CN108915702A - It is a kind of circle narrow-bore tunnel in shield method of reseptance - Google Patents

It is a kind of circle narrow-bore tunnel in shield method of reseptance Download PDF

Info

Publication number
CN108915702A
CN108915702A CN201810600751.5A CN201810600751A CN108915702A CN 108915702 A CN108915702 A CN 108915702A CN 201810600751 A CN201810600751 A CN 201810600751A CN 108915702 A CN108915702 A CN 108915702A
Authority
CN
China
Prior art keywords
steel
shield
tunnel
grouting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810600751.5A
Other languages
Chinese (zh)
Other versions
CN108915702B (en
Inventor
陈德国
经莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority to CN201810600751.5A priority Critical patent/CN108915702B/en
Publication of CN108915702A publication Critical patent/CN108915702A/en
Application granted granted Critical
Publication of CN108915702B publication Critical patent/CN108915702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

It is a kind of circle narrow-bore tunnel in shield method of reseptance, include the following steps:S1, tunnel advanced support;S2, preliminary bracing;S3, preliminary bracing hogback radial grouting are reinforced;S4, face block and reinforce the front soil body;S5, Tunnel Second Lining;S6, shield driving section advance support;S7, mortar backfill;S8, guide table installation;S9, precipitation;S10, shield receive;The present invention has many advantages, such as not needing installation rubber water-proof heavy curtain, succinct convenient, construction safety, can promote the use of shield machine and receive construction field.

Description

It is a kind of circle narrow-bore tunnel in shield method of reseptance
Technical field
The invention belongs to shield machines to receive construction field, and in particular to city underground in rich water sandy gravel circular tunnel Shield receives construction method.
Background technique
In city underground shield-tunneling construction, shield machine is received generally using direct directly on receiving bracket or arc guide table It receives, it is general to use " CD " method or " CRD " method or bilateral wall approach in the shallow-depth-excavation tunnel of city, it uses and faces in supporting section When median septum or interim inverted arch is set in the middle part of section, shield must cut off temporary support when receiving construction.And in this project, Tunnel Passing stratum is mainly sand-pebble layer, and level of ground water is higher, shield cutter diameter 6280mm, Mining Method circular tunnel lining Section internal diameter 6400mm is built, in addition Tunneling by mining method decomposition mileage is located at 12 layers of building basis footing lower part, simply uses Conventional method receives construction, it is difficult to ensure that construction safety.
Summary of the invention
Technical problem to be solved by the present invention lies in above-mentioned the deficiencies in the prior art are overcome, one kind is provided and does not need to install Shield method of reseptance in rubber water-proof heavy curtain, succinct convenient, construction safety round narrow-bore tunnel.
Above-mentioned technical problem is solved the technical solution adopted is that including the following steps:
S1, tunnel advanced support:In such a way that steel tube shed plus self-feeding anchor pile front pre-grouting are reinforced;
S2, preliminary bracing:Steel arch-shelf is arranged in loopful;
S3, preliminary bracing hogback radial grouting are reinforced:In the early stage when supporting construction within the scope of 120 ° of vault the pre-buried spray of molten steel Pipe makees Grouting Pipe, carries out grouting and reinforcing;
S4, face block and reinforce the front soil body:When Tunneling by mining method is excavated at plug wall, C25 is sprayed in time Concrete enclosing face and built-in pipe canopy guide pipe;
S5, Tunnel Second Lining:Under conditions of not tearing support open, the 200m thickness secondary lining that applies;
S6, shield driving section advance support:After completing secondary lining, set within the scope of 120 ° of end vault advanced big Pipe canopy;
S7, mortar backfill:After completing secondary lining and end daguanpeng construction, then removes temporary steel support and use The plain-water slurry backfill for mixing appropriate swelling agent blocks the section 9m;
S8, guide table installation:C20 pea gravel concreten guide table, pre-buried installation steel plate and guide rail are poured in circular tunnel bottom;
S9, precipitation:Using constructing tunnel dewatering well, precipitation is carried out in advance before shield receives;
S10, shield receive:Shield is directly tunneled to be received in guide table by 9m backfill section, and backfill section uses shield duct piece Assembly molding.
Step S1 of the invention includes:Steel tube shed uses diameter for the P110 steel floral tube of 146mm, wall thickness 9mm, and 120 ° of vault Injection in range, circumferential center spacing are 300mm, and outer limb is 1~2 °, and every loop number is 31, are overlapped by 3m, steel tube shed Slip casting use the ratio of mud for 0.5~1.0 cement single slurry, grouting pressure be 0.5~1.2MPa, mud jacking sequence from bottom to top, First two sides rear center, symmetrical mud jacking, grouting pressure are gradually increased by small;It is seamless that self-feeding anchor pile uses diameter to prick for the heat of 32mm Steel pipe, wall thickness 4mm, length 2.2m arrange, spacing circumferential direction 0.3m × longitudinal direction 1.0m that outer limb is 10 within the scope of 120 ° of hogback ~15 °, steel pipe tail end should be placed in steel arch-shelf abdomen, and slip casting uses 0.5~1.0 cement slurry of the ratio of mud, and grouting pressure 0.3~ 0.5MPa。
Step S2 of the invention includes:Steel arch-shelf, I20a steel arch-shelf spacing 0.5m setting is arranged in loopful, and diameter is 8mm's Double steel bar mesh sheet constitutes 150mm × 150mm grid, and the setting of loopful bilayer is respectively placed in inside and outside steel arch-shelf;Inside and outside The longitudinally connected muscle that diameter is 22mm, longitudinally connected muscle circumferential direction spacing 1.0m are set;Gunite concrete uses C25P6 early strong coagulation Soil, spray is mixed with a thickness of 300mm, and tunneling boring supporting, middle partition, interim inverted arch support thickness are 250mm;Lock foot anchoring stock uses R32S Self-drilling locks foot anchor tube, and long 3.0m is set to the girth joint of preliminary bracing steel arch-shelf and partial excavation base tunnel corner portion, between longitudinal direction Away from same steel arch-shelf longitudinal pitch, 120 ° of range built-in slip casting pipes of vault, spacing circumferential direction 2.0m × longitudinal direction 2.0m is in quincunx cloth It sets, Grouting Pipe uses diameter for the steel pipe of 32mm, wall thickness 3.5mm, length 0.8m.
Step S3 of the invention includes:The spray of molten steel pipe diameter is 42mm, wall thickness 3.5mm, length are preliminary bracing thickness Degree+0.5m, Grouting Pipe spacing circumferential direction 2.0m × longitudinal direction 2.0m, blossom type arrangement, whenever preliminary bracing is closed cyclization 50m length Afterwards, to preliminary bracing hogback grouting methol, the cement slurry ratio of mud is 0.5~1.0, and grouting pressure is 0.1~0.3MPa.
Step S4 of the invention includes:C25 concrete enclosing face is sprayed, the concrete thickness of injection is 300mm, is mixed The double-deck diameter is set in solidifying soil and constitutes 150mm × 150mm grid as the glass fiber-reinforced polymer of 12mm, and is connect with preliminary bracing grid, Reserved injected hole when plug wall is constructed.
Step S6 of the invention includes:The steel tube shed uses the P110 steel floral tube that diameter is 9mm for 146mm, wall thickness, In hogback, outer limb is 1~2 ° for circumferential center spacing 300mm injection, and steel tube shed length is 20m, and steel tube shed slip casting is using water ash Than 0.5~1.0 cement slurry single slurry, grouting pressure is 0.5~1.2MPa.
The present invention has the following advantages that compared with the prior art:
1, can be used for ground not reinforcing the shield launching of condition, receive construction, constructing operation is convenient;
2, reduce stratum settlement landslide risk, it is safer, quick that shield receives construction.
Detailed description of the invention
Fig. 1 is that shield of the present invention receives profilograph.
Fig. 2 is shield receiving plane figure of the present invention.
Fig. 3 is that shield of the present invention receives cross-sectional view.
In figure:1, preliminary bracing;2, hogback ejection for water plugging circle;3, Tunnel Second Lining;4, tunnel lining cutting three times;5, shield Section of jurisdiction;6, plug wall;7, steel tube shed;8, shield;9, mortar backfills.
Specific embodiment
The present invention is described in further details with reference to the accompanying drawings and examples, but the present invention is not restricted to these implement Example.
Embodiment 1
In figs. 1 to 3, shield method of reseptance in a kind of round narrow-bore tunnel of the present invention, includes the following steps:
S1, tunnel advanced support:In such a way that steel tube shed plus self-feeding anchor pile front pre-grouting are reinforced;Steel tube shed 7 is adopted It is 146mm with diameter, the P110 steel floral tube of wall thickness 9mm, injection within the scope of 120 ° of vault, circumferential center spacing is 300mm, extrapolation Angle be 1~2 °, every loop number be 31, by 3 meters overlap joints, 7 slip casting of steel tube shed use the ratio of mud for 0.5~1.0 cement slurry Single slurry, grouting pressure be 0.5~1.2MPa, mud jacking sequence from bottom to top, first two sides rear center, symmetrical mud jacking, grouting pressure It is gradually increased by small, final pressure, injection speed and the holding for final pressure that slip casting should be controlled during slip casting press the time, during slip casting Grouting pressure is observed at any time, analyzes slip casting situation, prevents blocking, running pulp, slip casting record is carried out, to analyze slip casting effect; Self-feeding anchor pile uses diameter for the heat bundle seamless steel pipe of 32mm, wall thickness 4mm, length 2.2m, arranges within the scope of 120 ° of vault, Spacing circumferential direction 0.3m × longitudinal direction 1.0m, outer limb are 10~15 °, and steel pipe tail end should be placed in steel arch-shelf abdomen, and slip casting is using water ash Than 0.5~1.0 cement slurry, 0.3~0.5MPa of grouting pressure.
S2, preliminary bracing:Steel arch-shelf is arranged in loopful;I20a steel arch-shelf spacing 0.5m setting, diameter are the double steel bar of 8mm Mesh sheet constitutes 150mm × 150mm grid, and the setting of loopful bilayer is respectively placed in inside and outside steel arch-shelf;Inside and outside diameter is set For the longitudinally connected muscle of 22mm, longitudinally connected muscle circumferential direction spacing 1.0m;Gunite concrete uses C25P6 early strength concrete, and spray is mixed With a thickness of 300mm, tunneling boring supporting, middle partition, interim inverted arch support thickness are 250mm;Lock foot anchoring stock uses R32S self-drilling Foot anchor tube is locked, long 3.0m, is set to 1 steel arch-shelf girth joint of preliminary bracing and partial excavation base tunnel corner portion, longitudinal pitch are same Steel arch-shelf longitudinal pitch, 120 ° of range built-in slip casting pipes of vault, spacing circumferential direction 2.0m × longitudinal direction 2.0m are in quincuncial arrangement, note Slurry pipe uses diameter for the steel pipe of 32mm, wall thickness 3.5mm, length 0.8m.
S3, preliminary bracing hogback radial grouting are reinforced:In the early stage when supporting construction within the scope of 120 ° of vault the pre-buried spray of molten steel Pipe makees Grouting Pipe, carries out grouting and reinforcing;The spray of molten steel pipe diameter is 42mm, wall thickness 3.5mm, length be 1 thickness of preliminary bracing+ 0.5m, Grouting Pipe spacing circumferential direction 2.0m × longitudinal direction 2.0m, blossom type arrangement are right after preliminary bracing is closed cyclization 50m length 1 hogback grouting methol of preliminary bracing, the cement slurry ratio of mud are 0.5~1.0, and grouting pressure is 0.1~0.3Mpa, specifically by existing Field determines still there is percolating water after the more location of underground water exposure, preliminary bracing backfill slip casting after excavation according to geology condition test Location should regard concrete condition and carry out slip casting to lining cutting behind deeper country rock.
S4, face block and reinforce the front soil body:When Tunneling by mining method is excavated at plug wall, C25 is sprayed in time Concrete enclosing face and built-in pipe canopy guide pipe;The concrete thickness of injection is 300mm, set in concrete the double-deck diameter as The glass fiber-reinforced polymer of 12mm constitutes 150mm × 150mm grid, and connect with 1 grid of preliminary bracing, reserved when plug wall 6 is constructed Injected hole, using injected hole to the 6 front soil body of plug wall carry out grouting and reinforcing, sealing, grouting and reinforcing use reinforcement measure and Material cannot influence shield and pass through, and can use single slurry.
S5, Tunnel Second Lining:Under conditions of not tearing support open, the 200m thickness secondary lining that applies;
S6, shield driving section advance support:After completing secondary lining, set within the scope of 120 ° of end vault advanced big Pipe canopy;The steel tube shed uses the P110 steel floral tube that diameter is 9mm for 146mm, wall thickness, circumferential center spacing 300mm injection In hogback, outer limb is 1~2 °, and steel tube shed length is 20m, and steel tube shed slip casting uses 0.5~1.0 cement slurry list liquid of the ratio of mud Slurry, grouting pressure are 0.5~1.2MPa.
S7, mortar backfill:After completing secondary lining and end daguanpeng construction, then removes temporary steel support and use The plain-water slurry backfill for mixing appropriate swelling agent blocks the section 9m;
S8, guide table installation:C20 pea gravel concreten guide table, pre-buried installation steel plate and guide rail are poured in circular tunnel bottom;
S9, precipitation:Using constructing tunnel dewatering well, precipitation is carried out in advance before shield receives;
S10, shield receive:Shield is directly tunneled to be received in guide table by 9m backfill section, and backfill section uses shield duct piece Assembly molding.

Claims (6)

1. shield method of reseptance in a kind of circle narrow-bore tunnel, it is characterised in that include the following steps:
S1, tunnel advanced support:In such a way that steel tube shed plus self-feeding anchor pile front pre-grouting are reinforced;
S2, preliminary bracing:Steel arch-shelf is arranged in loopful;
S3, preliminary bracing hogback radial grouting are reinforced:Pre-buried steel floral tube is made within the scope of 120 ° of vault when supporting construction in the early stage Grouting Pipe carries out grouting and reinforcing;
S4, face block and reinforce the front soil body:When Tunneling by mining method is excavated at plug wall, C25 coagulation is sprayed in time Grave closes face and built-in pipe canopy guide pipe;
S5, Tunnel Second Lining:Under conditions of not tearing support open, the 200m thickness secondary lining that applies;
S6, shield driving section advance support:After completing secondary lining, advanced big pipe is set within the scope of 120 ° of end vault Canopy;
S7, mortar backfill:After completing secondary lining and end daguanpeng construction, then removes temporary steel support and use incorporation The plain-water slurry backfill of appropriate swelling agent blocks the section 9m;
S8, guide table installation:C20 pea gravel concreten guide table, pre-buried installation steel plate and guide rail are poured in circular tunnel bottom;
S9, precipitation:Using constructing tunnel dewatering well, precipitation is carried out in advance before shield receives;
S10, shield receive:Shield is directly tunneled to be received in guide table by 9m backfill section, and backfill section uses shield segment assembling Molding.
2. shield method of reseptance in a kind of round narrow-bore tunnel according to claim 1, it is characterised in that:The step Suddenly S1 includes:Steel tube shed uses diameter for the P110 steel floral tube of 146mm, wall thickness 9mm, injection within the scope of 120 ° of vault, in circumferential direction In the heart away from for 300mm, outer limb is 1~2 °, and every loop number is 31, by 3m overlap joint, steel tube shed slip casting use the ratio of mud for 0.5~1.0 cement single slurry, grouting pressure be 0.5~1.2MPa, mud jacking sequence from bottom to top, first two sides rear center, symmetrically Mud jacking, grouting pressure are gradually increased by small;Self-feeding anchor pile uses diameter to prick seamless steel pipe, wall thickness 4mm, length for the heat of 32mm It for 2.2m, is arranged within the scope of 120 ° of hogback, spacing circumferential direction 0.3m × longitudinal direction 1.0m, outer limb is 10~15 °, and steel pipe tail end should be set In steel arch-shelf abdomen, slip casting uses 0.5~1.0 cement slurry of the ratio of mud, 0.3~0.5MPa of grouting pressure.
3. shield method of reseptance in a kind of round narrow-bore tunnel according to claim 1, it is characterised in that:The step Suddenly S2 includes:Steel arch-shelf, I20a steel arch-shelf spacing 0.5m setting is arranged in loopful, and the double steel bar mesh sheet that diameter is 8mm is constituted 150mm × 150mm grid, loopful bilayer setting, is respectively placed in inside and outside steel arch-shelf;Inside and outside setting diameter be 22mm Longitudinally connected muscle, longitudinally connected muscle circumferential direction spacing 1.0m;Gunite concrete uses C25P6 early strength concrete, spray it is mixed with a thickness of 300mm, tunneling boring supporting, middle partition, interim inverted arch support thickness are 250mm;Lock foot anchoring stock locks foot anchor using R32S self-drilling Pipe, long 3.0m are set to the girth joint of preliminary bracing steel arch-shelf and partial excavation base tunnel corner portion, and longitudinal pitch is vertical with steel arch-shelf To spacing, 120 ° of range built-in slip casting pipes of vault, spacing circumferential direction 2.0m × longitudinal direction 2.0m is in quincuncial arrangement, and Grouting Pipe uses Diameter is the steel pipe of 32mm, wall thickness 3.5mm, length 0.8m.
4. shield method of reseptance in a kind of round narrow-bore tunnel according to claim 1, it is characterised in that:The step Suddenly S3 includes:The spray of molten steel pipe diameter is 42mm, wall thickness 3.5mm, length are preliminary bracing thickness+0.5m, slip casting tube spacing Circumferential 2.0m × longitudinal direction 2.0m, blossom type arrangement, after preliminary bracing is closed cyclization 50m length, to preliminary bracing hogback pressure Cement injection, the cement slurry ratio of mud are 0.5~1.0, and grouting pressure is 0.1~0.3MPa.
5. shield method of reseptance in a kind of round narrow-bore tunnel according to claim 1, it is characterised in that:The step Suddenly S4 includes:Spray C25 concrete enclosing face, the concrete thickness of injection is 300mm, set in concrete the double-deck diameter as The glass fiber-reinforced polymer of 12mm constitutes 150mm × 150mm grid, and connect with preliminary bracing grid, reserved note when plug wall is constructed Starch hole.
6. shield method of reseptance in a kind of round narrow-bore tunnel according to claim 1, it is characterised in that:The step Suddenly S6 includes:The steel tube shed uses the P110 steel floral tube that diameter is 9mm for 146mm, wall thickness, circumferential center spacing 300mm In hogback, outer limb is 1~2 ° for injection, and steel tube shed length is 20m, and steel tube shed slip casting uses 0.5~1.0 cement slurry list of the ratio of mud Slurry, grouting pressure are 0.5~1.2MPa.
CN201810600751.5A 2018-06-12 2018-06-12 Shield receiving method in circular small-section tunnel Active CN108915702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810600751.5A CN108915702B (en) 2018-06-12 2018-06-12 Shield receiving method in circular small-section tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810600751.5A CN108915702B (en) 2018-06-12 2018-06-12 Shield receiving method in circular small-section tunnel

Publications (2)

Publication Number Publication Date
CN108915702A true CN108915702A (en) 2018-11-30
CN108915702B CN108915702B (en) 2020-09-22

Family

ID=64410827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810600751.5A Active CN108915702B (en) 2018-06-12 2018-06-12 Shield receiving method in circular small-section tunnel

Country Status (1)

Country Link
CN (1) CN108915702B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792457A (en) * 2019-10-12 2020-02-14 成都建工路桥建设有限公司 Tunnel portal structure installation method for shield tunneling through mine tunnel
CN110985016A (en) * 2019-12-16 2020-04-10 中铁一局集团有限公司 Quick receiving method of shield machine suitable for hard rock stratum in mine tunnel
CN114135318A (en) * 2021-12-06 2022-03-04 江西丰强科技发展有限公司 Closely-adhered underpass tunnel lining structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247585A (en) * 1998-12-10 1999-09-14 Mitsui Constr Co Ltd Shield backfilling equipment
CN103953355A (en) * 2014-04-23 2014-07-30 中铁十五局集团有限公司 Method of acceptance construction in slurry shield tunnel
CN104790959A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Shallowly buried small-spacing rock soil tunnel construction method
CN104790971A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Large pipe shed advanced pre-reinforcement method for shallow buried small-spacing rock soil tunnel construction
CN106437726A (en) * 2016-11-02 2017-02-22 中铁二十局集团第五工程有限公司 Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN107091101A (en) * 2017-03-27 2017-08-25 中铁隧道勘测设计院有限公司 Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247585A (en) * 1998-12-10 1999-09-14 Mitsui Constr Co Ltd Shield backfilling equipment
CN103953355A (en) * 2014-04-23 2014-07-30 中铁十五局集团有限公司 Method of acceptance construction in slurry shield tunnel
CN104790959A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Shallowly buried small-spacing rock soil tunnel construction method
CN104790971A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Large pipe shed advanced pre-reinforcement method for shallow buried small-spacing rock soil tunnel construction
CN106437726A (en) * 2016-11-02 2017-02-22 中铁二十局集团第五工程有限公司 Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN107091101A (en) * 2017-03-27 2017-08-25 中铁隧道勘测设计院有限公司 Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汤浩杰: "跨海超长地铁隧道设计与施工关键技术研究", 《交通世界》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792457A (en) * 2019-10-12 2020-02-14 成都建工路桥建设有限公司 Tunnel portal structure installation method for shield tunneling through mine tunnel
CN110985016A (en) * 2019-12-16 2020-04-10 中铁一局集团有限公司 Quick receiving method of shield machine suitable for hard rock stratum in mine tunnel
CN114135318A (en) * 2021-12-06 2022-03-04 江西丰强科技发展有限公司 Closely-adhered underpass tunnel lining structure and construction method thereof

Also Published As

Publication number Publication date
CN108915702B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN108194102B (en) The dismounting of limit section and safe stress check calculation construction method are invaded in Tunnel deformation
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN101864960A (en) Carst region double-arch road tunnel construction method
CN106907164A (en) A kind of water-bed combination of mine shield tunnel docking structure form and its construction method
CN112412475A (en) Method for reinforcing and excavating surrounding rock of ice water accumulation body tunnel under influence of seasonal rainfall and surrounding rock support
CN111287759B (en) Shallow-buried close-connection underground excavation tunnel construction method
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN111101964B (en) Construction method for blocking receiving tunnel portal by shield method
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN108915702A (en) It is a kind of circle narrow-bore tunnel in shield method of reseptance
CN110424460A (en) A kind of tunnel open excavation construction technology
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN108678781A (en) One kind closing on river shield launching end stratum consolidation method
CN107237638A (en) Both wired concealed tunneling structure and its construction method are worn under a kind of
CN110700843B (en) Tunnel three-step synchronous excavation construction method based on partition blasting
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN109505612A (en) Big descending bored tunnel shield sky selection structure and construction technology
CN109578035A (en) Steel pipe draining lock foot stake and construction method
CN209277905U (en) Tunnel bilayer I-steel preliminary bracing structure
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210125

Address after: 18-21 / F, Xiyuan building, intersection of Shun'an road and Yantai Road, Jinan west railway station, Shandong Province

Patentee after: CHINA RAILWAY 21 BUREAU GROUP RAIL TRANSIT ENGINEERING Co.,Ltd.

Patentee after: THE 2ND ENGINEERING CO., LTD. OF CHINA RAILWAY 22ND BUREAU Group

Address before: 18-21 / F, Xiyuan building, intersection of Shun'an road and Yantai Road, Jinan west railway station, Shandong Province

Patentee before: CHINA RAILWAY 21 BUREAU GROUP RAIL TRANSIT ENGINEERING Co.,Ltd.

TR01 Transfer of patent right