CN109242238A - A kind of extension of rural power grids and management system based on unmanned plane - Google Patents

A kind of extension of rural power grids and management system based on unmanned plane Download PDF

Info

Publication number
CN109242238A
CN109242238A CN201810782717.4A CN201810782717A CN109242238A CN 109242238 A CN109242238 A CN 109242238A CN 201810782717 A CN201810782717 A CN 201810782717A CN 109242238 A CN109242238 A CN 109242238A
Authority
CN
China
Prior art keywords
unmanned plane
electric pole
piling
extension
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810782717.4A
Other languages
Chinese (zh)
Inventor
代江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Hui Jie Xing Bang Electric Power Engineering Co Ltd
Original Assignee
Guizhou Hui Jie Xing Bang Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Hui Jie Xing Bang Electric Power Engineering Co Ltd filed Critical Guizhou Hui Jie Xing Bang Electric Power Engineering Co Ltd
Priority to CN201810782717.4A priority Critical patent/CN109242238A/en
Publication of CN109242238A publication Critical patent/CN109242238A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Animal Husbandry (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Agronomy & Crop Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The present invention discloses a kind of extension of rural power grids and management system based on unmanned plane, it includes unmanned plane, GPS positioning system, geo-locating signal processor and image collecting device are installed on unmanned plane, it is characterized by: geo-locating signal processor with along power grid turn out for work personnel's handheld terminal and administrative center's computer is connected, be equipped with infrared indicator straight down in unmanned plane lower surface.The present invention can integrate construction and management, can be convenient for the electric pole arrangement layout of roads of the extension of rural power grids and piling, conducive to the management of inspection and personnel to power grid.

Description

A kind of extension of rural power grids and management system based on unmanned plane
Technical field
The present invention relates to a kind of extension of rural power grids and management system based on unmanned plane, belong to electrical network field.
Background technique
The existing extension of rural power grids, usually by manually carrying out landform investigation, selection electric pole using total station or smart position instrument Layout points, it is but such in measurement process, it will usually to encounter other barriers such as mountain stone, trees, must at this time pass through Continuous traverse measurement instrument just can be carried out measurement and positioning again, and the difficulty that undoubtedly will cause in measurement in this way is low with working efficiency Under.After rural power grids come into operation, in management operating, it is also necessary to the inspection of line is constantly carried out, it is existing by manually examining on the spot The mode of looking into be also compare to take time and effort, meanwhile, management when, it is also desirable to the staff of the work station along power grid is examined It is frequently checked.
That is: a kind of extension of rural power grids and administrative skill are now needed, construction and management can be integrated, the extension of rural power grids can be convenient for Electric pole arranges layout of roads and piling, conducive to the management of inspection and personnel to power grid.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of extension of rural power grids and management system based on unmanned plane, can collect and build And if management can arrange layout of roads and piling convenient for the electric pole of the extension of rural power grids in one, conducive to power grid inspection and personnel Management, can be with overcome the deficiencies in the prior art.
The technical scheme is that a kind of extension of rural power grids and management system based on unmanned plane, it includes unmanned plane, GPS positioning system, geo-locating signal processor and image collecting device, geo-locating signal processor are installed on unmanned plane With along power grid turn out for work personnel's handheld terminal and administrative center's computer is connected, be equipped with straight down red in unmanned plane lower surface External indicator.
It the following steps are included:
S1: by unmanned plane, geography information between the starting point and target point of capital construction power grid is acquired;S2: by geography information in pipe Geographic model is done on reason centralized computer, and simulates more than one electric pole arrangement Decision Making of Line Schemes on geographic model;S3: unmanned plane It is flown on the spot along the route of each electric pole arrangement Decision Making of Line Schemes, acquires the information of each electric pole piling point;S4: according to The information for each scheme electric pole deployment line road electric pole piling point that step S3 is collected into, screens and determines electric pole arrangement route simultaneously Storage;S5: the electric pole arrangement route determined according to step S4 is passed through by the surface of the supreme each piling of unmanned plane during flying Infrared indicator carries out vertical pinpoint piling;S6: after completing construction usage, route, which carries out, to be arranged to electric pole by unmanned plane Inspection, while being turned out for work personnel's handheld terminal location information by work station along unmanned plane acquisition, it inspects the sentries.
The prior art compares, and the present invention is based on the extension of rural power grids of unmanned plane and management systems, it includes unmanned plane, at nobody GPS positioning system, geo-locating signal processor and image collecting device, geo-locating signal processor and electricity are installed on machine Turn out for work personnel's handheld terminal and administrative center's computer along net are connected, and are equipped with infrared finger straight down in unmanned plane lower surface Show device.It is the following steps are included: S1: by unmanned plane, acquiring geography information between the starting point and target point of capital construction power grid; S2: doing geographic model for geography information on administrative center's computer, and more than one electric pole arrangement is simulated on geographic model Decision Making of Line Schemes;S3: unmanned plane is flown on the spot along the route of each electric pole arrangement Decision Making of Line Schemes, is acquired each electric pole and is beaten The information of stake point;S4: according to the information of the step S3 each scheme electric pole deployment line road electric pole piling point being collected into, screening is simultaneously It determines electric pole arrangement route and stores;S5: arranging route according to the electric pole that step S4 is determined, supreme each by unmanned plane during flying The surface of piling carries out vertical pinpoint piling by infrared indicator;S6: after completing construction usage, pass through unmanned plane pair Electric pole arranges that route carries out inspection, at the same by unmanned plane acquire along work station turn out for work personnel's handheld terminal location information, into Row is inspected the sentries.Such system and its step first acquire geography information between starting point and target point by unmanned plane, then plan more A route plan, then the information of electric pole each in each scheme piling point is acquired, electric pole deployment line is finally determined again Road is avoided that when being carried out landform investigation using total station or smart position instrument, selected the layout points of electric pole in this way, encounters barrier instrument The low problem of the mobile trouble of device and working efficiency;By the surface of the supreme each piling of unmanned plane during flying, by infrared Indicator carries out vertical pinpoint piling, improves the efficiency of positioning;Meanwhile by inspecting the sentries along unmanned plane, can be convenient for turning out for work The management of rate.
Detailed description of the invention
Fig. 1 is attachment structure schematic diagram of the invention.
Wherein, unmanned plane 1;GPS positioning system 2;Geo-locating signal processor 3;Image collecting device 4;Handheld terminal 5;Administrative center's computer 6;Infrared indicator 7.
Specific embodiment
For embodiment 1. as shown in Figure 1, a kind of extension of rural power grids and management system based on unmanned plane 1, it includes unmanned plane 1, GPS positioning system 2, geo-locating signal processor 3 and image collecting device 4 are installed on unmanned plane 1, it is characterised in that: Geo-locating signal processor 3 with along power grid turn out for work personnel's handheld terminal 5 and administrative center's computer 6 is connected, in unmanned plane 1 Lower surface is equipped with infrared indicator 7 straight down, and the handheld terminal 5 includes the mobile phone or positioning bracelet of staff.
It the following steps are included:
S1: by unmanned plane 1, geography information between the starting point and target point of capital construction power grid is acquired;S2: by geography information in pipe Geographic model is done on reason centralized computer 6, and simulates more than one electric pole arrangement Decision Making of Line Schemes on geographic model;S3: nobody Machine 1 is flown on the spot along the route of each electric pole arrangement Decision Making of Line Schemes, acquires the information of each electric pole piling point;S4: According to the information of the step S3 each scheme electric pole deployment line road electric pole piling point being collected into, screens and determine electric pole deployment line Road simultaneously stores;S5: arranging route according to the electric pole that step S4 is determined, flown the surface of supreme each piling by unmanned plane 1, Vertical pinpoint piling is carried out by infrared indicator 7;S6: after completing construction usage, by unmanned plane 1 to electric pole deployment line Road carries out inspection, at the same by unmanned plane 1 acquire along work station turn out for work 5 location information of personnel's handheld terminal, inspect the sentries.

Claims (2)

1. a kind of extension of rural power grids and management system based on unmanned plane, it includes unmanned plane, and GPS positioning is equipped on unmanned plane System, geo-locating signal processor and image collecting device, it is characterised in that: along geo-locating signal processor and power grid Turn out for work personnel's handheld terminal and administrative center's computer be connected, be equipped with infrared indicator straight down in unmanned plane lower surface.
2. the extension of rural power grids and management system according to claim 1 based on unmanned plane, which is characterized in that it includes following Step:
S1: by unmanned plane, geography information between the starting point and target point of capital construction power grid is acquired;
S2: geography information is done into geographic model on administrative center's computer, and simulates more than one electric pole on geographic model Arrange Decision Making of Line Schemes;
S3: unmanned plane is flown on the spot along the route of each electric pole arrangement Decision Making of Line Schemes, acquires each electric pole piling point Information;
S4: it according to the information of the step S3 each scheme electric pole deployment line road electric pole piling point being collected into, screens and determines electricity Bar arrangement route simultaneously stores;
S5: route is arranged according to the electric pole that step S4 is determined, by the surface of the supreme each piling of unmanned plane during flying, by red External indicator carries out vertical pinpoint piling;
S6: after completing construction usage, route, which carries out inspection, to be arranged to electric pole by unmanned plane, while edge is acquired by unmanned plane Line work station is turned out for work personnel's handheld terminal location information, is inspected the sentries.
CN201810782717.4A 2018-07-17 2018-07-17 A kind of extension of rural power grids and management system based on unmanned plane Pending CN109242238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810782717.4A CN109242238A (en) 2018-07-17 2018-07-17 A kind of extension of rural power grids and management system based on unmanned plane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810782717.4A CN109242238A (en) 2018-07-17 2018-07-17 A kind of extension of rural power grids and management system based on unmanned plane

Publications (1)

Publication Number Publication Date
CN109242238A true CN109242238A (en) 2019-01-18

Family

ID=65072756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810782717.4A Pending CN109242238A (en) 2018-07-17 2018-07-17 A kind of extension of rural power grids and management system based on unmanned plane

Country Status (1)

Country Link
CN (1) CN109242238A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102662179A (en) * 2012-05-18 2012-09-12 四川省科学城久利科技实业有限责任公司 Three-dimensional optimizing route selection method based on airborne laser radar
CN103438873A (en) * 2013-08-28 2013-12-11 国网河南省电力公司南阳供电公司 Power line surveying and measuring technology
CN106019083A (en) * 2016-06-08 2016-10-12 广东容祺智能科技有限公司 Unmanned plane electric power line patrol comprehensive geography information system
CN107728640A (en) * 2017-09-25 2018-02-23 合肥艾斯克光电科技有限责任公司 A kind of cell monitoring illumination management system based on unmanned plane
WO2018094514A1 (en) * 2016-11-22 2018-05-31 Hydro-Quebec Unmanned aerial vehicle for monitoring an electrical line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102662179A (en) * 2012-05-18 2012-09-12 四川省科学城久利科技实业有限责任公司 Three-dimensional optimizing route selection method based on airborne laser radar
CN103438873A (en) * 2013-08-28 2013-12-11 国网河南省电力公司南阳供电公司 Power line surveying and measuring technology
CN106019083A (en) * 2016-06-08 2016-10-12 广东容祺智能科技有限公司 Unmanned plane electric power line patrol comprehensive geography information system
WO2018094514A1 (en) * 2016-11-22 2018-05-31 Hydro-Quebec Unmanned aerial vehicle for monitoring an electrical line
CN107728640A (en) * 2017-09-25 2018-02-23 合肥艾斯克光电科技有限责任公司 A kind of cell monitoring illumination management system based on unmanned plane

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭丹妹: "无人机影像在输电线路工程中的应用研究", 《中国优秀硕士学位论文全文数据库 基础科学辑》 *

Similar Documents

Publication Publication Date Title
CN102044094B (en) Line polling management system and method
CN105416097B (en) Contact Line Detection tool car and method based on laser radar
CN106771856B (en) Electric power transmission line lightning stroke point determination method based on unmanned aerial vehicle technology
CN106774322B (en) Photovoltaic power station inspection system and operation method thereof
CN105467241B (en) A kind of distribution converter transformer DC magnetic bias detecting system and its detection method
CN105241465B (en) A kind of method of road renewal
CN108037723A (en) A kind of highway maintenance Information Management System
CN105931458B (en) A kind of method of road traffic flow detection device reliability assessment
CN102809568A (en) Method and system for monitoring contamination distribution of insulator
CN107328783A (en) A kind of bridge intelligent checking system based on unmanned plane
CN104820759A (en) Data acquisition method and system of pipeline facility
CN103778681A (en) Vehicle-mounted high-speed road inspection system and data acquisition and processing method
CN112202242A (en) Tower comprehensive monitoring and intelligent early warning platform and early warning method
CN206945690U (en) A kind of soil environment detection means
CN107343291A (en) Antenna-feedback system detection method, device and base station
CN113741510A (en) Routing inspection path planning method and device and storage medium
CN110750107A (en) Photovoltaic power station unmanned aerial vehicle inspection method based on optical identification
CN105786699A (en) Test result analysis system
CN104602271B (en) The generation method and device of problem area in a kind of coverage optimization
CN114062839A (en) Railway power line fault positioning device and method thereof
CN107862484A (en) Ecological restoration of mine scheme based on Mine ecology detection instructs system
CN211529214U (en) Pipeline inspection device
CN109242238A (en) A kind of extension of rural power grids and management system based on unmanned plane
CN104914314A (en) Circuit layout and error correction system used for measuring grounding impedance
CN109743685A (en) Base station coverage area analysis method, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118