CN108915017A - A kind of mud excavating equipment - Google Patents
A kind of mud excavating equipment Download PDFInfo
- Publication number
- CN108915017A CN108915017A CN201810946171.1A CN201810946171A CN108915017A CN 108915017 A CN108915017 A CN 108915017A CN 201810946171 A CN201810946171 A CN 201810946171A CN 108915017 A CN108915017 A CN 108915017A
- Authority
- CN
- China
- Prior art keywords
- mud
- fixedly connected
- fixed
- rotation
- steering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/28—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Non-Deflectable Wheels, Steering Of Trailers, Or Other Steering (AREA)
Abstract
A kind of mud excavating equipment, including main frame part, mud transport section, multiple mud storage part, excavation part, it is characterised in that:Four firm bankings are fixed on first and are needed to dig on bank or ship near mud place, make to adjust suitable digging mud position before two conveyer belts with two the first steering engines rotations by two first hydraulic cylinder elongations, pass through two third steering engines later, two third hydraulic cylinders and two the 4th steering engine co-ordinations drive digger blade rotation to which mud has been dug to be subsequently poured into and has been poured into mud storage shovel, the defeated left side to equipment of mud storage unit partite transport of mud is filled with by six stepper motors drive two conveyer belt turning handles of drive, mud storage shovel turning handle mud is driven to pour into the mud vehicle that lower section has been stopped by two the second steering engines, then above-mentioned mechanical movement is repeated to dredge, both excavated by manual work mud expense had been reduced, improve the speed and efficiency for digging mud again simultaneously, realize automatic excavating mud.
Description
Technical field
The present invention relates to environment and river regulation technical field, in particular to a kind of mud excavating equipment.
Background technique
Mainly there are two mode, hand digging and excavators to excavate for the silt from the bottom of lake of people's excavation at present, the effect of hand digging
More slowly there is also safety problem, excavator excavates can only generally be limited in scope rate in bank excavation and expense is high, therefore need
Invent a kind of equipment that can quickly excavate mud that can be fixed on bank and ship.
Summary of the invention
In view of the above-mentioned problems, passing through two first hydraulic cylinder elongations and two the present invention provides a kind of mud excavating equipment
A first steering engine rotation passes through two third rudders to make to adjust suitable digging mud position before two conveyer belts later
Machine, two third hydraulic cylinders and two the 4th steering engine co-ordinations drive digger blade rotation to be subsequently poured into down to which mud has been dug
Enter in mud storage shovel, part is stored by the mud that six stepper motors drive two conveyer belt turning handles to fill with mud
The left side for transporting equipment drives mud storage shovel turning handle mud to pour into the mud vehicle stopped lower section by two the second steering engines
In, it then repeats above-mentioned mechanical movement and dredges, not only reduced excavated by manual work mud expense, but also improve the speed for digging mud
Degree and efficiency, realize automatic excavating mud.
Technical solution used in the present invention is:A kind of mud excavating equipment, including main frame part, mud Department of Transportation
Divide, multiple mud storage part, excavate part, it is characterised in that:The mud transport section is located in main frame part
Between position, two bottom ends on six stepper motor left sides are respectively and fixedly installed to two, the left side telescopic of main frame part
In groove on the inside of cylinder expansion rod part, the bottom end of two in-between stepper motors is respectively and fixedly installed to main frame part
In groove on the inside of two the first rotating bar right ends, the bottom end of two stepper motors of rightmost is respectively and fixedly installed to main body
In the groove of the lower end inside of two the second rotating bars of frame part;The of the left and right ends of described multiple mud storage part
The bottom end of two steering engine fixed blocks is fixedly connected on the inside of the fixed plate on mud transport section both sides respectively;The excavation part
Two third steering engines outside set casing dig that the inside front ends according to shovel fixed link are fixed to be connected with two of main frame part respectively
It connects;
The main frame part includes two fixed frames, two the first rotation free bearings, two first hydraulic cylinders, two the second rotations
Turning hinge seat, two the first rotating bars, two third rotation free bearings, two the first steering engines, two the second rotating bars, two diggings are according to shovel
Fixed link, connecting rod, four extension sleeves, four second hydraulic cylinders, four firm bankings, two the 4th rotation free bearings, it is described
Two fixed frames be by four molecular shelfs of bar respectively;The upper surface of the two first described rotation free bearings are fixed respectively to pacify
Below two fixed frame right ends, two rotary shaft is rotated with the cylinder body bottom end of two first hydraulic cylinders respectively to be connected
It connects;The bottom surface of the two second rotation free bearings is respectively and fixedly installed to above the rightmost of two the first rotating bars, and two
The rotating block of a top half is fixedly connected with the tailpiece of the piston rod of two first hydraulic cylinders respectively;Two first rotating bars
Horizontal positioned, the rotary shaft that two left end rotates free bearing with two the 4th respectively is rotatablely connected, two right end is respectively provided with one
A fixed block;The bottom of two thirds rotation free bearing is respectively and fixedly installed to the fixed block of two the first rotating bar right ends
Below;The lateral surface of two third rotation free bearings is respectively and fixedly installed on the inside of two first steering engines, two
The hole that steering engine axis is each passed through two third rotation free bearing sides is fixedly connected with the upper end of two the second rotating bars;Described two
A digging is respectively and fixedly installed to the upper surface of the rightmost of two the second rotating bars position according to the bottom end of shovel fixed link;The connection
Bar is a cylindrical pole, left and right ends respectively with it is top on the inside of the expansion rod part on two, the right of four extension sleeves
Position is fixedly connected;Four extension sleeves are placed vertically, the telescopic rod end that the left side is two respectively with two fixations
It is fixedly connected below the left end of frame, the flexible rod end on two, the right is fixed with below the vertical bar among two fixed frames respectively
Connection, four sleeve member base ends are fixedly connected with the upper surface of four firm bankings respectively;Four second hydraulic cylinders
It places straight up, four cylinder body bottom ends are respectively and fixedly installed to the upper of the baffle on the outside of the sleeve part of four extension sleeves
Face, four tailpieces of the piston rod are fixedly connected with below side baffle outside the expansion rod part of four extension sleeves respectively;Described
Two the 4th rotation free bearings are horizontal positioned, and bottom is respectively and fixedly installed to the right side of two vertical bars in two fixed frame middle positions
Face it is following;
The mud transport section includes two conveyer belts, multiple fixed plates, six the first rotation axis, six stepper motors,
The outside of two conveyer belts is equipped with multiple fixed plates;Six first rotation axis are evenly distributed in two respectively
The inside of conveyer belt, outside and the inside of conveyer belt are rotatablely connected;Six stepper motors are located at six first
The outside of rotation axis, six motor shafts pass through shaft joint respectively and are fixedly connected with six the first rotation axis;
The mud storage unit, which is divided to, stores shovel, two the second steering engines, two the second steering engine fixed blocks, the silt including mud
Mud storage shovel is the half for the cylindrical body that a centre hollows out;Two second steering engines are horizontal positioned, two bottom
End is respectively and fixedly installed in the groove on the inside of two the second steering engine fixed blocks, what two steering engine axis was shoveled with mud storage respectively
The right and left is fixedly connected;
The excavation part includes the second rotation axis, two third steering engines, two third hydraulic cylinders, two the 4th steering engines, digs
Pick shovel, second rotation axis is a cylinder axis;Two third steering engines are located at the two of the second rotation axis
End, two steering engine axis pass through the left and right ends fixed-link of shaft coupling and the second rotation axis respectively;Two third liquid
Cylinder pressure is placed straight down, two cylinder body bottom end is fixedly connected with the second rotation axis both sides respectively, two tailpiece of the piston rod point
It is not fixedly connected with the upper surface of the fixed block of two the 4th steering engines;Two the 4th steering engines are horizontal positioned, two bottom
It is separately mounted in the groove of fixed block, two steering engine axis is fixedly connected with two sides of digger blade respectively;The digging
Pick shovel is the triangular prism that a centre hollows out.
Beneficial effects of the present invention:By two first hydraulic cylinder elongations and two the first steering engine rotations to make two biographies
It send and adjusts suitable digging mud position before band, pass through two third steering engines, two third hydraulic cylinders and two the 4th later
Steering engine co-ordination drives digger blade rotation to which mud has been dug to be subsequently poured into and has been poured into mud storage shovel, passes through six steppings
Motor drives two conveyer belt turning handles to fill with the defeated left side to equipment of mud storage unit partite transport of mud, passes through two the
Two steering engines drive mud storage shovel turning handle mud to pour into the mud vehicle that lower section has been stopped, and then repeat above-mentioned mechanical movement and carry out
It dredges, has not only reduced excavated by manual work mud expense, but also improve the speed and efficiency for digging mud, realize automatic excavating silt
Mud.
Detailed description of the invention
Fig. 1, Fig. 2 are overall structure diagram of the invention.
Fig. 3 is the structural schematic diagram of main frame part of the invention.
Fig. 4 is the structural schematic diagram of mud transport section of the invention.
Fig. 5 is the structural schematic diagram that mud of the invention stores part.
Fig. 6 is the structural schematic diagram of excavation part of the invention.
Drawing reference numeral:1- main frame part, 2- mud transport section, 3- mud storage part, 4- excavation part, 101- are solid
Determine frame, 102- first rotates free bearing, 103- first hydraulic cylinder, 104- second rotate free bearing, the first rotating bar of 105-, 106- third
Free bearing, the first steering engine of 107-, the second rotating bar of 108-, 109- is rotated to dig according to shovel fixed link, 110- connecting rod, 111- telescopic
Cylinder, 112- second hydraulic cylinder, 113- firm banking, 114- the 4th rotate free bearing, 201- conveyer belt, 202- fixed plate, 203- the
One rotation axis, 204- stepper motor, 301- mud store shovel, the second steering engine of 302-, the second steering engine of 303- fixed block, 401- second
Rotation axis, 402- third steering engine, 403- third hydraulic cylinder, the 4th steering engine of 404-, 405- digger blade.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
Embodiment as shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, a kind of mud excavating equipment, including main frame part 1,
Mud transport section 2, excavates part 4 at multiple mud storage part 3, it is characterised in that:The mud transport section 2 is located at
Two bottom ends in the middle position of main frame part 1, six 204 left sides of stepper motor are respectively and fixedly installed to main frame portion
It is divided in the groove on the inside of 1 two, the left side, 111 expansion rod part of extension sleeve, the bottom end of two in-between stepper motors 204
It is respectively and fixedly installed in the groove on the inside of two 105 right ends of the first rotating bar of main frame part 1, two steps of rightmost
The groove of the lower end inside of two the second rotating bars 108 of main frame part 1 is respectively and fixedly installed into the bottom end of motor 204
In;The bottom end of second steering engine fixed block 303 of the left and right ends of described multiple mud storage part 3 respectively with mud Department of Transportation
The inside of the fixed plate 202 on 2 both sides is divided to be fixedly connected;The set casing of two third steering engines, 402 outside of the excavation part 4
It digs with two of main frame part 1 and is fixedly connected according to the inside front ends of shovel fixed link 109 respectively;
The main frame part 1 include two fixed frames, 101, two first rotation free bearings, 102, two first hydraulic cylinders 103,
Two second thirds of the first rotating bar 105, two of rotation free bearing 104, two rotate 106, two the first steering engines 107, two of free bearing
A second rotating bar 108, two are dug according to shovel fixed link 109, the second hydraulic cylinder of extension sleeve 111, four of connecting rod 110, four
112, four firm bankings, 113, two the 4th rotation free bearings 114, two fixed frames 101 are by four pole groups respectively
At shelf;The upper surface of the two first described rotation free bearings 102 are respectively and fixedly installed under two 101 right ends of fixed frame
Face, two rotary shaft are rotatablely connected with the cylinder body bottom end of two first hydraulic cylinders 103 respectively;Two second rotary hinges
The bottom surface of seat 104 is respectively and fixedly installed to above the rightmost of two the first rotating bars 105, the rotating block of two top half
It is fixedly connected respectively with the tailpiece of the piston rod of two first hydraulic cylinders 103;Two first rotating bars 105 are horizontal positioned,
The rotary shaft that two left ends rotate free bearing 114 with two the 4th respectively is rotatablely connected, two right end is respectively provided with a fixed block;
The bottom of two thirds rotation free bearing 106 is respectively and fixedly installed to the fixed block of two 105 right ends of the first rotating bar
Below;The inside of two first steering engines 107 is respectively and fixedly installed to the lateral surface of two third rotation free bearings 106,
Two steering engine axis are each passed through the hole of two third rotation 106 sides of free bearing and the fixed company in upper end of two the second rotating bars 108
It connects;Described two dig according to the bottom end of shovel fixed link 109 be respectively and fixedly installed to two the second rotating bars 108 rightmost it is upper
Face position;The connecting rod 110 is a cylindrical pole, left and right ends the right with four extension sleeves 111 respectively
Upper position is fixedly connected on the inside of two expansion rod parts;Four extension sleeves 111 are placed vertically, two, the left side
Telescopic rod end be fixedly connected respectively with below the left end of two fixed frames 101, the right two flexible rod end respectively with
Be fixedly connected below vertical bar among two fixed frames 101, four sleeve member base ends respectively with four firm bankings 113
The upper surface of be fixedly connected;Four second hydraulic cylinders 112 are placed straight up, and four cylinder body bottom ends are fixedly mounted respectively
The upper surface of baffle on the outside of the sleeve part of four extension sleeves 111, four tailpieces of the piston rod respectively with four extension sleeves
It is fixedly connected below the outer side baffle of 111 expansion rod part;Two the 4th rotation free bearings 114 are horizontal positioned, bottom
Portion is respectively and fixedly installed to the following of the right side of two vertical bars in two 101 middle positions of fixed frame;
The mud transport section 2 includes 202, six two conveyer belts 201, multiple fixed plates the first rotation axis 203, six
The outside of stepper motor 204, two conveyer belts 201 is equipped with multiple fixed plates 202;Six first rotation axis
203 are evenly distributed in the inside of two conveyer belts 201 respectively, and outside and the inside of conveyer belt 201 are rotatablely connected;Described
Six stepper motors 204 are located at the outside of six the first rotation axis 203, and six motor shafts pass through shaft joint and six respectively
A first rotation axis 203 is fixedly connected;
The mud storage part 3 includes mud storage shovel 301, two the second steering engines, 302, two the second steering engine fixed blocks
303, the mud storage shovel 301 is the half for the cylindrical body that a centre hollows out;Two second steering engines 302
Horizontal positioned, two bottom end is respectively and fixedly installed in the groove of two the second steering engine fixed blocks, 303 inside, two steering engine
Axis is fixedly connected with the right and left of mud storage shovel 301 respectively;
The excavation part 4 includes the third steering engine 402, two of the second rotation axis 401, two third hydraulic cylinder 403, two the
Four steering engines 404, digger blade 405, second rotation axis 401 are a cylinder axis;Two third steering engines 402 divide
Not Wei Yu the second rotation axis 401 both ends, two steering engine axis passes through the left and right ends of shaft coupling and the second rotation axis 401 respectively
Fixed-link;Two third hydraulic cylinders 403 are placed straight down, two cylinder body bottom end respectively with the second rotation axis
401 both sides are fixedly connected, two tailpiece of the piston rod is fixedly connected with the upper surface of the fixed block of two the 4th steering engines 404 respectively;Institute
Two the 4th steering engines 404 stated are horizontal positioned, two bottom is separately mounted in the groove of fixed block, two steering engine axis point
It is not fixedly connected with two sides of digger blade 405;The digger blade 405 is the triangular prism that a centre hollows out.
Working principle of the present invention:Four firm bankings 113 of main frame part 1 are fixed on by the present invention first when in use
It needs to dig on bank or ship near mud place, then makes first turn by the piston rod elongation of two first hydraulic cylinders 103
Lever 105 rotates down, so that two conveyer belts 201 of mud transport section 2 be made to go deep into water, passes through two the first steering engines
107 drive two the second rotating bar 108 rotations suitably to dig mud position to make to adjust before two conveyer belts 201, look for
To after suitable position, two third steering engines 402 by excavating part 4 drive the second rotation axis 401 to drive two the
The rotation of three hydraulic cylinders 403 makes digger blade 405 contact mud, passes through two by the piston rod elongation of two third hydraulic cylinders 403
4th steering engine 404 drives the rotation of digger blade 405 so that mud is dug, passes through two third steering engines 402 and two the in next step
Three hydraulic cylinders, 403 co-ordination is moved to the digger blade 405 for shoveling full mud the top of the mud storage part 3 of front end, so
It is poured into mud storage shovel 301 by two 404 turning handle mud of the 4th steering engine afterwards, then passes through the six of mud transport section 2
The mud storage that a stepper motor 204 drives six the first rotation axis 203 to drive two 201 turning handles of conveyer belt to fill with mud
Nonresident portion 3 transports the left side of equipment, then drives mud storage shovel by two the second steering engines 302 that mud stores part 3
301 turning handle mud pour into the mud vehicle that lower section has been stopped, and then repeat above-mentioned mechanical movement and dredge.It is retouched in of the invention
In stating, it should be noted that the orientation or positional relationship of the instructions such as term " on ", "lower", "front", "rear", "left", "right" is
Be based on the orientation or positional relationship shown in the drawings or the invention product using when the orientation or positional relationship usually put,
Be merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.In addition, term " first ",
" second ", " third " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
Claims (4)
1. a kind of mud excavating equipment, including main frame part(1), mud transport section(2), multiple mud store part(3),
Excavate part(4), it is characterised in that:The mud transport section(2)Positioned at main frame part(1)Middle position, six
A stepper motor(204)Two bottom ends on the left side are respectively and fixedly installed to main frame part(1)Two, left side extension sleeve
(111)In groove on the inside of expansion rod part, two in-between stepper motors(204)Bottom end be respectively and fixedly installed to main body
Frame part(1)Two the first rotating bars(105)In groove on the inside of right end, two stepper motors of rightmost(204)'s
Bottom end is respectively and fixedly installed to main frame part(1)Two the second rotating bars(108)Lower end inside groove in;Described
Multiple mud store part(3)Left and right ends the second steering engine fixed block(303)Bottom end respectively with mud transport section(2)
The fixed plate on both sides(202)Inside be fixedly connected;The excavation part(4)Two third steering engines(402)Outside is consolidated
Determine shell respectively with main frame part(1)Two dig according to shovel fixed link(109)Inside front ends be fixedly connected;
The main frame part(1)Including two fixed frames(101), two first rotation free bearings(102), two it is first hydraulic
Cylinder(103), two second rotation free bearings(104), two the first rotating bars(105), two thirds rotate free bearing(106), two
First steering engine(107), two the second rotating bars(108), two dig according to shovel fixed link(109), connecting rod(110), four it is flexible
Sleeve(111), four second hydraulic cylinders(112), four firm bankings(113), two the 4th rotation free bearings(114), described
Two fixed frames(101)It is by four molecular shelfs of bar respectively;The two first rotation free bearings(102)The upper surface of point
It is not fixedly mounted on two fixed frames(101)Below right end, two rotary shaft respectively with two first hydraulic cylinders(103)
Cylinder body bottom end rotation connection;The two second rotation free bearings(104)Bottom surface be respectively and fixedly installed to two first turn
Lever(105)Rightmost above, the rotating block of two top half respectively with two first hydraulic cylinders(103)Piston rod
End is fixedly connected;Two first rotating bars(105)It is horizontal positioned, two left end respectively with two the 4th rotation free bearings
(114)Rotary shaft rotation connection, two right end is respectively provided with a fixed block;Two thirds rotate free bearing(106)
Bottom be respectively and fixedly installed to two the first rotating bars(105)Below the fixed block of right end;Two first steering engines
(107)Inside be respectively and fixedly installed to two thirds rotation free bearings(106)Lateral surface, two steering engine axis is each passed through two
A third rotates free bearing(106)The hole of side and two the second rotating bars(108)Upper end be fixedly connected;Two digging evidences
Shovel fixed link(109)Bottom end be respectively and fixedly installed to two the second rotating bars(108)The upper surface of rightmost position;Described
Connecting rod(110)A cylindrical pole, left and right ends respectively with four extension sleeves(111)Two, the right it is flexible
Upper position is fixedly connected on the inside of bar part;Four extension sleeves(111)It is vertical to place, the telescopic rod that the left side is two
End respectively with two fixed frames(101)Left end below be fixedly connected, the flexible rod end on two, the right is solid with two respectively
Determine frame(101)Be fixedly connected below intermediate vertical bar, four sleeve member base ends respectively with four firm bankings(113)'s
It is fixedly connected above;Four second hydraulic cylinders(112)It places straight up, four cylinder body bottom ends are fixedly mounted respectively
In four extension sleeves(111)Sleeve part on the outside of the upper surface of baffle, four tailpieces of the piston rod respectively with four telescopics
Cylinder(111)The outer side baffle of expansion rod part below be fixedly connected;Two the 4th rotation free bearings(114)Level is put
It sets, bottom is respectively and fixedly installed to two fixed frames(101)The right side of two vertical bars in middle position it is following.
2. a kind of mud excavating equipment according to claim 1, it is characterised in that:The mud transport section(2)Packet
Include two conveyer belts(201), multiple fixed plates(202), six the first rotation axis(203), six stepper motors(204), described
Two conveyer belts(201)Outside be equipped with multiple fixed plates(202);Six first rotation axis(203)It is uniform respectively
Be distributed in two conveyer belts(201)Inside, outside and conveyer belt(201)Inside rotation connection;Six steps
Into motor(204)It is located at six the first rotation axis(203)Outside, six motor shafts pass through shaft joint and six respectively
First rotation axis(203)It is fixedly connected.
3. a kind of mud excavating equipment according to claim 1, it is characterised in that:The mud stores part(3)Packet
Include mud storage shovel(301), two the second steering engines(302), two the second steering engine fixed blocks(303), the mud, which stores, to be shoveled
(301)It is the half for the cylindrical body that a centre hollows out;Two second steering engines(302)It is horizontal positioned, two
Bottom end is respectively and fixedly installed to two the second steering engine fixed blocks(303)In the groove of inside, two steering engine axis respectively with mud
Storage shovel(301)The right and left be fixedly connected.
4. a kind of mud excavating equipment according to claim 1, it is characterised in that:The excavation part(4)Including
Two rotation axis(401), two third steering engines(402), two third hydraulic cylinders(403), two the 4th steering engines(404), digger blade
(405), second rotation axis(401)It is a cylinder axis;Two third steering engines(402)It is located at second
Rotation axis(401)Both ends, two steering engine axis passes through shaft coupling and the second rotation axis respectively(401)The fixed chain in left and right ends
It connects;Two third hydraulic cylinders(403)Place straight down, two cylinder body bottom end respectively with the second rotation axis(401)
Both sides are fixedly connected, two tailpiece of the piston rod respectively with two the 4th steering engines(404)The upper surface of fixed block be fixedly connected;It is described
Two the 4th steering engines(404)Horizontal positioned, two bottom is separately mounted in the groove of fixed block, two steering engine axis point
Not and digger blade(405)Two sides be fixedly connected;The digger blade(405)It is the triangular prism that a centre hollows out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810946171.1A CN108915017B (en) | 2018-08-20 | 2018-08-20 | Silt excavating equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810946171.1A CN108915017B (en) | 2018-08-20 | 2018-08-20 | Silt excavating equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108915017A true CN108915017A (en) | 2018-11-30 |
CN108915017B CN108915017B (en) | 2020-12-11 |
Family
ID=64405260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810946171.1A Active CN108915017B (en) | 2018-08-20 | 2018-08-20 | Silt excavating equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108915017B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719625A (en) * | 2020-06-25 | 2020-09-29 | 李世梅 | River channel dredging system |
CN112502227A (en) * | 2020-12-07 | 2021-03-16 | 张方娥 | Dam sludge cleaning equipment |
CN115316105A (en) * | 2022-08-18 | 2022-11-11 | 苏州市职业大学 | Self-retracting and propelling lotus root digging machine |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204940392U (en) * | 2015-07-28 | 2016-01-06 | 重庆交通大学 | One can sink and emerge type water energy powered desilting device automatically |
US20160122970A1 (en) * | 2014-10-24 | 2016-05-05 | The Charles Machine Works, Inc. | Linked Tooth Digging Chain |
CN206015765U (en) * | 2016-08-16 | 2017-03-15 | 邯郸学院 | A kind of riverway sludge elevator |
CN106522301A (en) * | 2017-01-05 | 2017-03-22 | 刘长苗 | Environment-friendly river channel sludge spreading and conveying system |
CN206815415U (en) * | 2017-04-05 | 2017-12-29 | 新兴铸管股份有限公司 | A kind of loader hopper with shovel board |
-
2018
- 2018-08-20 CN CN201810946171.1A patent/CN108915017B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160122970A1 (en) * | 2014-10-24 | 2016-05-05 | The Charles Machine Works, Inc. | Linked Tooth Digging Chain |
CN204940392U (en) * | 2015-07-28 | 2016-01-06 | 重庆交通大学 | One can sink and emerge type water energy powered desilting device automatically |
CN206015765U (en) * | 2016-08-16 | 2017-03-15 | 邯郸学院 | A kind of riverway sludge elevator |
CN106522301A (en) * | 2017-01-05 | 2017-03-22 | 刘长苗 | Environment-friendly river channel sludge spreading and conveying system |
CN206815415U (en) * | 2017-04-05 | 2017-12-29 | 新兴铸管股份有限公司 | A kind of loader hopper with shovel board |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111719625A (en) * | 2020-06-25 | 2020-09-29 | 李世梅 | River channel dredging system |
CN112502227A (en) * | 2020-12-07 | 2021-03-16 | 张方娥 | Dam sludge cleaning equipment |
CN112502227B (en) * | 2020-12-07 | 2023-01-10 | 南京智慧阳光科技有限公司 | Dam sludge cleaning equipment |
CN115316105A (en) * | 2022-08-18 | 2022-11-11 | 苏州市职业大学 | Self-retracting and propelling lotus root digging machine |
Also Published As
Publication number | Publication date |
---|---|
CN108915017B (en) | 2020-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108915017A (en) | A kind of mud excavating equipment | |
US3603010A (en) | Backhoe excavator with endless bucket attachment | |
WO1982004274A1 (en) | Material working machines | |
CN206706859U (en) | A kind of cutting assembly and earthwork processing unit | |
CN2913468Y (en) | Grappling bucket body for weighted underground sequential wall | |
CN215165981U (en) | Ditch desilting equipment for hydraulic engineering | |
JP3704666B2 (en) | Ground improvement method for large depths and horizontal cutter type ground improvement device | |
JP3460029B2 (en) | Waterway excavator | |
KR20210115286A (en) | Dredging vessel of 40ton class | |
US1859659A (en) | Swinging bucket line excavator | |
CN107657886A (en) | One kind teaching apparatus | |
KR102285169B1 (en) | Excavation unit for dredger having multi refracting structure | |
JPH067068Y2 (en) | Ground improvement device | |
CN109653266A (en) | A kind of slusher chain type trenching machine | |
CN218374109U (en) | Bucket structure | |
JP2000192787A (en) | Earth pressure shield excavator and excavating method therewith | |
JP2537686B2 (en) | Drilling bucket equipment | |
US5743A (en) | Floating excavatok | |
JPS62268431A (en) | Dredging working machine | |
JPH0473495B2 (en) | ||
JPH0150758B2 (en) | ||
JPS6011968Y2 (en) | Narrow trench trencher | |
JPH05156641A (en) | Digging hole forming apparatus for constructing thin film wall | |
JP2524940B2 (en) | Drilling rig | |
JP2847354B2 (en) | Dredging device and dredging method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201125 Address after: 225402 south side of the second ring road section of Chengdong Industrial Park, Taixing City, Taizhou City, Jiangsu Province Applicant after: JIANGSU YUANQUAN PUMP INDUSTRY Co.,Ltd. Address before: 066000 West 101 live room, west campus, Yanshan University, Qinhuangdao, Hebei. Applicant before: Yang Laisheng |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |