CN106761756A CN201510798764.4A CN201510798764A CN106761756A CN 106761756 A CN106761756 A CN 106761756A CN 201510798764 A CN201510798764 A CN 201510798764A CN 106761756 A CN106761756 A CN 106761756A
Authority
CN
China
Prior art keywords
stope
lower wall
ore
veins
arteries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510798764.4A
Other languages
Chinese (zh)
Other versions
CN106761756B (en
Inventor
王运敏
肖益盖
汪为平
陆玉根
尹裕
孙丽军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201510798764.4A priority Critical patent/CN106761756B/en
Publication of CN106761756A publication Critical patent/CN106761756A/en
Application granted granted Critical
Publication of CN106761756B publication Critical patent/CN106761756B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of stope structure for Upward slicing all-tailing cemented filling method, a segmentation(c)Height be 6~8m, and each is segmented(c)It is divided into higher slice(c1), lower leaf(c2), in higher slice(c1)Ore body lower wall side arrangement lower wall arteries and veins in connection roadway along the pulse(3), in lower leaf(c2)Ore body on connection roadway along the pulse in the upper disk arteries and veins of disk side arrangement(4);The interior connection roadway along the pulse of lower wall arteries and veins(3)As higher slice(c1)The ore removal connection roadway of back production, the interior connection roadway along the pulse of upper disk arteries and veins(4)As lower leaf(c2)The ore removal connection roadway of back production;Disk main haulage roadway on stage casing(2)By filling Kuang Chuanmailian lanes(12)With stage casing lower wall main haulage roadway(1)Communicate, the interior connection roadway along the pulse of lower wall arteries and veins(3)Ramp is got in touch with by Slice stoping(7)With stage casing lower wall main haulage roadway(1)Communicate, so as to form a complete transportation system.Production capacity of the present invention is high, adopt small quasi- quantities, process is simple, stope support low cost, is capable of achieving two steps and continuously exploits.

Description

A kind of stope structure for Upward slicing all-tailing cemented filling method
Technical field
The present invention relates on a kind of to route slicing and filling mining codes stope structure arrangement, be particularly well-suited to unstable rock The underground mine filling mining of layer, can be wide in the exploitation of the layering all-tailing cemented filling of the Underground Metallic Mines such as black, coloured General application.
Background technology
As the mankind are continuously increased to mineral products demand, mineral resources become fewer and feweri.How rationally, efficient, warp Help, safely carry out mineral resource development and utilization, reduce the loss of resource, reduce the dilution of ore, improve the quality of ore, be Exploitation of mineral resources person's questions of common interest.The method of mining by the way of filling is higher exploiting with its high-recovery, the advantage of the low rate of dilution Breakthrough is achieved in the difficulty mining bed of value, trackless mechanization cemented filling method is occurred in that, post mining with stowing is put Method, sublevel cut and fill method, large aperture stage open stope afterwards cementing (lumpy rock cementing) method of mining by the way of filling of tailings etc..
On to route stratified filling method be it is a kind of from bottom to top, with tunnel route mode slicing and the mining side of filling Method.The method has the advantages that back production safety, the rate of recovery is high, dilution is low, is primarily adapted for use in:1. ore-rock is built on the sand or ore is relative Firm mineral deposit;2. Ore body morphology is irregular, and thickness change is big, the compound many mineral deposits containing horsestone of branch;3. earth's surface needs to protect The mineral deposit of shield.
The characteristics of method is slicing from bottom to top, the back production of each layering be after layered-liaison tunnel is tunneled, with point Layer overall height across pitch or capwise divide route, spacing admission passage mining.One step drift stoping finishes Tight filling immediately, so Back production and two step routes are filled again afterwards, after after the drift stoping sand off of whole layering, then with a layering on drift stoping. The method is most used early in the mine of Sweden part, China from 1984 since the success of Jinchuan deposit Ⅱ area Experiment in Introduction the method, In many mine popularization and application, such as Shandong Gold Shandong Jiaojia, middle areas in Shandong Province mining industry Zhang Jia mining areas, Northern Huaihe River Anhui mining area.
The current method still suffers from certain limitation, such as:Limited by stope arrangement and operating condition, it is impossible to realize big rule Mould is exploited;Mining technology is complicated, adopts quasi- quantities big;Two step mineral building back production must be carried out in the obturation of a step back production Quasi- construction is adopted, security reliability is poor;Using two step back production, it is impossible to realize mine continuously exploitation etc.;Stope Parameters are steady by ore-rock The restriction of solidity, stope support high cost;Charge stratifying is highly small, it is impossible to realize big production capacity filling, and filling cost is high.
For example,《Gold》" application and development of the slicing and filling mining codes in Shandong Jiaojia " intermediary of the publication of in September, 1999 The application continued in mechanization to route slicing and filling mining codes in Shandong Jiaojia.The advantage of the method is:(1) the stope scope of operation It is many, it may be achieved to adopt, go out, fill parallel operations;(2) not pillar, loss late, the rate of dilution are smaller, generally 8 %~10 % with Under;(3) Drift span is small, and top board open-assembly time is short, is aided with roof bolting, meets engineering geological condition and mining is adopted, soon soon The requirement go out, filled soon, security is greatly improved;(4) ore removal method is more flexible, big with what ramp and segmentation tunnel were communicated Stope (mainly mother-lode), typically uses scraper ore removal.The method also exposes following shortcoming:(1) IV class particularly poor to rock Rock mass still cannot back production, even if tight supporting of meeting head on dig up mine successfully, but lose, the rate of dilution and mining cost all will be very high.Therefore, Industry ore body (mainly in -70~-100m stage casings) to the north of the line of Shandong Jiaojia 80, except it is lower to actual nugget in addition to, do not have substantially Make more back production.(2) crossed because of mother-lode dilation and with " people " font that 3 feel the pulse, when orebody thickness increases more, Script is placed in the drainage sump of stope middle part ore body lower wall, cannot be just continuing with when stope mining is to half, cause Part stope sill ponding is so that obturation softening, produces sunken car and base plate to adopt lower scattered ore deposit loss.(3)Production capacity of mining field is low, Typically only 80t/d.
The content of the invention
The purpose of the present invention aiming at it is upper at present to route stratified filling method production capacity it is low, adopt quasi- quantities greatly, work Skill is complicated, stope support high cost and two steps cannot realize the problems such as continuously exploiting, it is proposed that one kind is complete for Upward slicing The stope structure of tailing fill method, it is intended to realize high-efficiency and continuous large scale mining, reduces cost of winning.
To realize above-mentioned purpose of the invention, a kind of stope knot for Upward slicing all-tailing cemented filling method of the invention Structure, using following technical scheme:Arrange that, along orebody trend direction, every 45~60m is divided into a stope, one according to stope Stope arranges 9~12 routes, and the width of route is 4.5~5.5m;The disk drop shaft in arrangement outside the arteries and veins of disk on the ore body, in ore body Lower wall drop shaft is arranged outside lower wall arteries and veins, stage casing lower wall main haulage roadway is arranged in outside the mineral ore of ore body lower wall, disk main haulage roadway on stage casing It is arranged on ore body outside the mineral ore of disk, upper stage casing lower wall main haulage roadway is arranged in outside a mineral ore for stage casing ore body lower wall.With It is to route stratified filling method stope structure difference traditionally:One height of segmentation in the stage casing is 6~8 m, And each is divided into higher slice, lower leaf, the connection roadway along the pulse in the ore body lower wall side arrangement lower wall arteries and veins of higher slice, The connection roadway along the pulse in disk arteries and veins in the arrangement of disk side on the ore body of lower leaf;The interior connection roadway along the pulse of lower wall arteries and veins is used as higher slice back production Ore removal connection roadway, in upper disk arteries and veins along the pulse connection roadway as lower leaf back production ore removal connection roadway;Disk main haulage roadway leads on stage casing Cross dress Kuang Chuanmailian lanes to be communicated with stage casing lower wall main haulage roadway, connection roadway gets in touch with ramp by Slice stoping along the pulse in lower wall arteries and veins Communicated with stage casing lower wall main haulage roadway, so as to form a complete transportation system;Each stope lower wall centre position arrangement one Bar filling and the ventilation shaft of stope return air, as filling piping arrangement and the main thoroughfare of stope return air.
The m of height 7~8 of above-mentioned each segmentation is preferred, and wherein higher slice, the m of height 3.5~4 of lower leaf are advisable.
Preferably stope structure parameter of the invention is:Along orebody trend direction, a stope is divided into per 50m, one is adopted Field 10 routes of arrangement, the width of route is 5m;The height of each segmentation is 7~8m, and higher slice is highly 3.5m, and lower leaf is high It is 3.5~4.5m to spend.
A kind of stope structure for Upward slicing all-tailing cemented filling method of the invention is adopted using after following technical scheme Mining type is changed into:
1)A segmentation exploitation is merged into higher slice, lower leaf, a step is exploited higher slice, entered in higher slice higher slice first After road back production is finished, supporting is first carried out to higher slice top board or tunneling boring according to ore steadiness, then exploit lower leaf route Ore body;
2)According to the steadiness of ore in same panel horizontal direction, the mode of selection one stop panel or two stop panel is returned Adopt, after the completion of a step higher slice mineral building, lower leaf mineral building back production, consolidated fill is carried out, after obturation reaches curing strength The back production of adjacent mineral building is carried out immediately, continuous exploitation is realized, after the completion of a segmentation complete extraction, the unified layer that rises carries out higher slice Drift stoping works, and to reduce the quasi- quantities of adopting of two step pillar recoveries, improves back production efficiency, reduces mining cost.
Higher slice uses the horizontal rock drilling of drill jumbo, such as Boomer281 Fully-hydraulic drilling rigs, and lateral aperture falls ore deposit;Lower point Using lower to upright opening rock drilling drawing back, lateral caving, layer height can increase to 4.5m to layer drift stoping, reduce once Shield topmast shield, and the lower leaf back production explosion scope of freedom is more, improves blasting efficiency, reduces construction cost.Rendrock is selected Emulsion, detonation is segmented detonation using nonel tube.
Nugget for horizontal breadth more than 15m, the vertical orebody trend arrangement of stope, length of stope is thick ore body level Degree;When ore body horizontal breadth is excessive, multiple panels should be divided into by the no more than principle of 60m.
A kind of stope structure for Upward slicing all-tailing cemented filling method of the invention, is layered on traditional to route Stope structure parameter optimization is carried out on the basis of cemented filling mining method, has simplified mining technique, reduced stope support work Journey amount and quasi- quantities is adopted, so as to reduce mining cost, filling height of lift brings up to 7~8m by 3 traditional~5m, improves Pack effectiveness and mining production efficiency, have ensured mining safety and the rate of extraction, reduce ore dilution rate.
Compared with traditionally cemented-method is layered to route, the present invention is a kind of to be used for Upward slicing all-tailing cemented filling The stope structure of method is applied to opposite route Upward slicing all-tailing cemented filling method, is capable of achieving two steps and continuously exploits, and has Advantages below:
(1)Stope structure parameter is optimized, upper and lower two layerings merge back production, higher slice is highly 3.5m, lower leaf Highly it is 3.5~4.5m;Sublevel fill stoping highly reaches 7.0-8.0m;Route width is still 5m, can be appropriate according to ore-rock stability Increase parameter to 6~7m.
(2)Mining technology is simple, and higher slice uses the horizontal rock drilling of drill jumbo, lower leaf to be adopted using lower to vertical rock drilling Miner's skill is simpler, and Stope chute is arranged in outside arteries and veins, is easy to mine management.
(3)Production capacity of mining field is increased substantially.Higher slice back production is with to route layering consolidated fill process for stoping one Cause, lower leaf back production uses lower to vertical rock drilling drawing back, and back production efficiency is higher, and production capacity has obtained larger carrying Height, by consolidated fill, realizes continuous exploitation, can greatly improve the production capacity in mine, accomplishes scale production.
(4)Quasi- quantities is adopted to reduce.After a step mineral building back production terminates filling, obturation is stood after reaching curing strength The back production of adjacent mineral building is carried out, continuous mining technology is realized, reduce two step mineral building back production adopts quasi- quantities, adopts quasi- work Journey amount reduces about 1/3rd compared on to route layering cemented-method.
(5)Stope support cost is greatly reduced.It is of the invention to merge exploitation using upper and lower two layerings, divide in first back production Layer, protect after topmast shield, back production lower leaf ore body, it is not necessary to protected top again, according to stope structure parameter, per 7m~ 8m once protected topmast shield, support engineering amount compared on reduce about 40% to route slicing and filling, greatly reduce supporting into This.
(5)The rate of extraction is greatly improved.Stope chute is arranged in the outer rock of arteries and veins, is arranged a Tiao Chuanmai lanes and is adopted every 50m The contact of drop shaft, only need to reserve Chuan Mai lanes polycrystalline substance, and realize continuous mining technology, be not required to reserved studding and fore-set, can be with Greatly improve the mining rate of extraction.
(6)The rate of dilution is substantially reduced.Continuously being exploited using route slicing and filling can greatly reduce the incorporation rate of barren rock, drop The rate of dilution of low ore.
(7)Mining safety is improved.The present invention can realize continuous exploitation, reduce the safety wind of two step mineral building back production Danger.
Brief description of the drawings
Fig. 1 is a kind of stope structure side view for Upward slicing all-tailing cemented filling method of the invention.
Fig. 2 is a kind of stope structure top view for Upward slicing all-tailing cemented filling method.
Fig. 3 is a kind of stope structure front view for Upward slicing all-tailing cemented filling method.
Reference is:1- stage casings lower wall main haulage roadway;Disk main haulage roadway on 2- stage casings;Got in touch with along the pulse in 3- lower walls arteries and veins Lane;The interior connection roadway along the pulse of the upper disk arteries and veins of 4-;The upper stage casing lower wall main haulage roadways of 5-;6- wears arteries and veins transportation roadway ore pillar;7- Slice stopings are got in touch with Ramp;8- lower wall drop shafts;The upper disk drop shafts of 9-;10- higher slice stopes;11- lower leaf stopes;12- fills ore deposit Chuan Mailian lanes;13- stope filling ventilation shafts;14- obturations;15- bodies to be dug up mine;16- lower leaf back production blastholes;S- stopes;b- Route;C- is segmented;c1- higher slice;c2- lower leaf.
Specific embodiment
To further describe the present invention, the present invention is described in further detail with reference to the accompanying drawings and examples.
Central China submarine volcano sections mineral deposit, mine engineering complicated geology, the grade of ore is low, and ore body inclines in slow Tiltedly, tilt distribution and ore interlayer is more, ore body directly contact roof and floor country rock steadiness is poor, and upper disk roof fall is more serious, and Mining area periphery is generally village and farmland, and surrounding enviroment are complicated.
Mine early stage is exploited on to route stratified filling method, Two step mining, per slice drift one stop panel, production Ability is about 3000t/d, is influenceed and operating condition is limited due to being arranged by stope, it is impossible to realize large scale mining, and often Slicing and filling changes layer immediately after finishing, and causes two step mineral building back production difficulty larger.
For problem above, the present invention carries out technological improvement, has invented opposite route Upward slicing complete to former mining methods Tailing cemented filling mining codes.
Stope structure top view for Upward slicing all-tailing cemented filling method of as shown in Figure 1 of the invention a kind of is simultaneously tied Close Fig. 2, Fig. 3 to find out, stope structure parameter that the present invention is used, adopt quasi- engineering, process for stoping and be respectively:
(1)Stope structure parameter:Arranged according to stope, along orebody trend direction, a stope S, a stope are divided into per 50m S arranges 10 route b, and the width of route b is 5m, and 7 m are a height of segmentation c;By each segmentation, c points is higher slice c1, lower leaf c2, point higher slice and the opposite drift stoping of lower leaf, higher slice c1, lower leaf c2Height be all 3.5m.
(2)Adopt quasi- engineering:Disk drop shaft 9 in arrangement outside the arteries and veins of disk, arranges lower wall drop shaft outside ore body lower wall arteries and veins on the ore body 8, stage casing lower wall main haulage roadway 1 is arranged in outside the mineral ore of ore body lower wall, and disk main haulage roadway 2 is arranged in the ore deposit of disk on ore body on stage casing Outside arteries and veins, upper stage casing lower wall main haulage roadway 5 is arranged in outside a mineral ore for stage casing ore body lower wall.In higher slice c1Ore body lower wall Side interior connection roadway 3 along the pulse of arrangement lower wall arteries and veins, in lower leaf c2Ore body on connection roadway 4 along the pulse in the upper disk arteries and veins of disk side arrangement; The interior connection roadway 3 along the pulse of lower wall arteries and veins is used as higher slice c1The ore removal connection roadway of back production, the interior connection roadway 4 along the pulse of upper disk arteries and veins is used as lower leaf c2The ore removal connection roadway of back production;Dress Kuang Chuanmailian lanes 12 are arranged in the lower section for wearing arteries and veins transportation roadway ore pillar 6, disk main haulage roadway on stage casing 2 are communicated by filling Kuang Chuanmailian lanes 12 with stage casing lower wall main haulage roadway 1, and connection roadway 3 is joined by Slice stoping along the pulse in lower wall arteries and veins Network ramp 7 is communicated with stage casing lower wall main haulage roadway 1, so as to form a complete transportation system;In the middle of each stope lower wall One filling of location arrangements and the ventilation shaft 13 of stope return air, as filling piping arrangement and the main thoroughfare of stope return air.
(3)Process for stoping:By higher slice c1, lower leaf c2A segmentation c exploitation is merged into, a step is exploited point first Layer c1, in higher slice higher slice c1After drift stoping is finished, higher slice top board or tunneling boring are carried out according to ore steadiness first Supporting, then exploit lower leaf c2Route ore body;According to the steadiness of ore in same panel horizontal direction, selection one stop panel or The mode of person's two stop panel carries out back production, in a step higher slice c1Mineral building, lower leaf c2After the completion of mineral building back production, carry out cementing Filling, obturation reaches the back production for carrying out adjacent mineral building after curing strength immediately, realizes continuous exploitation, a segmentation complete extraction After the completion of, the unified layer that rises carries out higher slice drift stoping work.
Higher slice c1Using the horizontal rock drilling of drill jumbo, lateral aperture falls ore deposit;Lower leaf c2Drift stoping is using lower to upright opening Rock drilling drawing back, lateral caving.
Process for stoping is specially:
A. driling explosion:Using Boomer281 Fully-hydraulic drilling rigs, seven teeth drill bits of D45mm, drill steel model R38/ are selected T38-H35-R32, length 3.7m, higher slice c1Fallen ore deposit using lateral aperture, borehole depth is 3.7m.Lower leaf c2Using lower to vertical 4 rounds, about 6m are once collapsed in straight parallel hole-lower leaf back production blasthole 16, hole depth 3.5m, lateral caving, drawing back.Explosion Explosive selects emulsion, and detonation is segmented detonation using nonel tube, and the ore deposit that falls eye is one section, and it is two sections that periphery controls eye.On Layering c1Divide 5 sections of detonations, wherein single order keyhole and second order keyhole is respectively one section, and reliever is divided to two sections of detonations, periphery hole one Section.Lower leaf c2Back production, side eye and the ore deposit blasthole that falls are divided to two sections of detonations, protect adjacent stope or obturation not to be destroyed, and strengthen The stability and the reduction rate of dilution of stope.
B. stope ventilation:Pressure differential is formed using mine ventilation system to complete.It is fresh distinguished and admirable through stage casing lower wall fortune Disk main haulage roadway 2, dress Kuang Chuanmailian lanes 12, Slice stoping contact ramp 7 enter stope on Shu great lanes 1, stage casing, divide in cleaning Dirty wind after layer stope 10, lower leaf stope 11, upper stage casing return air system is discharged to through stope filling ventilation shaft 13 In system.
C. roof control:Point higher slice c in one segmentation c1, lower leaf c2Two opposite back production of layering, higher slice c1Back production When, anchor pole or anchor net tunneling boring supporting must be carried out to Stope roof.In stope away from tomography or country rock at, using anchor pole branch Shield, uses bolting with wire mesh mode at tomography or country rock.Lower leaf c2Back production, strengthens the observation to top board before each ore removal, Deform or supporting destroy when should immediately carry out consolidation process.
D. ore drawing in stope:Stope broken ore is discharged into lower wall and slips after being filled by WJD-2 scrapers mechanical shovel through dress Kuang Chuanmailian lanes 12 Direct route drop shaft in well 8 or the arteries and veins being directly discharged into stope, then from being located at the vibration ore dumping machine of drop shaft bottom to mine car ore drawing, lead to Cross locomotive haulage and be transported to main shaft.To reduce impact of the ore to vibrating bottom ore drawing machine and drop shaft, lower wall drop shaft 8, upper disk are slipped Well 9 should remain full of state.Each panel is equipped with a scraper, and the ore that stope falls is filled by scraper mechanical shovel, is worn through filling ore deposit Mai Lian lanes 12 are transported to lower wall drop shaft 8 and unload.Ore removal lumpiness is controlled in below 400mm, more than 400mm, two is carried out in stope Separate explosion treatment.
(4)Stope filling:Admission passage filling can be carried out by proportioning after the completion of all filling preparations, continuously filled necessary It is well-organized.Station filler reserve status is prepared according to earth's surface filling slurry and admission passage filling volume determine continuous filling when Between.The 28d compression strength that one step adopts admission passage filling body 14 is not less than 1.0MPa, and two steps are adopted route and carry out Non cemented filling, stope First, two steps adopt route carry out top dressing filling 28d compression strength be not less than 1.5 MPa, pour face thickness 40cm, be beneficial to higher slice The walking of trackless equipment during back production.All admission passage fillings finish rear enclosed connecting taxiway, with same method charge stratifying connecting taxiway, system One liter of layer carries out higher slice drift stoping work, the body to be dug up mine 15 on back production top.
Coordinate efficient mechanical rock drilling to shovel dress equipment by improving process for stoping, mine after using the method, production capacity Improved to 5000t/d by original 3000t/d, the rate of recovery improves 1%, and dilution reduces 2%, and production cost reduces about 20%, Achieve extraordinary technology, economic effect.

Claims (4)

1. a kind of stope structure for Upward slicing all-tailing cemented filling method, arranges, along orebody trend side according to stope To every 45~60m is divided into a stope(S), stope (S) 9~12 routes of arrangement(b), route(b)Width be 4.5~5.5m;The disk drop shaft in arrangement outside the arteries and veins of disk on the ore body(9), lower wall drop shaft is arranged outside ore body lower wall arteries and veins(8), stage casing Lower wall main haulage roadway(1)It is arranged in outside the mineral ore of ore body lower wall, disk main haulage roadway on stage casing(2)It is arranged in the mineral ore of disk on ore body Outward, upper stage casing lower wall main haulage roadway(5)It is arranged in outside a mineral ore for stage casing ore body lower wall, it is characterised in that:The stage casing One segmentation(c)Height be 6~8 m, and each is segmented(c)It is divided into higher slice(c1), lower leaf(c2), at upper point Layer(c1)Ore body lower wall side arrangement lower wall arteries and veins in connection roadway along the pulse(3), in lower leaf(c2)Ore body on disk side arrangement on The interior connection roadway along the pulse of disk arteries and veins(4);The interior connection roadway along the pulse of lower wall arteries and veins(3)As higher slice(c1)The ore removal connection roadway of back production, upper disk The interior connection roadway along the pulse of arteries and veins(4)As lower leaf(c2)The ore removal connection roadway of back production;Disk main haulage roadway on stage casing(2)Worn by filling ore deposit Mai Lian lanes(12)With stage casing lower wall main haulage roadway(1)Communicate, the interior connection roadway along the pulse of lower wall arteries and veins(3)Slope is got in touch with by Slice stoping Road(7)With stage casing lower wall main haulage roadway(1)Communicate, so as to form a complete transportation system;Each stope lower wall interposition Put the ventilation shaft of one filling of arrangement and stope return air(13), as filling piping arrangement and the main thoroughfare of stope return air.
2. a kind of stope structure for Upward slicing all-tailing cemented filling method as claimed in claim 1, its feature exists In:Each segmentation(c)Height be 7~8 m, wherein higher slice(c1), lower leaf(c2)Height be 3.5~4 m.
3. a kind of stope structure for Upward slicing all-tailing cemented filling method as claimed in claim 1, it is characterised in that: Each segmentation(c)Height be 7~8 m, wherein higher slice(c1)Highly it is 3.5m, lower leaf(c2)Highly it is 3.5~4.5m.
4. a kind of stope structure for Upward slicing all-tailing cemented filling method as claimed in claim 1, it is characterised in that: Along orebody trend direction, a stope is divided into per 50m(S), stope (S) 10 routes of arrangement(b), route(b)Width It is 5m to spend;The height of each segmentation is 7~8m, higher slice(c1)Highly it is 3.5m, lower leaf(c2)Highly it is 3.5~4.5m.
CN201510798764.4A 2015-11-19 2015-11-19 A kind of stope structure for Upward slicing all-tailing cemented filling method Active CN106761756B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510798764.4A CN106761756B (en) 2015-11-19 2015-11-19 A kind of stope structure for Upward slicing all-tailing cemented filling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510798764.4A CN106761756B (en) 2015-11-19 2015-11-19 A kind of stope structure for Upward slicing all-tailing cemented filling method

Publications (2)

Publication Number Publication Date
CN106761756A true CN106761756A (en) 2017-05-31
CN106761756B CN106761756B (en) 2018-07-03

Family

ID=58914484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510798764.4A Active CN106761756B (en) 2015-11-19 2015-11-19 A kind of stope structure for Upward slicing all-tailing cemented filling method

Country Status (1)

Country Link
CN (1) CN106761756B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708726A (en) * 2018-05-18 2018-10-26 中南大学 A kind of double-layer double-direction horizontal slices open stope afterwards filling mining methods
CN108843318A (en) * 2018-05-31 2018-11-20 西北矿冶研究院 Method for improving ore removal efficiency of underground stope
CN109458181A (en) * 2018-11-26 2019-03-12 贵州大学 A kind of filling mining method of metallic ore across pitch full-seam mining
CN109931063A (en) * 2019-04-25 2019-06-25 马钢集团矿业有限公司 To substep alternating expression filling mining method in one kind
CN110552701A (en) * 2019-10-10 2019-12-10 锡林郭勒盟山金阿尔哈达矿业有限公司 Partitioned combined filling mining method
CN110905516A (en) * 2019-11-29 2020-03-24 金川集团股份有限公司 High-sublevel cut-and-fill mining method with downward layered horizontal access
CN113530541A (en) * 2021-08-03 2021-10-22 长沙矿山研究院有限责任公司 Open stope subsequent filling mining method for sectioned rock drilling stage of thick and large ore body
CN113565507A (en) * 2021-08-03 2021-10-29 长沙矿山研究院有限责任公司 Open stope subsequent filling mining method for V-shaped top column subsection rock drilling stage of thick and large ore body
CN114000878A (en) * 2021-09-23 2022-02-01 瓮安大信北斗山磷矿 Upward layered filling mining method
WO2022052716A1 (en) * 2020-09-11 2022-03-17 中钢集团马鞍山矿山研究总院股份有限公司 Novel ore mining method suitable for multi-stope synchronous mining of large and thick ore body

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5199768A (en) * 1991-07-19 1993-04-06 Tripolko Alexandr S Method for developing thick beds of minerals
RU2309253C1 (en) * 2006-05-31 2007-10-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method for kimberlite pipe cutting in layers in upward direction along with goaf filling
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN101956556A (en) * 2009-07-16 2011-01-26 中国瑞林工程技术有限公司 Roof and bottom pillar-free stage upward continuous filling and mining method
CN103206215A (en) * 2013-04-11 2013-07-17 中南大学 Precontrol top upward access cut-and-filling stopping method
CN103557002A (en) * 2013-11-21 2014-02-05 武汉科技大学 Panel mechanized centralized ore-pass upward horizontal cut-and-filling stoping method
CN103573268A (en) * 2012-08-05 2014-02-12 彭康 Upward horizontal layered filling mining method of stress arch continuous mining

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5199768A (en) * 1991-07-19 1993-04-06 Tripolko Alexandr S Method for developing thick beds of minerals
RU2309253C1 (en) * 2006-05-31 2007-10-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method for kimberlite pipe cutting in layers in upward direction along with goaf filling
CN101956556A (en) * 2009-07-16 2011-01-26 中国瑞林工程技术有限公司 Roof and bottom pillar-free stage upward continuous filling and mining method
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN103573268A (en) * 2012-08-05 2014-02-12 彭康 Upward horizontal layered filling mining method of stress arch continuous mining
CN103206215A (en) * 2013-04-11 2013-07-17 中南大学 Precontrol top upward access cut-and-filling stopping method
CN103557002A (en) * 2013-11-21 2014-02-05 武汉科技大学 Panel mechanized centralized ore-pass upward horizontal cut-and-filling stoping method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林友等: "上向分层进路充填采矿法在木利锑矿的应用", 《昆明冶金高等专科学校学报》 *
邱景平等: "小官庄铁矿上向进路充填采矿方法试验研究", 《金属矿山》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708726B (en) * 2018-05-18 2019-07-19 中南大学 A kind of double-layer double-direction horizontal slices open stope afterwards filling mining methods
CN108708726A (en) * 2018-05-18 2018-10-26 中南大学 A kind of double-layer double-direction horizontal slices open stope afterwards filling mining methods
CN108843318A (en) * 2018-05-31 2018-11-20 西北矿冶研究院 Method for improving ore removal efficiency of underground stope
CN109458181A (en) * 2018-11-26 2019-03-12 贵州大学 A kind of filling mining method of metallic ore across pitch full-seam mining
CN109931063B (en) * 2019-04-25 2020-07-24 安徽马钢矿业资源集团有限公司 Upward step-by-step staggered filling mining method
CN109931063A (en) * 2019-04-25 2019-06-25 马钢集团矿业有限公司 To substep alternating expression filling mining method in one kind
CN110552701A (en) * 2019-10-10 2019-12-10 锡林郭勒盟山金阿尔哈达矿业有限公司 Partitioned combined filling mining method
CN110905516A (en) * 2019-11-29 2020-03-24 金川集团股份有限公司 High-sublevel cut-and-fill mining method with downward layered horizontal access
CN110905516B (en) * 2019-11-29 2021-05-11 金川集团股份有限公司 High-sublevel cut-and-fill mining method with downward layered horizontal access
WO2022052716A1 (en) * 2020-09-11 2022-03-17 中钢集团马鞍山矿山研究总院股份有限公司 Novel ore mining method suitable for multi-stope synchronous mining of large and thick ore body
CN113530541A (en) * 2021-08-03 2021-10-22 长沙矿山研究院有限责任公司 Open stope subsequent filling mining method for sectioned rock drilling stage of thick and large ore body
CN113565507A (en) * 2021-08-03 2021-10-29 长沙矿山研究院有限责任公司 Open stope subsequent filling mining method for V-shaped top column subsection rock drilling stage of thick and large ore body
CN113565507B (en) * 2021-08-03 2023-05-23 长沙矿山研究院有限责任公司 Open-stoping subsequent filling mining method for V-shaped top column sectional rock drilling stage of thick and large ore body
CN114000878A (en) * 2021-09-23 2022-02-01 瓮安大信北斗山磷矿 Upward layered filling mining method

Also Published As

Publication number Publication date
CN106761756B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN106761756B (en) A kind of stope structure for Upward slicing all-tailing cemented filling method
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN105587318B (en) A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip
CN102518438B (en) Roof regeneration medium-length hole ore blast backfill mining method
CN105041314B (en) A kind of combined mining method of deep afterwards rooming-slicing ore pillar
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN1260461C (en) Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN102619513B (en) Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
CN108612530A (en) A kind of mining methods of upper disk rock crusher slant middle thick orebody
CN104018836B (en) A kind of point mining method that has false top rake middle thickness orebody built on the sand
CN108561135A (en) A kind of mechanization stoping method of the suitable unstable middle thickness orebody of low-angle dip country rock
CN101737052A (en) Sublevel fill-mining method
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN103437768B (en) Pre-set space filling mining method without top column and bottom column
CN1982649A (en) Mining method
CN110388209A (en) A kind of high-dipping bilayer ore body stage deep hole mining method
CN105909247A (en) Non-pillar sublevel mining cemented filling mining method
CN108798672B (en) A kind of mining methods for the area's ore high-efficiency mining that collapses greatly
CN110374601A (en) A kind of safe and efficient mining codes of high-dipping bilayer ore body
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN107165635A (en) A kind of oblique pinpoint blasting mining codes for slight slope and thin ore body
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN108049870B (en) The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
CN109057798A (en) A kind of wall type filling mining method suitable for gently inclined phosphate body bed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

CP01 Change in the name or title of a patent holder