CN108920860A - 一种gil管廊工程数字化建模方法 - Google Patents
一种gil管廊工程数字化建模方法 Download PDFInfo
- Publication number
- CN108920860A CN108920860A CN201810782623.7A CN201810782623A CN108920860A CN 108920860 A CN108920860 A CN 108920860A CN 201810782623 A CN201810782623 A CN 201810782623A CN 108920860 A CN108920860 A CN 108920860A
- Authority
- CN
- China
- Prior art keywords
- model
- equipment
- modeling
- data
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000010276 construction Methods 0.000 claims abstract description 16
- 238000013461 design Methods 0.000 claims abstract description 10
- 238000011161 development Methods 0.000 claims abstract description 9
- 238000004088 simulation Methods 0.000 claims abstract description 8
- 238000011282 treatment Methods 0.000 claims abstract description 3
- 125000000174 L-prolyl group Chemical group [H]N1C([H])([H])C([H])([H])C([H])([H])[C@@]1([H])C(*)=O 0.000 claims description 6
- 230000002452 interceptive effect Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 2
- 241001269238 Data Species 0.000 abstract description 2
- 239000000463 material Substances 0.000 abstract description 2
- 230000000007 visual effect Effects 0.000 abstract 1
- 230000018109 developmental process Effects 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 5
- 230000006870 function Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 239000004703 cross-linked polyethylene Substances 0.000 description 1
- 229920003020 cross-linked polyethylene Polymers 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810782623.7A CN108920860A (zh) | 2018-07-17 | 2018-07-17 | 一种gil管廊工程数字化建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810782623.7A CN108920860A (zh) | 2018-07-17 | 2018-07-17 | 一种gil管廊工程数字化建模方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108920860A true CN108920860A (zh) | 2018-11-30 |
Family
ID=64414443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810782623.7A Pending CN108920860A (zh) | 2018-07-17 | 2018-07-17 | 一种gil管廊工程数字化建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108920860A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114397815A (zh) * | 2021-12-14 | 2022-04-26 | 国网江苏省电力工程咨询有限公司 | 一种基于电力管廊及运维监控***的精准甄控方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101082993A (zh) * | 2006-06-02 | 2007-12-05 | 中国农业机械化科学研究院 | 一种数字化机械设计方法 |
CN106354943A (zh) * | 2016-08-31 | 2017-01-25 | 赖正伦 | 一种工程模块化制造***及其制造方法 |
CN106960410A (zh) * | 2017-03-30 | 2017-07-18 | 中建地下空间有限公司 | 基于bim和gis技术的地下综合管廊信息管理方法 |
CN107967398A (zh) * | 2017-12-12 | 2018-04-27 | 北京航空航天大学 | 一种产品可靠性分析方法及装置 |
-
2018
- 2018-07-17 CN CN201810782623.7A patent/CN108920860A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101082993A (zh) * | 2006-06-02 | 2007-12-05 | 中国农业机械化科学研究院 | 一种数字化机械设计方法 |
CN106354943A (zh) * | 2016-08-31 | 2017-01-25 | 赖正伦 | 一种工程模块化制造***及其制造方法 |
CN106960410A (zh) * | 2017-03-30 | 2017-07-18 | 中建地下空间有限公司 | 基于bim和gis技术的地下综合管廊信息管理方法 |
CN107967398A (zh) * | 2017-12-12 | 2018-04-27 | 北京航空航天大学 | 一种产品可靠性分析方法及装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114397815A (zh) * | 2021-12-14 | 2022-04-26 | 国网江苏省电力工程咨询有限公司 | 一种基于电力管廊及运维监控***的精准甄控方法 |
CN114397815B (zh) * | 2021-12-14 | 2023-08-01 | 国网江苏省电力工程咨询有限公司 | 一种基于电力管廊及运维监控***的精准甄控方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103021024A (zh) | 用于对变电站中的电磁场进行三维可视化展示的方法 | |
CN104166892A (zh) | 一种基于三维设计***的工程管控方法及*** | |
CN204303029U (zh) | 用于地铁管线碰撞检测及后期运营维护的bim数据库*** | |
CN111797450B (zh) | 基于bim的电网工程模型设计***、方法、设备和存储介质 | |
CN102750618A (zh) | 一种地铁综合管线施工辅助管理***及实施方法 | |
Lu et al. | Design and implementation of virtual interactive scene based on unity 3D | |
CN103646091A (zh) | 一种电网图形数据的生成方法及装置 | |
CN110704904A (zh) | 一种多软件协同的变电站三维规划方法 | |
CN116090981A (zh) | 基于ar的施工辅助***、方法、计算机设备及存储介质 | |
CN108920860A (zh) | 一种gil管廊工程数字化建模方法 | |
CN104298800A (zh) | 一种智能变电站的三维集成化模型 | |
CN116341064B (zh) | 基于3DMax建模的智能变电站云***的建模***和方法 | |
Jiang et al. | Virtual reality training environment for electric systems | |
CN113971300A (zh) | 一种桥梁维修改造信息可视化方法 | |
CN116109258A (zh) | 基于bim和ar的施工管理***、方法及计算机设备 | |
Ren et al. | Research on application of construction model based on 4D visualization in construction of intelligent substation | |
Gao | Application of 3D digital technology in the substation design | |
Maik et al. | Flexible photorealistic vr training system for electrical operators | |
CN109117496B (zh) | 一种变电站工程临建布置三维模拟设计方法和*** | |
Zhang | [Retracted] Application of Landscape Architecture 3D Visualization Design System Based on AI Technology | |
Gao | Application of 3d design technology in substation design | |
Mattioli et al. | Semi-automatic generation of virtual reality environments for electric power substations | |
Zhang et al. | Application of 3D modeling and virtual reality technology in power system training | |
CN111080771B (zh) | 一种应用于三维智能辅助设计的信息模型构建方法 | |
Chang et al. | Research and Application of BIM+ GIS Technology for Underground Pipeline of Nuclear Power Plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 210000 Zhongshan Road, Nanjing City, Jiangsu Province, No. 251 Applicant after: STATE GRID JIANGSU ECONOMIC Research Institute Applicant after: STATE GRID JIANGSU ELECTRIC POWER ENGINEERING CONSULTATION Co.,Ltd. Address before: 210000 No. 22, Beijing West Road, Gulou District, Nanjing City, Jiangsu Province Applicant before: STATE GRID JIANGSU ELECTRIC POWER ENGINEERING CONSULTATION Co.,Ltd. Applicant before: STATE GRID JIANGSU ECONOMIC Research Institute |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |