CN108919046A CN201810461211.3A CN201810461211A CN108919046A CN 108919046 A CN108919046 A CN 108919046A CN 201810461211 A CN201810461211 A CN 201810461211A CN 108919046 A CN108919046 A CN 108919046A
Authority
CN
China
Prior art keywords
fault
route
value
examination
decision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810461211.3A
Other languages
Chinese (zh)
Other versions
CN108919046B (en
Inventor
霍健
尹茂林
施冬明
林祺蓉
刘博�
瞿寒冰
臧宏伟
王俏俏
孙雯
牛阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810461211.3A priority Critical patent/CN108919046B/en
Publication of CN108919046A publication Critical patent/CN108919046A/en
Application granted granted Critical
Publication of CN108919046B publication Critical patent/CN108919046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Theoretical Computer Science (AREA)
  • Locating Faults (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The embodiment of the invention discloses a kind of examinations of distribution net work earthing fault to stop route tagmeme decision-making technique and system, route successively stopped to choosing and after non-loaded line road test stops, if not determining fault point yet, tagmeme examination is carried out according to its ground fault Synthetic Measurement value descending sequence to remaining route and is stopped.The present invention provides the reference frame that reliable, scientific, fixed route examination stops sequence for dispatcher, can quickly check the circuit that is out of order, ensure line security.

Description

A kind of examination of distribution net work earthing fault stops route tagmeme decision-making technique and system
Technical field
The present invention relates to power scheduling technical field, specifically a kind of distribution net work earthing fault examination stops route tagmeme and determines Plan method and system.
Background technique
Singlephase earth fault is one of most common failure in distribution system.The power distribution network of neutral point indirect earthing occurs Singlephase earth fault, earth current is smaller, and breaker protection is failure to actuate, and reminds regulation personnel by issuing ground signalling, needs The artificial method for drawing road is taken according to route selection information to judge faulty line and be isolated.Reduce ground fault to the shadow of system power supply It rings, is mainly realized by following two aspect:
First is that identification earth fault line provides ground path information by ground fault electrical quantity Variation Features.It is neutral In the earth-free power distribution network of point, line selection apparatus judges earth fault line by one of following three kinds of principles.
1, zero-sequence current direction method.When single-phase earthing of small current earthing system, ground path zero-sequence current size is equal to same The sum of bus non-fault line zero-sequence current, it is contrary.The direction of all route zero-sequence currents of earth bus, can be used as and sentence The foundation of other earth fault line.
2, current injection method when singlephase earth fault occurs for neutral point non-direct grounding system, passes through Injection Current, tracking Current direction can detecte earth fault, so that it is determined that ground fault section.
3, parallel medium resistance method, in neutral point non-direct grounding system, when singlephase earth fault occurs, neutral point is in short-term The small resistance in parallel with arc suppression coil is put into, parallel low resistance constitutes earth fauit loops, fault current by earth fault Become larger, can detecte earth fault line.
Second is that optimization examination stops line sequence in the case where earthing wire-selecting information is inaccurate, improves examination and stop being directed to for route Property, reduce line outage.
But the above line selection apparatus only passes through low current information and provides 1 possible ground path, and due to ageing equipment, existing The reasons such as field bad environments, route selection accuracy rate is not high, if route selection information errors, ground connection examination will be caused to stop the blindness for the treatment of process Property and ground connection overlong time caused by the person, equipment safety risk.
Summary of the invention
A kind of examination of distribution net work earthing fault is provided in the embodiment of the present invention and stops route tagmeme decision-making technique and system, with solution When certainly ground fault occurs in the prior art, examination stops route inaccuracy, blindness selection examination stops sequence and route is caused to be grounded for a long time, The high problem of security risk.
In order to solve the above-mentioned technical problem, the embodiment of the invention discloses following technical solutions:
The present invention provides a kind of examinations of distribution net work earthing fault to stop route tagmeme decision-making technique, successively stops route and sky to choosing Route is carried to try after stopping, it is descending according to its ground fault Synthetic Measurement value to remaining route if not determining fault point yet Sequence carries out tagmeme examination and stops.
Further, the calculation formula of the ground fault Synthetic Measurement value M is
M=w1m1+w2m2+w3m3
In formula, m1For route historical failure measure value, m2For idle variation fault measurement value, m3For the survey of line construction failure Angle value, w1、w2And w3Respectively route historical failure measure value, idle variation fault measurement value and line construction fault measurement value Weight.
Further, the route historical failure measure value m1Calculation formula be
m1=NfG+fT
fGFor line-to-ground fault history number, fTFor line tripping fault history number, N is coefficient.
Further, the idle variation fault measurement value m2Calculating process be:
According to the accumulative average value of t moment active power, reactive power historical data, obtain distribution line has in t moment The standard value of function power, reactive power;
When ground fault occurs, the changing value of active power before and after failure is calculated;
If the changing value of active power is more than the first setting value, m2Take 0;
If the changing value of active power is less than the first setting value, reactive power is calculated in the bust amount of fault moment;
If bust amount is positive, m2Take bust amount and fault moment idle work variable quantity and failure previous moment idle work variable quantity The relative value of difference;
If bust amount is negative, m2Take 0.
Further, the average value accumulative according to t moment active power, reactive power historical data, obtains distribution Route is in the detailed process of t moment active power, the standard value of reactive power:
Every Fixed Time Interval, the numerical value of the active power and reactive power in distribution line is obtained;
Calculate the relative scale of t moment active power changing value and reactive power changing value;
If the relative scale is more than the second setting value, the numerical value of the moment active power and reactive power is rejected;
If the relative scale is less than the second setting value, the moment active power and reactive power are calculated and stored Accumulative average value, and using accumulative average value as distribution line t moment active power and reactive power standard value.
Further, the line construction fault measurement value m3Calculation formula be
m3=NB*pov
NBFor branch's number of lines, povFor the ratio of overhead transmission line in whole route.
Further, according to obtained m1、m2And m3Value, in conjunction with actual earth fault line, to weight w1、w2And w3 Adaptively adjusted.
Further, described to weight w1、w2And w3The detailed process adaptively adjusted is:
It obtains according to measure value m1、m2And m3The failure examination respectively obtained stops tagmeme nSE1、nSE2And nSE3And it actual connects Earth fault route;
Calculate the variation delta w of weighti=nSEj/(nSE1+nSE2+nSE3), and i+j=4;
According to the variable quantity of weight, to w1、w2And w3It is adaptively adjusted, the formula adaptively adjusted is wi=vwi,+ (1-v)ΔwiV indicates the amplitude adjusted every time.
The present invention also provides a kind of examinations of distribution net work earthing fault to stop route tagmeme decision system, including ground connection examination stops sequence Decision-making module, the ground connection examination stop Sequence Decision module and stop route selection route and nonloaded line for successively trying in ground fault, The ground connection examination stops Sequence Decision module and is also used to remaining route according to descending suitable of its ground fault Synthetic Measurement value Sequence carries out tagmeme examination and stops.
Further, the influence factor of the ground fault Synthetic Measurement value includes route historical failure, idle variation event Barrier and line construction failure, the system also includes the adaptive feedback regulation module of decision parameters, the decision parameters are adaptive Feedback regulation module is used to that practical earth fault line to be combined to carry out the weight of each influence factor of ground fault Synthetic Measurement value Adjustment.
The effect provided in summary of the invention is only the effect of embodiment, rather than invents all whole effects, above-mentioned A technical solution in technical solution has the following advantages that or beneficial effect:
1, on the basis of original examination first stops route selection route and then tries to stop nonloaded line, to remaining all routes according to it Ground fault Synthetic Measurement value determines the size of its ground fault possibility, lists the rational sorting that examination stops route.To dispatch people Member provides reliable, scientific, fixed examination and stops route reference frame, can quickly check the circuit that is out of order, and ensures line security.
2, electrical quantity anomalous variation situation when according to the fault history of route, line construction and failure, quantitatively indicates Every line-to-ground fault possibility ground size, and according to the size of ground fault Synthetic Measurement value, corresponding examination is provided and stops line Road sequence.Overcome influence line-to-ground fault many factors can not comprehensive quantification indicate the shortcomings that.
3, the decision formula of ground fault Synthetic Measurement value is proposed, and proposes the adaptive feedback regulation side of weight parameter Method adjusts the weight parameter of correlative factor in decision formula according to practical ground connection information.To realize decision formula according to practical event Hinder the adaptive adjustment of result.The accuracy of line-to-ground fault Synthetic Measurement decision formula is continuously improved.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, without creative efforts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow diagram of the method for the invention;
Fig. 2 is ground fault Synthetic Measurement value influence factor of the present invention and obtains trying to stop sequence according to Synthetic Measurement value Logical schematic;
Fig. 3 is the distribution system single phase earthing failure schematic diagram of neutral point indirect earthing of the present invention;
Fig. 4 is that active power of the present invention, reactive power add up the calculation flow chart of average value;
Fig. 5 is the idle variation fault measurement value m of the present invention2Calculation flow chart;
Fig. 6 is the flow diagram that weight of the present invention adaptively adjusts.
Specific embodiment
In order to clarify the technical characteristics of the invention, below by specific embodiment, and its attached drawing is combined, to this hair It is bright to be described in detail.Following disclosure provides many different embodiments or example is used to realize different knots of the invention Structure.In order to simplify disclosure of the invention, hereinafter the component of specific examples and setting are described.In addition, the present invention can be with Repeat reference numerals and/or letter in different examples.This repetition is that for purposes of simplicity and clarity, itself is not indicated Relationship between various embodiments and/or setting is discussed.It should be noted that illustrated component is not necessarily to scale in the accompanying drawings It draws.Present invention omits the descriptions to known assemblies and treatment technology and process to avoid the present invention is unnecessarily limiting.
Stop line sequence as shown in Figure 1, stopping Sequence Decision module by ground connection examination and providing ground connection examination, stops in original examination first On the basis of route selection route and nonloaded line, its ground fault may be determined according to its ground fault Synthetic Measurement value to remaining route Property size, list examination and stop the rational sorting of route.Each line-to-ground fault Synthetic Measurement is worth decision formula by route history Failure, line construction failure and idle variation fault condition etc. determine.After determining earth fault line, practical ground path is believed Breath passes through the relevant parameter of the adaptive feedback adjustment module feedback of decision parameters to decision formula, decision formula is continuously improved Order of accuarcy.
In Fig. 1, ground connection examination stops Sequence Decision module after receiving ground fault information, determines route selection according to route selection information Route determines nonloaded line according to line load information.Route selection route is classified as the examination of the first cis-position and stops sequence, nonloaded line is arranged Stop sequence for the examination of the second cis-position, if ground path does not determine after examination stops route selection route and nonloaded line, remaining route examination stops Sequence sorts by ground fault Synthetic Measurement value.Stop after determining ground path according to sequence examination, actual ground path is believed Breath feeds back to the adaptive feedback regulation module of decision parameters, which adjusts ground fault measure function according to practical ground connection information In corresponding influence factor weight, and by parameter assignment adjusted in the decision formula of route.To realize decision formula root The factually adaptive adjustment of border fail result.
As shown in Fig. 2, the ground fault for seeking characterizing its ground fault possibility size is comprehensive for every distribution line Measure value stops sorting according to the examination that respective lines are listed in the sequence of its ground fault Synthetic Measurement value size.
Line-to-ground resultant fault measure value M is by historical failure measure value (m1), idle variation fault measurement value (m2), line Line structure fault measurement value (m3) assign different weight (w1、w2、w3) weighted sum obtains.I.e.
M=w1m1+w2m2+w3m3
For the stability and w for guaranteeing ground fault Synthetic Measurement value M1、w2、w3The feasibility adaptively adjusted, takes w1+w2+ w3=1.
For every faulty line historical failure measure value m1, idle variation fault measurement value m2It is surveyed with line construction failure Angle value m3 specifically calculates method for solving and w1、w2、w3Self-adapting regulation method is as follows:
Line fault historical failure measure value m1:Take m1=NfG+fT, f in formulaGFor line-to-ground fault history number, fTFor Line tripping fault history number, takes fGWeight is fTN times, N takes the value greater than 5, indicates line-to-ground historical failure to route The reference degree of ground fault possibility is much larger than tripping fault.
Fig. 3 illustrates the ground fault in the case of the distribution system single phase earthing of neutral point indirect earthing, and Z, C are respectively The equivalent impedance and equivalent capacitance of route, ZfFor single-phase earthing impedance, iCFor the capacitive earth current of respective lines.Single-phase earthing Afterwards, it is the earth-fault current I that the earth flows to bus that earth fault line, which increases direction,f, therefore it is reflected in reactive power distribution aspect, For the idle output bust of earth fault line.Therefore by control ground fault after the idle situation of change (Δ QF) of distribution line with Difference between the normal reactive power fluctuation (Δ Q) of route characterizes the size of line-to-ground fault possibility.
Idle variation fault measurement value m2Seek by data acquire, screening, memory module complete.Under normal circumstances, it adjusts Spending automated system is 300s (5min) to distribution line active power value, reactive power value, load value sampling interval.For certain One fixed time t takes daily moment (t) active power, reactive power to add up average value respectively, as the distribution line this when Carve the standard value of (t) active reactive, the basis of reference as the idle situation of change of route in the case of singlephase earth fault.
As shown in figure 4, every Fixed Time Interval, acquisition is matched before calculating active power, reactive power adds up average value Active-power P ' (t) in electric linenAnd reactive power Q ' (t)nNumerical value;Calculate t moment active power changing value and idle function The relative scale of rate changing value, calculation formula areIf relative scale is more than the second setting value, the moment is rejected The numerical value of active power and reactive power, accumulative average value is constant, i.e. P (t)n=P (t)n-1;Q(t)n=Q (t)n-1;If comparing Example is less than the second setting value, then calculates and store the accumulative average value of the moment active power and reactive power, t moment is active Power, reactive power add up average value calculation formula be respectively And using accumulative average value as distribution line t moment active power and reactive power standard value.Second sets in the present embodiment Definite value is 1.2, i.e. basisCarry out the screening of numerical value.P'(t),Q'(t)nWhen respectively indicating n-th day t Carve active power, the reactive power of the distribution line, P (t), Q (t)nThe active power of route and idle after indicating accumulative average Performance number.
As shown in figure 5, when ground fault occurs, according to obtained distribution line in t moment active power, reactive power Standard value, calculate the changing value of active power before and after failure, the calculation formula of active power changing value isIf active The changing value of power is more than the first setting value, active power changing value be more than the first setting value when, it is believed that idle variation because Load variations cause, and do not consider because ground fault causes, then m20 is taken, the first setting value takes 1.5 in the present embodiment, that is, meetsm2Take 0;If the changing value of active power is less than the first setting value, reactive power is calculated in failure The bust amount at quarter, bust amount Δ QFCalculation formula be Δ QF=Q ' (t-1)n-Q′(t)nIf bust amount is positive, m2Take bust The relative value of amount and fault moment idle work variable quantity and failure previous moment idle work variable quantity difference, if bust amount is negative, m2 Take 0, i.e.,
Wherein Δ Q=| Q (t-1)n-1-Q(t)n-1|.It should be noted is that the value of m (Δ Q) shown in Fig. 5, that is, decision is public M in formula2Value, because of m2Value be variable, in Fig. 5 with m (Δ Q) indicate.
Line construction fault measurement value m3:Take m3=NB*pov, NBFor branch's number of lines, povFor overhead transmission line in whole route Ratio.More with quantized versions characterization branch's number of lines, the big route of overhead transmission line ratio is by biggish ground fault possibility.
As shown in fig. 6, being carried out after trying to stop according to decision formula, in conjunction with influence factor in actual earth fault line and 3 Fault measurement value m1、m2、m3Order of accuarcy, adjust m1、m2、m3Weighted value in decision formula.Order of accuarcy is higher Increase its weighted value, lower its weighted value of reduction of order of accuarcy.
It is obtained respectively according to measure value m1、m2And m3The failure examination respectively obtained stops tagmeme nSE1、nSE2And nSE3, corresponded to Sequence k1、k2、k3And actual earth fault line;Calculate the variation delta w of weighti, formula is Δ wi=nSEj/(nSE1 +nSE2+nSE3), and i+j=4, nSEjIt indicates and sequence nSEiIn nSE1、nSE2、nSE3Middle sequence kiOpposite sequence number, even ki =1, then kj=3;If ki=2, then kj=2;If ki=3, then kj=1.For example, it is directed to actual earth fault line, if according to It is 2 that sequence is drawn in its examination of line fault historical failure measure value m1;According to idle variation fault measurement value m2It tries to draw sequence to be 3; According to line construction fault measurement value m3It tries to draw sequence to be 4;Then Δ w1=4/ (2+3+4);Δw2=3/ (2+3+4);Δw2= 2/(2+3+4);
According to the variable quantity of weight, to w1、w2And w3It is adaptively adjusted, the formula adaptively adjusted is wi=vwi,+ (1-v)ΔwiThe amplitude that v expression adjusts every time, 0<v<1.
The above is the preferred embodiment of the present invention, for those skilled in the art, Without departing from the principles of the invention, several improvements and modifications can also be made, these improvements and modifications are also regarded as this hair Bright protection scope.

Claims (10)

1. a kind of distribution net work earthing fault examination stops route tagmeme decision-making technique, it is characterized in that:Route and non-loaded line successively are stopped to choosing After road test stops, if not determining fault point, the sequence descending according to its ground fault Synthetic Measurement value to remaining route yet Tagmeme examination is carried out to stop.
2. a kind of distribution net work earthing fault examination according to claim 1 stops route tagmeme decision-making technique, it is characterized in that:It is described The calculation formula of ground fault Synthetic Measurement value M is
M=w1m1+w2m2+w3m3
In formula, m1For route historical failure measure value, m2For idle variation fault measurement value, m3For line construction fault measurement value, w1、w2And w3Respectively route historical failure measure value, the idle power for changing fault measurement value and line construction fault measurement value Weight.
3. a kind of distribution net work earthing fault examination according to claim 2 stops route tagmeme decision-making technique, it is characterized in that:It is described Route historical failure measure value m1Calculation formula be
m1=NfG+fT
fGFor line-to-ground fault history number, fTFor line tripping fault history number, N is coefficient.
4. a kind of distribution net work earthing fault examination according to claim 2 stops route tagmeme decision-making technique, it is characterized in that:It is described Idle variation fault measurement value m2Calculating process be:
According to the accumulative average value of t moment active power, reactive power historical data, distribution line is obtained in t moment wattful power Rate, the standard value of reactive power;
When ground fault occurs, the changing value of active power before and after failure is calculated;
If the changing value of active power is more than the first setting value, m2Take 0;
If the changing value of active power is less than the first setting value, reactive power is calculated in the bust amount of fault moment;
If bust amount is positive, m2Take bust amount and fault moment idle work variable quantity and failure previous moment idle work variable quantity difference Relative value;
If bust amount is negative, m2Take 0.
5. a kind of distribution net work earthing fault examination according to claim 4 stops route tagmeme decision-making technique, it is characterized in that:It is described According to the accumulative average value of t moment active power, reactive power historical data, distribution line is obtained in t moment active power, nothing The detailed process of the standard value of function power is:
Every Fixed Time Interval, the numerical value of the active power and reactive power in distribution line is obtained;
Calculate the relative scale of t moment active power changing value and reactive power changing value;
If the relative scale is more than the second setting value, the numerical value of the moment active power and reactive power is rejected;
If the relative scale is less than the second setting value, the accumulative of the moment active power and reactive power is calculated and stored Average value, and using accumulative average value as distribution line t moment active power and reactive power standard value.
6. a kind of distribution net work earthing fault examination according to claim 2 stops route tagmeme decision-making technique, it is characterized in that:It is described Line construction fault measurement value m3Calculation formula be
m3=NB*pov
NBFor branch's number of lines, povFor the ratio of overhead transmission line in whole route.
7. a kind of distribution net work earthing fault examination according to claim 2 stops route tagmeme decision-making technique, it is characterized in that:According to Obtained m1、m2And m3Value, in conjunction with actual earth fault line, to weight w1、w2And w3Adaptively adjusted.
8. a kind of distribution net work earthing fault examination according to claim 7 stops route tagmeme decision-making technique, it is characterized in that:It is described To weight w1、w2And w3The detailed process adaptively adjusted is:
It obtains according to measure value m1、m2And m3The failure examination respectively obtained stops tagmeme nSE1、nSE2And nSE3And actual ground connection event Hinder route;
Calculate the variation delta w of weighti=nSEj/(nSE1+nSE2+nSE3), and i+j=4;
According to the variable quantity of weight, to w1、w2And w3It is adaptively adjusted, the formula adaptively adjusted isV indicates the amplitude adjusted every time.
9. a kind of distribution net work earthing fault examination stops route tagmeme decision system, including ground connection examination stops Sequence Decision module, described to connect Ground examination stops Sequence Decision module and stops route selection route and nonloaded line for successively trying in ground fault, it is characterized in that:It is described to connect Ground examination stops Sequence Decision module and is also used to carry out remaining route according to the descending sequence of its ground fault Synthetic Measurement value Tagmeme examination stops.
10. a kind of distribution net work earthing fault examination according to claim 9 stops route tagmeme decision system, it is characterized in that:Institute The influence factor for stating ground fault Synthetic Measurement value includes route historical failure, idle variation failure and line construction failure, institute The system of stating further includes the adaptive feedback regulation module of decision parameters, and the adaptive feedback regulation module of decision parameters is for combining Practical earth fault line is adjusted the weight of each influence factor of ground fault Synthetic Measurement value.
CN201810461211.3A 2018-05-15 2018-05-15 Power distribution network ground fault trial stop line sequence decision method and system Active CN108919046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810461211.3A CN108919046B (en) 2018-05-15 2018-05-15 Power distribution network ground fault trial stop line sequence decision method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810461211.3A CN108919046B (en) 2018-05-15 2018-05-15 Power distribution network ground fault trial stop line sequence decision method and system

Publications (2)

Publication Number Publication Date
CN108919046A true CN108919046A (en) 2018-11-30
CN108919046B CN108919046B (en) 2020-11-06

Family

ID=64402427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810461211.3A Active CN108919046B (en) 2018-05-15 2018-05-15 Power distribution network ground fault trial stop line sequence decision method and system

Country Status (1)

Country Link
CN (1) CN108919046B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110488154A (en) * 2019-08-28 2019-11-22 国网四川省电力公司成都供电公司 A kind of small current earthing wire-selecting method for scheduling station end
CN112015160A (en) * 2019-05-31 2020-12-01 北京新能源汽车股份有限公司 Fault temperature determination method and device
CN112394296A (en) * 2019-08-12 2021-02-23 Abb瑞士股份有限公司 Handling of ground faults in high impedance grounded power systems

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560645A (en) * 2004-03-03 2005-01-05 西安交通大学 Small Current earthing line selecting method based on model parametric recognition
CN102097792A (en) * 2010-12-15 2011-06-15 长沙理工大学 Ground fault protection method of distribution network
CN103543376A (en) * 2013-09-09 2014-01-29 国家电网公司 Radial basis function neutral network method used for fault line selection of small current grounding system
CN103605042A (en) * 2013-08-27 2014-02-26 上海交通大学 Ground grid fault diagnosis method based on self-adaptive particle swarm algorithm
CN103728532A (en) * 2013-12-26 2014-04-16 长园深瑞继保自动化有限公司 Power distribution network single-phase grounding fault judging and locating method
CN104833900A (en) * 2015-05-11 2015-08-12 国家电网公司 Integrated line selection method for small-current single-phase grounding fault
CN105629128A (en) * 2016-01-15 2016-06-01 国网河北省电力公司电力科学研究院 Device and searching method for searching power grid undercurrent single-phase earth fault
CN105759171A (en) * 2016-03-30 2016-07-13 广西电网有限责任公司南宁供电局 Method for improving distribution network switching-out inspection efficiency based on distribution line condition evaluation
CN106940411A (en) * 2017-04-21 2017-07-11 国网江苏省电力公司宿迁供电公司 A kind of single-phase ground fault line selecting method of small-electric current grounding system
CN106990332A (en) * 2017-06-06 2017-07-28 国网重庆市电力公司电力科学研究院 A kind of method for locating single-phase ground fault based on power distribution network data processing
CN107329044A (en) * 2017-06-30 2017-11-07 国网江苏省电力公司徐州供电公司 A kind of wire selection method for power distribution network single phase earthing failure based on electric arc transient state component
CN107561414A (en) * 2017-10-31 2018-01-09 国家电网公司 Rapidly find out the selection method and wire selection system in single-phase grounded malfunction in grounded system of low current loop
CN107561404A (en) * 2016-06-30 2018-01-09 中国电力科学研究院 A kind of voltage selection method of resonant earthed system
JP2018004596A (en) * 2016-07-08 2018-01-11 東北電力株式会社 Ground fault detector

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560645A (en) * 2004-03-03 2005-01-05 西安交通大学 Small Current earthing line selecting method based on model parametric recognition
CN102097792A (en) * 2010-12-15 2011-06-15 长沙理工大学 Ground fault protection method of distribution network
CN103605042A (en) * 2013-08-27 2014-02-26 上海交通大学 Ground grid fault diagnosis method based on self-adaptive particle swarm algorithm
CN103543376A (en) * 2013-09-09 2014-01-29 国家电网公司 Radial basis function neutral network method used for fault line selection of small current grounding system
CN103728532A (en) * 2013-12-26 2014-04-16 长园深瑞继保自动化有限公司 Power distribution network single-phase grounding fault judging and locating method
CN104833900A (en) * 2015-05-11 2015-08-12 国家电网公司 Integrated line selection method for small-current single-phase grounding fault
CN105629128A (en) * 2016-01-15 2016-06-01 国网河北省电力公司电力科学研究院 Device and searching method for searching power grid undercurrent single-phase earth fault
CN105759171A (en) * 2016-03-30 2016-07-13 广西电网有限责任公司南宁供电局 Method for improving distribution network switching-out inspection efficiency based on distribution line condition evaluation
CN107561404A (en) * 2016-06-30 2018-01-09 中国电力科学研究院 A kind of voltage selection method of resonant earthed system
JP2018004596A (en) * 2016-07-08 2018-01-11 東北電力株式会社 Ground fault detector
CN106940411A (en) * 2017-04-21 2017-07-11 国网江苏省电力公司宿迁供电公司 A kind of single-phase ground fault line selecting method of small-electric current grounding system
CN106990332A (en) * 2017-06-06 2017-07-28 国网重庆市电力公司电力科学研究院 A kind of method for locating single-phase ground fault based on power distribution network data processing
CN107329044A (en) * 2017-06-30 2017-11-07 国网江苏省电力公司徐州供电公司 A kind of wire selection method for power distribution network single phase earthing failure based on electric arc transient state component
CN107561414A (en) * 2017-10-31 2018-01-09 国家电网公司 Rapidly find out the selection method and wire selection system in single-phase grounded malfunction in grounded system of low current loop

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁睿: "基于故障类型的单相接地故障综合选线研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112015160A (en) * 2019-05-31 2020-12-01 北京新能源汽车股份有限公司 Fault temperature determination method and device
CN112394296A (en) * 2019-08-12 2021-02-23 Abb瑞士股份有限公司 Handling of ground faults in high impedance grounded power systems
CN112394296B (en) * 2019-08-12 2024-04-16 日立能源有限公司 Handling of ground faults in high impedance grounded power systems
CN110488154A (en) * 2019-08-28 2019-11-22 国网四川省电力公司成都供电公司 A kind of small current earthing wire-selecting method for scheduling station end

Also Published As

Publication number Publication date
CN108919046B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
Lin et al. Adaptive overcurrent protection for microgrids in extensive distribution systems
CN108919046A (en) A kind of examination of distribution net work earthing fault stops route tagmeme decision-making technique and system
Sanaye-Pasand et al. Transmission line fault detection & phase selection using ANN
Khoshkhoo et al. On-line dynamic voltage instability prediction based on decision tree supported by a wide-area measurement system
Tokel et al. A new approach for machine learning-based fault detection and classification in power systems
EP3410554A1 (en) Distribution system analysis using meter data
CN109001573B (en) Method for determining short-circuit capacity of collector bus of wind power plant
AU2012203278A1 (en) Directional detection of a resistive earth fault and of breaking of a medium-voltage conductor
CN104616061B (en) Island detection method based on wavelet packet logarithmic energy entropy and genetic algorithm optimization
Koley et al. Detection and classification of faults on six phase transmission line using ANN
Yadav et al. Transmission line fault distance and direction estimation using artificial neural network
Ayyagari Artificial neural network based fault location for transmission lines
CN109828227A (en) A kind of electronic current mutual inductor method for diagnosing faults based on current information feature
CN109494696A (en) Power distribution network asymmetry fault section and isolation method and system based on adaptive reclosing
Ashok et al. Fault diagnosis scheme for cross-country faults in dual-circuit line with emphasis on high-impedance fault syndrome
Nagam et al. Artificial neural network based fault locator for three phase transmission line with STATCOM
Grando et al. Fault classification in power distribution systems using PMU data and machine learning
Krishna et al. Transient stability assessment using artificial neural networks
Lehtonen et al. Simple fault path indication techniques for earth faults
Biswas et al. A Single-Pole Filter Assisted Improved Protection Scheme for the TCSC Compensated Transmission Line Connecting Large-Scale Wind Farms
CN109613372A (en) A kind of electric network failure diagnosis method based on polynary electric network database
Fayaz et al. ANN-based relaying algorithm for protection of SVC-compensated AC transmission line and criticality analysis of a digital relay
CN106370983B (en) Fault feeder selection method and system in multi circuit transmission lines
Koley et al. Artificial neural network based protection scheme for one conductor open faults in six phase transmission line
Obi et al. An extended ann-based high speed accurate transmission line fault location for double phase to earth fault on non-directground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant