CN109064041A - A kind of project in construction management system and method - Google Patents

A kind of project in construction management system and method Download PDF

Info

Publication number
CN109064041A
CN109064041A CN201810901680.2A CN201810901680A CN109064041A CN 109064041 A CN109064041 A CN 109064041A CN 201810901680 A CN201810901680 A CN 201810901680A CN 109064041 A CN109064041 A CN 109064041A
Authority
CN
China
Prior art keywords
server
construction
user
user terminal
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810901680.2A
Other languages
Chinese (zh)
Inventor
颜虎平
赵维
刘义平
张舟
牟正平
张伟
李重庆
姚雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Hengxing Municipal Engineering Co
Original Assignee
Xi'an Hengxing Municipal Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Hengxing Municipal Engineering Co filed Critical Xi'an Hengxing Municipal Engineering Co
Priority to CN201810901680.2A priority Critical patent/CN109064041A/en
Publication of CN109064041A publication Critical patent/CN109064041A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of project in construction management system and methods, the project in construction management system includes the first user terminal, second user terminal, third user terminal, fourth user terminal, 5th user terminal, 6th user terminal, 7th user terminal, 8th user terminal, 9th user terminal and server, project in construction management method includes: the first user, second user, third user orientation server uploads work progress control record and problem is fed back, fourth user is to construction Difficulties, construction delays provide solution, second user is constructed after obtaining solution referring to solution, and by the photo upload in construction to server, fourth user obtains the photo on server in construction, and solution is closed.The present invention has accomplished Engineering Standardization management, efficiently records construction overall process, provides stronger evidence support for every check from now on, has stronger retrospective.

Description

A kind of project in construction management system and method
Technical field
The present invention relates to project in construction management domain more particularly to a kind of project in construction management systems and method.
Background technique
Though project management system on the market has simple construction speed record and search function at present, still can not Solve the following problems faced in engineering management:
(1) than the dynamic information management power convenient for personnel;
(2) the quality control of critical component production process is time-consuming and laborious;
(3) information difficulty record, difficult inquiry, difficult statistics;
(4) Engineering Standardization managerial confusion, construction equipment management are not in place;
(5) need efficiently to record and supervise inspection overall process information in construction.
In view of this, it is necessary to project management system in the prior art be improved, to solve the above problems.
Summary of the invention
The purpose of the present invention is to provide a kind of project in construction management system and methods, by on-site personnel in user Terminal adds voice, picture or location information, and backstage or other terminals check addition record at any time, realizes that efficiently record was constructed Journey data, convenient for the inquiry and statistics of construction in later period data.
Realize that the technical solution of the object of the invention is as follows:
A kind of project in construction management system, comprising:
The construction plan woven is uploaded to server by the first user terminal, wherein construction plan includes: construction network figure;
Construction speed evident information, construction keynote message, construction Difficulties information are uploaded to server by second user terminal;
Server receives all data informations of the first user terminal and the upload of second user terminal, and, to each user terminal Data information needed for sending each user terminal;
Third user terminal obtains construction plan and construction speed evident information on server, and believes construction speed evidence Breath is evaluated, and obtains evaluation result, evaluation result is also uploaded to server, the evaluation result packet by the third user Include: whether current construction promotes on schedule;
Fourth user terminal obtains construction keynote message, construction Difficulties information, evaluation result on server, according to getting Information provide solution and be uploaded to server, the solution include construct major project, construction Difficulties solution arrange It applies, construction delays remedial measure;
The second user terminal also obtains the solution stored on server, and the second user terminal will also be according to the solution Certainly the construction results after scheme construction are uploaded to server;
The third user terminal also obtains the construction results on server;
The fourth user terminal also obtains the construction results on server, and the fourth user terminal also uploads the construction knot The corresponding closure result of fruit,
The second user terminal and third user terminal also obtain the closure result stored on server.
A kind of above-mentioned project in construction management system, further includes:
Material planning information is uploaded to server by the 5th user terminal;The server generates after receiving material planning information First declaration request Concurrency is sent to May Day user terminal;
May Day user terminal first receives the first declaration request that server is sent, then obtains the material planning letter on server Approval results are then uploaded to server by breath;It is raw after the server receives the approval results that May Day user terminal is sent The five or two user terminal is sent at the second declaration request;
Five or two user terminal first receives the second declaration request that server is sent, then obtains the material planning letter on server Approval results are then uploaded to server by breath;It is raw after the server receives the approval results that the five or two user terminal is sent The five or three user terminal is sent at third declaration request;
And so on;
5th N user terminal first receives the N declaration request that server is sent, then obtains the material planning information on server, Approval results are then uploaded to server;The server receives the approval results that the 5th N user terminal is sent, and generates examination & approval It completes information and is sent to the 5th user terminal, the 5th user terminal obtains the approval results on server.
A kind of above-mentioned project in construction management system, further includes:
6th user terminal, the server also send examination & approval to the 6th user terminal and complete information, the 6th user terminal After receiving examination & approval completion information, material planning information is obtained from server, the 6th user terminal is also sent to server Material is purchased into factory's information, server receives buying material into after factory's information, generating material inspection recording and sending to the 7th User terminal;
7th user terminal receives the material inspection record that server is sent, after elder generation to server send material inspection information, Examining report, the server received in sequence to material after inspection information, examining report, generate material tests and complete information simultaneously It is sent to the 6th user terminal;
After 6th user terminal receives material tests completion information, the examining report on server is obtained.
A kind of above-mentioned project in construction management system, further includes:
8th user terminal uploads security risk forensic information to server;The server receives security risk evidence obtaining letter Generation security risk recording and sending is to second user terminal after breath, after second user terminal receives security risk record, from Server obtains security risk forensic information, and rectification result is uploaded to server.
A kind of above-mentioned project in construction management system, further includes:
9th user terminal uploads process quality inspection to server as a result, the 9th 1 user terminal obtains the process matter on server Inspection as a result, and quality inspection auditing result is uploaded to server, second user terminal obtains the quality inspection auditing result on server.
A kind of project in construction management method, comprising:
The construction plan woven is uploaded to server by the first user;
Construction speed evident information, construction keynote message, construction Difficulties information are uploaded to server by second user;
Third user obtains construction plan and construction speed evident information on server, and carries out to construction speed evident information Evaluation, obtains evaluation result, evaluation result is also uploaded to server by the third user, and the evaluation result includes: current Whether construction promotes on schedule;
Fourth user obtain server on construction keynote message, construction Difficulties information, evaluation result, provide solution and on Server is reached, which includes construction major project, the solution of construction Difficulties, construction delays remedial measure;
Second user obtains solution from server and constructs according to solution, and second user is also by the construction of solution As a result it is uploaded to server;
Third user obtains the construction results on server, carries out monthly comment to second user by evaluation result and construction results Valence;
Fourth user obtains the construction results on server, is closed, is closed to the construction results after implementation solution Close as a result, and the closure result is uploaded to server, obtained for second user and third user.
The present invention has accomplished Engineering Standardization management, efficiently records construction overall process, provides relatively by force for every check from now on Evidence support, have stronger retrospective.
Material planning information is uploaded to server by a kind of above-mentioned project in construction management method, the 5th user, server Declaration information is sent to the higher level of the 5th user, wherein the material planning information is compiled according to construction plan and construction speed The material planning application form made and leading body at a higher level is reported to examine;
The higher level of 5th user first obtains material planning information from server after receiving declaration information, then believes the material planning Breath is examined, and approval results are finally output to server, supervisory to the 5th user after server receives approval results Higher level sends declaration information, and so on, until approval results are uploaded to server by highest leader;
Server sends written instructions to the 5th user and completes information, and the 5th user obtains approval results from server.The present invention is whole Informationization is carried out, time raising working efficiency is greatly saved.
A kind of above-mentioned project in construction management method, server also send the written instructions to the 6th user and complete information, the Six users obtain material planning information from server, arrange the procurement work for making comments and instructions material in material planning information, purchase Material is into after factory, and the 6th uploads buying material into factory's information with user orientation server, and server generates inspection Notification Record simultaneously should Record be sent to the 7th user, after the 7th user receives inspection Notification Record, take inspection material and to server send material Inspection information, the 7th user report, server material after the completion of the examining report of the inspection material to server uploading detection Inspection result completion notice is sent to the 6th user, the 6th user obtains examining report from server, pacifies after checking testing result It ranked second user to use or material is arranged to move back factory.After project raw material of the invention are marched into the arena, material is carried out by live materialman Appearance test, and ask for product certificate and quality certificate and this procedural information is uploaded to server.After project raw material are marched into the arena, Reach inspection batch, generates an inspection Notification Record in server by live materialman, record has a short message after generating Inspection is carried out to material after notifying field test person, laboratory technician to receive information, and records an inspection information, generation on platform Tabular order material has carried out inspection, and after room to be tested comes out material inspection report, inspection result information is uploaded to letter by Quality Inspector Platform is ceased, to make entire material from marching into the arena to examining to using whole process all to be monitored in real time.
A kind of above-mentioned project in construction management method, the 8th user are responsible for the safety investigation of construction site, the 8th user couple Server is uploaded to after the security risk evidence obtaining of construction site to remember the security risk after server generates security risk record Record is sent to second user, and second user receives the notice that server is sent, will be whole after being rectified and improved for security risk record Change result and be uploaded to server, server will rectify and improve result generation rectification record and be sent to the 8th user.
Process quality inspection result is uploaded to server by a kind of above-mentioned project in construction management method, the 9th user, and the 9th uses The higher level at family from server obtain process quality inspection as a result, and audit inspection is carried out to the process quality inspection result, obtain auditing result, Auditing result is uploaded to server by the higher level of the 9th user, and second user obtains the auditing result on server, is arranged next The construction of procedure.
In the construction process, the completion of a procedure or interim completion carry out quality by project scene Quality Inspector It examines, and carries out checkout procedure photo and correlated results to be uploaded to server, such as off quality, then project management department is rectified and improved Closure, just can enter next procedure after acceptance(check).Whole process information will all be uploaded to server and record, convenient for public affairs Quality inspection portion of department is controlled and is instructed in real time to Project quality management, and record is retained, and counts Project quality management process In data.
Detailed description of the invention
Fig. 1 is the logic diagram of project in construction management system;
Fig. 2 is the flow chart one of project in construction management method;
Fig. 3 is the flowchart 2 of project in construction management method;
Fig. 4 is the flow chart that process quality is examined;
Fig. 5 is the flow chart of raw material inspection;
Fig. 6 is security official's check process figure;
Fig. 7 is material planning approval process figure.
Specific embodiment
The present invention is described in detail for each embodiment shown in reference to the accompanying drawing, but it should be stated that, these Embodiment is not limitation of the present invention, those of ordinary skill in the art according to these embodiments made by function, method, Or equivalent transformation or substitution in structure, all belong to the scope of protection of the present invention within.
In the description of the present embodiment, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For the limitation to the invention.
In addition, term " first ", " second ", " third " etc. are used for description purposes only, it is not understood to indicate or imply Relative importance or the quantity for implicitly indicating indicated technical characteristic.The feature of " first ", " second " etc. is defined as a result, It can explicitly or implicitly include one or more of the features.In the description of the invention, unless otherwise indicated, The meaning of " plurality " is two or more.
Term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.For the ordinary skill in the art, can pass through Concrete condition understands concrete meaning of the above-mentioned term in the invention.
Embodiment 1:
In order to solve the problems, such as that construction information difficulty is collected, hardly possible records, a kind of project in construction as shown in Figure 1 is present embodiments provided Management system, comprising:
The construction plan woven is uploaded to server by the first user terminal, wherein construction plan includes: construction network figure;
Construction speed evident information, construction keynote message, construction Difficulties information are uploaded to server by second user terminal;
Server receives all data informations of the first user terminal and the upload of second user terminal, and, to each user terminal Data information needed for sending each user terminal;
Third user terminal obtains construction plan and construction speed evident information on server, and believes construction speed evidence Breath is evaluated, and obtains evaluation result, evaluation result is also uploaded to server, the evaluation result packet by the third user Include: whether current construction promotes on schedule;
Fourth user terminal obtains construction keynote message, construction Difficulties information, evaluation result on server, according to getting Information provide solution and be uploaded to server, the solution include construct major project, construction Difficulties solution arrange It applies, construction delays remedial measure;
The second user terminal also obtains the solution stored on server, and the second user terminal will also be according to the solution Certainly the construction results after scheme construction are uploaded to server;
The third user terminal also obtains the construction results on server;
The fourth user terminal also obtains the construction results on server, and the fourth user terminal also uploads the construction knot The corresponding closure result of fruit,
The second user terminal and third user terminal also obtain the closure result stored on server.
For the project in construction management system, project in construction management method is as shown in Figure 2, comprising:
The construction plan woven is uploaded to server by the first user;
Construction speed evident information, construction keynote message, construction Difficulties information are uploaded to server by second user;
Third user obtains construction plan and construction speed evident information on server, and carries out to construction speed evident information Evaluation, obtains evaluation result, evaluation result is also uploaded to server by the third user, and the evaluation result includes: current Whether construction promotes on schedule;
Fourth user obtain server on construction keynote message, construction Difficulties information, evaluation result, provide solution and on Server is reached, which includes construction major project, the solution of construction Difficulties, construction delays remedial measure;
Second user obtains solution from server and constructs according to solution, and second user is also by the construction of solution As a result it is uploaded to server;
Third user obtains the construction results on server, carries out monthly comment to second user by evaluation result and construction results Valence;
Fourth user obtains the construction results on server, is closed, is closed to the construction results after implementation solution Close as a result, and the closure result is uploaded to server, obtained for second user and third user.
The first user, second user, third user orientation server in the present invention upload work progress control record and ask Topic feedback, fourth user provide solution to construction Difficulties, construction delays, and reference solves after second user obtains solution Scheme construction, and by the photo upload in construction to server, fourth user obtains the photo on server in construction, and to solution Certainly scheme is closed.The present invention has accomplished Engineering Standardization management, efficiently records construction overall process, mentions for every check from now on For stronger evidence support, there is stronger retrospective.
Specifically, being responsible for working out Double-Code Network Diagram (being the net indicated with Double-Code Network Diagram by technology before project kickoff Network plan) it uploads onto the server, projects administrative staff, project progress counterpart, company leader group look on the server See construction plan.Engineering Unit is responsible for whether engineering promotes on schedule, and projects construction is responsible for uploading the evidence of construction speed.Project management department Team leader is responsible for the remedial measure after construction plan delay, and remedial measure is uploaded onto the server by the project commanding officer, and Engineering Unit is monthly Performance is evaluated.Information above all in server publicity, facilitate everybody corporate department and leadership to supervise and guide, Project management department personnel specific implementation.
The project in construction management system of the present embodiment also simplifies material approval process, holds application of materials without materialman Table looks for leaders to examine everywhere, and material examination and approval procedures can be rapidly completed by server.It is specific:
Project in construction management system, further includes:
Material planning information is uploaded to server by the 5th user terminal;The server generates after receiving material planning information First declaration request Concurrency is sent to May Day user terminal;
May Day user terminal first receives the first declaration request that server is sent, then obtains the material planning letter on server Approval results are then uploaded to server by breath;It is raw after the server receives the approval results that May Day user terminal is sent The five or two user terminal is sent at the second declaration request;
Five or two user terminal first receives the second declaration request that server is sent, then obtains the material planning letter on server Approval results are then uploaded to server by breath;It is raw after the server receives the approval results that the five or two user terminal is sent The five or three user terminal is sent at third declaration request;
And so on;
5th N user terminal first receives the N declaration request that server is sent, then obtains the material planning information on server, Approval results are then uploaded to server;The server receives the approval results that the 5th N user terminal is sent, and generates examination & approval It completes information and is sent to the 5th user terminal, the 5th user terminal obtains the approval results on server.
In project in construction management method, the material measures and procedures for the examination and approval include:
Material planning information is uploaded to server by the 5th user, and server sends declaration information to the higher level of the 5th user, In, the material planning information is the material planning application worked out according to construction plan and construction speed and leading body at a higher level is reported to examine Table;
The higher level of 5th user first obtains material planning information from server after receiving declaration information, then believes the material planning Breath is examined, and approval results are finally output to server, supervisory to the 5th user after server receives approval results Higher level sends declaration information, and so on, until approval results are uploaded to server by highest leader;
Server sends written instructions to the 5th user and completes information, and the 5th user obtains approval results from server.
To the demand of material in the project implementation process, the application for monthly carrying out moon material planning is responsible for by project, week plans Application of materials and auxiliary material plan application are intended to generate record by server, and it is logical to issue short message for server after record generates Know that project material person is examined, materialman approval record is generated in server after materialman examination & approval pass through, after record generates Server issue short massage notice spread superintendent examine, and so on step by step by materialman, spread superintendent, executive manager, material Material portion is examined, and carries out material purchase by material portion after recording all generations above and passing through.Letter is all carried out in the process Time raising working efficiency is greatly saved in breathization.
The project in construction management system of the present embodiment further includes material purchases, into factory, test stage, specifically,
The project in construction management system of the present embodiment, further includes:
6th user terminal, the server also send examination & approval to the 6th user terminal and complete information, the 6th user terminal After receiving examination & approval completion information, material planning information is obtained from server, the 6th user terminal is also sent to server Material is purchased into factory's information, server receives buying material into after factory's information, generating material inspection recording and sending to the 7th User terminal;
7th user terminal receives the material inspection record that server is sent, after elder generation to server send material inspection information, Examining report, the server received in sequence to material after inspection information, examining report, generate material tests and complete information simultaneously It is sent to the 6th user terminal;
After 6th user terminal receives material tests completion information, the examining report on server is obtained.
For project in construction management system, project in construction management method further include: server also sends institute to the 6th user It states written instructions and completes information, the 6th user obtains material planning information from server, arranges to make comments and instructions material in material planning information Procurement work, the material purchased is into after factory, and the 6th uploads buying material into factory's information with user orientation server, and server generation is sent The record is simultaneously sent to the 7th user by inspection Notification Record, after the 7th user receives inspection Notification Record, inspection material of taking And material inspection information is sent to server, the 7th user is after the completion of the examining report of the inspection material, on server Examining report is passed, server sends inspection result completion notice to the 6th user, and the 6th user obtains examining report from server, It arranges second user to use after checking testing result or material is arranged to move back factory.
Materials arrival verifying: after project raw material are marched into the arena, appearance test is carried out to material by live materialman, and ask for out This procedural information is simultaneously uploaded to server by factory's quality certification and quality certificate.After project raw material are marched into the arena, reach inspection batch, by existing Materialman generates an inspection Notification Record in server, and record has a short massage notice to field test person after generating, Laboratory technician carries out inspection to material after receiving information, and an inspection information is recorded on platform, represents time material and has been sent Inspection, after room to be tested comes out material inspection report, inspection result information is uploaded to information platform by Quality Inspector, to make entire Material is from marching into the arena to examining to using whole process all to be monitored in real time.
After server has the function of that short massage notice, materialman generate Notification Record, server can lead to directly in the form of short message Know specified laboratory technician.After laboratory technician receives server notice, checks information, then carry out test inspection, it will after as a result coming out As a result it uploads onto the server.Materials arrival is the quality inspection report and qualification for carrying out appearance verifying by materialman and asking for producer Card, inspection result are embodied in store keeping materials arrival authentication unit.Review is exactly to carry out inspection by laboratory technician, will by laboratory technician As a result result is passed on the server.
The project in construction management system of the present embodiment further includes safety inspection and rectification link in construction.Specifically:
A kind of project in construction management system further includes the 8th user terminal, uploads security risk forensic information to server;It is described Server generates security risk recording and sending to second user terminal after receiving security risk forensic information, and second user is whole After termination receives security risk record, security risk forensic information is obtained from server, and rectification result is uploaded to server.
Using the project in construction management method of the project in construction management system, the 8th user is responsible for the safety row of construction site It looking into, the 8th user is uploaded to server after collecting evidence to the security risk of construction site, after server generates security risk record, Security risk record is sent to second user, and second user receives the notice that server is sent, for security risk record into After row rectification, rectification result is uploaded to server, server will rectify and improve result generation rectification record and be sent to the 8th user.
In engineering construction, safety manager in current check as discovery security risk, then by the security risk with The form of verbal description cooperation hidden danger photo is uploaded to server, and after server generates security risk record, server passes through hair The corresponding project construction of short massage notice is sent to be responsible for, construction is responsible for being checked after receiving short massage notice, and arranges corresponding rectification Person liable rectifies and improves, and rectification result is sent to server in the form of text+photo.To complete a Rectification of hidden dangers Closing course.Meanwhile safety manager upload hidden danger record when, to security risk carry out judgement classification (electricity consumption hidden danger, High falling, collapsing, fire hazard, mechanical wounding, lifting injury etc.), it is for statistical analysis by server, to judge this item The emphasis of mesh safety management.
The project in construction management system of the present embodiment further includes each process construction quality inspection record in construction.Specifically Ground:
A kind of project in construction management system further includes the 9th user terminal, uploads process quality inspection to server as a result, the 9th 1 uses Family terminal obtain server on process quality inspection as a result, and quality inspection auditing result is uploaded to server, second user terminal obtains Take the quality inspection auditing result on server.
Using the project in construction management method of the project in construction management system, process quality inspection result is uploaded to by the 9th user Server, the higher level of the 9th user from server obtain process quality inspection as a result, and audit inspection is carried out to the process quality inspection result, Auditing result is obtained, auditing result is uploaded to server by the higher level of the 9th user, and second user obtains the audit on server As a result, arranging the construction of next process.
In the construction process, the completion of a procedure or interim completion carry out quality by project scene Quality Inspector It examines, and carries out checkout procedure photo and correlated results to be uploaded to server, such as off quality, then project management department is rectified and improved Closure, just can enter next procedure after acceptance(check).Whole process information will all be uploaded to server and record, convenient for public affairs Quality inspection portion of department is controlled and is instructed in real time to Project quality management, and record is retained, and counts Project quality management process In data.
It is responsible for auditing by project management department's technology before Quality Inspector's upload information, information is uploaded to by Quality Inspector after the completion of audit Platform uploads quality inspection portion of Hou You company to carry out audit inspection result.Construction is responsible for after seeing that Quality Inspector uploads qualified record, Arrange next process.
It should be noted that the unqualified information after Quality Inspector, the audit of quality inspection portion of company is cannot to be uploaded to information platform , Quality Inspector checks that unqualified rear directly notification technique is responsible for, construction is responsible for, and is responsible for taking out reform advice by technology, constructs negative Duty arranges to be implemented, and is examined again after rectification is qualified by Quality Inspector.
Embodiment 2:
In order to solve the problems, such as construction information difficulty collect, difficult record, present embodiments provide tracked down that it is as shown in Figure 3 Build project management method, comprising: the construction plan that technology is responsible for weave is uploaded to server;
Construction is responsible for construction speed evident information, construction keynote message, construction Difficulties information being uploaded to server;
Engineering Unit obtains construction plan and construction speed evident information on server, and comments construction speed evident information Valence obtains evaluation result, and evaluation result is also uploaded to server by the Engineering Unit, and the evaluation result includes: current construction Whether promote on schedule;
Project management department minister obtains construction keynote message, construction Difficulties information, evaluation result on server, provides solution simultaneously It is uploaded to server, which includes construction major project, the solution of construction Difficulties, construction delays remedial measure;
Construction is responsible for obtaining solution from server and construct according to solution, and construction is responsible for also by the construction of solution As a result it is uploaded to server;
Engineering Unit obtains the construction results on server, is responsible for construction carrying out monthly comment by evaluation result and construction results Valence;
Project management department minister obtains the construction results on server, is closed, obtains to the construction results after implementation solution Closure result, and the closure result is uploaded to server, it is responsible for obtaining with Engineering Unit for constructing.
Before project kickoff, it is responsible for working out Double-Code Network Diagram (being the network planning indicated with Double-Code Network Diagram) by technology It uploads onto the server, construction meter is checked on the server by projects administrative staff, project progress counterpart, company leader group It draws.Engineering Unit is responsible for whether engineering promotes on schedule, and each project construction is responsible for uploading the evidence of construction speed.Project management department minister is negative Remedial measure after blaming construction plan delay, remedial measure are uploaded onto the server all focal plates by project management department minister, Engineering Unit Monthly performance is evaluated.
Information above all in server publicity, facilitates owner, corporate department and leadership to supervise and guide, project management department personnel Specific implementation.
As shown in figure 4, process quality inspection result is uploaded to server by project scene Quality Inspector, project scene Quality Inspector's is upper Grade (quality inspection portion) from server obtain process quality inspection as a result, and audit inspection is carried out to the process quality inspection result, obtain audit knot Auditing result is uploaded to server by the higher level (quality inspection portion) of fruit, project scene Quality Inspector, is constructed and is responsible for obtaining on server Auditing result arranges the construction of next process.In the construction process, the completion of a procedure or interim completion, by item Mesh scene Quality Inspector tests to quality, and carries out checkout procedure photo and correlated results to be uploaded to server, such as quality Unqualified, then the responsible arrangement personnel that construct carry out rectification closure, just can enter next procedure after acceptance(check).Whole process letter Breath all process photo upload to server is recorded, Project quality management is controlled in real time convenient for quality inspection portion of company and Guidance, and record is retained, count the data during Project quality management.
It is responsible for (the first user) by project management department's technology before Quality Inspector's upload information to audit, by Quality Inspector after the completion of audit It is uploaded to information platform, uploads quality inspection portion of Hou You company to carry out audit inspection result.Construction is responsible for seeing Quality Inspector's upload After qualification record, next process is arranged.The unqualified information that audit checks cannot be uploaded to information platform, Quality Inspector's inspection It looks into unqualified rear directly notification technique to be responsible for, construct and be responsible for, is responsible for taking out reform advice by technology, construction is responsible for arranging progress real It applies, is examined again after rectification is qualified by Quality Inspector.
As shown in figure 5, server also sends written instructions completion information to material purchases person, material purchases person is from server Material planning information is obtained, arranges the procurement work for making comments and instructions material in material planning information, the material purchased is into after factory, material Purchasing agent uploads buying material into factory's information to server, and server generates inspection Notification Record and the record is sent to test Member, after laboratory technician receives inspection Notification Record, taking inspection material and sends material inspection information, laboratory technician to server It after the completion of the examining report of the inspection material, is reported to server uploading detection, server sends inspection to material purchases person As a result completion notice, material purchases person obtain examining report from server, check after testing result arrange materialman zone material, Or notice can be used to the responsible sending material of construction or material is arranged to move back factory.
Materials arrival verifying: after project raw material are marched into the arena, appearance test is carried out to material by live materialman, and ask for out This procedural information is simultaneously uploaded to server by factory's quality certification and quality certificate.After project raw material are marched into the arena, reach inspection batch, by existing Materialman generates an inspection Notification Record in server, and record has a short massage notice to field test person after generating, Laboratory technician carries out inspection to material after receiving information, and an inspection information is recorded on platform, represents time material and has been sent Inspection, after room to be tested comes out material inspection report, inspection result information is uploaded to information platform by Quality Inspector, to make entire Material is from marching into the arena to examining to using whole process all to be monitored in real time.
After server has the function of that short massage notice, materialman generate Notification Record, server can lead to directly in the form of short message Know specified laboratory technician.After laboratory technician receives server notice, checks information, then carry out test inspection, it will after as a result coming out As a result it uploads onto the server.Materials arrival is the quality inspection report and qualification for carrying out appearance verifying by materialman and asking for producer Card, inspection result are embodied in store keeping materials arrival authentication unit.Review is exactly to carry out inspection by laboratory technician, will by laboratory technician As a result result is passed on the server.
As shown in fig. 6, security official is responsible for the safety investigation of construction site, security official collects evidence to the security risk of construction site After be uploaded to server, after server generates security risk record, security risk record is sent to construction and is responsible for, construction is negative Duty receives the notice that server is sent, and after being rectified and improved for security risk record, rectification result is uploaded to server, is serviced Device will rectify and improve result generation rectification record and be sent to the 8th user.
In engineering construction, security official (safety manager) such as discovery security risk in current check, then by the peace Full hidden danger is uploaded to server in the form of verbal description cooperates hidden danger photo, after server generates security risk record, service Device is responsible for by sending the corresponding project construction of short massage notice, and construction is responsible for being checked after receiving short massage notice, and arranges phase The rectification person liable answered rectifies and improves, and rectification result is sent to server in the form of text+photo.To complete one The closing course of Rectification of hidden dangers.Meanwhile when safety manager uploads hidden danger record, judgement classification is carried out to security risk (electricity consumption hidden danger, high falling, collapsing, fire hazard, mechanical wounding, lifting injury etc.), it is for statistical analysis by server, from And judge the emphasis of this project safety management.
As shown in fig. 7, material planning information is uploaded to server, higher level (construction of the server to materialman by materialman It is responsible for) send declaration information, wherein and the material planning information is to be worked out according to construction plan and construction speed and higher level is reported to lead Lead the material planning application form of examination & approval;
The higher level (construction is responsible for) of materialman first obtains material planning information from server after receiving declaration information, then to the material Material plan information is examined, and approval results are finally output to server, after server receives approval results, is used to the 5th The supervisory higher level in family (project management department minister) sends declaration information, and so on, until executive manager, highest leader (material portion) Approval results are uploaded to server;
Server sends written instructions to materialman and completes information, and materialman obtains approval results from server.
Specifically, to the demand of material in the project implementation process, by project be responsible for monthly carrying out moon material planning application, All planning materials applications and auxiliary material plan application are intended to generate record by server, and server can issue after record generates Short massage notice project material person is examined, and generates materialman approval record, record in server after materialman examination & approval pass through After generation server issue short massage notice spread superintendent examine, and so on step by step by materialman, spread superintendent, Zhu Guanjing Reason, material portion are examined, and carry out material purchase by material portion after recording all generations above and passing through.It is all real in the process Time raising working efficiency is greatly saved in row information.Materials arrival verifying: after project raw material are marched into the arena, by material purchases Member carries out appearance test to material, and asks for product certificate and quality certificate and this procedural information is uploaded to server.
Embodiment 3:
During project construction, dominant item quality inspection is unqualified, construction Difficulties can not solve in a short time, construction material is adopted Purchase extension etc., miscellaneous factor will lead to construction plan and can not carry out on schedule.It is applied to adjust construction plan and control Work change in process, this embodiment introduces visas.
Based on this, the project in construction management system of the present embodiment further include: master control visa is uploaded to by the first user terminal Server, second user terminal and third user terminal obtain the master control visa in server, second user and third user Newest visa information is solved, second user terminal is uploaded to server also directed to master control visa, by construction implementation state, and third is used Family terminal implements follow-up information and is uploaded to server also directed to master control visa.The project in construction management system of the present embodiment, second User and third user are not necessarily to enter scene, just can grasp visa information, implementation state anywhere or anytime and implement follow-up.
Technology is responsible for establishment visa and handles planning chart, after the responsible department for review visa of technology handles planning chart, by visa It is uploaded to server, construction is responsible for and tech stock checks visa information, plans stock tracking implementing state, condition of construction, completes label After card, technology is responsible for the timely upload server of visa, change, work contact list, confirmation form that signature formality is completed, for skill Art is responsible for, construction is responsible for, Engineering Unit is checked.
The series of detailed descriptions listed above only for feasible embodiment of the invention specifically Protection scope bright, that they are not intended to limit the invention, it is all without departing from equivalent implementations made by technical spirit of the present invention Or change should all be included in the protection scope of the present invention.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. a kind of project in construction management system characterized by comprising
The construction plan woven is uploaded to server by the first user terminal, wherein construction plan includes: construction network figure;
Construction speed evident information, construction keynote message, construction Difficulties information are uploaded to server by second user terminal;
Server receives all data informations of the first user terminal and the upload of second user terminal, and, to each user terminal Data information needed for sending each user terminal;
Third user terminal obtains construction plan and construction speed evident information on server, and believes construction speed evidence Breath is evaluated, and obtains evaluation result, evaluation result is also uploaded to server, the evaluation result packet by the third user Include: whether current construction promotes on schedule;
Fourth user terminal obtains construction keynote message, construction Difficulties information, evaluation result on server, according to getting Information provide solution and be uploaded to server, the solution include construct major project, construction Difficulties solution arrange It applies, construction delays remedial measure;
The second user terminal also obtains the solution stored on server, and the second user terminal will also be according to the solution Certainly the construction results after scheme construction are uploaded to server;
The third user terminal also obtains the construction results on server;
The fourth user terminal also obtains the construction results on server, and the fourth user terminal also uploads the construction knot The corresponding closure result of fruit,
The second user terminal and third user terminal also obtain the closure result stored on server.
2. project in construction management system as described in claim 1, which is characterized in that further include:
Material planning information is uploaded to server by the 5th user terminal;The server generates after receiving material planning information First declaration request Concurrency is sent to May Day user terminal;
May Day user terminal first receives the first declaration request that server is sent, then obtains the material planning letter on server Approval results are then uploaded to server by breath;It is raw after the server receives the approval results that May Day user terminal is sent The five or two user terminal is sent at the second declaration request;
Five or two user terminal first receives the second declaration request that server is sent, then obtains the material planning letter on server Approval results are then uploaded to server by breath;It is raw after the server receives the approval results that the five or two user terminal is sent The five or three user terminal is sent at third declaration request;
And so on;
5th N user terminal first receives the N declaration request that server is sent, then obtains the material planning information on server, Approval results are then uploaded to server;The server receives the approval results that the 5th N user terminal is sent, and generates examination & approval It completes information and is sent to the 5th user terminal, the 5th user terminal obtains the approval results on server.
3. project in construction management system as claimed in claim 2, which is characterized in that further include:
6th user terminal, the server also send examination & approval to the 6th user terminal and complete information, the 6th user terminal After receiving examination & approval completion information, material planning information is obtained from server, the 6th user terminal is also sent to server Material is purchased into factory's information, server receives buying material into after factory's information, generating material inspection recording and sending to the 7th User terminal;
7th user terminal receives the material inspection record that server is sent, after elder generation to server send material inspection information, Examining report, the server received in sequence to material after inspection information, examining report, generate material tests and complete information simultaneously It is sent to the 6th user terminal;
After 6th user terminal receives material tests completion information, the examining report on server is obtained.
4. the project in construction management system as described in claim any one of 1-3, which is characterized in that further include:
8th user terminal uploads security risk forensic information to server;The server receives security risk evidence obtaining letter Security risk recording and sending is generated after breath to second user terminal;
After the second user terminal receives security risk record, security risk forensic information is obtained from server, and will be whole Change result and is uploaded to server.
5. the project in construction management system as described in claim any one of 1-3, which is characterized in that further include:
9th user terminal uploads process quality inspection result to server;
9th 1 user terminal, for obtaining the process quality inspection on server as a result, and quality inspection auditing result is uploaded to service Device;
The second user terminal obtains the quality inspection auditing result on server.
6. a kind of project in construction management method, comprising:
The construction plan woven is uploaded to server by the first user;
Construction speed evident information, construction keynote message, construction Difficulties information are uploaded to server by second user;
Third user obtains construction plan and construction speed evident information on server, and carries out to construction speed evident information Evaluation, obtains evaluation result, evaluation result is also uploaded to server by the third user, and the evaluation result includes: current Whether construction promotes on schedule;
Fourth user obtain server on construction keynote message, construction Difficulties information, evaluation result, provide solution and on Server is reached, which includes construction major project, the solution of construction Difficulties, construction delays remedial measure;
Second user obtains solution from server and constructs according to solution, and second user is also by the construction of solution As a result it is uploaded to server;
Third user obtains the construction results on server, carries out monthly comment to second user by evaluation result and construction results Valence;
Fourth user obtains the construction results on server, is closed, is closed to the construction results after implementation solution Close as a result, and the closure result is uploaded to server, obtained for second user and third user.
7. project in construction management method as claimed in claim 6, which is characterized in that material planning information is uploaded to by the 5th user Server, server send declaration information to the higher level of the 5th user, wherein the material planning information is according to construction plan The material planning application form worked out with construction speed and leading body at a higher level is reported to examine;
The higher level of 5th user first obtains material planning information from server after receiving declaration information, then believes the material planning Breath is examined, and approval results are finally output to server, supervisory to the 5th user after server receives approval results Higher level sends declaration information, and so on, until approval results are uploaded to server by highest leader;
Server sends written instructions to the 5th user and completes information, and the 5th user obtains approval results from server.
8. project in construction management method as claimed in claim 7, which is characterized in that server also sends described batch to the 6th user Show and complete information, the 6th user obtains material planning information from server, arranges the buying for making comments and instructions material in material planning information Work, the material purchased is into after factory, and the 6th uploads buying material into factory's information with user orientation server, and it is logical that server generates inspection Know record and the record is sent to the 7th user, after the 7th user receives inspection Notification Record, take inspection material and to Server sends material inspection information, and the 7th user uploads to server and examines after the completion of the examining report of the inspection material Announcement is observed and predicted, server sends inspection result completion notice to the 6th user, and the 6th user obtains examining report from server, checks It arranges second user to use after testing result or material is arranged to move back factory.
9. the project in construction management method as described in claim any one of 6-8, which is characterized in that the 8th user is responsible for construction site Safety investigation, for the 8th user to server is uploaded to after the evidence obtaining of the security risk of construction site, server generates security risk After record, security risk record is sent to second user, second user receives the notice that server is sent, hidden for safety Suffer from after record rectified and improved, rectification result is uploaded to server, server, which will rectify and improve result and generate rectification record, is sent to the Eight users.
10. the project in construction management method as described in claim any one of 6-8, which is characterized in that the 9th user is by process quality inspection As a result be uploaded to server, the higher level of the 9th user from server obtain process quality inspection as a result, and to the process quality inspection result into Row audit checks, obtains auditing result, and auditing result is uploaded to server by the higher level of the 9th user, and second user obtains service Auditing result on device arranges the construction of next process.
CN201810901680.2A 2018-08-09 2018-08-09 A kind of project in construction management system and method Pending CN109064041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810901680.2A CN109064041A (en) 2018-08-09 2018-08-09 A kind of project in construction management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810901680.2A CN109064041A (en) 2018-08-09 2018-08-09 A kind of project in construction management system and method

Publications (1)

Publication Number Publication Date
CN109064041A true CN109064041A (en) 2018-12-21

Family

ID=64678819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810901680.2A Pending CN109064041A (en) 2018-08-09 2018-08-09 A kind of project in construction management system and method

Country Status (1)

Country Link
CN (1) CN109064041A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109726832A (en) * 2018-12-28 2019-05-07 安运实驰智能科技(上海)有限公司 Hidden danger and demand for security solution in a kind of railway projects
CN111178680A (en) * 2019-12-09 2020-05-19 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN115063117A (en) * 2022-07-01 2022-09-16 公诚管理咨询有限公司 Project management method, system, equipment and medium based on artificial intelligence

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103177306A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Workflow control system of project implementation
CN105512856A (en) * 2015-11-27 2016-04-20 清华大学 Wechat-based potential safety hazard management method and system for large-scale civil engineering
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107730204A (en) * 2017-09-30 2018-02-23 四川民工加网络科技有限公司 The efficient management system of construction operation and the efficient management terminal of construction operation
CN107958328A (en) * 2017-11-22 2018-04-24 北京善筑科技股份有限公司 Green assembled architecture digitlization construct platform and its method of work

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103177306A (en) * 2011-12-20 2013-06-26 中工国际工程股份有限公司 Workflow control system of project implementation
CN105512856A (en) * 2015-11-27 2016-04-20 清华大学 Wechat-based potential safety hazard management method and system for large-scale civil engineering
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107730204A (en) * 2017-09-30 2018-02-23 四川民工加网络科技有限公司 The efficient management system of construction operation and the efficient management terminal of construction operation
CN107958328A (en) * 2017-11-22 2018-04-24 北京善筑科技股份有限公司 Green assembled architecture digitlization construct platform and its method of work

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109726832A (en) * 2018-12-28 2019-05-07 安运实驰智能科技(上海)有限公司 Hidden danger and demand for security solution in a kind of railway projects
CN111178680A (en) * 2019-12-09 2020-05-19 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN111178680B (en) * 2019-12-09 2024-02-27 河北建投新能源有限公司 Wind power plant engineering quality overall process management system, method and equipment
CN115063117A (en) * 2022-07-01 2022-09-16 公诚管理咨询有限公司 Project management method, system, equipment and medium based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN109064041A (en) A kind of project in construction management system and method
Kaufman et al. A citizen science and government collaboration: Developing tools to facilitate community air monitoring
CN107515953A (en) One kind welding overall process quality tracing and analysis system
US20120284124A1 (en) Building energy performance/improvements
Huovila et al. CITYkeys smart city performance measurement system
CN102804211B (en) Messaging device, information processing system, information processing method and message handling program
Perlman Causal relationships in the balanced scorecard: A path analysis approach
CN107958326A (en) A kind of plant process method for inspecting based on planar bar code technology
CN106019087A (en) Intermittent electricity stealing monitoring system
CN109829693A (en) One kind being used for Construction Schedule management system and management method
CN104965140B (en) A kind of mobile terminal and Data Processing Method of for transformer field test
Motegi et al. Web-based energy information systems for large commercial buildings
CN107563671A (en) A kind of enterprise's test and appraisal planning service system based on internet
CN109829637A (en) A kind of medical services performance assessment system
Yesudas et al. Identifying consumer requirements as an antidote to resistance to smart meters
CN107884740A (en) Electric power meter field test intelligent management system
CN110850356A (en) Diagnostic intelligent electric energy meter data system and platform
Damin et al. An investigation into the use of the education Management Information System (EMIS) in Iraq: Case study
CN109388672A (en) Supplier's inspection of the scene of a crime method
CN114301897B (en) Method, system, device and storage medium for automatic inspection of electric website room
Werzi The operational status of the IMS radionuclide particulate network
CN211628274U (en) Project management system based on Internet of things
Shrestha et al. Building a software tool for transparent and efficient process assessments in IT Service Management
CN113256835B (en) On-duty monitoring method and device, computer equipment and storage medium
Eliyana et al. The Influence of Information Technology Governance Audit Using Cobit 5 For The Development Public Library:(Case Study: Public Library In East Java)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination