CN108930228A - The construction method of bent cap hoop bracket overall pulling down - Google Patents

The construction method of bent cap hoop bracket overall pulling down Download PDF

Info

Publication number
CN108930228A
CN108930228A CN201810886407.7A CN201810886407A CN108930228A CN 108930228 A CN108930228 A CN 108930228A CN 201810886407 A CN201810886407 A CN 201810886407A CN 108930228 A CN108930228 A CN 108930228A
Authority
CN
China
Prior art keywords
bent cap
bracket
wirerope
pressure
bearing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810886407.7A
Other languages
Chinese (zh)
Inventor
何德华
郭贤
郭一贤
冯永斌
曾韵
陈建宁
余跃
颜苓
龙舜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Testing Co
Original Assignee
Guangzhou Municipal Engineering Testing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Municipal Engineering Testing Co filed Critical Guangzhou Municipal Engineering Testing Co
Priority to CN201810886407.7A priority Critical patent/CN108930228A/en
Publication of CN108930228A publication Critical patent/CN108930228A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of construction methods of bent cap hoop bracket overall pulling down, comprising the following steps: S1: installation pressure-bearing device;S2: installation wirerope;S3: first time stress system conversion;The conversion of S4: second stress system;S5: bracket is hung down and drops to ground.The construction method of bent cap hoop bracket overall pulling down of the invention, it is converted by carrying out stress system twice, decomposition dismounting is carried out so that hoop bracket integrally be hung down and be down to ground, to reduce a large amount of high altitude operation and hoisting and hanging operation, the dismounting efficiency for improving bent cap hoop bracket, has ensured the safety of construction personnel.

Description

The construction method of bent cap hoop bracket overall pulling down
Technical field
The present invention relates to bridge construction technology fields, and in particular to a kind of construction party of bent cap hoop bracket overall pulling down Method.
Background technique
As the construction technology of bridge construction is continuously improved, Coping Construction falsework is various informative, wherein Hold Hoop method branch The relatively traditional full framing of frame rides over pier stud top using the bridge pier poured is outstanding, has power transmission simple, it is heavy that there is no brackets Drop, without carrying out basement process, nor affects on current advantage;It is opposite to cross the suspended scaffolds such as fashioned iron, utilize anchor ear and pier For frictional force as structure dead load and construction loads bearing capacity, having will not influence pillarwork between column, will not be to pier stud appearance The advantages that impacting more and more is used in bridge construction.
But there is also deficiencies for Hold Hoop method bracket, belong to suspended scaffold, fulcrum is located at bridge pier column top, supporting structure Girder across footpath be equal to the across footpath of bent cap structure, secondary beam across footpath is equal to pier stud diameter, opposite other types strutting system it is similar The big many of component across footpath.In order to ensure bracket meets the requirement of construction safety and service performance, bracket mostly uses bending resistant section The big truss of modulus or relatively large fashioned iron, support element self weight is also larger, and bent cap structure pour after press bracket, remove space-time Between it is limited, traditionally construct bent cap Hold Hoop method bracket, a large amount of high altitude operation and hoisting and hanging operation, Ren Yuanchi will be generated The continuous high-risk operations time is long, long in time limit, and it is big that construction safety controls difficulty.
Summary of the invention
In order to overcome the above technical problems, the present invention provides a kind of construction method of bent cap hoop bracket overall pulling down, Reduce worker the high altitude operation time and a large amount of hoisting and hanging operation, improve the dismounting efficiency of bent cap hoop bracket, protect The safety of construction personnel is hindered.
To achieve the above object, the construction method of a kind of bent cap hoop bracket overall pulling down provided by the present invention, it is special Sign is, comprising the following steps:
S1: the pressure-bearing device installation pressure-bearing device: is placed on 1/2 cantilever position of bent cap with crane;
S2: installation wirerope: one end of wirerope is fixed on to the upper end of the bracket, the other end of wirerope is fixed on On the pressure-bearing device, the pressure of wirerope is passed into bent cap by the pressure-bearing device, and connect in wirerope and bent cap The property at parts of edges and corners of touching is protected with gasket;
S3: the conversion of first time stress system: first pine removes holder jacking, then pine removes anchor ear bolt, and with wirerope by anchor ear It is fixed below the bracket, after anchor ear bolt whole pine removes, the gravity of entire bracket is born by the pressure-bearing device completely, Complete the conversion of first time stress system;
The conversion of S4: second stress system: the hook of crane is connect with the end of the bracket with wirerope, is utilized Crane lifting wirerope makes bracket rise about 2cm, and the stress of pressure-bearing device is made to be completely transferred to crane, complete second by Power system transform;
S5: bracket is hung down and drops to ground: the wirerope on pressure-bearing device is released, then utilize crane by hoop bracket Whole hang down drops to ground.
Further, in the step S1, fillet is bundled into the cuboid flitch heap of 2m*1m*1m with wirerope, Using the cuboid flitch heap as the load carrier.
Further, in the step S1, the quantity of the load carrier is two, and two load carriers are symmetrical Set on 1/2 cantilever position of the bent cap.
Further, in the step S2, the gasket is rubber block.
Further, specific steps of the pine except holder jacking in the step S3 are as follows: the spinner of runing rest jacking, until Until rack template is detached from bent cap 10cm.
A kind of construction method of bent cap hoop bracket overall pulling down provided by the present invention compared with the prior art, have with Lower technical effect:
The present invention by carry out twice stress system convert, thus by hoop bracket integrally hang down be down to ground carry out decompose tear open It removes, to reduce a large amount of high altitude operation and hoisting and hanging operation, improves the dismounting efficiency of bent cap hoop bracket, ensure The safety of construction personnel.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of bent cap hoop bracket of the embodiment of the present invention.
Wherein, 1, pressure-bearing device, 2, bent cap, 3, wirerope, 4, bracket, 5, holder jacking, 6, anchor ear, 7, pier stud.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
A kind of construction method of bent cap hoop bracket overall pulling down of the present invention, comprising the following steps:
S1: the pressure-bearing device 1 installation pressure-bearing device 1: is placed on the bent cap 2 with crane (not shown) 1/2 cantilever position;
S2: one end of wirerope 3: being fixed on the upper end of the bracket 4 by installation wirerope 3, and the other end of wirerope 3 is solid It is scheduled on the pressure-bearing device 1, the pressure of wirerope 3 is passed into bent cap 2 by the pressure-bearing device 1, and in wirerope 3 The property at parts of edges and corners contacted with bent cap 2 is protected with gasket (not shown);
S3: the conversion of first time stress system: first pine removes holder jacking 5, then pine removes anchor ear bolt, and will be embraced with wirerope 3 Hoop 6 is fixed on the lower section of the bracket 4, and after anchor ear bolt whole pine removes, the gravity of entire bracket 4 is filled by the pressure-bearing completely 1 receiving is set, the conversion of first time stress system is completed;
S4: second stress system conversion: by the end steel of the hook and the bracket 4 of crane (not shown) Cord connection makes bracket 4 rise about 2cm, has been completely transferred to the stress of pressure-bearing device 1 using crane lifting wirerope 3 Heavy-duty machine completes second of stress system conversion;
S5: bracket 4 being hung down and drops to ground: the wirerope 3 on pressure-bearing device 1 is released, and then utilizes crane by anchor ear Whole hang down of bracket 4 drops to ground.
The present invention is converted by carrying out stress system twice, is down to ground and carries out decomposition dismounting whole hang down of hoop bracket 4, To reduce a large amount of high altitude operation and hoisting and hanging operation, the dismounting efficiency of bent cap hoop bracket 4 is improved, has ensured and has applied The safety of worker person.
In embodiments of the present invention, it is preferable that in the step S1, with wirerope by the flitch of the 10cm*10cm of 2m long Item is bundled into the cuboid flitch heap of 2m*1m*1m, using the cuboid flitch heap as the load carrier 1.
Preferably, in the step S1, the quantity of the load carrier 1 is two, and two load carriers 1 are symmetrical Set on 1/2 cantilever position of the bent cap 2.
Preferably, in the step S2, the gasket is rubber block.
Preferably, specific steps of the pine except holder jacking 5 in the step S3 are as follows: the spinner of runing rest jacking 5, until Until rack template is detached from 2 top 10cm of bent cap.
To sum up, a kind of construction method of bent cap hoop bracket overall pulling down provided by the present invention, the present invention pass through progress Stress system is converted twice, decomposition dismounting is carried out so that 4 entirety of hoop bracket be hung down and be down to ground, to reduce a large amount of height Idle job and hoisting and hanging operation improve the dismounting efficiency of bent cap hoop bracket 4, have ensured the safety of construction personnel.
The above is only the preferred embodiment of the present invention, it is noted that those skilled in the art are come It says, without departing from the technical principles of the invention, several improvement and replacement can also be made, these are improved and replacement is also answered It is considered as protection scope of the present invention.

Claims (5)

1. a kind of construction method of bent cap hoop bracket overall pulling down, which comprises the following steps:
S1: the pressure-bearing device installation pressure-bearing device: is placed on 1/2 cantilever position of bent cap with crane;
S2: one end of wirerope: being fixed on the upper end of the bracket by installation wirerope, and the other end of wirerope is fixed on described On pressure-bearing device, the pressure of wirerope is passed into bent cap by the pressure-bearing device, and contacted in wirerope with bent cap Property at parts of edges and corners is protected with gasket;
S3: the conversion of first time stress system: first pine removes holder jacking, then pine removes anchor ear bolt, and is fixed anchor ear with wirerope Below the bracket, after anchor ear bolt whole pine removes, the gravity of entire bracket is born by the pressure-bearing device completely, is completed The conversion of first time stress system;
The conversion of S4: second stress system: the hook of crane is connect with the end of the bracket with wirerope, lifting is utilized Machine lifting wirerope makes bracket rise about 2cm, so that the stress of pressure-bearing device is completely transferred to crane, completes second of beaer System's conversion;
S5: bracket is hung down and drops to ground: the wirerope on pressure-bearing device is released, it is then using crane that hoop bracket is whole It hangs down and drops to ground.
2. the construction method of bent cap hoop bracket overall pulling down as described in claim 1, which is characterized in that the step S1 In, fillet is bundled into the cuboid flitch heap of 2m*1m*1m with wirerope, the cuboid flitch heap is held as described in Refitting is set.
3. the construction method of bent cap hoop bracket overall pulling down as described in claim 1, which is characterized in that the step S1 In, the quantity of the load carrier is two, and two load carriers are symmetrically set in 1/2 cantilever position of the bent cap.
4. the construction method of bent cap hoop bracket overall pulling down as described in claim 1, which is characterized in that the step S2 In, the gasket is rubber block.
5. the construction method of bent cap hoop bracket overall pulling down as described in claim 1, which is characterized in that in the step S3 Pine removes the specific steps of holder jacking are as follows: the spinner of runing rest jacking, until rack template is detached from bent cap 10cm.
CN201810886407.7A 2018-08-06 2018-08-06 The construction method of bent cap hoop bracket overall pulling down Pending CN108930228A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810886407.7A CN108930228A (en) 2018-08-06 2018-08-06 The construction method of bent cap hoop bracket overall pulling down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810886407.7A CN108930228A (en) 2018-08-06 2018-08-06 The construction method of bent cap hoop bracket overall pulling down

Publications (1)

Publication Number Publication Date
CN108930228A true CN108930228A (en) 2018-12-04

Family

ID=64444811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810886407.7A Pending CN108930228A (en) 2018-08-06 2018-08-06 The construction method of bent cap hoop bracket overall pulling down

Country Status (1)

Country Link
CN (1) CN108930228A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110438911A (en) * 2019-07-22 2019-11-12 安徽省交通建设股份有限公司 The construction method of the ecological dismounting structure in Urban Bridge part
CN111620223A (en) * 2020-05-25 2020-09-04 中铁建工集团有限公司 Construction method for lifting net rack through secondary stress conversion of support
CN111764261A (en) * 2020-06-04 2020-10-13 上海建工四建集团有限公司 Structure and method for converting stress state of large cantilever lifting basket type prefabricated bent cap
CN112144417A (en) * 2020-10-12 2020-12-29 中建八局第一建设有限公司 Construction device and construction method for hollow coping of special-shaped pier gem
CN113481869A (en) * 2021-08-06 2021-10-08 中交路桥华东工程有限公司 Method for assembling and disassembling capping beam platform
CN114134829A (en) * 2021-12-29 2022-03-04 杭州萧山交通建设管理有限公司 Prestressed hollow slab beam bridge dismantling system and construction method
CN114606870A (en) * 2022-04-02 2022-06-10 中铁六局集团有限公司 Integral dismantling method for hoop-method bent cap supporting system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012852A (en) * 2016-06-15 2016-10-12 江苏燕宁建设工程有限公司 Construction method for overall support removal
CN205775859U (en) * 2016-05-20 2016-12-07 中交第一航务工程局有限公司 Device removed by bridge coping bed die
CN207484292U (en) * 2017-08-11 2018-06-12 中交四公局第三工程有限公司 Bent cap bed die removes device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205775859U (en) * 2016-05-20 2016-12-07 中交第一航务工程局有限公司 Device removed by bridge coping bed die
CN106012852A (en) * 2016-06-15 2016-10-12 江苏燕宁建设工程有限公司 Construction method for overall support removal
CN207484292U (en) * 2017-08-11 2018-06-12 中交四公局第三工程有限公司 Bent cap bed die removes device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
缪玉卢: "公路桥梁独柱双悬臂盖梁施工技术", 《科技与创新》 *
陈海英等: "盖梁抱箍支架整体安拆施工技术", 《市政技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110438911A (en) * 2019-07-22 2019-11-12 安徽省交通建设股份有限公司 The construction method of the ecological dismounting structure in Urban Bridge part
CN111620223A (en) * 2020-05-25 2020-09-04 中铁建工集团有限公司 Construction method for lifting net rack through secondary stress conversion of support
CN111764261A (en) * 2020-06-04 2020-10-13 上海建工四建集团有限公司 Structure and method for converting stress state of large cantilever lifting basket type prefabricated bent cap
CN112144417A (en) * 2020-10-12 2020-12-29 中建八局第一建设有限公司 Construction device and construction method for hollow coping of special-shaped pier gem
CN113481869A (en) * 2021-08-06 2021-10-08 中交路桥华东工程有限公司 Method for assembling and disassembling capping beam platform
CN114134829A (en) * 2021-12-29 2022-03-04 杭州萧山交通建设管理有限公司 Prestressed hollow slab beam bridge dismantling system and construction method
CN114134829B (en) * 2021-12-29 2023-08-08 杭州萧山交通建设管理有限公司 Prestressed hollow slab girder bridge dismantling system and construction method
CN114606870A (en) * 2022-04-02 2022-06-10 中铁六局集团有限公司 Integral dismantling method for hoop-method bent cap supporting system

Similar Documents

Publication Publication Date Title
CN108930228A (en) The construction method of bent cap hoop bracket overall pulling down
CN102900021B (en) Split mounting type bridge wet joint construction method
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN202848940U (en) Chamber roof truss overall declining removal device of large gas chamber
CN204847752U (en) Be used for hanging small -size sectionalised gallows of hook type crane handling
CN207738316U (en) Large scale single wall bottom board steel lifting box integral hoisting suspender
CN113481869A (en) Method for assembling and disassembling capping beam platform
CN105836640A (en) Self-climbing fixing device and method for climbing tower crane
CN201176365Y (en) Light-duty adjustable hanger
CN202754690U (en) Large weight hoisting tools with center of gravity deviating from geometric center to one side
CN201411911Y (en) Suspension attachment for pre-stressing tensioning jack
CN211815662U (en) Cable force conversion device for replacing suspender
CN104129730B (en) A kind of transformer and JP cabinet dismounting suspender
CN106044580A (en) Whole lifting method of wet electrostatic dust removing device body equipment
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN210457169U (en) Novel lifting appliance suitable for lifting all sections of steel trussed beams of suspension bridge
CN210658016U (en) Trolley for movably dismounting bridge guardrail template
CN216042679U (en) Unsettled pipeline mounting tool
CN219469429U (en) Roof color plate lifting device
CN2216104Y (en) Hanging lift scaffold
CN218420711U (en) Safety belt fastening and hanging device for operation at bottom of bridge
CN209262658U (en) A kind of reinforcement by connection structure when gas chamber piston system hangs are removed
CN212503607U (en) Panel lifting frame for construction
CN220598178U (en) Cover beam bracket convenient to detach
CN201581649U (en) Strung-hung carrying pole beam for mounting of high multi-layer steel structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181204

RJ01 Rejection of invention patent application after publication