exploited.
6. joint filling mining method according to claim 5, which is characterized in that
It is constituted to by the lower layer in the middle layer on the upper layer of the segmentation mining area, the segmentation mining area and the segmentation mining area The segmentation mining area carry out exploitation include:
4th ore bed studding construction step marks off at the position corresponding with the third ore bed studding of the 4th ore bed 4th studding builds area, and the 4th studding construction zoning is divided into a plurality of arrange along the short transverse Z and along the width What degree direction Y extended the 4th wears arteries and veins route, digs to dig and fill a plurality of described 4th and wears arteries and veins route, and described the after making a plurality of filling Four, which wear arteries and veins route, is configured to the 4th ore bed studding;
4th ore bed Pre-control roof construction step digs one article of drilling drift of chisel along the width direction Y in the 4th ore bed, and The top plate of construction slot raise to first ore bed is tilted upward, is then helped with freely expanding towards two sides for the slot raise At to the first ore bed studding;
And segmentation mining area's stages of mining, to the segmentation in the 4th ore bed, third ore bed and second ore bed Mining area is exploited using sublevel drilling segmentation ore removal mining methods.
7. joint filling mining method according to claim 6, which is characterized in that
First bed top, first studding, second studding, the third studding and the 4th studding difference Including respective reinforcing bar network framework, filling material is poured filled with classified tailings in the steel mesh skeletal internal.
8. joint filling mining method according to claim 3, which is characterized in that
In the first bed top construction step, by the way of digging one at interval of three diggings to a plurality of Strike drift into Row back production.
9. joint filling mining method according to claim 1, which is characterized in that the joint filling mining method also wraps It includes:
One is respectively set along the layering drift that the length direction X extends in each ore bed, and each described The layering drift is connected to by one stope connection roadway of subsection setup, the stope connection roadway with segmentation drift.
10. joint filling mining method according to claim 9, which is characterized in that the joint filling mining method is also Include:
Classified tailings are laid on the bottom surface corresponding with the layering drift of the 4th ore bed of the third ore bed to pour Filling material reinforcing bar enhancement layer.
CN201811462124.6A 2018-11-30 2018-11-30 Combined filling mining method Active CN109268011B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811462124.6A CN109268011B (en) 2018-11-30 2018-11-30 Combined filling mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811462124.6A CN109268011B (en) 2018-11-30 2018-11-30 Combined filling mining method

Publications (2)

Publication Number Publication Date
CN109268011A true CN109268011A (en) 2019-01-25
CN109268011B CN109268011B (en) 2020-05-08

Family

ID=65186603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811462124.6A Active CN109268011B (en) 2018-11-30 2018-11-30 Combined filling mining method

Country Status (1)

Country Link
CN (1) CN109268011B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502710A (en) * 2020-11-10 2021-03-16 西北矿冶研究院 Pressure relief roadway type cemented filling mining method
CN113863929A (en) * 2021-07-15 2021-12-31 中国恩菲工程技术有限公司 Upward layered pressure relief layered filling mining method in high ground stress environment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU861604A1 (en) * 1978-08-14 1981-09-07 Предприятие П/Я М-5175 Stand for simulating mining steeply dipping rock bodies by system of underblock caving
CN101338674A (en) * 2008-08-14 2009-01-07 武汉理工大学 Non-pillar sublevel caving mining method for direct loading for ore
CN102182461A (en) * 2011-04-02 2011-09-14 山东黄金矿业(玲珑)有限公司 Efficient mining method for thick metal ore body in slanting
CN103603665A (en) * 2013-10-25 2014-02-26 河北省矾山磷矿有限公司 Hanging wall side orebody extracting method in mine mining range
CN105649631A (en) * 2016-03-02 2016-06-08 大冶有色金属有限责任公司 Efficient mechanical mining method for gently-inclined thin ore bodies
CN107524442A (en) * 2017-10-23 2017-12-29 贵州开磷集团股份有限公司 A kind of filling mining method of mineral building centering interlaced arrangement
CN107762515A (en) * 2017-11-15 2018-03-06 中冶沈勘秦皇岛工程设计研究总院有限公司 A kind of gently inclined medium thick orebody panel filling mining method
CN107939403A (en) * 2018-01-09 2018-04-20 驰宏科技工程股份有限公司 To cemented filling mining technique under a kind of square crossing rectangle route type panel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU861604A1 (en) * 1978-08-14 1981-09-07 Предприятие П/Я М-5175 Stand for simulating mining steeply dipping rock bodies by system of underblock caving
CN101338674A (en) * 2008-08-14 2009-01-07 武汉理工大学 Non-pillar sublevel caving mining method for direct loading for ore
CN102182461A (en) * 2011-04-02 2011-09-14 山东黄金矿业(玲珑)有限公司 Efficient mining method for thick metal ore body in slanting
CN103603665A (en) * 2013-10-25 2014-02-26 河北省矾山磷矿有限公司 Hanging wall side orebody extracting method in mine mining range
CN105649631A (en) * 2016-03-02 2016-06-08 大冶有色金属有限责任公司 Efficient mechanical mining method for gently-inclined thin ore bodies
CN107524442A (en) * 2017-10-23 2017-12-29 贵州开磷集团股份有限公司 A kind of filling mining method of mineral building centering interlaced arrangement
CN107762515A (en) * 2017-11-15 2018-03-06 中冶沈勘秦皇岛工程设计研究总院有限公司 A kind of gently inclined medium thick orebody panel filling mining method
CN107939403A (en) * 2018-01-09 2018-04-20 驰宏科技工程股份有限公司 To cemented filling mining technique under a kind of square crossing rectangle route type panel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502710A (en) * 2020-11-10 2021-03-16 西北矿冶研究院 Pressure relief roadway type cemented filling mining method
CN113863929A (en) * 2021-07-15 2021-12-31 中国恩菲工程技术有限公司 Upward layered pressure relief layered filling mining method in high ground stress environment

Also Published As

Publication number Publication date
CN109268011B (en) 2020-05-08

Similar Documents

Publication Publication Date Title
CN107339104B (en) Security personnel's curtain wall recovery method
CN102251773B (en) Route type upward horizontal layered filling mining method suitable for extremely complex ore body mining
CN101818643B (en) Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN102518438B (en) Roof regeneration medium-length hole ore blast backfill mining method
CN105649631B (en) A kind of efficient mining methods of the mechanization of slight slope and thin ore body
CN111255459B (en) Combined downward mechanized filling mining method for steeply inclined extremely-broken ore vein
CN105019902B (en) Intra-vein inclined drift overhand cut-and-filling mining method
CN103362510B (en) Sublevel-drilling bench-combination ore-removal sublevel-room mining method
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN103206215B (en) Precontrol top upward access cut-and-filling stopping method
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN105041314A (en) Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN103437769A (en) Medium-length hole ore breaking synergistic anchor cable support subsequent filling mining method of combined reconstructed structural body
CN107829739B (en) Mining method of steeply inclined thin vein
CN108868771A (en) A kind of mining methods of horizontal medium-length hole back production slant middle thick orebody
CN110388209A (en) A kind of high-dipping bilayer ore body stage deep hole mining method
CN102979526B (en) Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining
CN107989617B (en) A kind of strip mining transformation method of gently inclined orebody
CN106761756A (en) A kind of stope structure for Upward slicing all-tailing cemented filling method
CN104695960A (en) Air column well completion back coming subsequent filling mining method
CN105673014A (en) Method for controlling rock burst of hard roof jump mining working face
CN107130962A (en) Sublevel caving subsequent cemented filling mining method for thick and large ore body
CN109268011A (en) Joint filling mining method
CN108952725B (en) Low dilution mining method suitable for gentle dip thin ore body
CN109931063A (en) To substep alternating expression filling mining method in one kind

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant