CN109131435B - Method for overhauling urban vehicle body - Google Patents

Method for overhauling urban vehicle body Download PDF

Info

Publication number
CN109131435B
CN109131435B CN201811076533.2A CN201811076533A CN109131435B CN 109131435 B CN109131435 B CN 109131435B CN 201811076533 A CN201811076533 A CN 201811076533A CN 109131435 B CN109131435 B CN 109131435B
Authority
CN
China
Prior art keywords
vehicle body
door
overhauling
replacing
cab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811076533.2A
Other languages
Chinese (zh)
Other versions
CN109131435A (en
Inventor
李经伟
李加祺
殷勤
刘高坤
林飞
王林
左玉东
蒲思培
周明星
焦博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201811076533.2A priority Critical patent/CN109131435B/en
Publication of CN109131435A publication Critical patent/CN109131435A/en
Application granted granted Critical
Publication of CN109131435B publication Critical patent/CN109131435B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K13/00Other auxiliaries or accessories for railways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60SSERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
    • B60S5/00Servicing, maintaining, repairing, or refitting of vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
  • Air-Conditioning For Vehicles (AREA)

Abstract

The invention discloses a method for overhauling a train body of a railway vehicle in a city area, which is characterized by comprising the following steps of: s1: pre-checking a train to be repaired; s2: decomposing and cleaning the train in the S1; s3: further performing body part disassembly on the train having completed S2; s4: the main parts of the car body disassembled in the step S3 are sent to corresponding professional departments for maintenance; s5: and (4) reinstalling each part qualified by detection on the corresponding urban vehicle body to finish the vehicle body overhaul. The method comprises the steps of disassembling the vehicle body parts, and installing the vehicle body parts after detection is finished, wherein main parts in the vehicle body, including the through passage, the built-in facilities, the vehicle door system, the cab and the air conditioner and ventilation system, are disassembled and then sent to corresponding professional maintenance departments for maintenance.

Description

Method for overhauling urban vehicle body
Technical Field
The invention belongs to the technical field of urban vehicle maintenance, and particularly relates to a method for maintaining an urban vehicle body.
Background
Urban railways, also called urban rail transit, are urban public rail transit systems based on railway technical equipment, which operate exclusively between adjacent cities and urban areas, and are fast mass transit public transit modes connecting urban areas with suburbs and satellite towns or urban circles around cities in a range of tens of kilometers or even more. Generally, a certain region is taken as a main point, and the service region location of the urban railway reflects the urban comprehensive rail transit system of 'inter-rail and inter-city railway communication' in the urban region. The urban railway operation speed per hour is generally 120-200 km/h, the station spacing is small, the line generally directly enters an urban area, the urban railway operation speed per hour is a novel rail transit transportation mode between urban rail transit (subway and light rail) and an intercity high-speed railway, the existing rail transit forms of the subway, the light rail and the like are limited by the operation speed, the target expectation of resident travel in urban construction cannot be achieved, compared with the urban rail transit, the urban railway operation speed per hour line has the characteristics of large average station spacing, large passenger capacity, high speed target value, high traveling speed, moderate traveling density and the like, the interconnection and intercommunication with a national railway trunk line can be realized, and the urban external radiation capability is enhanced.
The main structure of the urban railway vehicle comprises: the vehicle body is one of main component bodies of the vehicle, and the vehicle body is a passenger riding carrier and a foundation for installing and connecting other component parts (such as a running gear, a braking device, a vehicle end connecting device, vehicle interior decoration equipment and the like).
The repair process of the motor train unit in China is based on the introduction of the vehicle type, on the premise of ensuring the operation safety, the advanced and mature repair concept and the repair method in China are digested and absorbed, the China national conditions and the road conditions are combined, the uniform and standard CRH series vehicle repair process is constructed, and a high-efficiency repair system combining the planned repair, the state repair and the balanced repair is implemented. The overhaul and repair process of the motor train unit is divided into a first level, a second level, a third level, a fourth level and a fifth level. The disassembly and maintenance of the bogie are used as a boundary between the operation maintenance and the regular maintenance. As the first-level repair and the second-level repair are mainly routine inspection, replacement, adjustment and replenishment of consumable parts; the third-level repair is mainly used for overhauling parts such as a bogie, therefore, in the aspect of urban vehicle body overhauling, the fourth-level repair and the fifth-level repair need to be changed, and a proper overhauling method is made to adapt to the urban vehicle body overhauling range and the change of a specific process.
Disclosure of Invention
The invention provides a method for overhauling a vehicle body of a municipal vehicle, aiming at the defects or the improvement requirements of the prior art, the method is adopted for disassembling the vehicle body part firstly and then installing the vehicle body part after the detection is finished, main parts in the vehicle body, including a through passage, an internal installation facility, a vehicle door system, a cab and an air conditioner and ventilation system, are disassembled and then sent to a corresponding professional overhauling department for overhauling at the same time, after the overhauling of each part is finished, each part is reinstalled, and each part after the detection is qualified is reinstalled on the corresponding municipal vehicle body. The vehicle body overhauling method provided by the invention comprehensively detects each part in the vehicle body, thereby not only improving the overhauling efficiency, but also ensuring the overhauling quality and accuracy.
In order to realize the aim, the method for overhauling the train body of the urban railway vehicle comprises the following steps:
s1: pre-checking a train to be repaired;
s2: decomposing and cleaning the train;
s3: further carrying out body part disassembly on the train;
s4: the method comprises the following steps of sending the main parts of the disassembled vehicle body to corresponding professional departments for maintenance, and specifically comprises the following steps:
s41: overhauling the disassembled internal parts of the through passage;
s42: sending each part of the disassembled built-in facility to a corresponding equipment maintenance department;
s43: overhauling each part in the disassembled vehicle door system;
s44: overhauling each component in the driver's cab after disassembly;
s45: completing the overhaul of the disassembled air conditioner and ventilation system;
s5: and re-installing each part of the vehicle body, and re-installing each part after being detected to be qualified on the corresponding urban vehicle body to finish the vehicle body overhaul.
Further, in step S41, the repairing of the through passage includes the steps of:
s411: firstly, checking the bellows connected with each vehicle body in the through passage in the step S41, and replacing the bellows if the bellows is unqualified;
s412: and further checking and replacing the wear strip of the transition plate in the through passage.
Further, in step S42, the in-plant service includes the steps of:
s421: checking passenger room seats which are arranged in a longitudinal and transverse mode on two sides in the vehicle body, and if unqualified seats exist, replacing the unqualified seats;
s422: checking whether the states of the armrests on the two sides of the vehicle body are firm;
s423: and finally, inspecting the floor at the bottom of the vehicle body, the surrounding wall plates and the roof plate at the top of the vehicle body.
Further, in step S43, the vehicle door system inspection includes the following steps:
s431: overhauling the disassembled passenger room door, namely replacing a sealing rubber strip around the passenger room door, replacing a roller of a balance wheel assembly, replacing a roller swing arm assembly, replacing an emergency unlocking switch and disassembling and overhauling a passenger room side door;
s432: further, in the process of overhauling the side door of the cab, the door sealing rubber strip needs to be replaced as in S431, whether the door lock of the cab is in a normal state needs to be checked, then the window glass rubber strip is replaced, and the side door of the cab is disassembled and repaired;
s433: carrying out emergency evacuation door maintenance, including replacing a sealing rubber strip of the emergency evacuation door, replacing an air spring of the emergency evacuation door and replacing a safety belt of the emergency evacuation door;
s434: and finally, passenger room end door overhaul such as replacing a vehicle door sealing rubber strip, replacing an infrared sensor in an end door, and replacing a gear rack is completed.
Further, in step S44, the cab maintenance includes the following steps:
s441: the ventilation unit of the cab is replaced, so that the normal circulation of air in the cab is ensured;
s442: continuously checking whether equipment and wiring in the cab integrated cabinet are normal and safe;
s443: cleaning the power distribution cabinet and the control console, so that the cab is clean and tidy;
s444: and cleaning the front windshield of the cab.
Furthermore, in S444, the maintenance of the cab requires that the front windshield of the cab not be fogged or damaged, the heating and defrosting functions of the windshield at the driving side are normal, and if the heating and defrosting functions are not normal, the windshield needs to be replaced.
Further, in step S45, the overhaul of the air conditioner and the ventilation equipment includes the following steps:
s451: after the inspection and repair of the air conditioning unit and the control cabinet are finished, the method comprises the steps of replacing a fresh air filter screen, inspecting and testing an air conditioning control system, replacing an air outlet-air return port sealing rubber pad, and replacing a control cabinet breaker, a contactor and a relay;
s452: further needs to be maintained in the exhaust device on the roof, including exhaust fan bearing replacement and exhaust valve actuator replacement.
Further, in step S3, the train is disassembled and cleaned after the preliminary inspection is completed, the train body is disassembled step by step, the bogie falls down, the train is replaced with a stand car, and cleaning and painting are performed.
In general, compared with the prior art, the above technical solution contemplated by the present invention can achieve the following beneficial effects:
(1) the invention relates to a method for overhauling a city domain vehicle body, which comprises the steps of disassembling a vehicle body part, detecting and installing the vehicle body part, disassembling main parts in the vehicle body, including a through passage, an internal installation facility, a vehicle door system, a cab and an air conditioner and ventilation system, and then sending the main parts to a corresponding professional overhauling department for overhauling, reinstalling each part after overhauling each part, and reinstalling each part after being qualified to the corresponding city domain vehicle body. The vehicle body overhauling method provided by the invention comprehensively detects each part in the vehicle body, thereby not only improving the overhauling efficiency, but also ensuring the overhauling quality and accuracy.
(2) The invention relates to a method for overhauling a train body of a city domain vehicle, which is mainly improved in four-level and five-level overhauling in the existing overhauling work of an intercity motor train unit, and comprises the following steps of: the pressure protection system is cancelled, the exhaust duct in the floor, the air conditioner in the cab, the washroom, the luggage rack and the like are cancelled. An appropriate maintenance method is made to adapt to the maintenance range of the vehicle body of the vehicle in the city area and the change of the specific process.
(3) The method for overhauling the urban vehicle body comprises the steps of train pre-inspection, train decomposition and cleaning, equipment disassembly and overhauling, overhauling of main parts of the vehicle body and final part installation, so that the overall overhauling result is more rigorous and reliable, and the aim of overhauling the urban vehicle body is fulfilled.
Drawings
FIG. 1 is a general flow chart of vehicle body overhaul related to a method for overhauling a vehicle body of a city area vehicle according to an embodiment of the invention;
fig. 2 is a flow chart of main vehicle body component overhaul related to the method for overhauling the vehicle body of the urban vehicle in the embodiment of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. In addition, the technical features involved in the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
Fig. 1 is a general flow chart of vehicle body overhaul related to an overhaul method of a vehicle body in a city area according to an embodiment of the present invention, and as shown in fig. 1, the overhaul method of the vehicle body in the city area includes: the method comprises the following steps of train pre-inspection, train disassembly and cleaning, equipment disassembly and maintenance, maintenance of main parts of a train body and final part installation. Firstly, performing train pre-inspection, decomposing and cleaning the train after the pre-inspection is finished, decomposing a train body step by step to enable a bogie to fall down, changing a stand vehicle, cleaning and spraying paint; after the disassembly of the vehicle body parts is finished, all parts in the vehicle body roof equipment, the vehicle lower equipment, the vehicle inner equipment and the vehicle end connecting device need to be disassembled from the vehicle body and sent to corresponding professional departments for maintenance; and then, carrying out maintenance work on main parts of the vehicle body, wherein the main parts of the vehicle body comprise a through passage, a vehicle window, an interior facility, a vehicle door system, an air conditioner, a ventilation system, a cab and the like, reinstalling each part after the maintenance of each part is finished, and reinstalling each part after the detection is qualified onto a corresponding urban vehicle body. The main components in the vehicle body including a through passage, an interior facility, a vehicle door system, a cab and an air conditioner and ventilation system are disassembled and then sent to corresponding professional maintenance departments for maintenance by adopting a method of disassembling the vehicle body components, detecting and then installing the vehicle body components, after the maintenance of the components is completed, the components are re-installed, and the components which are qualified in detection are re-installed on the corresponding urban vehicle body. The method for overhauling the urban vehicle body mainly improves four-level and five-level overhauling in the existing overhauling work of the urban motor train unit, and makes adaptive change due to the increase and decrease of the structure of the urban vehicle body part.
Fig. 2 is a flow chart of main vehicle body component overhaul related to the method for overhauling the vehicle body of the urban vehicle in the embodiment of the invention. As shown in fig. 2, the overhaul of main parts of the vehicle body comprises the overhaul of a door through passage, an interior facility, a door system, a cab and an air conditioner and ventilation system, wherein the bellows connecting each vehicle body in the through passage is firstly inspected, if the inspection is unqualified, the bellows needs to be replaced, and then the roof wearing strip and the cab wearing strip of the through passage are inspected and replaced. The back is accomplished and is overhauld the built-in facility of vehicle automobile body, the guest room seat to the inside both sides of automobile body range of moving about freely and quickly is examined, if need change if unqualified seat, it is firm to inspect the handrail state of automobile body both sides simultaneously, inspect the floor of bottom of the car body and the roof at around wallboard and automobile body top at last, go over to the maintenance of carrying out the door system after all overhauing of above facility, the door system includes the guest room door, the driver's cabin side door, urgent sparse door and guest room end door. At first, overhaul the passenger room door, including changing joint strip around the passenger room door, change the gyro wheel of balance wheel subassembly, change the gyro wheel swing arm subassembly, change urgent unblock switch and passenger room side door and disassemble and repair, the maintenance work to the driver room side door is accomplished next to the passenger room door after the repair is accomplished, the door joint strip that need change with the passenger room door is the same, and whether normal condition is handled to the need inspection driver's cabin door lock, further change window glass adhesive tape again and disassemble and repair the driver room side door. In order to ensure that the emergency evacuation door can play a normal role, the emergency evacuation door is overhauled after the overhaul of the cab door is finished, and the overhaul comprises the replacement of a sealing rubber strip of the emergency evacuation door, the replacement of an air spring of the emergency evacuation door and the replacement of a safety belt of the emergency evacuation door. And finally, the passenger room end door needs to be overhauled, including replacing the sealing rubber strip of the vehicle door, replacing the infrared sensor, the gear rack and other related components in the end door. Accomplish the maintenance back of the whole door system of vehicle automobile body, further accomplish the maintenance work of cab, change cab ventilation unit, ensure the normal circulation of cab interior air, whether equipment and wiring are normal and safe in the inspection cab synthesis cabinet after that, again to the switch board, the control cabinet is done cleanly, make the cab clean and tidy, avoid causing the unnecessary influence to the operation, the most important is to the cleaning work of cab front windshield, avoid causing the interference to driver's sight, still need ask cab front windshield not to be hazed, the not damaged, it is normal to drive side windshield heating defrosting function, if abnormal then need change. After the cab is overhauled, the air conditioning unit and the control cabinet are overhauled finally, the air conditioning unit and the control cabinet are inspected and repaired firstly, the air conditioning unit and the control cabinet are replaced by a fresh air filter screen, an air conditioning control system is inspected and tested, an air outlet-air return port sealing rubber mat is replaced, a control cabinet breaker, a contactor, a relay and the like are replaced to ensure that the air conditioner is normally used and operated when a vehicle runs, and further, a waste exhaust device is required to be replaced by a waste exhaust fan bearing replacement and a waste exhaust valve actuator replacement, so that the train can ventilate normally, and the comfort level of the train is ensured. And after the maintenance of each part is finished, the part is installed, and all the parts qualified in detection are installed on the corresponding urban vehicle body again.
It will be understood by those skilled in the art that the foregoing is only a preferred embodiment of the present invention, and is not intended to limit the invention, and that any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (6)

1. A method for overhauling a train body of a railway train in a city area is characterized by comprising the following steps:
s1: pre-checking a train to be repaired;
s2: decomposing and cleaning the train;
s3: further carrying out body part disassembly on the train;
s4: the method comprises the following steps of sending the main parts of the disassembled vehicle body to corresponding professional departments for maintenance, and specifically comprises the following steps:
s41: overhauling the disassembled internal parts of the through passage;
s42: sending each part of the disassembled built-in facility to a corresponding equipment maintenance department;
s43: overhauling each part in the disassembled vehicle door system;
in step S43, the inspection of the door system includes the steps of:
s431: overhauling the disassembled passenger room door, namely replacing a sealing rubber strip around the passenger room door, replacing a roller of a balance wheel assembly, replacing a roller swing arm assembly, replacing an emergency unlocking switch and disassembling and overhauling a passenger room side door;
s432: further overhauling the side door of the cab, namely replacing a vehicle door sealing rubber strip as in S431, checking whether a cab door lock is in a normal state, replacing a window glass rubber strip, and disassembling and overhauling the side door of the cab;
s433: carrying out emergency evacuation door maintenance, including replacing a sealing rubber strip of the emergency evacuation door, replacing an air spring of the emergency evacuation door and replacing a safety belt of the emergency evacuation door;
s434: finally, passenger room end door maintenance is completed, including replacing the sealing rubber strip of the vehicle door, replacing the infrared sensor in the end door and replacing the gear rack;
s44: overhauling each component in the driver's cab after disassembly;
s45: completing the overhaul of the disassembled air conditioner and ventilation system;
s5: reinstalling each part of the vehicle body, reinstalling each part which is qualified after detection on the corresponding urban vehicle body, and completing vehicle body overhaul;
in step S41, the maintenance of the through passage includes the steps of:
s411: firstly, checking the bellows connected with each vehicle body in the through passage in the step S41, and replacing the bellows if the bellows is unqualified;
s412: and further checking and replacing the wear strip of the transition plate in the through passage.
2. The method for repairing a vehicle body of a commercial railway vehicle as claimed in claim 1, wherein the step of repairing the interior installation of step S42 comprises the steps of:
s421: checking passenger room seats which are arranged in a longitudinal and transverse mode on two sides in the vehicle body, and if unqualified seats exist, replacing the unqualified seats;
s422: checking whether the states of the armrests on the two sides of the vehicle body are firm;
s423: and finally, inspecting the floor at the bottom of the vehicle body, the surrounding wall plates and the roof plate at the top of the vehicle body.
3. The method for overhauling the car body of the urban railway vehicle as claimed in claim 1, wherein in the step S44, the overhauling of the cab comprises the following steps:
s441: the ventilation unit of the cab is replaced, so that the normal circulation of air in the cab is ensured;
s442: continuously checking whether equipment and wiring in the cab integrated cabinet are normal and safe;
s443: cleaning the power distribution cabinet and the control console, so that the cab is clean and tidy;
s444: and cleaning the front windshield of the cab.
4. The method as claimed in claim 3, wherein in step S44, the cab front windshield is required to be not fogged or damaged, the heating and defrosting functions of the driving side windshield are normal, and the cab front windshield is required to be replaced if the heating and defrosting functions are not normal.
5. The method for repairing a commercial railway vehicle body as claimed in claim 1, wherein the step of repairing the air-conditioning and ventilating system in step S45 comprises the steps of:
s451: the inspection and repair of the air conditioning unit and the control cabinet are completed, including the replacement of a fresh air filter screen, the inspection and test of an air conditioning control system, the replacement of an air outlet-air return port sealing rubber gasket, and the replacement of a control cabinet circuit breaker, a contactor and a relay;
s452: further needs to be maintained in the exhaust device on the roof, including exhaust fan bearing replacement and exhaust valve actuator replacement.
6. The method of repairing a commercial railway vehicle body according to claim 1, wherein the disassembly and cleaning of the train are performed after the preliminary inspection is completed, the train body is disassembled step by step to drop the bogie, the bogie is replaced with a stand car, and the train body is cleaned and painted in step S2.
CN201811076533.2A 2018-09-14 2018-09-14 Method for overhauling urban vehicle body Active CN109131435B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811076533.2A CN109131435B (en) 2018-09-14 2018-09-14 Method for overhauling urban vehicle body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811076533.2A CN109131435B (en) 2018-09-14 2018-09-14 Method for overhauling urban vehicle body

Publications (2)

Publication Number Publication Date
CN109131435A CN109131435A (en) 2019-01-04
CN109131435B true CN109131435B (en) 2020-08-25

Family

ID=64825491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811076533.2A Active CN109131435B (en) 2018-09-14 2018-09-14 Method for overhauling urban vehicle body

Country Status (1)

Country Link
CN (1) CN109131435B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112172865A (en) * 2020-09-03 2021-01-05 中铁第四勘察设计院集团有限公司 Wheel replacement repair process flow method for suspension type monorail train
CN112172864B (en) * 2020-09-03 2023-01-17 中铁第四勘察设计院集团有限公司 Train inspection process flow method for suspension type monorail train
CN114228667B (en) * 2022-01-19 2023-06-20 中铁第四勘察设计院集团有限公司 Annual inspection process method suitable for intelligent rail train

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004058897A (en) * 2002-07-30 2004-02-26 East Japan Railway Co Inspection method of rolling stock
CN203381634U (en) * 2013-07-17 2014-01-08 青岛四方车辆研究所有限公司 Repair line for air conditioners and air interchangers of motor train unit

Also Published As

Publication number Publication date
CN109131435A (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN109131435B (en) Method for overhauling urban vehicle body
CN109398411B (en) Five-level repair process for urban railway vehicle
CN109436023B (en) Urban railway vehicle primary repair process
CN109398410B (en) Four-stage repair process for urban railway vehicle
CN102785670B (en) Internal combustion locomotive with low axle weight and narrow track
CN109398409A (en) A kind of administrative region of a city rolling stock three-level repairs technique
CN109436022A (en) A kind of administrative region of a city rolling stock second level repairs technique
WO2022147867A1 (en) Multiple unit train for freight
CN103738348B (en) Intercity type rail traffic vehicles
CN114475696B (en) Comprehensive overhaul process flow method for intelligent rail vehicle
CN109249212B (en) Manufacturing process of urban railway vehicle
Yu et al. A study on reliability centered rolling stock maintenance methods
CN112373515A (en) Comprehensive maintenance process flow method for suspension type monorail train
CN106976464A (en) A kind of dual-purpose self-powered meter-gage guard's van of railway passenger and freight
CN202243491U (en) Fresh air device at end part of high-speed rail vehicle
RU2146627C1 (en) Vehicle for monorail transportation system
CN219651167U (en) Brake pressure monitoring system in passenger room of metro vehicle
CN202783201U (en) Internal combustion locomotive for low-axle heavy narrow rail
CN215706286U (en) Freight train set
CA3000350C (en) Windscreen for housing a sanding system, railway vehicle with sanding system, and method for installing a sanding system in a railway vehicle
RU55699U1 (en) MOBILE REPAIR-DIAGNOSTIC COMPLEX FOR REPAIR AND MAINTENANCE OF VEHICLES
Boocock Life extending Scottish Region electric multiple units
Hasebe et al. JR East EV-E301 Catenary and Battery Powered Hybrid Railcar
Powell et al. The design of drivers' cabs
Inglis The Toronto subway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant