CN108979685A - A kind of construction method using prestressed component suspension roof support mine broken rock - Google Patents

A kind of construction method using prestressed component suspension roof support mine broken rock Download PDF

Info

Publication number
CN108979685A
CN108979685A CN201810914666.6A CN201810914666A CN108979685A CN 108979685 A CN108979685 A CN 108979685A CN 201810914666 A CN201810914666 A CN 201810914666A CN 108979685 A CN108979685 A CN 108979685A
Authority
CN
China
Prior art keywords
prestressed component
screw rod
anchor pole
branch
prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810914666.6A
Other languages
Chinese (zh)
Other versions
CN108979685B (en
Inventor
李兵磊
刘建兴
黄明清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201810914666.6A priority Critical patent/CN108979685B/en
Publication of CN108979685A publication Critical patent/CN108979685A/en
Application granted granted Critical
Publication of CN108979685B publication Critical patent/CN108979685B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of construction methods using prestressed component suspension roof support mine broken rock, comprising the following steps: in mine, broken rock bores branch guard aperture;After drilling, the remaining sillar in branch guard aperture is cleared up;The resin anchoring agent being set on prestressed component anchor pole anchor head is stirred evenly, anchor pole is filled in branch guard aperture, fixes prestressed component anchor pole upper end;Pull down prestressed component anchor pole, top suspension device be unfolded and complete it is self-locking, and make lower part rotation ascending branch protection unit be unfolded;The pallet for withstanding palisades outside branch guard aperture is installed in the lower part of prestressed component anchor pole;By being set on prestressed component anchor pole and exporting slip casting in the once grouting Guan Xiangzhi guard aperture for leading to prestressed component anchor pole top;Secondary grouting is carried out by the secondary grouting pipe being set on prestressed component anchor pole.The construction method advantageously accounts in chamber, tunnel rock in tunneling process, the construction safeties problem such as wall caving, roof fall that the relatively broken place of country rock occurs.

Description

A kind of construction method using prestressed component suspension roof support mine broken rock
Technical field
The present invention relates to a kind of construction methods using prestressed component suspension roof support mine broken rock, are suitable for cave The support engineerings construction field such as mouth, tunnel.
Background technique
During cave mouth is crushed belt construction, easily there is collapsing, inbreak;Construction safety environment is poor;Cave mouth supporting matter Amount requires high, large carrying capacity.Currently used construction method is the method for grouting filling to handle crushed zone, and cost is high, effect Fruit is poor, and speed of application is slow.And suspension roof support is as a kind of effective development heading support pattern, due to roadway surrounding rock intensity Invigoration effect is remarkably improved the stability of country rock, in addition lower with support cost, fast at lane speed, labor intensity mitigation, It improves drift section utilization rate, simplify that Ileal neobladder end service procedure, to be obviously improved operating environment and safety production condition etc. excellent The economic benefit of mine can be improved in point, and use is more and more extensive, thus becomes a kind of main supporting of coal mining enterprise's mine laneway Form represents the main direction of development of colliery tunnel support technology.But suspension roof support is used, the disadvantage is that it belongs to recessive branch Shield, is not easy the monitoring and detection of supporting quality and reliability, it sometimes appear that the roof fall accident without obvious tendency, in addition, right The very big soft rock of deflection, the biggish tunnel of plasticity stope drift active workings, supporting effect is not easy to guarantee, tunnel is caused not to be available.
Summary of the invention
The purpose of the present invention is to provide a kind of construction method using prestressed component suspension roof support mine broken rock, It advantageously accounts in chamber, tunnel rock in tunneling process, the construction safeties such as wall caving, roof fall that the relatively broken place of country rock occurs are asked Topic.
Technical program of the present invention lies in: a kind of construction party using prestressed component suspension roof support mine broken rock Method, comprising the following steps:
1) drill: in mine, broken rock bores branch guard aperture;
2) borehole cleaning: after drilling, the remaining sillar in branch guard aperture is cleared up;
3) prestressed component anchor pole: the resin anchoring agent being set on prestressed component anchor pole anchor head is stirred evenly, it Anchor pole is filled in branch guard aperture afterwards, fixes prestressed component anchor pole upper end, it is ensured that prestressed component it is anchor rod anchored securely subject to;
4) anchor the construction of end: after ensuring that resin anchoring agent anchoring is tight, drop-down prestressed component anchor pole makes to be set to pre- answer Top suspension device on power component anchor pole is unfolded and completes self-locking, and makes to be set to prestressed component by nut rotating mechanism Lower part rotation ascending branch protection unit expansion on anchor pole;
5) pallet is installed: installing the pallet for withstanding palisades outside branch guard aperture in the lower part of prestressed component anchor pole;
6) once grouting: by being set on prestressed component anchor pole and the primary note on prestressed component anchor pole top is led in outlet Slip casting in Guan Xiangzhi guard aperture is starched, slurries are infused from top to bottom, to infuse the standard that do not enter to fill;
7) it secondary grouting: 2-3 days after once grouting, is carried out by the secondary grouting pipe being set on prestressed component anchor pole secondary Slip casting.
Further, do not had in the step 2 using the remaining sillar in giant cleaning drilling with drilling is intermediate Sillar blocking drilling is standard.
Further, the prestressed component anchor pole includes screw rod, and the upper end of the screw rod is provided with anchor head, the anchor head Outside be enclosed with and be encapsulated in the intracorporal resin anchoring agent of bag, be located on the downside of anchor head on screw rod after being provided with screw rod drop-down and be unfolded And the top suspension device of branch guard aperture side wall is blocked, prestressing force regulating device is provided on the shaft of the screw rod, under screw rod Portion be provided with expansion after block branch guard aperture side wall lower part rotation ascending branch protection unit, the pallet be placed on screw rod and be located at lower part The downside of ascending branch protection unit is revolved, is located on the screw rod and is equipped with stop grouting plug on the downside of pallet and is bolted with locking nut, screw rod Both sides be correspondingly arranged on once grouting pipe and secondary grouting pipe that grout outlet is located at screw rod top, the once grouting The other end of pipe and secondary grouting pipe is pierced by by pallet respectively.
Further, the anchor head includes anchor head set, and vertical blind hole from bottom to top is provided in the anchor head set, described The front-rear side walls of vertical blind hole are respectively arranged with longitudinal blind hole, the two sidewalls of vertical blind hole and the downside setting for being located at longitudinal blind hole There is cross through hole, the connecting rod for being connected with screw rod upper end, the upper end of the connecting rod are provided in the vertical blind hole Through being connected at the top of spring and vertical blind hole, the front and back side of connecting rod is respectively arranged with upper springs ejector pin, and the two of connecting rod Side and be located at upper springs ejector pin on the downside of be provided with lower springs ejector pin.
Further, the top suspension device includes the hinge that screw rod is fixedly connected with and be used for the lower end of anchor head and is passed through Joint chair, the circumference interval of the hinged seat are hinged with several connecting rods, the screw rod top and downside for being located at hinged seat is fixed There is fixing seat, the downside that connecting rod is located in the fixing seat, which corresponds to, is hinged with branch guard bar, the other end of the connecting rod and upper branch It is hinged in the middle part of guard bar.
Further, the prestressed component regulating device includes the top fixinig plate with screw rod top bolt, described Top fixinig plate circumference is fixed at intervals with several prestress wires, and the lower part of the screw rod is bolted with lower fixing piece, institute The circumference interval for stating lower fixing piece is bolted with several bolts being arranged from bottom to top, the bolt and corresponding prestress steel It mutually welds the lower end of twisted wire.
Further, in the step 3), before the mounting, check whether prestress wire is secured, while applying pre- Stress, it is ensured that prestress wire is loaded with prestressing force.
Further, the both sides of the top fixinig plate and lower fixing piece are respectively arranged with vertical through holes, and described one The upper end of secondary Grouting Pipe and secondary grouting pipe is passed through by corresponding vertical through holes on the fixinig plate of top respectively and is fixed on through buckle On screw rod, the same end of once grouting pipe and secondary grouting pipe is each passed through on lower fixing piece corresponding vertical through holes and by holding in the palm Through-hole in the middle part of disk is pierced by;The other end end for ensuring to infuse primary slurry pipe and secondary grouting pipe in the installation process of pallet is exposed at Outside.
Further, the lower part rotation ascending branch protection unit includes the upper mounted plate being connected with screw rod lower part, described solid The circumference interval of fixed board is hinged with lower branch guard bar, is located on the downside of upper mounted plate on screw rod and is equipped with bottom plate, spiral shell on screw rod The rotation for being connected to driving bottom plate lifting rises nut, and the circumference of the bottom plate is corresponding to be hinged in the middle part of upper end and lower branch guard bar The support rod being hinged.
Further, the nut rotating mechanism in the step 4) includes the casing for being sleeved on the screw rod, described sleeve pipe Upper end be provided with and revolve and rise the Hexagon hole that matches of nut, be welded with bearing in the middle part of casing, lower end, which is provided with, to be used for The outer-hexagonal structure being connected with spanner.
Compared with prior art, the invention has the following advantages that this is broken using prestressed component suspension roof support mine The construction method of rock stratum, so that the operation safeties problem such as chamber, tunnel rock stratum are slack and undisciplined, relatively broken, easy collapsing slabbing to controlling substantially System is conducive to effectively solve in chamber, tunnel rock in tunneling process, and wall caving, the roof fall etc. that the relatively broken place of country rock occurs are applied Work safety problem;Practical is strong, not only ensure that stability and the safety of construction, but also improves construction efficiency, props up simultaneously Protect significant effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of prestressed component anchor pole of the invention;
Fig. 2 is the structural schematic diagram of anchor head of the invention;
Fig. 3 is the A-A cross-sectional view of Fig. 2 of the invention;
Fig. 4 is the structural schematic diagram of top suspension device of the invention;
Fig. 5 is the structural schematic diagram of prestressing force regulating device of the invention;
Fig. 6 is the B-B cross-sectional view of Fig. 5 of the invention;
Fig. 7 is the structural schematic diagram that ascending branch protection unit is revolved in lower part of the invention;
Fig. 8 is the structural schematic diagram of nut rotating mechanism of the invention.
Specific embodiment
To make the foregoing features and advantages of the present invention clearer and more comprehensible, special embodiment below, and cooperate attached drawing, make detailed It is carefully described as follows, but the present invention is not limited thereto.
Referring to figs. 1 to Fig. 8
A kind of construction method using prestressed component suspension roof support mine broken rock, comprising the following steps:
1) it drills: branch guard aperture is bored in mine broken rock by the common drilling device in mine,;
2) borehole cleaning: after drilling, the remaining sillar in branch guard aperture is cleared up;
3) prestressed component anchor pole: the resin anchoring agent being set on prestressed component anchor pole anchor head is stirred evenly, it Anchor pole is filled in branch guard aperture afterwards, fixes prestressed component anchor pole upper end, it is ensured that prestressed component it is anchor rod anchored securely subject to;
4) anchor the construction of end: after ensuring that resin anchoring agent anchoring is tight, pulling down prestressed component anchor pole, make in anchor head from Latch mechanism snaps into card slot, and the top suspension device being set on prestressed component anchor pole is unfolded and realizes under the effect of gravity certainly The lower part being set on prestressed component anchor pole rotation ascending branch protection unit is unfolded by nut Xuan Sheng mechanism and is supported on supporting by lock The side wall in hole;
5) pallet is installed: installing the pallet for withstanding palisades outside branch guard aperture in the lower part of prestressed component anchor pole;
6) once grouting: anchoring whole tensioning after pallet installation, can slip casting immediately, by being set to prestressed component anchor Slip casting in the once grouting Guan Xiangzhi guard aperture on prestressed component anchor pole top is led on bar and outlet, and slurries are infused from top to bottom, with Infuse the standard that do not enter to fill;
7) it secondary grouting: 2-3 days after once grouting, is carried out by the secondary grouting pipe being set on prestressed component anchor pole secondary Slip casting, the grout outlet of secondary grouting pipe ensure that the top suspension device of upper end forms one by secondary grouting in the upper end of screw rod A positive fimbriatum.
In the present embodiment, using the remaining sillar in giant cleaning drilling in the step 2, do not have so that drilling is intermediate Having sillar blocking drilling is standard.
In the present embodiment, the prestressed component anchor pole includes screw rod 10, and the upper end of the screw rod is provided with anchor head 20, institute It states to be enclosed on the outside of anchor head and is encapsulated in the intracorporal resin anchoring agent 22 of bag, be located on the downside of anchor head on screw rod and be provided under screw rod It is unfolded and blocks the top suspension device 30 of branch guard aperture side wall after drawing, prestressing force is provided on the shaft of the screw rod and adjusts dress It sets, the lower part of screw rod is provided with the lower part rotation ascending branch protection unit 50 that branch guard aperture side wall is blocked after expansion, and the pallet 60 is placed on On screw rod and it is located at the downside that ascending branch protection unit is revolved in lower part, is located on the downside of pallet on the screw rod and is equipped with stop grouting plug 71, pad Piece 72 is simultaneously bolted with locking nut 73, to block the hole on pallet by stop grouting plug, and completes pallet by locking nut And the locking of stop grouting plug.The both sides of screw rod are correspondingly arranged on the once grouting pipe 11 and two that grout outlet is located at screw rod top The other end of secondary Grouting Pipe 12, the once grouting pipe and secondary grouting pipe is pierced by by pallet respectively, will pass through once grouting Pipe and secondary grouting pipe complete slip casting process.
In the present embodiment, the anchor head includes anchor head set 21, and vertical blind hole from bottom to top is provided in the anchor head set 211, the front-rear side walls of the vertical blind hole are respectively arranged with longitudinal blind hole 212, the two sidewalls of vertical blind hole and are located at longitudinal blind It is provided with cross through hole 213 on the downside of hole, the connecting rod 23 for being connected with screw rod upper end is provided in the vertical blind hole, Through being connected at the top of spring 24 and vertical blind hole, the front and back side of connecting rod is respectively arranged with top bullet for the upper end of the connecting rod Spring ejector pin 231, the both sides of connecting rod and be located at upper springs ejector pin on the downside of be provided with lower springs ejector pin 232, so as to When screw rod pulls downward on, it is caught in upper springs ejector pin in longitudinal blind hole, lower springs ejector pin is caught in cross through hole, and then is made It is completed after the expansion of top suspension device self-locking.
In the present embodiment, the upper springs ejector pin, lower springs ejector pin respectively include being set to the spring in connecting rod 233, the both ends of the spring are connected separately with cylindrical clamp.
In the present embodiment, in the present embodiment, the top suspension device includes being fixedly connected and being used for the lower end of anchor head The hinged seat 31 that screw rod or connecting rod pass through, the circumference interval of the hinged seat are hinged with several connecting rods 32, the screw rod Top and it is located on the downside of hinged seat and is fixed with fixing seat 33, the downside correspondence that connecting rod is located in the fixing seat is hinged with branch Guard bar 34, the number of the upper branch guard bar are four, are hinged in the middle part of the other end of the connecting rod and upper branch guard bar.To logical Cross pull downward on screw rod make top suspension device formed a reversed umbrella-type support frame, and under rod piece self gravitation effect get over It is more fastened toward drop-down.
In the present embodiment, the prestressing force regulating device includes the top fixinig plate 41 with screw rod top bolt, described Top fixinig plate circumference is fixed at intervals with several prestress wires 42, and the lower part of the screw rod is bolted with lower fixing piece 43, the circumference interval of the lower fixing piece is bolted with several bolts being arranged from bottom to top 44, state bolt with it is corresponding pre- The lower end of prestress steel strand is mutually welded or hingedly, to adjust the rate of tension of prestress wire by rotation bolt.
In the present embodiment, the number of the prestress wire is 3 and the laying of 120 ° of interval, thus after the completion of slip casting Prestress wire and screw rod and slurry is set to form entirety, so that anchoring strength further be turned up.In the step 3), installing Before, check whether prestress wire is secured, while applying prestressing force, it is ensured that prestress wire is loaded with prestressing force.
In the present embodiment, the both sides of the top fixinig plate and lower fixing piece are respectively arranged with vertical through holes 45, institute The upper end for stating once grouting pipe and secondary grouting pipe is passed through respectively by corresponding vertical through holes on the fixinig plate of top and through buckle 13 It is fixed on screw rod, the same end of once grouting pipe and secondary grouting pipe is each passed through corresponding vertical through holes on lower fixing piece And the through-hole gap by passing through in the middle part of pallet for screw rod is pierced by;Ensure to infuse primary slurry pipe and secondary in the installation process of pallet The other end end of Grouting Pipe is exposed, so as to later period slip casting.
In the present embodiment, the lower part rotation ascending branch protection unit includes the upper mounted plate 51 being connected with screw rod lower part, described The circumference interval of upper mounted plate is hinged with branch guard bar 52 under four, is located on the downside of upper mounted plate on screw rod and is equipped with bottom plate 53, the rotation that driving bottom plate lifting is bolted on screw rod rises nut 54, and the circumference correspondence of the bottom plate is hinged with four The support rod 55 being hinged in the middle part of upper end and lower branch guard bar, lower branch guard bar to be unfolded after rotating liter nut upwards and to block On the side wall of branch guard aperture.It is known that whether bottom end structure opens up into suitable position by the circle number that liter nut is revolved in rotation in use It sets.
In the present embodiment, fixed plate includes the upper fixture nut 511 with screw rod bolt, is located on screw rod upper solid Determine to be equipped with the connecting plate 512 for being hinged with lower branch guard bar on the downside of nut, interval is hinged with four on the connecting plate Lower branch guard bar is located on the downside of connecting plate the lower fixture nut 513 that is spirally connected on the screw rod, thus realize the positioning of connecting plate, and It can be according to the position of branch guard aperture specific depth adjustment lower part rotation ascending branch protection unit.The other end of the lower branch guard bar is provided with suction Disc type disk 56, to be preferably adsorbed on branch guard aperture side wall.
In the present embodiment, the nut rotating mechanism in the step 4) includes for being covered from bottom to top in screw rod when in use On casing 81, the upper end of described sleeve pipe, which is provided with and revolves, rises the Hexagon hole 82 that matches of nut, is welded with axis in the middle part of casing 83 are held, it is as shown in Figure 8 that lower end is provided with the outer-hexagonal structure 84(for being connected with spanner), to pass through spanner or set Cylinder makes rotation rise nut and rises with sleeve rotating, can unload casing after the expansion of branch guard bar.
The foregoing is merely presently preferred embodiments of the present invention, for the ordinary skill in the art, according to this hair Bright introduction is designed various forms of construction methods using prestressed component suspension roof support mine broken rock and is not needed Creative labor, without departing from the principles and spirit of the present invention it is all done according to scope of the present invention patent it is equal Equal change, modification, replacement and modification, are all covered by the present invention.

Claims (10)

1. a kind of construction method using prestressed component suspension roof support mine broken rock, which is characterized in that including following step It is rapid:
1) drill: in mine, broken rock bores branch guard aperture;
2) borehole cleaning: after drilling, the remaining sillar in branch guard aperture is cleared up;
3) prestressed component anchor pole: the resin anchoring agent being set on prestressed component anchor pole anchor head is stirred evenly, it Anchor pole is filled in branch guard aperture afterwards, fixes prestressed component anchor pole upper end, it is ensured that prestressed component it is anchor rod anchored securely subject to;
4) anchor the construction of end: after ensuring that resin anchoring agent anchoring is tight, drop-down prestressed component anchor pole makes to be set to pre- answer Top suspension device on power component anchor pole is unfolded and completes self-locking, and makes to be set to prestressed component by nut rotating mechanism Lower part rotation ascending branch protection unit expansion on anchor pole;
5) pallet is installed: installing the pallet for withstanding palisades outside branch guard aperture in the lower part of prestressed component anchor pole;
6) once grouting: by being set on prestressed component anchor pole and the primary note on prestressed component anchor pole top is led in outlet Slip casting in Guan Xiangzhi guard aperture is starched, slurries are infused from top to bottom, to infuse the standard that do not enter to fill;
7) it secondary grouting: 2-3 days after once grouting, is carried out by the secondary grouting pipe being set on prestressed component anchor pole secondary Slip casting.
2. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 1, It is characterized in that, using the remaining sillar in giant cleaning drilling in the step 2, is blocked so that drilling is intermediate without sillar Drilling is standard.
3. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 1 or 2, It is characterized in that, the prestressed component anchor pole includes screw rod, the upper end of the screw rod is provided with anchor head, the outside of the anchor head It is enclosed with and is encapsulated in the intracorporal resin anchoring agent of bag, be located on the downside of anchor head on screw rod after being provided with screw rod drop-down and be unfolded and block The top suspension device of branch guard aperture side wall is provided with prestressing force regulating device, the lower part setting of screw rod on the shaft of the screw rod There is the lower part rotation ascending branch protection unit that branch guard aperture side wall is blocked after being unfolded, the pallet, which is placed on screw rod and is located at lower part, revolves ascending branch The downside of protection unit is located on the screw rod and is equipped with stop grouting plug on the downside of pallet and is bolted with locking nut, the two sides of screw rod Portion is correspondingly arranged on the once grouting pipe and secondary grouting pipe that grout outlet is located at screw rod top, the once grouting pipe and two The other end of secondary Grouting Pipe is pierced by by pallet respectively.
4. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 3, It is characterized in that, the anchor head includes anchor head set, and vertical blind hole from bottom to top, the vertical blind hole are provided in the anchor head set Front-rear side walls be respectively arranged with longitudinal blind hole, two sidewalls of vertical blind hole and being located on the downside of longitudinal blind hole are provided with laterally logical Hole, is provided with the connecting rod for being connected with screw rod upper end in the vertical blind hole, the upper end of the connecting rod through spring with It is connected at the top of vertical blind hole, the front and back side of connecting rod is respectively arranged with upper springs ejector pin, the both sides and position of connecting rod Lower springs ejector pin is provided on the downside of upper springs ejector pin.
5. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 3, It is characterized in that, the top suspension device includes the hinged seat that screw rod is fixedly connected with and be used for the lower end of anchor head and is passed through, institute The circumference interval for stating hinged seat is hinged with several connecting rods, the screw rod top and is located on the downside of hinged seat and is fixed with fixation , the downside that connecting rod is located in the fixing seat, which corresponds to, is hinged with branch guard bar, the other end of the connecting rod and upper branch guard bar Middle part is hinged.
6. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 3, It is characterized in that, the prestressing force regulating device includes the top fixinig plate with screw rod top bolt, the top fixinig plate week Portion is fixed at intervals with several prestress wires, and the lower part of the screw rod is bolted with lower fixing piece, the lower fixing piece Circumference interval be bolted with several bolts being arranged from bottom to top, the lower end phase of the bolt and corresponding prestress wire Welding.
7. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 6, It is characterized in that in the step 3), before the mounting, checking whether prestress wire is secured, while applying prestressing force, it is ensured that Prestress wire is loaded with prestressing force.
8. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 6 or 7, It is characterized in that, the both sides of the top fixinig plate and lower fixing piece are respectively arranged with vertical through holes, the once grouting The upper end of pipe and secondary grouting pipe is passed through by corresponding vertical through holes on the fixinig plate of top respectively and is fixed on screw rod through buckle, The same end of once grouting pipe and secondary grouting pipe is each passed through on lower fixing piece corresponding vertical through holes and by the middle part of pallet Through-hole be pierced by;The other end end for ensuring to infuse primary slurry pipe and secondary grouting pipe in the installation process of pallet is exposed.
9. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 3, It is characterized in that, the lower part rotation ascending branch protection unit includes the upper mounted plate being connected with screw rod lower part, the week of fixed plate Portion interval is hinged with lower branch guard bar, is located on the downside of upper mounted plate on screw rod and is equipped with bottom plate, driving is bolted on screw rod The rotation of bottom plate lifting rises nut, and the circumference of the bottom plate is corresponding to be hinged with what upper end was hinged with lower branch guard bar middle part Support rod.
10. a kind of construction method using prestressed component suspension roof support mine broken rock according to claim 9, It is characterized in that, the nut rotating mechanism in the step 4) includes the casing for being sleeved on the screw rod, and the upper end of described sleeve pipe is set Be equipped with and revolve and rise the Hexagon hole that matches of nut, be welded with bearing in the middle part of casing, lower end be provided with for spanner phase The outer-hexagonal structure of connection.
CN201810914666.6A 2018-08-13 2018-08-13 Construction method for supporting broken rock stratum of mine by adopting prestress component anchor rod Active CN108979685B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810914666.6A CN108979685B (en) 2018-08-13 2018-08-13 Construction method for supporting broken rock stratum of mine by adopting prestress component anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810914666.6A CN108979685B (en) 2018-08-13 2018-08-13 Construction method for supporting broken rock stratum of mine by adopting prestress component anchor rod

Publications (2)

Publication Number Publication Date
CN108979685A true CN108979685A (en) 2018-12-11
CN108979685B CN108979685B (en) 2023-10-10

Family

ID=64552705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810914666.6A Active CN108979685B (en) 2018-08-13 2018-08-13 Construction method for supporting broken rock stratum of mine by adopting prestress component anchor rod

Country Status (1)

Country Link
CN (1) CN108979685B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457976A (en) * 2018-12-14 2019-03-12 中国三冶集团有限公司 A kind of field fabrication steel strand anchoring end end onion device
CN110608061A (en) * 2019-08-14 2019-12-24 四川大学 Prestressed grouting anchor rod and installation and recovery method thereof
CN111379581A (en) * 2020-03-24 2020-07-07 淮南东华欧科矿山支护设备有限责任公司 Deep roadway prestress full-anchor support construction equipment and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5599140A (en) * 1995-09-13 1997-02-04 The Eastern Company Mine roof support system including an expansion anchor with means assisting resin component mixing and method of installation thereof
CN104500115A (en) * 2014-12-15 2015-04-08 王振伟 Pre-stress full-length anchoring rock bolt retaining and protecting method
CN106523006A (en) * 2016-11-29 2017-03-22 中铁二十三局集团第工程有限公司 Glass fiber anchor rod and construction method
CN206539357U (en) * 2017-03-15 2017-10-03 中铁十七局集团第一工程有限公司 The quick grouting device of self-feeding anchor pile
CN107780955A (en) * 2017-12-15 2018-03-09 湖南科技大学 A kind of controllable grouting and reinforcing device and construction method for breaking surrounding rock tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5599140A (en) * 1995-09-13 1997-02-04 The Eastern Company Mine roof support system including an expansion anchor with means assisting resin component mixing and method of installation thereof
CN104500115A (en) * 2014-12-15 2015-04-08 王振伟 Pre-stress full-length anchoring rock bolt retaining and protecting method
CN106523006A (en) * 2016-11-29 2017-03-22 中铁二十三局集团第工程有限公司 Glass fiber anchor rod and construction method
CN206539357U (en) * 2017-03-15 2017-10-03 中铁十七局集团第一工程有限公司 The quick grouting device of self-feeding anchor pile
CN107780955A (en) * 2017-12-15 2018-03-09 湖南科技大学 A kind of controllable grouting and reinforcing device and construction method for breaking surrounding rock tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457976A (en) * 2018-12-14 2019-03-12 中国三冶集团有限公司 A kind of field fabrication steel strand anchoring end end onion device
CN110608061A (en) * 2019-08-14 2019-12-24 四川大学 Prestressed grouting anchor rod and installation and recovery method thereof
CN110608061B (en) * 2019-08-14 2024-04-05 四川大学 Prestressed grouting anchor rod and installation and recovery method thereof
CN111379581A (en) * 2020-03-24 2020-07-07 淮南东华欧科矿山支护设备有限责任公司 Deep roadway prestress full-anchor support construction equipment and construction method thereof
CN111379581B (en) * 2020-03-24 2021-08-31 淮南东华欧科矿山支护设备有限责任公司 Deep roadway prestress full-anchor support construction equipment and construction method thereof

Also Published As

Publication number Publication date
CN108979685B (en) 2023-10-10

Similar Documents

Publication Publication Date Title
CN108979685A (en) A kind of construction method using prestressed component suspension roof support mine broken rock
CN105257328B (en) A kind of the segmentation archoring slip casting archoring-balt device and its anchoring process of energy automatic clamping
CN109098742B (en) A kind of list anchor focuses the steel tendon and its method for protecting support of formula full length fastening
CN107701213B (en) A kind of in due course pressure device and its anchoring process of allowing can compensate for large deformation of roadway
CN110374600A (en) A kind of ultra close distance coal seam group stope drift active workings are error-free away from formula method for arranging
CN106050282B (en) A kind of anchor structure and reinforcement means of gob side entry retaining thin coal pillar
CN109505639A (en) A kind of gob side entry driving coal column hardened system and its application method
CN109578033A (en) Coal mine roadway anchor and its implementation method
CN102071961A (en) Downward gas drainage drill hole and pressure testing drill hole sealing method
CN106321124A (en) Mine grouting anchor cable supporting method
CN208587173U (en) A kind of both ends anchoring prestress component grouted anchor bar for underground mine tunnel
CN105840222B (en) Push-press type can quick anchoring installation binding type hollow bolt
CN108442954A (en) A kind of deep anchoring pressure-type can connect pressure-relieving achor bar and application method
CN205858371U (en) A kind of colliery big cross section digging laneway combined support structure
CN108825278A (en) A kind of both ends anchoring prestress component grouted anchor bar and its application method for underground mine tunnel
CN102900447B (en) A kind of anchor pole reinforced for weak surrounding rock
CN109958454A (en) Stope drift active workings pucking control system and its control method
CN207499892U (en) A kind of mining fixing anchor bar for roadway support function
CN103758564A (en) Method for suspending monorail crane in soft and weak coal seam roadway
CN105201510B (en) A kind of creepage type bump preventing control method
CN208605210U (en) A kind of novel slurry filling anchor system
CN103557007B (en) Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces
CN206600182U (en) A kind of anti-disconnected anchor for being adapted to roadway with large deformation country rock
CN100434655C (en) Advanced supporting and protecting technology for cracked top plate of digging operation face
CN213574151U (en) Installation device suitable for multi-arch tunnel lock foot stock location anchor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant