CN108979010A CN201811109782.7A CN201811109782A CN108979010A CN 108979010 A CN108979010 A CN 108979010A CN 201811109782 A CN201811109782 A CN 201811109782A CN 108979010 A CN108979010 A CN 108979010A
Authority
CN
China
Prior art keywords
preparation
sleeve
grout sleeve
annealing
extruding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811109782.7A
Other languages
Chinese (zh)
Inventor
王明杨
梁绍辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Qifu Machinery Co Ltd
Original Assignee
Chongqing Qifu Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Qifu Machinery Co Ltd filed Critical Chongqing Qifu Machinery Co Ltd
Priority to CN201811109782.7A priority Critical patent/CN108979010A/en
Publication of CN108979010A publication Critical patent/CN108979010A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention provides full grout sleeve of a kind of extruding steel and preparation method thereof, include the following steps: that the sleeve hollow billet of (A) Jing Guo cold rolling in 600-660 DEG C of primary annealing 20-25min, then squeezes the draw;(B) by the processed casing of above-mentioned steps after 550-600 DEG C of double annealing handles 15-20min, processing and forming.Preparation method of the invention prepares grout sleeve by using the method for extruding, previous all drawbacks that grout sleeve is prepared using ball milling and machining are abandoned, it is quality controllable in production process, it is not in the process for having mechanical performance change, production efficiency is fast, and save the cost is discharged without waste iron filing in production process, it is environmentally protective, operating process is controllable, and the performance for the grout sleeve various aspects being prepared is more excellent, therefore the application that should be widely promoted.

Description

Full grout sleeve of a kind of extruding steel and preparation method thereof
Technical field
The present invention relates to grout sleeves to process preparation field, in particular to a kind of full grout sleeve of extruding steel and Preparation method.
Background technique
Prefabricated assembled concrete structure has speed of application as a kind of structure type for meeting industrialized production Fastly, labor intensity is low, noise pollution and wet construction is few and the advantages such as product quality is easy to control, has obtained answering extensively in developed country With.Use prefabrication and assembly construction construction techniques can with effectively save resource and the energy, improve material realize building energy conservation and Utilization rate in terms of structural behaviour overcomes the limitation of construction site and environmental condition to site operation, reduces site operation labour Power quantity reduces the adverse effect of building waste and Construction on Environment, improves building function and structural behaviour.Promote prefabrication and assembly construction Formula concrete structure is advantageously implemented the Green Development requirement of " four sections, one environmental protection ", realizes the building course of low energy consumption, low emission, Scheduled target for energy-saving and emission-reduction is realized in the sound development that can promote Building Trade in China, is the developing direction of China's future architecture.
The performance that reinforcing bar connects in prefabricated assembled concrete component directly determines that the overall performance of structure and reinforcing bar pass The performance of the effect of power, reinforcing bar connection is the key factor of steel bar force transfer, and the selection of reinforcing bar connection type directly affects building Speed of application and cost.Also, the connection of longitudinal reinforcement is crucial in prefabricated assembled concrete component, wherein longitudinal reinforcement For the reinforcing bar laid along prefabricated assembled concrete component longitudinal length and its steel bar stress.In cast-in-place concrete structure, Common longitudinal reinforcement connection type has the connection types such as binding overlap joint, welded connecting and mechanical connection, but due to prefabricated dress Reinforcing bar connecting portion space with formula concrete component is smaller, is not easy to construct using above-mentioned traditional reinforcing bar connection type.Steel Muscle sleeve grouting jointing can be well solved the longitudinal reinforcement connectivity problem in prefabricated assembled concrete structure, can have Effect realizes the equivalent cast-in-place design requirement of assembly, and due to the application generality of grout sleeve, the excellent of performance is directly decide The operation difficulty of construction, and the quality problems of construction.
What existing grout sleeve manufacture craft generallyd use is nodular cast iron technique and mechanical processing technique, nodular cast iron The shortcomings that technique is: 1, Oxygen potential >=85% is entirely unstable in factory's regulation mechanical performance.2. spheroidal graphite cast-iron elongation percentage is low disconnected The easy kingfisher of rate elongation >=5% is easy to produce internal stress afterwards.It is easily rupturable in the case where fatigue and resonance.3, spheroidal graphite cast-iron contamination of products It is unfavorable for environmental protection greatly.The shortcomings that mechanical processing technique is: 1, machine adds difficulty mass production inefficiency at high cost.2, machine adds process The a large amount of iron filings discharge wasting of resources and environmental protection are uncontrollable.3, rolled steel dosage is big, process wedge angle easy to form, internal stress collection In crack.
It can be seen that destroying sleeve mechanical property, tensile strength after the generally existing difficult processing of the processing technology of the prior art, processing The problems such as qualification rate is not high and tension test is long in time limit.
In view of this, the present invention is specifically proposed.
Summary of the invention
The first object of the present invention is to provide a kind of preparation method for squeezing full grout sleeve, and the preparation method is by adopting Grout sleeve is prepared with the method for extruding, has abandoned previous all disadvantages for preparing grout sleeve using ball milling and machining It holds, it is quality controllable in production process, it is not in the process for having mechanical performance change, production efficiency is fast, and production process is without scrap iron Bits discharge save the cost, environmentally protective, operating process is controllable, and the performance for the grout sleeve various aspects being prepared is more excellent It is different, therefore the application that should be widely promoted.
The second object of the present invention is to provide the full grout sleeve of extruding that above-mentioned preparation method is prepared, the full grouting It is equipped with circular arc shearing slot inside and outside sleeve and both ends are closed up, enhances the tensile strength of sleeve itself, unstressed centrostigma, tension Intensity >=600MPa, rate elongation >=16% of having no progeny, yield strength >=355MPa, various aspects of performance are superior to using traditional handicraft system Standby obtained full grout sleeve.
In order to realize above-mentioned purpose of the invention, the following technical scheme is adopted:
The embodiment of the invention provides a kind of preparation methods for squeezing the full grout sleeve of steel, include the following steps:
(A) then the sleeve hollow billet Jing Guo cold rolling squeezes the draw at 600-660 DEG C of primary annealing 20-25min;
(B) by the processed casing of above-mentioned steps after 550-600 DEG C of double annealing handles 15-20min, processing and forming is It can.
Full grout sleeve refers to that the reinforcing bar at both ends passes through grouting material and is directly attached with sleeve.It is main in the prior art It is prepared using nodular cast iron and mechanical processing technique.But the generally existing difficult processing of the processing technology of the prior art, processing The problems such as sleeve mechanical property, tensile strength qualification rate be not high and tension test is long in time limit is destroyed afterwards.
To solve the above-mentioned problems, the present invention provides a kind of method that extrusion process prepares full grout sleeve, the present invention Above-mentioned preparation process in, key be the operation temperature of twice annealing process and the control of operating time, because of prior art In also have the technical process annealed, but the time and temperature control due to annealing is not proper, the grouting set prepared Cylinder rough surface, uneven, irregular colour, matt, the mechanical performance of various aspects itself is also not guaranteed, but of the invention Inventor by the way that the concrete operation step of annealing process has been carried out a large amount of practices after, the grout sleeve surface light that is prepared Sliding, glossy, color is uniform, and appearance condition uniformity is high, and the mechanical performance of various aspects has obtained the promotion of matter, is existing The performance for the grout sleeve that other techniques in technology are prepared is incomparable.
Preferably as further enforceable mode of operation, in the step (A), 620-650 DEG C of primary annealing 21-24min。
Preferably as further enforceable mode of operation, in the step (B), 560-580 DEG C of double annealing processing 18-19min。
The rate of heat addition of above-mentioned twice annealing process controls between 8-9 DEG C/min, for example, can for 8.3 DEG C/min, 8.4 DEG C/min, 8.5 DEG C/min, 8.6 DEG C/min, 8.7 DEG C/min etc..
Primarily to eliminating seamless steel overpressure, reduction seamless steel pipe interior tissue reaches the purpose of annealing for the first time The structure refinement uniformity.The purpose of double annealing eliminates pressure in material caused by extruded product and reduces residual deformation, passes through The control of twice annealed concrete operations parameter improves the stability for the full grout sleeve being prepared, improves its various aspects Performance.
There is the processing step (not heating) for squeezing the draw between annealing for the first time and second of annealing, which can answer Power deformation, it is therefore desirable to residual stress be performed corresponding processing, if not handling the full grout sleeve surface being prepared very Be easy to produce crackle, so need to carry out double annealing processing, if but residual stress is eliminated improper, sleeve itself is too It is soft to easily deform, or even it is directly becoming substandard product, the requirement normally produced is influenced whether, so carrying out secondary move back During fire, the temperature of annealing and the time of annealing be required to control it is proper, to prevent occur residual stress eliminate it is improper, it is raw The underproof product of output.
After residual stress is eliminated, the performance of butt joint is needed to be evaluated and tested, performance parameter needs to meet following require:
In one directional tensile test: residual deformation (mm) u0≤ 0.10 (d≤32), u0≤ 0.14 (d > 32), it is total under maximum, force Elongation percentage (%), Asgt >=6.0.
High stress is repeatedly in tensile compression test, residual deformation (mm) u20≤0.3。
Large deformation is repeatedly in tensile compression test, residual deformation (mm) u4≤ 0.3 and u8≤0.6。
After prepared by operating procedure according to the invention, performance is able to satisfy above-mentioned standard.
It successively include such as before cold rolling in the step (A) preferably as further enforceable mode of operation Lower step: the step of rod iron is passed through into cutting, hot piercing, scale removal phospholeum.
Preferably as further enforceable mode of operation, in the step (A), Steel material that rod iron uses is 45 Number steel, the elongation control of Steel material is 18% or more, and due to being related to deformation operation during extrusion process, deformation ratio is larger It is just easy to generate the deformation of stress, it is therefore desirable to control the elongation percentage of the raw material of steel, to meet the grouting of production The performance requirement of the various aspects of sleeve.
Preferably as further enforceable mode of operation, in the step (B), the step of processing and forming, is successively wrapped It includes: boring grout nipple, attack grout nipple silk, after drill centers, mark knowledge, assembling assembly.
Preferably as further enforceable mode of operation, in the step (A), the sleeve during the draw is squeezed Compressive plane length is controlled in 200mm or less.
Preferably as further enforceable mode of operation, sleeve diameter after extruding is reduced in 6mm or less;
Preferably, the mold that both ends are all made of multiple fissions during the extruding draw forms a complete grout sleeve week Shape, effect of the mold of multiple fissions Jing Guo hydraulic coupling are shunk simultaneously, grouting end outer circle formed a plurality of contraction trace with into Row squeezes.In the production process, the mold for being completely divided into multiple fissions using one carries out squeeze to the present invention, this The mold of sample entirety, which not only squeezes, to be more uniformly stressed, and is more favorable to form.
The solution of the present invention also protects a kind of full grout sleeve of the extruding being prepared using above-mentioned preparation method, this is complete The performance of grout sleeve can reach following index: tensile strength >=600MPa of full grout sleeve, rate elongation >=16% of having no progeny are bent Take intensity >=355MPa.
Compared with prior art, the invention has the benefit that
(1) preparation method of the full grout sleeve of extruding of the invention prepares grout sleeve by using the method for extruding, gets rid of Abandon previous all drawbacks that grout sleeve is prepared using ball milling and machining, it is quality controllable in production process, it will not go out The process of existing machinery performance change, production efficiency is fast, and save the cost is discharged without waste iron filing in production process, environmentally protective, operation The performance of process control, the grout sleeve various aspects being prepared is more excellent, therefore the application that should be widely promoted;
(2) it is equipped with circular arc shearing slot inside and outside the full grout sleeve of extruding of the invention and both ends are closed up, enhances sleeve sheet The tensile strength of body, unstressed centrostigma, tensile strength >=600MPa, rate elongation >=16% of having no progeny, yield strength >=355MPa, Various aspects of performance is superior to the full grout sleeve being prepared using traditional handicraft.
Specific embodiment
Embodiment of the present invention is described in detail below in conjunction with embodiment, but those skilled in the art will Understand, the following example is merely to illustrate the present invention, and is not construed as limiting the scope of the invention.It is not specified in embodiment specific Condition person carries out according to conventional conditions or manufacturer's recommended conditions.Reagents or instruments used without specified manufacturer is The conventional products that can be obtained by commercially available purchase.
Embodiment 1
A kind of preparation method of full grout sleeve includes the following steps:
1) raw material rod iron is examined, and the material of rod iron is No. 45 steel;
2) it is cut out;
3) hot piercing;
4) scale removal phospholeum: it is 20%, pH that the processed sleeve hollow billet of above-mentioned steps, which is immersed pickling solution concentration, 25min in≤2 pickling liquid bath;It immerses in the first rinse bath, then slings after the good sleeve hollow billet of pickling is drained, so up and down It lifts by crane 2-3 times repeatedly and spent acid is washed;It immerses in the second rinse bath, then slings again, so lift by crane 2-3 progress repeatedly up and down Cleaning;Then phosphating solution pH=2 is immersed after cleaned sleeve hollow billet being drained, temperature is phosphatization in 75 DEG C of phosphatization liquid baths 20min;It immerses in third rinse bath, then slings after the good sleeve hollow billet of phosphatization is drained again, so lift by crane 2~3 repeatedly up and down It is secondary to be cleaned;It immerses in the saponification liquid bath that saponification liquor temperature is 80 DEG C and is saponified after finally cleaned sleeve hollow billet is drained 15min, then hang on material stock frame and place naturally dry;
5) cold rolling;
6) primary annealing: the sleeve hollow billet after cold rolling is placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 600 DEG C, and annealing time is 25min, and will treated sleeve hollow billet correlated performance detection;
7) draw is squeezed after cutting, grout sleeve mold is made of 8 valves, and extruded length is comprehensive to be pressed up to 200mm Power, it is relatively high to the toughness reguirements of Steel material;
8) double annealing is handled: the sleeve hollow billet after cold rolling being placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 550 DEG C, and annealing time is 20min, and sleeve hollow billet correlated performance detects by treated;
9) grout nipple is bored, attacks grout nipple silk, after drill centers, mark knowledge, assembling assembly, last test package storage.
Embodiment 2
A kind of preparation method of full grout sleeve includes the following steps:
1) raw material rod iron is examined, and the material of rod iron is No. 45 steel, and the elongation percentage of Steel material is 18%;
2) it is cut out;
3) hot piercing;
4) scale removal phospholeum: it is 20%, pH that the processed sleeve hollow billet of above-mentioned steps, which is immersed pickling solution concentration, 25min in≤2 pickling liquid bath;It immerses in the first rinse bath, then slings after the good sleeve hollow billet of pickling is drained, so up and down It lifts by crane 2-3 times repeatedly and spent acid is washed;It immerses in the second rinse bath, then slings again, so lift by crane 2-3 progress repeatedly up and down Cleaning;Then phosphating solution pH=2 is immersed after cleaned sleeve hollow billet being drained, temperature is phosphatization in 75 DEG C of phosphatization liquid baths 20min;It immerses in third rinse bath, then slings after the good sleeve hollow billet of phosphatization is drained again, so lift by crane 2~3 repeatedly up and down It is secondary to be cleaned;It immerses in the saponification liquid bath that saponification liquor temperature is 80 DEG C and is saponified after finally cleaned sleeve hollow billet is drained 15min, then hang on material stock frame and place naturally dry;
5) cold rolling;
6) primary annealing: the sleeve hollow billet after cold rolling is placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 660 DEG C, and that once anneals adds Hot rate is 9 DEG C/min, annealing time 25min, and will treated sleeve hollow billet correlated performance detection;
7) draw is squeezed after cutting, grout sleeve mold is made of 8 valves, and up to 200mm, squeezing diameter can contract extruded length Small 6mm, it is comprehensive to be under pressure, it is relatively high to the toughness reguirements of Steel material;
8) double annealing is handled: the sleeve hollow billet after cold rolling being placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 600 DEG C, and double annealing adds Hot rate is 8 DEG C/min, annealing time 15min, and sleeve hollow billet correlated performance detects by treated;
9) grout nipple is bored, attacks grout nipple silk, after drill centers, mark knowledge, assembling assembly, last test package storage.
Embodiment 3
Concrete operation step and embodiment 2 are almost the same, and only difference is:
6) primary annealing: the sleeve hollow billet after cold rolling is placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 620 DEG C, and that once anneals adds Hot rate is 8.5 DEG C/min, annealing time 24min, and will treated sleeve hollow billet correlated performance detection;
7) draw is squeezed after cutting, grout sleeve mold is made of 8 valves, and up to 200mm, squeezing diameter can contract extruded length Small 5mm, it is comprehensive to be under pressure, it is relatively high to the toughness reguirements of Steel material;
8) double annealing is handled: the sleeve hollow billet after cold rolling being placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 560 DEG C, and double annealing adds Hot rate is 8.4 DEG C/min, annealing time 19min, and sleeve hollow billet correlated performance detects by treated.
Embodiment 4
Concrete operation step and embodiment 2 are almost the same, and only difference is:
6) primary annealing: the sleeve hollow billet after cold rolling is placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 620 DEG C, and that once anneals adds Hot rate is 8.5 DEG C/min, annealing time 24min, and will treated sleeve hollow billet correlated performance detection;
7) draw is squeezed after cutting, grout sleeve mold is made of 8 valves, and up to 200mm, squeezing diameter can contract extruded length Small 6mm, it is comprehensive to be under pressure, it is relatively high to the toughness reguirements of Steel material;
8) double annealing is handled: the sleeve hollow billet after cold rolling being placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 580 DEG C, and double annealing adds Hot rate is 8.4 DEG C/min, annealing time 18min, and sleeve hollow billet correlated performance detects by treated.
Embodiment 5
Concrete operation step and embodiment 2 are almost the same, and only difference is:
6) primary annealing: the sleeve hollow billet after cold rolling is placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 650 DEG C, and that once anneals adds Hot rate is 8.6 DEG C/min, annealing time 21min, and will treated sleeve hollow billet correlated performance detection;
7) draw is squeezed after cutting, grout sleeve mold is made of 8 valves, and up to 180mm, squeezing diameter can contract extruded length Small 6mm, it is comprehensive to be under pressure, it is relatively high to the toughness reguirements of Steel material;
8) double annealing is handled: the sleeve hollow billet after cold rolling being placed in continuous annealing furnace and carries out continuous annealing treatment, even 7 nozzles are set on continuous annealing furnace, the air quantity of continuous annealing furnace is set as greatly, and annealing temperature is set as 570 DEG C, and double annealing adds Hot rate is 8.4 DEG C/min, annealing time 18min, and sleeve hollow billet correlated performance detects by treated.
Comparative example 1
Body operating procedure and embodiment 5 are almost the same, and only difference is: the temperature once made annealing treatment is 700 DEG C, is moved back The fiery time is 1h.
Comparative example 2
Body operating procedure and embodiment 5 are almost the same, and only difference is: the temperature of double annealing processing is 400 DEG C, is moved back The fiery time is 10min.
Comparative example 3
Grout sleeve is prepared according to the preparation process of following spheroidal graphite cast-iron: being made according to certain chemical component element molten iron Smelting, spheroidising, casting;By obtained cast iron through 930 DEG C of -1100 DEG C of heating, furnace cooling after soaking in 2-4 hours is kept the temperature, Obtain ferrite ductile cast iron grout sleeve;
In above-mentioned technical process, needs to add chemical element and carry out certain temperature control, chemical element ratio is bad Control, the constructional transfer for pouring mold influence the quality of sleeve itself, such as the problems such as stomata.
Comparative example 4
Grout sleeve is prepared according to the preparation process being machined as follows:
1) raw material rod iron is examined, and the material of rod iron is No. 45 steel, and the elongation percentage of Steel material is 18%;
2) it is cut out;
3) hot piercing;
4) scale removal phospholeum: it is 20%, pH that the processed sleeve hollow billet of above-mentioned steps, which is immersed pickling solution concentration, 25min in≤2 pickling liquid bath;It immerses in the first rinse bath, then slings after the good sleeve hollow billet of pickling is drained, so up and down It lifts by crane 2-3 times repeatedly and spent acid is washed;It immerses in the second rinse bath, then slings again, so lift by crane 2-3 progress repeatedly up and down Cleaning;Then phosphating solution pH=2 is immersed after cleaned sleeve hollow billet being drained, temperature is phosphatization in 75 DEG C of phosphatization liquid baths 20min;It immerses in third rinse bath, then slings after the good sleeve hollow billet of phosphatization is drained again, so lift by crane 2~3 repeatedly up and down It is secondary to be cleaned;It immerses in the saponification liquid bath that saponification liquor temperature is 80 DEG C and is saponified after finally cleaned sleeve hollow billet is drained 15min, then hang on material stock frame and place naturally dry;
5) cold rolling;
6) overall length is cut, car shearing slot shears slot outside vehicle, bores grout nipple, attacks grout nipple silk, after drill centers, mark knows, Assembling assembly, last test package storage.
Mach thickness is thick, and production efficiency is low.
Experimental example 1
The performance for the grout sleeve that each embodiment is prepared with comparative example is tested, concrete outcome such as the following table 1 institute Show.
1 test result of table compares
From above-mentioned test result can be seen that full grout sleeve that the extrusion process of the embodiment of the present invention is prepared from appearance, Aspect of performance show it is more excellent, if but do not adjusted for annealing operation parameter important in preparation process of the invention Into claimed range of the invention, the quality of grout sleeve itself is certain to have a certain impact, because if annealing Temperature is too high, too low its can all influence the microstructure in Steel material itself, to be easy to cause cracking, is not achieved ideal Intensity, if same annealing time it is too long, it is too short also full grout sleeve can be made to easily deform, influence its mechanical property It can, it is therefore desirable to which manufacture craft according to the invention carries out.
Although illustrate and describing the present invention with specific embodiment, it will be appreciated that without departing substantially from of the invention Many other change and modification can be made in the case where spirit and scope.It is, therefore, intended that in the following claims Including belonging to all such changes and modifications in the scope of the invention.

Claims (10)

1. a kind of preparation method for squeezing the full grout sleeve of steel, which comprises the steps of:
(A) then the sleeve hollow billet Jing Guo cold rolling squeezes the draw at 600-660 DEG C of primary annealing 20-25min;
(B) by the processed casing of above-mentioned steps after 550-600 DEG C of double annealing handles 15-20min, processing and forming.
2. preparation method according to claim 1, which is characterized in that in the step (A), 620-650 DEG C of primary annealing Handle 21-24min;
Preferably, the rate of heat addition once annealed is controlled in 8-9 DEG C/min.
3. preparation method according to claim 1, which is characterized in that in the step (B), 560-580 DEG C of double annealing Handle 18-19min.
Preferably, the rate of heat addition of double annealing is controlled in 8-9 DEG C/min.
4. preparation method according to claim 1, which is characterized in that in the step (A), before cold rolling, successively wrap Include following steps: the step of rod iron is passed through into cutting, hot piercing, scale removal phospholeum.
5. the preparation method according to claim 4, which is characterized in that in the step (A), Steel material that rod iron uses for No. 45 steel, the elongation control of the Steel material is 16% or more.
6. preparation method according to claim 1-5, which is characterized in that in the step (B), processing and forming Step successively includes: brill grout nipple, attacks grout nipple silk, after drill centers, mark knowledge, assembling assembly.
7. preparation method according to claim 6, which is characterized in that in the step (A), squeeze the set during the draw Cylinder compressive plane length control is in 220mm or less.
8. preparation method according to claim 7, which is characterized in that in the step (B), sleeve diameter contracting after extruding It is small in 6mm or less;
Preferably, the mold that both ends are all made of multiple fissions during the extruding draw forms a complete grout sleeve week shape Shape, effect of the mold of multiple fissions Jing Guo hydraulic coupling are shunk simultaneously, form a plurality of contraction trace in grouting end outer circle to carry out It squeezes.
9. the full grout sleeve of extruding that the described in any item preparation methods of claim 1-8 are prepared.
10. according to claim 9 squeeze full grout sleeve, which is characterized in that the tensile strength of the full grout sleeve >=600MPa, rate elongation >=16% of having no progeny, yield strength >=355MPa.
CN201811109782.7A 2018-09-21 2018-09-21 Full grout sleeve of a kind of extruding steel and preparation method thereof Pending CN108979010A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811109782.7A CN108979010A (en) 2018-09-21 2018-09-21 Full grout sleeve of a kind of extruding steel and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811109782.7A CN108979010A (en) 2018-09-21 2018-09-21 Full grout sleeve of a kind of extruding steel and preparation method thereof

Publications (1)

Publication Number Publication Date
CN108979010A true CN108979010A (en) 2018-12-11

Family

ID=64546529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811109782.7A Pending CN108979010A (en) 2018-09-21 2018-09-21 Full grout sleeve of a kind of extruding steel and preparation method thereof

Country Status (1)

Country Link
CN (1) CN108979010A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11279666A (en) * 1998-03-27 1999-10-12 Nippon Steel Corp Outlet side press roll for electric heating device and method for preventing breakage of roll
CN101386037A (en) * 2008-10-29 2009-03-18 常熟市旋力轴承钢管有限公司 Treatment technique of 1010 steel for bearing ring
CN103758292A (en) * 2014-01-24 2014-04-30 东南大学 Shearing reinforcing type full-grouting sleeve
CN104338778A (en) * 2013-07-31 2015-02-11 无锡大金高精度冷拔钢管有限公司 Method for manufacturing precise inner hole honing tube
CN104338781A (en) * 2013-07-31 2015-02-11 无锡大金高精度冷拔钢管有限公司 Method for manufacturing high-hardness cold-drawn steel tube

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11279666A (en) * 1998-03-27 1999-10-12 Nippon Steel Corp Outlet side press roll for electric heating device and method for preventing breakage of roll
CN101386037A (en) * 2008-10-29 2009-03-18 常熟市旋力轴承钢管有限公司 Treatment technique of 1010 steel for bearing ring
CN104338778A (en) * 2013-07-31 2015-02-11 无锡大金高精度冷拔钢管有限公司 Method for manufacturing precise inner hole honing tube
CN104338781A (en) * 2013-07-31 2015-02-11 无锡大金高精度冷拔钢管有限公司 Method for manufacturing high-hardness cold-drawn steel tube
CN103758292A (en) * 2014-01-24 2014-04-30 东南大学 Shearing reinforcing type full-grouting sleeve
CN103758292B (en) * 2014-01-24 2016-04-06 东南大学 The full grout sleeve of a kind of shearing enhancement mode

Similar Documents

Publication Publication Date Title
CN104722702B (en) Supercritical unit high temperature steam pipeline forging molding process
CN107116339B (en) A kind of zirconium alloy cladding tubing preparation process
CN104511726B (en) Five cylinder pressure break pump crankcase manufacture method of Whole fiber Integral die-forged
CN101825200A (en) Titanium alloy TC4 hot-rolled tube and production method thereof
CN103846305A (en) Preparation machining method of large-diameter pipe material and special-shaped pipe fitting
CN111906498A (en) Processing method of TA18 titanium alloy seamless pipe for bicycle frame
CN104561651A (en) Titanium alloy (Ti5563) rolled pipe and preparation method thereof
CN105986144A (en) Titanium alloy TA18 seamless pipe and preparation method thereof
CN103540796A (en) Titanium alloy (TC11) rolled tube and preparation method thereof
CN108421839A (en) A kind of flat-bulb steel diplopore model extrusion method
CN110252918A (en) 3D printing powder Ti2The preparation method of AlNb based alloy bar
CN108979009A (en) A kind of half grout sleeve of extruding steel and preparation method thereof
CN105215242B (en) Method for forging concavity mold cavity module
CN105441713A (en) A titanium alloy seamless tube and a manufacturing method thereof
CN109371335B (en) Steel for ultrahigh-strength marine hose and preparation method thereof
CN108979010A (en) Full grout sleeve of a kind of extruding steel and preparation method thereof
CN106947852B (en) A method of it improves to cast and squeezes combined shaping large-sized heavy-wall tube performance
CN109513766A (en) A kind of manufacturing method of high concentricity martensitic stainless steel seamless pipe material
CN117245045A (en) Forging method of large-size Ti80 titanium alloy forging stock
CN102465200A (en) Manufacture method for seamless steel tube
KR20140006186A (en) Holding part forming type upsetting dies for a heavy metal forging process and the heavy metal forging process by it
CN107574336A (en) A kind of titanium alloy and preparation method thereof
CN112080621A (en) Pipe die material and post-forging heat treatment method thereof
CN103056164B (en) Reinforced chilled roll and preparation method thereof
CN106541063B (en) A kind of high-strength ductile cast iron forging method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211

RJ01 Rejection of invention patent application after publication