CN109057366A - A kind of steel construction spiral stairs segmented assembly method - Google Patents

A kind of steel construction spiral stairs segmented assembly method Download PDF

Info

Publication number
CN109057366A
CN109057366A CN201811014862.4A CN201811014862A CN109057366A CN 109057366 A CN109057366 A CN 109057366A CN 201811014862 A CN201811014862 A CN 201811014862A CN 109057366 A CN109057366 A CN 109057366A
Authority
CN
China
Prior art keywords
steel
girder
platform
steel box
bench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811014862.4A
Other languages
Chinese (zh)
Inventor
宋林
敬承钱
徐国友
周敬
张望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201811014862.4A priority Critical patent/CN109057366A/en
Publication of CN109057366A publication Critical patent/CN109057366A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of steel construction spiral stairs segmented assembly method, include the following steps: 1) to draw steel construction spiral stairs in the ground line-transect on ground in the ratio of 1:1 on the ground;2) it makes on the ground and assembling support is installed;3) the ground line-transect of rest steel platform steel box-girder is drawn on platform steel plate and marks control point;4) rest steel platform steel box-girder is successively lifted on platform steel plate using crane;5) interim junction steel plate is made;6) several interim junction steel plates are welded on the upside of bench steel box-girder;7) bench steel box-girder is lifted into installation site using crane, is docked bench steel box-girder one end by control point with platform steel box-girder by interim junction steel plate.The present invention can make the assembly of spiral stairs more convenient, more efficient, and effectively improve assembled accuracy, while higher with site environment and the design requirement goodness of fit, to greatly improve the in-site installation construction efficiency of steel construction spiral stairs.

Description

A kind of steel construction spiral stairs segmented assembly method
Technical field
The present invention relates to technical field of building construction more particularly to a kind of steel construction spiral stairs segmented assembly methods.
Background technique
With the development of national economy technology, the moulding of more and more public buildings is also more and more graceful, in order to keep The overall beautiful and coordination of project, and the big feature of people streams in public places amount is taken into account, indoor pedestrian passage uses beautiful design, holds Carry power it is high, from heavy and light, the quick steel construction spiral stairs of installation.
Steel construction spiral stairs belong to special-shaped space structure, while considering the production, transport, installation of steel construction spiral stairs Etc. factors, need by steel construction spiral stairs carry out sectional making, be generally divided into bench+rest steel platform, but making Bench is divided into inside steel box-girder, middle part steel box-girder, outside steel box-girder, H-type connecting cross beam and step plate composition again in journey;Rest steel Platform is divided into platform steel box-girder, H profile steel connecting cross beam and platform board, therefore after each component completes, is spelled Dress.It in the assembled build process of spiral stairs, if carrying out assembly at the scene, not only bothered, but also the waste construction time, and influenced to apply Work progress.Therefore, it is attempted to carry out assembly in factory, but carries out assembly in factory, it is also very troublesome, and cannot effectively protect The accuracy of assembly and the goodness of fit with site environment and design requirement are demonstrate,proved, is brought greatly not to the construction of spiral stairs Just.
Summary of the invention
In view of the above shortcomings of the prior art, it is an object of the invention to solve steel structure stairway segmented assembly fiber crops Tired, accuracy is low, and the problem with site environment and design requirement goodness of fit difference provides a kind of steel construction spiral stairs segmented assembly Method can make the assembly of spiral stairs more convenient, more efficient, and effectively improve assembled accuracy, at the same with it is existing Field environment and the design requirement goodness of fit are higher, to greatly improve the in-site installation construction efficiency of steel construction spiral stairs.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is that such: a kind of steel construction spiral stairs Segmented assembly method, characterized by the following steps:
1) by floor leveling in factory, and the ground line-transect in the ratio drafting steel construction spiral stairs of 1:1 on ground on the ground, The ground line-transect includes the ground line-transect of rest steel platform and the ground line-transect of bench steel box-girder and marks control point;
2) it makes on the ground and assembling support is installed;The assembling support includes four columns, and the four columns are in rectangular Shape distribution, wherein four columns are located at the ground line-transect two sides of rest steel platform;It is horizontal solid respectively in the lower end of four columns Surely there is a mounting plate, which is fixedly connected with the ground by bar planting bolt;It is set respectively between the top of two adjacent upright There is a upper beam, a lower beam is respectively equipped between the lower part of two adjacent upright;It is equipped in the upper horizontal of upper beam several Support beam, the length direction of the support beam is consistent with width direction rectangular where four columns, the support beam Both ends be connected respectively with upper beam;A platform steel plate is equipped with above support beam, which is located at rest steel Right above the ground line-transect of platform steel box-girder, and it is fixedly connected with each support beam;Several load bearing beams are equipped with above platform steel plate, The load bearing beam is parallel to each other, and its length direction is vertical with the length direction of support beam;
3) the ground line-transect of rest steel platform steel box-girder is drawn on platform steel plate and marks control point;
4) rest steel platform steel box-girder is successively lifted on platform steel plate using crane, adjusts its installation site, its mark of repetition measurement Rest steel platform steel box-girder is attached after qualified by connecting cross beam, is assembled by height;
5) interim junction steel plate is made, one section of the downside which is connected with rest steel platform is plane, with One section connected of downside of bench steel box-girder is cambered surface, and the radian of the cambered surface is consistent with the radian of bench steel box-girder;
6) several interim junction steel plates are welded in the upside of one end that bench steel box-girder is connected with rest steel platform steel box-girder, In, the cambered surface of interim junction steel plate is bonded with bench steel box-girder, and the spacing between interim junction steel plate is 40-60mm;
7) bench steel box-girder is lifted into installation site using crane, by bench steel box-girder one end and is put down by interim junction steel plate Platform steel box-girder is docked by control point, while the other end of bench steel box-girder is placed on ground and is overlapped with ground line-transect; By bench steel box-girder line-transect after the assay was approved, by interim junction steel plate and rest steel platform steel box-girder by way of spot welding Welding, meanwhile, bench steel box-girder is attached by connecting cross beam, is assembled.
Further, in step 2, the three-dimensional that steel construction spiral stairs are accurately established in 1:1 setting-out is carried out using BIM technology Model generates the local coordinate and three-dimensional localization size of node;The minimum altitude H of the platform steel plateminFor under rest steel platform Surface is to the vertical range between the upper surface or ground of the adjacent rest steel platform of underface.
Further, rest steel platform steel box-girder and ladder in step 6), in BIM model, to steel construction spiral stairs Section steel box-girder docking location establishes butted line respectively, and the butted line is plotted in rest steel platform steel box-girder and bench steel box-girder On;The interim junction steel plate is overlapped with the position of the butted line of bench steel box-girder.
Further, the rest steel platform steel box-girder includes left side rest steel platform steel box-girder, interval steel platform Steel box-girder and right side rest steel platform steel box-girder, corresponding, bench steel box-girder includes left side bench steel box-girder, middle part bench steel Box beam and right side bench steel box-girder;Wherein, left side bench steel box-girder, middle part bench steel box-girder and right side bench steel box-girder point It Dui Ying not be with left side rest steel platform steel box-girder, interval steel platform steel box-girder and right side rest steel platform steel box-girder phase Even.
Further, the column, upper beam, lower beam, support beam, load bearing beam and connecting cross beam are all made of H-type Steel, and weld together between upper beam and column and between lower beam and column;The platform steel plate and support beam Top flange plate weld together.
Further, on upper beam, the position at corresponding each support beam both ends is respectively welded two screw rods, and two screw rods It is vertically arranged, and is distributed in the web two sides of carrying two;On the bottom wing listrium of support beam, the position of corresponding screw rod is offered Screw hole, the screw rod pass through the screw hole of corresponding position;Adjusting nut and locking nut are equipped on screw rod, wherein the adjusting Nut is located at the downside of the bottom wing listrium of support beam, and the locking nut is located at the upside of the bottom wing listrium of support beam, leads to Support beam is locked by the cooperation for crossing locking nut and adjusting nut.
Further, the distance between the upper beam and the upper end of the column are 1-1.5m.
Compared with prior art, the present invention has the advantage that
1, the installation environment of live steel construction spiral stairs can be simulated by using assembling support, in this way, carrying out segmentation spelling During dress, enable to the assembly of bench and rest steel platform more convenient, and position it is more accurate, production precision more It is high;Also, make spiral stairs bench and rest steel platform and site environment and the design requirement goodness of fit it is higher, to mention significantly The in-site installation construction efficiency of high steel construction spiral stairs.
2, butted line is established to the rest steel platform steel box-girder of steel construction spiral stairs and bench steel box-girder docking location, faces When junction steel plate serve not only as the control panel of docking location and precision, while also having the function of temporary support.
3, there is spiral characteristic using steel construction spiral stairs, is circle in the perspective view of horizontal plane, with ground For horizontal plane, projection line is drawn on the ground, in-site installation height is simulated with assembling support, passes through absolute altitude and projection line traffic control The splicing accuracy of steel construction spiral stairs, raises labour productivity.
4, entire rotation can be completed by a measure bracket assembly by the support beam steel and load bearing beam of assembling support Turn the assembly of stair;By adjusting the height of support beam and replacing the load bearing beam of different height, a bracket can be passed through Complete the assembly of entire spiral stairs;So that bracket is more adaptable;Use cost can be substantially reduced, energy-saving ring is reached The purpose of guarantor.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of assembling support.
Fig. 2 is the structural schematic diagram after the installation of rest steel platform steel box-girder.
Fig. 3 is the structural schematic diagram after the installation of bench steel box-girder.
Fig. 4 is the attachment structure schematic diagram of rest steel platform steel box-girder and bench steel box-girder.
In figure: 1-column, 2-mounting plates, 3-upper beams, 4-lower beams, 5-support beams, 6-platform steel plates, 7-load bearing beams, 8-rest steel platform steel box-girders, 9-connecting cross beams, 10-bench steel box-girders, 11-interim junction steel plates.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
Embodiment: referring to Fig. 1 to Fig. 4, a kind of steel construction spiral stairs segmented assembly method includes the following steps:
1) by floor leveling in factory, and the ground line-transect in the ratio drafting steel construction spiral stairs of 1:1 on ground on the ground, The ground line-transect includes the ground line-transect of rest steel platform and the ground line-transect of bench steel box-girder 10 and marks control point.
2) it makes on the ground and assembling support is installed.The assembling support includes four columns 1, the four columns 1 It is rectangle distribution, wherein four columns 1 are located at the ground line-transect two sides of rest steel platform;In the lower end of four columns 1 point It is not horizontally fixed with a mounting plate 2, which is fixedly connected with the ground by bar planting bolt.On the top of two adjacent upright 1 Between be respectively equipped with a upper beam 3, a lower beam 4 is respectively equipped between the lower part of two adjacent upright 1.In the upper of upper beam 3 Fang Shuiping is equipped with several support beams 5, rectangular width side where the length direction and four columns 1 of the support beam 5 To consistent, the both ends of the support beam 5 are connected with upper beam 3 respectively.It is equipped with a platform steel plate 6 in the top of support beam 5, The platform steel plate 6 is located at right above the ground line-transect of rest steel platform steel box-girder 8, and is fixedly connected with each support beam 5;In platform Several load bearing beams 7 are equipped with above steel plate 6, the load bearing beam 7 is parallel to each other, and the length side of its length direction and support beam 5 To vertical.In the production process, the threedimensional model that steel construction spiral stairs are accurately established in 1:1 setting-out is carried out using BIM technology, it is raw At the local coordinate and three-dimensional localization size of node;The minimum altitude H of the platform steel plate 6minIt is arrived for rest steel platform lower surface Vertical range between the upper surface or ground of the adjacent rest steel platform of underface.Between 1 upper end of the upper beam 3 and column Distance be 1-1.5m;In this way, the construction of the assembly to rest steel platform of being more convenient for, and the positioning to rest steel platform.
3) the ground line-transect of rest steel platform steel box-girder 8 is drawn on platform steel plate 6 and marks control point.
4) rest steel platform steel box-girder 8 is successively lifted on platform steel plate 6 using crane, adjusts its installation site, it is multiple Its absolute altitude is surveyed, rest steel platform steel box-girder 8 is attached, is assembled by connecting cross beam 9 after qualified.
5) interim junction steel plate 11 is made, one section of the downside which is connected with rest steel platform is Plane, one section of downside being connected with bench steel box-girder 10 are cambered surface, and the arc of the radian of the cambered surface and bench steel box-girder 10 Degree is consistent.
6) several interim connection steel are welded in the upside of one end that bench steel box-girder 10 is connected with rest steel platform steel box-girder 8 Plate 11, wherein the cambered surface of interim junction steel plate 11 is bonded with bench steel box-girder 10, and the spacing between interim junction steel plate 11 is 40—60mm.During practice of construction, in BIM model, to the rest steel platform steel box-girder 8 and bench of steel construction spiral stairs 10 docking location of steel box-girder establishes butted line respectively, and the butted line is plotted in rest steel platform steel box-girder 8 and bench steel case On beam 10;The interim junction steel plate 11 is overlapped with the position of the butted line of bench steel box-girder 10.
7) bench steel box-girder 10 is lifted into installation site using crane, by interim junction steel plate 11 by bench steel box-girder 10 one end are docked with platform steel box-girder by control point, at the same by the other end of bench steel box-girder 10 be placed on ground and with Ground line-transect is overlapped.After the assay was approved by 10 ground line-transect of bench steel box-girder, by way of spot welding by interim junction steel plate 11 with Rest steel platform steel box-girder 8 welds, meanwhile, bench steel box-girder 10 is attached by connecting cross beam 9, is assembled.
As an implementation, in the present solution, the rest steel platform steel box-girder 8 includes left side rest steel platform steel case Beam 8, interval steel platform steel box-girder 8 and right side rest steel platform steel box-girder 8, corresponding, bench steel box-girder 10 includes a left side Side bench steel box-girder 10, middle part bench steel box-girder 10 and right side bench steel box-girder 10;Wherein, left side bench steel box-girder 10, in Portion's bench steel box-girder 10 and right side bench steel box-girder 10 respectively correspond and left side rest steel platform steel box-girder 8, interval steel Platform steel box-girder 8 and right side rest steel platform steel box-girder 8 are connected.
For the stability for guaranteeing entire bracket, the column 1, upper beam 3, lower beam 4, support beam 5, load bearing beam 7 with And connecting cross beam 9 is all made of H profile steel, and is welded on one between upper beam 3 and column 1 and between lower beam 4 and column 1 It rises;The platform steel plate 6 and the top flange plate of support beam 5 weld together.
On upper beam 3, the position at corresponding each 5 both ends of support beam is respectively welded two screw rods, and two screw rods are set vertically It sets, and is distributed in the web two sides of carrying two.On the bottom wing listrium of support beam 5, the position of corresponding screw rod offers screw hole, The screw rod passes through the screw hole of corresponding position.Adjusting nut and locking nut are equipped on screw rod, wherein the adjusting nut position In the downside of the bottom wing listrium of support beam 5, the locking nut is located at the upside of the bottom wing listrium of support beam 5, passes through lock Support beam 5 is locked by the cooperation of tight nut and adjusting nut.In this way, passing through screw rod between support beam 5 and upper beam 3 It is connected with the cooperation for adjusting bolt and clamping screw, in this way, adjustment adjusts the position of bolt as needed, then passes through locking screw Bolt is locked, it will be able to be finely adjusted to the mounting height of rest steel platform, so as to better ensure that rest steel Assembling accuracy between platform and bench greatly improves the quality of the segmental machining spiral stairs in factory.
Finally, it should be noted that technical side the above examples are only used to illustrate the technical scheme of the present invention and are not limiting Case, those skilled in the art should understand that, modification or equivalent replacement of the technical solution of the present invention are made for those, and The objective and range for not departing from the technical program, are intended to be within the scope of the claims of the invention.

Claims (7)

1. a kind of steel construction spiral stairs segmented assembly method, characterized by the following steps:
1) by floor leveling in factory, and the ground line-transect in the ratio drafting steel construction spiral stairs of 1:1 on ground on the ground, The ground line-transect includes the ground line-transect of rest steel platform and the ground line-transect of bench steel box-girder and marks control point;
2) it makes on the ground and assembling support is installed;The assembling support includes four columns, and the four columns are in rectangular Shape distribution, wherein four columns are located at the ground line-transect two sides of rest steel platform;It is horizontal solid respectively in the lower end of four columns Surely there is a mounting plate, which is fixedly connected with the ground by bar planting bolt;It is set respectively between the top of two adjacent upright There is a upper beam, a lower beam is respectively equipped between the lower part of two adjacent upright;It is equipped in the upper horizontal of upper beam several Support beam, the length direction of the support beam is consistent with width direction rectangular where four columns, the support beam Both ends be connected respectively with upper beam;A platform steel plate is equipped with above support beam, which is located at rest steel Right above the ground line-transect of platform steel box-girder, and it is fixedly connected with each support beam;Several load bearing beams are equipped with above platform steel plate, The load bearing beam is parallel to each other, and its length direction is vertical with the length direction of support beam;
3) the ground line-transect of rest steel platform steel box-girder is drawn on platform steel plate and marks control point;
4) rest steel platform steel box-girder is successively lifted on platform steel plate using crane, adjusts its installation site, its mark of repetition measurement Rest steel platform steel box-girder is attached after qualified by connecting cross beam, is assembled by height;
5) interim junction steel plate is made, one section of the downside which is connected with rest steel platform is plane, with One section connected of downside of bench steel box-girder is cambered surface, and the radian of the cambered surface is consistent with the radian of bench steel box-girder;
6) several interim junction steel plates are welded in the upside of one end that bench steel box-girder is connected with rest steel platform steel box-girder, In, the cambered surface of interim junction steel plate is bonded with bench steel box-girder, and the spacing between interim junction steel plate is 40-60mm;
7) bench steel box-girder is lifted into installation site using crane, by bench steel box-girder one end and is put down by interim junction steel plate Platform steel box-girder is docked by control point, while the other end of bench steel box-girder is placed on ground and is overlapped with ground line-transect; By bench steel box-girder line-transect after the assay was approved, by interim junction steel plate and rest steel platform steel box-girder by way of spot welding Welding, meanwhile, bench steel box-girder is attached by connecting cross beam, is assembled.
2. a kind of steel construction spiral stairs segmented assembly method according to claim 1, it is characterised in that: in step 2, The threedimensional model that steel construction spiral stairs are accurately established in 1:1 setting-out is carried out using BIM technology, generates the local coordinate and three of node Tie up location dimension;The minimum altitude H of the platform steel plateminIt is flat for the adjacent rest steel of rest steel platform lower surface to underface Vertical range between the upper surface or ground of platform.
3. a kind of steel construction spiral stairs segmented assembly method according to claim 1, it is characterised in that: in step 6), In BIM model, the rest steel platform steel box-girders of steel construction spiral stairs and bench steel box-girder docking location are established pair respectively Wiring, and the butted line is plotted on rest steel platform steel box-girder and bench steel box-girder;The interim junction steel plate and bench The position of the butted line of steel box-girder is overlapped.
4. a kind of steel construction spiral stairs segmented assembly method according to claim 1, it is characterised in that: the rest steel Platform steel box-girder includes left side rest steel platform steel box-girder, interval steel platform steel box-girder and right side rest steel platform steel case Beam, corresponding, bench steel box-girder includes left side bench steel box-girder, middle part bench steel box-girder and right side bench steel box-girder;Wherein, Left side bench steel box-girder, middle part bench steel box-girder and right side bench steel box-girder respectively correspond and left side rest steel platform steel case Beam, interval steel platform steel box-girder and right side rest steel platform steel box-girder are connected.
5. a kind of steel construction spiral stairs segmented assembly method according to claim 1, it is characterised in that: the column, Upper beam, lower beam, support beam, load bearing beam and connecting cross beam are all made of H profile steel, and between upper beam and column and under Weld together between crossbeam and column;The platform steel plate and the top flange plate of support beam weld together.
6. a kind of steel construction spiral stairs segmented assembly method according to claim 5, it is characterised in that: in upper beam On, the position at corresponding each support beam both ends is respectively welded two screw rods, and two screw rods are vertically arranged, and is distributed in carrying two Web two sides;On the bottom wing listrium of support beam, the position of corresponding screw rod offers screw hole, and the screw rod passes through corresponding position Screw hole;Adjusting nut and locking nut are equipped on screw rod, wherein the adjusting nut is located at the bottom wing listrium of support beam Downside, the locking nut is located at the upside of the bottom wing listrium of support beam, passes through the cooperation of locking nut and adjusting nut Support beam is locked.
7. a kind of steel construction spiral stairs segmented assembly method according to claim 1, it is characterised in that: the upper beam The distance between the upper end of the column is 1-1.5m.
CN201811014862.4A 2018-08-31 2018-08-31 A kind of steel construction spiral stairs segmented assembly method Pending CN109057366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811014862.4A CN109057366A (en) 2018-08-31 2018-08-31 A kind of steel construction spiral stairs segmented assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811014862.4A CN109057366A (en) 2018-08-31 2018-08-31 A kind of steel construction spiral stairs segmented assembly method

Publications (1)

Publication Number Publication Date
CN109057366A true CN109057366A (en) 2018-12-21

Family

ID=64758155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811014862.4A Pending CN109057366A (en) 2018-08-31 2018-08-31 A kind of steel construction spiral stairs segmented assembly method

Country Status (1)

Country Link
CN (1) CN109057366A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109740218A (en) * 2018-12-25 2019-05-10 三箭建设工程集团有限公司 A kind of steel construction integral hoisting system based on BIM
CN110605531A (en) * 2019-07-31 2019-12-24 共享钢构有限责任公司 Processing method of spiral stair with double-spiral box-shaped steel structure
CN112983017A (en) * 2021-03-15 2021-06-18 中建八局第二建设有限公司 Construction method of suspension type prestress spiral steel structure
CN114005643A (en) * 2021-10-25 2022-02-01 中国十九冶集团有限公司 Interim supporting platform of transformer
CN115370011A (en) * 2022-09-20 2022-11-22 中建五局华东建设有限公司 Construction and installation process of large-span overweight special-shaped arch truss

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205259592U (en) * 2015-12-02 2016-05-25 中国化学工程第十四建设有限公司 Template structure of steel construction floor
CN106623529A (en) * 2016-08-31 2017-05-10 浙江精工钢结构集团有限公司 Solid-web large-section spiral stair box girder shaped like Chinese character ''mu'' and manufacturing method
CN206205401U (en) * 2016-11-24 2017-05-31 中冶建工集团有限公司 Sectional shelf-unit system is used in a kind of stainless steel spiral stairses construction
CN107009097A (en) * 2017-04-28 2017-08-04 中国二十冶集团有限公司 The preparation method of large-scale bending steel stair
CN107190993A (en) * 2017-05-31 2017-09-22 中国二十冶集团有限公司 The preassembling moulding bed and its assembling method of large span inverted trapezoidal truss
CN107237461A (en) * 2017-07-17 2017-10-10 深圳市建艺装饰集团股份有限公司 A kind of full suspending rotary steel structure stairway structure and construction method
CN107327146A (en) * 2017-07-13 2017-11-07 上海二十冶建设有限公司 Assembled simple jig frame and its application method for steel structure assembling
CN107341847A (en) * 2017-07-07 2017-11-10 四川云图瑞科技有限公司 A kind of steel structure assembling members three-dimensional modeling data processing method based on BIM technology
CN107476585A (en) * 2017-07-13 2017-12-15 上海二十冶建设有限公司 Adjustable assembled moulding bed and its application method for steel structure assembling
CN207616467U (en) * 2017-11-02 2018-07-17 广东精工钢结构有限公司 A kind of stair assembling jig frame

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205259592U (en) * 2015-12-02 2016-05-25 中国化学工程第十四建设有限公司 Template structure of steel construction floor
CN106623529A (en) * 2016-08-31 2017-05-10 浙江精工钢结构集团有限公司 Solid-web large-section spiral stair box girder shaped like Chinese character ''mu'' and manufacturing method
CN206205401U (en) * 2016-11-24 2017-05-31 中冶建工集团有限公司 Sectional shelf-unit system is used in a kind of stainless steel spiral stairses construction
CN107009097A (en) * 2017-04-28 2017-08-04 中国二十冶集团有限公司 The preparation method of large-scale bending steel stair
CN107190993A (en) * 2017-05-31 2017-09-22 中国二十冶集团有限公司 The preassembling moulding bed and its assembling method of large span inverted trapezoidal truss
CN107341847A (en) * 2017-07-07 2017-11-10 四川云图瑞科技有限公司 A kind of steel structure assembling members three-dimensional modeling data processing method based on BIM technology
CN107327146A (en) * 2017-07-13 2017-11-07 上海二十冶建设有限公司 Assembled simple jig frame and its application method for steel structure assembling
CN107476585A (en) * 2017-07-13 2017-12-15 上海二十冶建设有限公司 Adjustable assembled moulding bed and its application method for steel structure assembling
CN107237461A (en) * 2017-07-17 2017-10-10 深圳市建艺装饰集团股份有限公司 A kind of full suspending rotary steel structure stairway structure and construction method
CN207616467U (en) * 2017-11-02 2018-07-17 广东精工钢结构有限公司 A kind of stair assembling jig frame

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴德胜: "北京保利国际广场钢结构旋转楼梯加工关键技术", 《 工业建筑》 *
李水冰: "钢结构螺旋楼梯安装技术研究", 《山西建筑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109740218A (en) * 2018-12-25 2019-05-10 三箭建设工程集团有限公司 A kind of steel construction integral hoisting system based on BIM
CN109740218B (en) * 2018-12-25 2023-03-24 三箭建设工程集团有限公司 Steel construction integral hoisting system based on BIM
CN110605531A (en) * 2019-07-31 2019-12-24 共享钢构有限责任公司 Processing method of spiral stair with double-spiral box-shaped steel structure
CN112983017A (en) * 2021-03-15 2021-06-18 中建八局第二建设有限公司 Construction method of suspension type prestress spiral steel structure
CN112983017B (en) * 2021-03-15 2022-08-30 中建八局第二建设有限公司 Construction method of suspension type prestress spiral steel structure
CN114005643A (en) * 2021-10-25 2022-02-01 中国十九冶集团有限公司 Interim supporting platform of transformer
CN115370011A (en) * 2022-09-20 2022-11-22 中建五局华东建设有限公司 Construction and installation process of large-span overweight special-shaped arch truss

Similar Documents

Publication Publication Date Title
CN109057366A (en) A kind of steel construction spiral stairs segmented assembly method
CN105401732A (en) Assembling method of large steel structure module of nuclear power plant
CN103195247B (en) Saddle-shaped hyperboloidal concrete slab construction method
CN104631684A (en) Single-layer latticed shell steel structure roof system based on concrete building and assembling method of single-layer latticed shell steel structure roof system based on concrete building
CN105401741A (en) Basement roof reinforcement construction device and construction method thereof
CN109441034A (en) A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN108277882A (en) Super-huge steel structure canopy construction technology under mal-condition
CN111648243A (en) Method for assembling large sections of bolted and welded combined steel truss girder
CN115059308A (en) Large-span hyperbolic reducing inverted triangular pipe truss assembling method
CN110565856B (en) Quick installation method for double-curved-surface metal plate curtain wall
CN204000618U (en) A kind of truss-like 0# piece cast-in-place support
CN104074364A (en) Steel casting funnel-shaped structure pre-assembling positioning construction method
CN103321325B (en) Construction method for giant combined L-shaped box-type thick plate shearing wall column
CN203867201U (en) Adjustable tool scaffold for steel structure splicing
CN201927268U (en) Practice teaching platform for steel structure installation
CN104196165B (en) Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof
CN107378358A (en) Arc wing plate center line positioning instrument, localization method and Curved beam assembly welding method
CN113107101B (en) Construction method for oblique crossing connection of broken line steel pipe column and arc box girder based on BIM
CN116451527A (en) Construction method of large-span hyperboloid saddle-shaped space grid steel structure with arch-shaped posts
CN101875163A (en) Assembling and welding jig frame used for bracket of bridge fabrication machine and method for fabricating bracket by using same
CN203383396U (en) Multi-connection and large-section combined box-type thick plate side column
CN104196150B (en) A kind of steel plate shear force wall and making method thereof
CN114790687A (en) Construction method of large-span steel box arch-connected bridge
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN208702150U (en) A kind of steel construction spiral stairs segmented assembly bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221