CN109121529A - A kind of ecological treatment method of north avalanche Riparian Zone - Google Patents

A kind of ecological treatment method of north avalanche Riparian Zone Download PDF

Info

Publication number
CN109121529A
CN109121529A CN201811136749.3A CN201811136749A CN109121529A CN 109121529 A CN109121529 A CN 109121529A CN 201811136749 A CN201811136749 A CN 201811136749A CN 109121529 A CN109121529 A CN 109121529A
Authority
CN
China
Prior art keywords
willow
stake
withy
willow stake
avalanche
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811136749.3A
Other languages
Chinese (zh)
Other versions
CN109121529B (en
Inventor
王继丰
倪红伟
韩大勇
邢军会
谢立红
付晓宇
付晓玲
刘赢男
韩辉
柴春荣
杨帆
隋心
许楠
张玉
孙大昭
程新宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute Of Nature And Ecology Heilongjiang Academy Of Sciences
Original Assignee
Institute Of Nature And Ecology Heilongjiang Academy Of Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute Of Nature And Ecology Heilongjiang Academy Of Sciences filed Critical Institute Of Nature And Ecology Heilongjiang Academy Of Sciences
Priority to CN201811136749.3A priority Critical patent/CN109121529B/en
Publication of CN109121529A publication Critical patent/CN109121529A/en
Application granted granted Critical
Publication of CN109121529B publication Critical patent/CN109121529B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

A kind of ecological treatment method of north avalanche Riparian Zone.One, willow stake and withy Plants types choice;Two, the determination of willow stake and withy specification;Three, willow stake is played, along river natural curvature, living body willow stake is played at neighbouring water body, willow stake spacing is 1m, and 1~2 row, 4~6 willow stakes of every row, the angle of every row willow stake and riverbank are in 20~30 degree of angles, and willow stake embedded depth is 100~150cm;Four, crouch willow, and in the above-mentioned upper layout wicker of willow stake, since wicker facing riverain willow stake, 15~25 degree of angle layouts obliquely;Five, the spacing of two willows row is 4~8m;Six, with excavator by river sand or soil landfill to layout willow stake and abrupt slope between, at excavation with willow stake at a distance from guarantee 1m or more;Seven, at withy cuttage, including bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre of 15~25 withies, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters;Eight, draft is transplanted, and sedge is transplanted at matrix filling.

Description

A kind of ecological treatment method of north avalanche Riparian Zone
Technical field
The present invention relates to a kind of ecological treatment methods of northern avalanche Riparian Zone, belong to ecological treatment method technical field.
Background technique
Riparian Zone is river --- carried out between terrestrial ecosystems substance, energy, information interchange important ecological transition Area.In recent years, with the development of economy and society, under the driving of economic interests, Riparian Zone is by the serious broken of mankind's activity Bad, using agriculture cultivation as representative, the original forest of Riparian Zone, meadow, wetland are opened up wasteland as farmland, original natural vegetation disappearance Or significant degradation occurs, root system of plant fixing soil ability is decreased obviously, and soil is flowed due to the fixation without root system of plant Water is washed away, is corroded, and Riparian Zone is caused to collapse, and Regional Soil is caused seriously to be lost.Therefore, administer Riparian Zone avalanche key be as What effective fast quick-recovery vegetation.The important component and water for thering is document to show riparian vegetation buffer zone as Riparian Zone Important ecotone between land in control bank erosion, retention surface flow silt and nutrient, protection water quality of river, is adjusted Water temperature provides habitat, maintenance river bio-diversity and ecosystem integrity for land and water animals and plants and improves riverside landscape Quality etc. has the function of important.
The country that foreign countries administer damaged riverside band is concentrated mainly on the countries such as Germany, Switzerland, Japan, France, Austria, Administration idea is converted to current civil engineering by initial civil engineering and merges ecological principle, using ecological management, such as beats Timber, bamboo cage, cobble, ecological tree species etc., the river bank-protection works in China is largely still set using traditional planning Thought and technology are counted, still only considers the safety issue in river, based on concrete revetment, without considering engineering construction Influence to river environment and the ecosystem and its animals and plants living environment, although having carried out some fruitful work at present, But many queries are still had about work of the damaged riverside with revegetation and in terms of rebuilding, are especially administering avalanche riverbank Band etc. need to still be short of mature applicable crucial revegetation and reconstruction technique.
Summary of the invention
The purpose of the present invention is to solve the above-mentioned problems of the prior art, and then provide a kind of northern avalanche riverbank The ecological treatment method of band.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of ecological treatment method of north avalanche Riparian Zone,
Step 1: willow stake and withy Plants types choice, the wider crimping willow of willow stake selection Water Ecology, Songjiang willow, Wormwood artemisia willow or korean willow, withy, i.e., sleeping Liu Liuzhi and cuttage withy, select crimping willow or wormwood artemisia willow.
Step 2: willow stake and withy specification, willow stake and withy are living body, willow pile length is 200~300cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground 8 ~15cm, the Liu Liuzhi length that crouches are 200~350cm, and the butt end diameter of a cross-section of a tree trunk 1.3 meters above the ground is 2~3cm, and cuttage withy length is 30~50cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground For 1~2cm.
Step 3: play willow stake, along river natural curvature, play living body willow stake at neighbouring water body, willow stake spacing is 1m, 1~2 Row, 4~6 willow stakes of every row, the angle of every row willow stake and riverbank are in 20~30 degree of angles, and willow stake embedded depth is 100~150cm, Willow stake wants taper end butt end is upward downward, and willow stake is suppressed using by the way of the piling of artificial or excavator, willow stake will according to water flow with The curvature on riverbank arranges.
Step 4: sleeping willow, in the above-mentioned upper layout wicker of willow stake, wicker since facing riverain willow stake, obliquely 15~ 25 degree of angle layouts, wicker is intensive, and wicker butt end is under, and taper end is upper, and from riverbank along willow stake to river on direction, the willow that crouches is completed There are 30~60cm distances on willow stake top afterwards, form willow row.
Step 5: willow arranges spacing: the spacing of two willows row is 4~8m.
Step 6: matrix fill, with excavator by river sand or soil landfill to layout willow stake with abrupt slope it Between, guarantee 1m or more at a distance from willow stake at excavation, take quantity of sand and mud and be subject to the butt end for covering wicker, acts on to reinforce bank Slope, and survived for wicker and growth substrate is provided.
Step 7: at withy cuttage, including bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre 15 ~25 withies, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters.
Step 8: draft is transplanted, sedge is transplanted at matrix filling, selects natural pond raw or the sedge type of middle life, with distension capsule tongue fur Based on grass, Carex pseudocuraica or grey arteries and veins sedge, 30~50 plants of every square metre of sedge, the nearly water body of sedge.
In step 2, willow pile length is 250cm.
In step 2, the Liu Liuzhi length that crouches is 280cm.
In step 2, cuttage withy length is 40cm.
In step 3, the angle of every row willow stake and riverbank are in 25 degree of angles.
In step 3, willow stake embedded depth is 130cm.
In step 4, there are 50cm distances on willow stake top after the completion of the willow that crouches.
In step 5, the spacing of two willows row is 6m.
In step 7, bank band withy cuttage width 2.5m.
In step 7, every square metre of 20 withies.
The ecological treatment method of northern avalanche Riparian Zone of the invention, outstanding feature are in conjunction with ecological, agrology and water The principles such as literary dynamics use the ecological restoration and reconstruction technology based on vegetation, can significantly improve vegetation coverage, increase Species diversity reduces soil erosion, inhabites habitat for animal construction is good, has to improvement river bank band environment very aobvious The effect of work.2016, the long 550m in river is administered in Songhua River Basin Chinese parasol tree river, demonstration shows that vegetation coverage improves 40% ~60%, species diversity increases by 80% or more (containing fish, amphibian animal and floristics), and soil erosion phenomenon is had Effect is administered, and animal living enviroment is obviously improved.And applicability of the present invention is wide, and government, enterprises and institutions can bear, can be obvious Improve region environment.Present invention is particularly useful for northern Riparian Zone severe water and soil erosion sections.
Detailed description of the invention
Fig. 1 is the willow stake distribution schematic diagram in the ecological treatment method of the northern avalanche Riparian Zone of the present invention.
Specific embodiment
Below in conjunction with attached drawing, the present invention is described in further detail: the present embodiment is being with technical solution of the present invention Under the premise of implemented, give detailed embodiment, but protection scope of the present invention is not limited to following embodiments.
Embodiment 1
A kind of ecological treatment method of northern avalanche Riparian Zone is provided, steps are as follows:
The purpose of the present embodiment is that providing a kind of ecological treatment method of northern avalanche Riparian Zone.The purpose of the present embodiment It is achieved in that steps are as follows:
Step 1: willow stake and withy Plants types choice, the wider crimping willow of willow stake selection Water Ecology, Songjiang willow, The plants such as wormwood artemisia willow, korean willow, withy (withy of sleeping willow and slotting willow) selection crimping willow and wormwood artemisia willow.
Step 2: willow stake and withy specification, willow stake and withy are living body, and willow pile length is 200~300cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground 8 ~15cm, the Liu Liuzhi length that crouches are 200~350cm, and the butt end diameter of a cross-section of a tree trunk 1.3 meters above the ground is 2~3cm, and cuttage withy length is 30~50cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground For 1~2cm.
Step 3: playing willow stake, along river natural curvature, plays living body willow stake at neighbouring water body, and willow stake spacing is 1m, and 1~2 20~30 degree of row, every row 4~6 willows stake, the angle of every row willow stake and riverbank, as shown in Figure 1, willow stake embedded depth for 100~ 150cm, taper end is wanted in willow stake, and butt end is upward downward.Willow stake is suppressed using modes such as artificial or excavator piling.Willow stake will be according to Water flow and the arrangement of the curvature on riverbank.
Step 4: sleeping willow (layout withy), in the above-mentioned upper layout wicker of willow stake, wicker since facing riverain willow stake, 15~25 degree of angle layouts obliquely, wicker is intensive, and wicker butt end is under, and taper end is upper, from riverbank along willow stake to river on direction It flows, there are 30~60cm distances on willow stake top after the completion of the willow that crouches, and form willow row.
Step 5: willow arranges spacing, and the spacing of 2 willows row is 4~8m.
Step 6: matrix filling, with excavator by river sand or soil landfill to layout willow stake with abrupt slope it Between, guarantee 1m or more at a distance from willow stake at excavation, takes quantity of sand and mud to cover the butt end of wicker and be preferred.Effect is reinforcing bank Slope, and survived for wicker and growth substrate is provided.
Step 7: withy cuttage: at bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre 15 ~25 withies, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters or so.
Step 8: draft transplanting: transplanting sedge at matrix filling, selects natural pond raw or the sedge type of middle life, generally distension Based on capsule sedge, Carex pseudocuraica, grey arteries and veins sedge etc., 30~50 plants of every square metre of sedge, the nearly water body of sedge.
Embodiment 2
A kind of ecological treatment method of northern avalanche Riparian Zone is provided, steps are as follows:
The purpose of the present embodiment is that providing a kind of ecological treatment method of northern avalanche Riparian Zone.The purpose of the present embodiment It is achieved in that steps are as follows:
Step 1: willow stake and withy Plants types choice, the wider crimping willow of willow stake selection Water Ecology, Songjiang willow, The plants such as wormwood artemisia willow, korean willow, withy (withy of sleeping willow and slotting willow) selection crimping willow and wormwood artemisia willow.
Step 2: willow stake and withy specification, willow stake and withy are living body, and willow pile length is 200~300cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground 8 ~15cm, the Liu Liuzhi length that crouches are 200~350cm, and the butt end diameter of a cross-section of a tree trunk 1.3 meters above the ground is 2~3cm, and cuttage withy length is 30~50cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground For 1~2cm.
Step 3: playing willow stake, along river natural curvature, plays living body willow stake at neighbouring water body, and willow stake spacing is 1m, 1 row, 20~30 degree of 4~6 willow stakes of every row, the angle of every row willow stake and riverbank, willow stake embedded depth are 100cm, and taper end court is wanted in willow stake Under, butt end is upward.Willow stake is suppressed using modes such as artificial or excavator piling.Willow stake will be arranged according to water flow and the curvature on riverbank Column.
Step 4: sleeping willow (layout withy), in the above-mentioned upper layout wicker of willow stake, wicker since facing riverain willow stake, 15~25 degree of angle layouts obliquely, wicker is intensive, and wicker butt end is under, and taper end is upper, from riverbank along willow stake to river on direction It flows, there are 30~60cm distances on willow stake top after the completion of the willow that crouches, and form willow row.
Step 5: willow arranges spacing, and the spacing of 2 willows row is 4~8m.
Step 6: matrix filling, with excavator by river sand or soil landfill to layout willow stake with abrupt slope it Between, guarantee 1m or more at a distance from willow stake at excavation, takes quantity of sand and mud to cover the butt end of wicker and be preferred.Effect is reinforcing bank Slope, and survived for wicker and growth substrate is provided.
Step 7: at withy cuttage, including bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre 15 ~25 withies, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters or so.
Step 8: draft is transplanted, and sedge is transplanted at matrix filling, selects natural pond raw or the sedge type of middle life, generally distension Based on capsule sedge, Carex pseudocuraica, grey arteries and veins sedge etc., 30~50 plants of every square metre of sedge, the nearly water body of sedge.
Embodiment 3
A kind of ecological treatment method of northern avalanche Riparian Zone is provided, steps are as follows:
The purpose of the present embodiment is that providing a kind of ecological treatment method of northern avalanche Riparian Zone.The purpose of the present embodiment It is achieved in that steps are as follows:
Step 1: willow stake and withy Plants types choice, the wider crimping willow of willow stake selection Water Ecology, Songjiang willow, The plants such as wormwood artemisia willow, korean willow, withy (withy of sleeping willow and slotting willow) selection crimping willow and wormwood artemisia willow.
Step 2: willow stake and withy specification, willow stake and withy are living body, and willow pile length is 200~300cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground 8 ~15cm, the Liu Liuzhi length that crouches are 200~350cm, and the butt end diameter of a cross-section of a tree trunk 1.3 meters above the ground is 2~3cm, and cuttage withy length is 30~50cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground For 1~2cm.
Step 3: playing willow stake, along river natural curvature, plays living body willow stake at neighbouring water body, and willow stake spacing is 1m, 2 rows, 20~30 degree of 4~6 willow stakes of every row, the angle of every row willow stake and riverbank, willow stake embedded depth are 150cm, and taper end court is wanted in willow stake Under, butt end is upward.Willow stake is suppressed using modes such as artificial or excavator piling.Willow stake will be arranged according to water flow and the curvature on riverbank Column.
Step 4: sleeping willow (layout withy), in the above-mentioned upper layout wicker of willow stake, wicker since facing riverain willow stake, 25 degree of angle layouts obliquely, wicker is intensive, and under, taper end crouches from riverbank along willow stake to river on direction upper wicker butt end There are 50cm distances on willow stake top after the completion of willow, form willow row.
Step 5: willow arranges spacing, and the spacing of 2 willows row is 8m.
Step 6: matrix filling, with excavator by river sand or soil landfill to layout willow stake with abrupt slope it Between, guarantee 1m or more at a distance from willow stake at excavation, takes quantity of sand and mud to cover the butt end of wicker and be preferred.Effect is reinforcing bank Slope, and survived for wicker and growth substrate is provided.
Step 7: at withy cuttage, including bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre 15 ~25 withies, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters or so.
Step 8: draft is transplanted, and sedge is transplanted at matrix filling, selects natural pond raw or the sedge type of middle life, generally distension Based on capsule sedge, Carex pseudocuraica, grey arteries and veins sedge etc., 30~50 plants of every square metre of sedge, the nearly water body of sedge.
Embodiment 4
A kind of ecological treatment method of northern avalanche Riparian Zone is provided, steps are as follows:
The purpose of the present embodiment is that providing a kind of ecological treatment method of northern avalanche Riparian Zone.The purpose of the present embodiment It is achieved in that steps are as follows:
Step 1: willow stake and withy Plants types choice, the wider crimping willow of willow stake selection Water Ecology, Songjiang willow, The plants such as wormwood artemisia willow, korean willow, withy (withy of sleeping willow and slotting willow) selection crimping willow and wormwood artemisia willow.
Step 2: willow stake and withy specification, willow stake and withy are living body, and willow pile length is 200~300cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground 8 ~15cm, the Liu Liuzhi length that crouches are 200~350cm, and the butt end diameter of a cross-section of a tree trunk 1.3 meters above the ground is 2~3cm, and cuttage withy length is 30~50cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground For 1~2cm.
Step 3: playing willow stake, along river natural curvature, plays living body willow stake at neighbouring water body, and willow stake spacing is 1m, 1 row, 20~30 degree of 4 willow stakes of every row, the angle of every row willow stake and riverbank, willow stake embedded depth are 100cm, and willow stake wants taper end downward, Butt end is upward.Willow stake is suppressed using modes such as artificial or excavator piling.Willow stake will be arranged according to water flow and the curvature on riverbank.
Step 4: sleeping willow (layout withy), in the above-mentioned upper layout wicker of willow stake, wicker since facing riverain willow stake, 25 degree of angle layouts obliquely, wicker is intensive, and under, taper end crouches from riverbank along willow stake to river on direction upper wicker butt end There are 30cm distances on willow stake top after the completion of willow, form willow row.
Step 5: willow arranges spacing, and the spacing of 2 willows row is 6m.
Step 6: matrix filling, with excavator by river sand or soil landfill to layout willow stake with abrupt slope it Between, guarantee 1m or more at a distance from willow stake at excavation, takes quantity of sand and mud to cover the butt end of wicker and be preferred.Effect is reinforcing bank Slope, and survived for wicker and growth substrate is provided.
Step 7: at withy cuttage, including bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre 15 A withy, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters or so.
Step 8: draft is transplanted, and sedge is transplanted at matrix filling, selects natural pond raw or the sedge type of middle life, generally distension Based on capsule sedge, Carex pseudocuraica, grey arteries and veins sedge etc., 30~50 plants of every square metre of sedge, the nearly water body of sedge.
The foregoing is only a preferred embodiment of the present invention, these specific embodiments are all based on the present invention Different implementations under general idea, and scope of protection of the present invention is not limited thereto, it is any to be familiar with the art Technical staff in the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of, should all cover of the invention Within protection scope.Therefore, the scope of protection of the invention shall be subject to the scope of protection specified in the patent claim.

Claims (10)

1. a kind of ecological treatment method of north avalanche Riparian Zone, which is characterized in that
Step 1: willow stake and withy Plants types choice, the wider crimping willow of willow stake selection Water Ecology, Songjiang willow, wormwood artemisia willow Or korean willow, withy, i.e., sleeping Liu Liuzhi and cuttage withy, select crimping willow or wormwood artemisia willow;
Step 2: willow stake and withy specification, willow stake and withy are living body, and willow pile length is 200~300cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground is 8~ 15cm, the Liu Liuzhi length that crouches are 200~350cm, and the butt end diameter of a cross-section of a tree trunk 1.3 meters above the ground is 2~3cm, and cuttage withy length is 30~50cm, the diameter of a cross-section of a tree trunk 1.3 meters above the ground 1 ~2cm;
Step 3: play willow stake, along river natural curvature, play living body willow stake at neighbouring water body, willow stake spacing is 1m, 1~2 row, 4~6 willow stakes of every row, the angle of every row willow stake and riverbank are in 20~30 degree of angles, and willow stake embedded depth is 100~150cm, willow stake Wanting taper end, butt end is upward downward, and willow stake is suppressed by the way of the piling of artificial or excavator, and willow stake will be according to water flow and riverbank Curvature arrangement;
Step 4: sleeping willow, in the above-mentioned upper layout wicker of willow stake, since wicker facing riverain willow stake, 15~25 degree obliquely Angle layout, wicker is intensive, wicker butt end under, taper end upper, on direction from riverbank after the completion of willow stake to river, the willow that crouches willow There are 30~60cm distances at stake top end, form willow row;
Step 5: willow arranges spacing: the spacing of two willows row is 4~8m;
Step 6: matrix fill, with excavator by river sand or soil landfill to layout willow stake and abrupt slope between, dig Guarantee 1m or more at a distance from willow stake at pick, take quantity of sand and mud and be subject to the butt end for covering wicker, acts on to reinforce bank slope, and It is survived for wicker and growth substrate is provided;
Step 7: at withy cuttage, including bank band and matrix filling, bank band 2~3m of withy cuttage width, every square metre 15~25 A withy, withy is in the form of cluster at matrix filling, 3~5 withies of every cluster, every square metre of 3~5 clusters;
Step 8: draft is transplanted, sedge is transplanted at matrix filling, selects natural pond raw or the sedge type of middle life, with distension capsule sedge, drift Based on raft sedge or grey arteries and veins sedge, 30~50 plants of every square metre of sedge, the nearly water body of sedge.
2. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 2, willow Pile length is 250cm.
3. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 2, crouch Liu Liuzhi length is 280cm.
4. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 2, skewer Inserting withy length is 40cm.
5. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 3, often The angle and riverbank for arranging willow stake are in 25 degree of angles.
6. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 3, willow Stake embedded depth is 130cm.
7. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 4, crouch There are 50cm distances on willow stake top after the completion of willow.
8. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 5, two The spacing of a willow row is 6m.
9. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 7, bank Band withy cuttage width 2.5m.
10. the ecological treatment method of avalanche Riparian Zone in the north according to claim 1, which is characterized in that in step 7, often Square metre 20 withies.
CN201811136749.3A 2018-09-28 2018-09-28 Ecological management method for northern collapsed riparian zone Active CN109121529B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811136749.3A CN109121529B (en) 2018-09-28 2018-09-28 Ecological management method for northern collapsed riparian zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811136749.3A CN109121529B (en) 2018-09-28 2018-09-28 Ecological management method for northern collapsed riparian zone

Publications (2)

Publication Number Publication Date
CN109121529A true CN109121529A (en) 2019-01-04
CN109121529B CN109121529B (en) 2021-06-04

Family

ID=64813047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811136749.3A Active CN109121529B (en) 2018-09-28 2018-09-28 Ecological management method for northern collapsed riparian zone

Country Status (1)

Country Link
CN (1) CN109121529B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468781A (en) * 2019-09-06 2019-11-19 天津泰达盐碱地绿化研究中心有限公司 A kind of the reparation structure and restorative procedure of Riparian buffers

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392432A (en) * 2011-11-11 2012-03-28 武汉沃田生态科技有限公司 Method for ecological rehabilitation of flood control revetment
CN202509452U (en) * 2012-02-29 2012-10-31 江苏明睿科技实业有限公司 Ecological slope protection building block
CN203256694U (en) * 2013-05-03 2013-10-30 交通运输部天津水运工程科学研究所 Ecotype joint bank protecting structure
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel
US20170107131A1 (en) * 2015-04-28 2017-04-20 Soochow University Unpowered water purification system for a riverfront landscape constructed wetland

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392432A (en) * 2011-11-11 2012-03-28 武汉沃田生态科技有限公司 Method for ecological rehabilitation of flood control revetment
CN202509452U (en) * 2012-02-29 2012-10-31 江苏明睿科技实业有限公司 Ecological slope protection building block
CN203256694U (en) * 2013-05-03 2013-10-30 交通运输部天津水运工程科学研究所 Ecotype joint bank protecting structure
US20170107131A1 (en) * 2015-04-28 2017-04-20 Soochow University Unpowered water purification system for a riverfront landscape constructed wetland
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468781A (en) * 2019-09-06 2019-11-19 天津泰达盐碱地绿化研究中心有限公司 A kind of the reparation structure and restorative procedure of Riparian buffers

Also Published As

Publication number Publication date
CN109121529B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
CN104604475B (en) A kind of promotion region of no relief is conceded the land the method that limnocryptophyte recovers in also wet field ground
CN104594288B (en) A kind of Taihu Lake bank planting restoration of the ecosystem technique
CN104047263B (en) Be adapted to terraced pool building method and the terraced pool structure in arm hillside fields, falling zone
CN107347410A (en) A kind of more habitat solid vegetation construction methods of embankment type lakeside zone
CN102220745A (en) Small and medium straight river longitudinal winding form construction method
CN106592511B (en) A kind of quick recovery method of city river natural landscape
CN207619924U (en) A kind of ecology channel revetment structure
CN206986835U (en) One kind is planted raw formula retaining wall ecological revetment structure
CN106818277B (en) Seaside intertidal zone wind wave resistant planting system and construction method thereof
CN102704441A (en) Arrangement method of ecological gabion chamber revetment type
CN108316243A (en) Mountain bridge river technology
CN101580305A (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN113615469A (en) Reservoir tail hydro-fluctuation belt wetland restoration method based on forest Zea habitat
CN103774627A (en) Method for constructing anti-seepage type ecological channel in irrigation region
CN109736257A (en) It is a kind of for constructing the double river structures and its construction method of ecological circulation water system
CN102963974B (en) Ecological restoration method of slow flow reuse water riverway
CN112554126A (en) Water area habitat recovery method for sandy river corridor in plain area
CN112154945A (en) Construction method suitable for spawning ground of muco-sinker oviparous fishes in acute abortion
CN206015604U (en) A kind of colonnade formula stacked arrangement ecological revetment
CN109121529A (en) A kind of ecological treatment method of north avalanche Riparian Zone
CN112281744A (en) Three gorges reservoir area coastal river hydro-fluctuation zone interface ecological regulation and control system and method
CN106745788A (en) A kind of river sewage purification and the stero of landslide control
CN208430482U (en) Mountain bridge river
CN107585866A (en) A kind of underwater littoral barrier constructed with celluar concrete and interception and the method for controlling algae
CN114215003B (en) Construction method of water and soil conservation ecological system during construction of landscape topography in sea entrance area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant