Background technique
Non-fragment orbit refers to the track knot for replacing shot ballast bed using mass-type foundations such as concrete, asphalts
Structure.Non-fragment orbit avoids railway ballast splashing, ride comfort is good, and stability is good, long service life, durability compared with Ballast track
Good, maintenance work is few, is applied more and more.Plate-type ballastless track construction relate generally to track plates, asphalt mortar, bituminous mortar or
The structures such as self-compacting concrete filling layer, pedestal or supporting course, wherein pedestal or supporting course use concrete structure, are layed in bottom
Seat or the asphalt mortar, bituminous mortar on supporting course or self-compacting concrete filling layer are the structures of ballastless track structure adjustment and bearing power transmission
Layer.
Currently, China's plate-type ballastless track pattern mainly has III template of I plate-type of CRTS, II plate-type of CRTS and CRTS
Formula non-fragment orbit.I plate-type non-fragment orbit of CRTS is cell board, not vertical between plate and plate to connect, and does not set lateral block, is laid on existing
On the reinforced concrete footing with convex block machine poured, limited by convex block machine.In unit plate type ballastless track structure, it is laid with
Be between every piece of track plates after installation it is independent, shortcoming is, line road transport row for a period of time after, track plates and pitch
Mortar filled layer can be peeling-off, and the longitudinal end of track plates is also easy to produce warpage, this can undoubtedly give the stationarity of train operation, relax
The service life of adaptive and track structure adversely affects.Although presently, there are the scheme for being correspondingly improved connection type,
All in all it is still difficult to meet stress deformation and preparation process challenge between plate body, and current nothing can not be overcome
Tiny fragments of stone, coal, etc. track sketch plate excessively leads to problems such as the assembly of entire non-fragment orbit, maintenance difficult.
It uses longitudinal-connecting type to II plate-type fragment-free track slab of CRTS, and the company of indulging, passes through longitudinal essence between fragment-free track slab and plate
It pricks spiral and tensioning latch fitting forms vertical connection structure, be equipped with lateral block, I plate-type non-fragment orbit of CRTS can be overcome to exist
Segmental defect.Such as tensioning lock for longitudinal connection of ballastless track slab disclosed in patent document 201695285U, by from rail
It is longitudinally connected that the longitudinally projecting reinforcing bar of guidance tape is attached locking realization.But this linked vector graph is essentially identical to longitudinal direction and answers in advance
The mode of power reinforcing bar, connecting structure is complicated, constructs more loaded down with trivial details, and this is rigidly attached to the excessive situation of TEMPERATURE FORCE
Under, there are still the possibility of arch for track plates, this causes the stationarity in service life and train operation to track structure, comfort not
The influence of benefit.
To overcome drawbacks described above, presently, there are the technical solutions that two basic plate longitudinal ends are directly bolted, such as
Patent document CN 201495454U discloses a kind of high-speed railway plate type ballastless track longitudinal connecting structure comprising along route
The track plates being longitudinally laid with, the longitudinal end of track plates are arranged at intervals at least two groups pit and arc-shaped through-hole, arc-shaped through-hole
Both ends are communicated in pit with the longitudinal terminal surface of track plates respectively, are set to pit with the arch screw bolt in arc-shaped through-hole and are connected group
Part is longitudinally connected by adjacent two pieces of track plates.This connection structure, which can overcome, is rigidly attached to the excessive situation lower rail of TEMPERATURE FORCE
The problem of guidance tape arches up, but need to open up the pit of certain depth at plate body both ends in this scheme, then by a groove
On the one hand the bolt hole for opening up perforation connecting pin end additionally opens up pit on plate body and needs to increase process, it is difficult to increase manufacture
Degree and cost, in addition pit therein is in order to meet opening up for bolt hole and being connected and fixed for bolt, inner wall size and shape
With high requirement, so that manufacture difficulty increases;In particular, the setting of this pit causes rainwater, dirt etc. to deposit, and make
It is bolted and is corroded or is difficult to dismount reparation, to increase later maintenance maintenance difficulty.
To overcome drawbacks described above, disclosed in the patent document CN107190584A of applicant's earlier application a kind of for nothing
The assembled position limiting structure of tiny fragments of stone, coal, etc. track, wherein the non-fragment orbit of this assembled position limiting structure of the correspondence disclosed to drawbacks described above into
Targetedly Curve guide impeller is gone.Non-fragment orbit in the technical solution is on the one hand by using the basic plate of multiple various specifications
Flexible configuration and combination are carried out, can need to be assembled into various sizes of cell board according to scene, combining form more diversity, and
And prefabricated basic plate miniaturization, lightness, it is more convenient for manufacturing, stacks transport and assembled in situ, reduce existing Special-shaped Plates
Use;On the other hand it, which is used, is arranged the protrusion and recessed portion to match in the connecting pin of prefabricated basic plate, so as to form
Mortise structure simultaneously carries out fastening using arch screw bolt by the arch screw bolt hole that wherein opens up to anchor basic plate, may be implemented
First several basic plates of assembled non-fragment orbit of Prefabrication, then basic plate is assembled at the scene by certain size by attachment device
Cell board, so as to flexibly arrange in pairs or groups and combine formation length be suitable for scene needs cell board.The non-fragment orbit knot
Structure can make manufacture difficulty therein reduce, and rainwater dirt deposition is not present, and connector corrosion and dismounting difficulty reduce,
Later period repairs easy maintenance.
But the connection of the ballastless track structure each unit plate is realized by the lug boss and recessed portion to match, structure
Still complex, track plates needs are especially prefabricated, and above-mentioned bulge-structure makes protrusion in the middle part of entire raceway surface, in example
Be unsatisfactory for safe escape requirement in such as subway occasion, in addition, between each unit plate of track male-female engagement connection belong to it is mixed
The direct Hard link of concrete board, connection precision is poor, and there is no bufferings between each unit plate, so that whole to entire non-fragment orbit
Body precision is affected;On the other hand, the track plates limiting device of this non-fragment orbit uses special position limiting structure, wherein not
But it is prefabricated to locating part progress, and it will carry out aperture to the basic plate surface connecting with track plates, need specially to base
Plinth plate is designed and is transformed, and not only complex procedures project amount is big, and limit effect is not ideal enough.In particular, this track
Connection structure is arranged between each unit track plates in structure, and position limiting structure is that multiple connectors connect into after certain length again
Setting, i.e., connection structure is individually separated setting with position limiting structure and the two is not corresponded with track plate unit, connects and limits
Position is required to be separately provided and is designed and constructs respectively, and design process is more and project amount is larger, if increase with
The corresponding multiple position limiting structures of connection structure, then prefabricated and improvement project amount is big, if the limit component that setting is less, limit effect
Fruit not can guarantee.
Summary of the invention
At least one aiming at the above defects or improvement requirements of the prior art, the present invention provides one kind for vibration damping
The prefabricated sleeper of section is board-like or the wet of track plate-type ballastless track connects formula assembly method, and it is real to be poured connection fill part by one
Now to the effect that is vertically and horizontally fixed and realizing buffering of concrete slab sleeper, the simple assembling structure of assembly method is stablized.
To achieve the goals above, provide that a kind of prefabricated sleeper for vibration damping location is board-like or the board-like no tiny fragments of stone, coal, etc. of pre-track
The wet of track connects formula assembly method, includes the following steps:
S1, rail inferior portion basis is performed;
S2, damping layer is performed on the basis of the rail inferior portion;
S3, the prefabricated concrete slab sleeper or precast track plate that manufacture in factory be carried to construction site, predetermined quantity it is described
Prefabricated concrete slab sleeper or precast track plate are erected in the damping layer along the arrangement of route longitudinal gap, carry out initial adjustment positioning;
S4, in spacer region, the transverse ends of the prefabricated concrete slab sleeper or precast track plate pass through multiple longitudinally connected respectively
Part assembly connection each other carries out accurate adjustment positioning;
S5, multiple limit steel bars are set on the basis of the rail inferior portion of part or all of spacer region, outside limit steel bar
It is arranged placement spacing collar;
Alternatively, multiple spacing collars, spacing collar is arranged on the basis of the rail inferior portion of part or all of spacer region
Protection is arranged in interior placement limit steel bar, spacing collar outside;
S6, cast in situs armored concrete, on the rail inferior portion basis and the prefabricated concrete slab sleeper or precast track plate
Between form in-situ layer;
S7, it is provided in the spacer region of longitudinal connecting member and limit component, distinguishes in the transverse ends of spacer region at the same time
Cast in situs armored concrete, package cover the longitudinal connecting member, the limit steel bar, the spacing collar;Shape after solidification
At connection fill part, four are integrally formed realization while limiting and connecting;In part or all of, the not set limit steel bar
The transverse ends of spacer region distinguish cast in situs armored concrete, package covers the longitudinal connecting member;By primary cast-in-place
It is completed at the same time integration, laterally/longitudinal limit and allows vertical flexible deformation, thus several pieces of prefabricated concrete slab sleepers
Or precast track plate is assembled to form the track element of predetermined length and forms same force structure body.
It further, in step s3, include multipair fastener track in the prefabricated concrete slab sleeper or precast track plate,
Preferably 2-10 pairs, more preferably 4-6 pairs.
Further, in step s3, the prefabricated concrete slab sleeper or the setting of precast track plate longitudinal direction both ends are jagged, described
Cover board is set on notch, forms smooth fire escape.
Further, in step sl, the rail inferior portion basis is configured with gutter along its longitudinal direction.
Further, in step S6 or step S7, when cast-in-situ steel reinforced concrete, in the prefabricated concrete slab sleeper or prefabricated rail
The both lateral sides of guidance tape shape gutter.
Further, the first position limiting structure optionally is set in certain prefabricated concrete slab sleepers or precast track plate two sides,
Or the second position limiting structure is set in plate.
Further, plate stitch is set between multiple adjacent track elements, is arranged in the part or all of plate stitch
Third position limiting structure.
Above-mentioned further improvement technical characteristic can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can obtain down and show
Beneficial effect:
(1) method of the invention connects for the assembled sleeper plate or the wet of track platy ballastless track structure in vibration damping location
Formula assembly, multiple prefabricated short concrete slab sleeper intervals, which are arranged and pass through longitudinal connecting member, forms length by connecting fill part assembly connection
Concrete slab sleeper, spacer region is arranged limit steel bar and spacing collar, limit steel bar and spacing collar one of them with connect filling part
Divide and fix, another is fixed with reinforced concrete earthen backfill layer, forms the slide construction of limit steel bar and spacing collar, and convenient for connecting
It connects fill part to move up and down, the buffering for generating vibration to vehicle is realized while playing vertically and horizontally limit, wherein connection is filled out
It fills the connection that part is realized while realizing limit, process is few easy for construction.
(2) method of the invention for vibration damping location assembled sleeper is board-like or track platy ballastless track structure it is wet
Formula assembly is connect, the length of prefabricated concrete slab sleeper can be with very little, by the assembly of the prefabricated concrete slab sleeper of minimum length, with accommodation curve section
Concrete slab sleeper high-precision installation.Concrete slab sleeper longitudinal direction both ends are provided with semi-circular opening, and being open by semi-circular, it is convex to be formed
Platform is convenient for the assembly of adjacent two sleeper.
(3) method of the invention for vibration damping location assembled sleeper is board-like or track platy ballastless track structure it is wet
Formula assembly is connect, longitudinal connecting member includes longitudinal reinforcement and sleeve, is embedded in advance in the prefabricated concrete slab sleeper by longitudinal reinforcement and another
The setting of one longitudinal reinforcement interval is connected to each other finally by sleeve, or by the way that the sleeve is embedded in the prefabricated concrete slab sleeper in advance
In, the both ends of a longitudinal reinforcement are separately connected two sleeves, realize phase by the flexible setting of reinforcing bar and sleeve
Connection between adjacent two prefabricated concrete slab sleepers.
(4) method of the invention for vibration damping location assembled sleeper is board-like or track platy ballastless track structure it is wet
Formula assembly is connect, short slab is first made in concrete slab sleeper, then be transported to construction site in factory, is connected by longitudinal connecting member, and with logical
It crosses connection fill part and is connected and fixed adjacent two short slab, realize short concrete slab sleeper assembly growth concrete slab sleeper, in casting connection filling
Before part, limit steel bar or spacing collar are fixed on reinforced concrete earthen backfill layer, corresponding casting connection fill part makes
It is fixedly connected with spacing collar or is fixedly connected with limit steel bar, and limit steel bar and spacing collar are flexibly connected, to realize
Effect that is vertically and horizontally fixed and realizing buffering to concrete slab sleeper, the simple assembling structure of assembly method are stablized.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not
For limiting the present invention.
In addition, as long as technical characteristic involved in the various embodiments of the present invention described below is each other not
Constituting conflict can be combined with each other.
Assembled sleeper is board-like in the preferred embodiment of the present invention or the signal of the overall structure of track platy ballastless track structure
Figure is as shown in Figures 1 and 2, wherein ballastless track structure passes through the prefabricated concrete slab sleeper or prefabricated being sequentially arranged at intervals along longitudinal direction
Track plates, which are correspondingly connected with, to be assembled, and in following preferred embodiment of the invention, is preferably explained by taking prefabricated concrete slab sleeper 1 as an example
It states, certainly, precast track plate can also carry out being correspondingly connected with assembly by the setting form in following preferred embodiment, be formed without the tiny fragments of stone, coal, etc.
Track structure.
In a preferred embodiment of the invention, ballastless track structure include the prefabricated concrete slab sleeper 1 for successively matching setting, it is cast-in-place
Layer 2 and rail inferior portion basis 3;Further specifically, basic 3 direction along ng a paths of rail inferior portion in preferred embodiment are arranged,
Concrete bed made of can further preferably being poured as cement concrete or basis backfill layer, for carrying prefabricated concrete slab sleeper
1 and the rail 5 that is arranged on the concrete slab sleeper 1, and operate in the train on rail 5;Preferred embodiment middle orbit infrastructure 3
Width and thickness be not specifically limited, can carry out according to actual needs preferably, so this will not be repeated here;Further preferably
Ground is correspondingly arranged on gutter 301 as shown in Figure 3 on track infrastructure 3, to exclude and be reduced in track in time
Ponding, the gutter 301 in preferred embodiment can be more preferably direction along ng a path setting, and be preferably provided at rail inferior portion
The middle part on basis 3;Certainly, gutter 301, which may also preferably be, is disposed side by side on two of basic 3 two sides of rail inferior portion, Huo Zheshe
One with the basic 3 any sides of rail inferior portion is set, this can be carried out preferably according to actual needs, and this will not be repeated here.
Further, it is preferable to the in-situ layer 2 in embodiment is arranged between prefabricated concrete slab sleeper 1 and rail inferior portion basis 3,
Can be placed on rail inferior portion basis 3 by prefabricated concrete slab sleeper 1 and by being correspondingly connected with, coarse adjustment, accurate adjustment after-pouring obtain so that
Prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 fit closely, to bear the vertical force transmitted on prefabricated concrete slab sleeper 1, play buffering by
The effect of power and uniform stressed, the setting of in-situ layer 2 can sufficiently realize the adjustment of prefabricated concrete slab sleeper 1 in work progress, it is ensured that nothing
The levelness or flatness of each position track in tiny fragments of stone, coal, etc. track guarantee the planarization of track operation;In a preferred embodiment, prefabricated
After concrete slab sleeper 1 is correspondingly placed on rail inferior portion basis 3, adjust between each prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 away from
From so that the rail 5 being arranged on each prefabricated concrete slab sleeper 1 can be correspondingly connected with, and guaranteeing the corresponding splicing precision of track;Further tool
Body, in a preferred embodiment, after prefabricated concrete slab sleeper 1 is arranged on the track infrastructure 3, between the two between be separated with it is certain
Distance then carries out coarse adjustment and accurate adjustment to prefabricated concrete slab sleeper 1, and between the two every space in pour the coagulation of corresponding thickness
Soil, to form the in-situ layer 2 of ballastless track structure.
It is further preferred that reliable to improve the connection between in-situ layer 2 and prefabricated concrete slab sleeper 1 and rail inferior portion basis 3
Property has carried out at " texturing " lower surface of prefabricated concrete slab sleeper 1 and/or the upper surface on rail inferior portion basis 3 in preferred embodiment
Reason, i.e., so that the upper surface roughness on the lower surface of prefabricated concrete slab sleeper 1 and/or rail inferior portion basis 3 increases, flatness is reduced,
The stiction for connecting in-situ layer 2 with prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 increases, and is further promoted cast-in-place
The connective stability of layer 2 and prefabricated concrete slab sleeper 1 and rail inferior portion basis 3, so that prefabricated concrete slab sleeper 1 and rail inferior portion basis 3 are logical
It crosses in-situ layer 2 and forms same track structure beaer, to further promote the force stability of ballastless track structure.
Further, it is preferable to the prefabricated concrete slab sleeper 1 in embodiment is as shown in Fig. 1~2, plate-like structure, and it is prefabricated
Concrete slab sleeper 1 is preferably that non-prestressed plate may be alternatively provided as the form of prestressed slab certainly, this can be used according to actual needs
Related art method in the prior art is realized;Further, the prefabricated concrete slab sleeper 1 of muti-piece can successively be set at direction along ng a path interval
It sets on track infrastructure 3 and corresponding connect forms whole ballastless track structure, with side between adjacent two prefabricated concrete slab sleeper 1
In face of just matching connection afterwards;Further, it is preferable in embodiment the top direction along ng a path of prefabricated concrete slab sleeper 1 be arranged at intervals with it is more
To the fastener track that can correspond to installation rail 5, spaced fastener support rail number of units on prefabricated concrete slab sleeper 1 in preferred embodiment
Amount is 4 pairs, and certainly, the setting quantity of prefabricated 1 upper fastener track of concrete slab sleeper can be according to the length of prefabricated concrete slab sleeper 1 or adjacent
Interval between two fastener tracks carries out preferably, being such as set as 2 pairs, 3 pairs, 5 pairs, 6 pairs, 7 pairs, 8 pairs, 9 pairs, 10 equities,
In can further be particularly preferred as 4~6 pairs.
Further, it is preferable to it is provided with longitudinal connecting member between two contiguous prefabricated concrete slab sleepers 1 in embodiment, it can be into one
Respectively arranged longitudinal reinforcement 102 on the side that two prefabricated concrete slab sleepers 1 can be correspondingly connected in step specially preferred embodiment, it is longitudinal
Reinforcing bar 102 is arranged along the length direction of prefabricated concrete slab sleeper 1, i.e., is arranged along the orbital direction of ballastless track structure, and longitudinal reinforcement
102 is multiple on prefabricated 1 side of concrete slab sleeper to be arranged at intervals in a preferred embodiment, and then two prefabricated concrete slab sleepers 1 are being to after just,
Each longitudinal reinforcement 102 on two prefabricated 1 opposite flanks of concrete slab sleeper can be respectively to just, and then realizes and be correspondingly connected with;It is further excellent
Selection of land respectively corresponds in preferred embodiment and two positive longitudinal reinforcements 102 is provided with sleeve, and one end can be correspondingly connected with wherein one
A longitudinal reinforcement 102 on prefabricated 1 side of concrete slab sleeper of block, the other end can be correspondingly connected with another piece of prefabricated 1 side of concrete slab sleeper
Upper corresponding longitudinal reinforcement 102, so as to be correspondingly connected with two prefabricated concrete slab sleepers 1 by sleeve.
Certainly, the connection of longitudinal reinforcement 102 is not limited to above-mentioned form, can also be arranged by corresponding longitudinal reinforcement 102
Bridge piece is respectively welded two longitudinal reinforcements 102 with the both ends of bridge piece, realizes the longitudinally connected of two prefabricated concrete slab sleepers 1;And
And longitudinal connecting member is also not limited to the form of above-mentioned setting longitudinal reinforcement 102, can according to actual needs be preferably other shape
Such as in another preferred embodiment connecting plate is arranged on the side of two prefabricated concrete slab sleepers 1 respectively, then be correspondingly arranged longitudinal direction in formula
Two prefabricated concrete slab sleepers 1 to be correspondingly connected with by bolt, to realize the longitudinally connected of prefabricated concrete slab sleeper 1;Or it is excellent at another
It selects in embodiment, bolt is passed through by the plate end pre-buried structure in prefabricated concrete slab sleeper 1, such as pre-embedded steel slab, embedded iron parts, later period
Connection, welding or the patterns such as hinged form solid and reliable connection, complete the assembly connection of prefabricated concrete slab sleeper 1.
Further, it is preferable to which the prefabricated concrete slab sleeper 1 in embodiment is used to be provided with multiple longitudinal reinforcements on the side of connection
102, the both ends of above-mentioned side are divided into, and the respectively arranged longitudinal reinforcement 102 in above-mentioned side both ends in preferred embodiment
Quantity be 4, i.e., the longitudinal reinforcement 102 being arranged on prefabricated 1 connecting end surface of concrete slab sleeper is 8, then two prefabricated concrete slab sleepers 1 it
Between can be to being just correspondingly connected with afterwards by 8 sleeves, corresponding composition is vertical in a preferred embodiment with sleeve 105 for longitudinal reinforcement 102
To connector, the longitudinally connected of prefabricated concrete slab sleeper 1 is realized, and then form the integral unit of direction along ng a path;Certainly, two is prefabricated
Longitudinal reinforcement 102 can partially can also be correspondingly connected with by sleeve all with the connection of sleeve Corresponding matching between concrete slab sleeper 1.
Further, multiple prefabricated concrete slab sleepers 1 can be correspondingly connected with into along longitudinal direction by being correspondingly connected with by longitudinal connecting member
The long plate unit of certain length, then the ballastless track structure in preferred embodiment can pass through one or more long plate unit pair
Composition should be combined;Further, it is preferable to which the long plate unit in embodiment can be whole by in-situ layer 2 and 3 formation of rail inferior portion basis
Body force structure forms track element, then ballastless track structure can be filled by longitudinally disposed multiple track elements are corresponding
With forming, each track element completes the stress of ballastless track structure respectively as whole force structure.
Further, it is preferable to be provided with plate stitch between each long plate unit in embodiment, and it is correspondingly arranged in plate stitch
There is position limiting structure, with the corresponding limit for realizing long plate unit of position limiting structure, which can be more preferably boss, circle
Column etc., the position limiting structure property of can choose setting, can also be respectively provided in each plate stitch, this can be carried out preferably according to the actual situation,
This will not be repeated here.
Certainly, the limit of long plate unit is also not limited to the above-mentioned position limiting structure of setting, can be set as according to actual needs
Other form is such as in a preferred embodiment respectively arranged with position limiting structure in the two sides of long plate unit, by long slab cell side
Position limiting structure on side is correspondingly connected with rail inferior portion basis, realizes the limit of long plate unit, which can be further preferred
To be vertically provided at anchor bar or connection boss on prefabricated 1 side of concrete slab sleeper;Correspondingly, in another preferred embodiment
In, through-hole structure or setting can be vertically opened up in the plate face by concrete slab sleeper 1 prefabricated some or all of in long plate unit
It is connected to the sleeve of two plate faces, so that bar planting or setting in above-mentioned through-hole or sleeve can be passed through after long plate unit is assembled to position
The mode of limit steel nail realizes the limit of long plate unit, and the reinforcing bar or limit steel nail Corresponding matching of bar planting are basic into rail inferior portion
In, guarantee that the limit of long plate unit is firm.In addition, the limit of each long plate unit can also be preferably arranged to according to actual needs it is other
Form, this is easier to realize with related art method in the prior art, so this will not be repeated here.
Further, it is preferable to after two contiguous prefabricated concrete slab sleepers 1 in embodiment are correspondingly connected with by longitudinal connecting member, it can be right
Longitudinal connecting member setting connection fill part is answered, it is preferably mixed by the cast-in-place cement of spacer region between two prefabricated concrete slab sleepers 1
It is obtained after solidifying soil or organic material;It is, of course, preferable to can the company of being correspondingly arranged between the transverse ends of all spacer regions in embodiment
Fill part is connect, connection fill part can also be only correspondingly arranged between the transverse ends of part spacer region, this can be according to reality
Situation carries out preferred;It is further preferred that preferred embodiment before in-situ cement concrete, is preferably being indulged on longitudinal connecting member
To on connector be arranged cross sectional planes direction circumferential stirrup, by two plate spacer regions multiple longitudinal connecting members and connection
Fill part connects into overall structure, and the setting quantity of circumferential stirrup, which can be one, to be the multiple of longitudinally spaced setting,
And the type of attachment of circumferential stirrup and longitudinal connecting member is not specifically limited, and can also be connected by binding by being welded to connect
It connects, is not specifically limited herein;Further, the longitudinal connecting member to two contiguous prefabricated concrete slab sleepers is correspondingly connected with, and circumferential hoop
After muscle and longitudinal connecting member matching connect into integral frame structure, cast-in-place coagulating cement is corresponded in above-mentioned integral frame structure
Soil, so that the setting stability of the connection fill part between two prefabricated concrete slab sleepers 1 is higher, multiple prefabricated concrete slab sleepers 1 can be corresponded to
Form stable long plate unit, that is, form same force structure body so that each prefabricated concrete slab sleeper 1 in long plate unit it is not single by
Power, but whole stress, so that it is guaranteed that the force stability of long plate unit or even ballastless track structure.
It is further preferred that correspondence opens up jagged on the side that plate body 101 is used to match connection, it is preferably in semi-ring
Shape, and two prefabricated concrete slab sleepers 1 with side to just and after matching connection, two notches on two relative side can be respectively to just, and group
The notch circularized, as shown in fig. 1, then corresponding cover board is arranged in the corresponding notch being composed, so that without tiny fragments of stone, coal, etc. rail
The zone level between two rails 5 in road structure, convenient for walking, the rubbish also reduced on sleeper surface is fallen into gutter 301.
It is further preferred that prefabricated concrete slab sleeper 1 be used for match connection both sides of the face in the middle part of correspondence offer it is semiorbicular
Notch, notch are arranged so that the both ends of each end face are respectively formed bulge-structure, and then each longitudinal reinforcement 102 can be correspondingly arranged at
On the end face of two bulge-structures, i.e., when two prefabricated concrete slab sleepers 1 are correspondingly connected with, it can correspond to so that two prefabricated 1 ends of concrete slab sleeper
Bulge-structure is to just, then making on bulge-structure corresponding longitudinal reinforcement 102 respectively to just, to realize prefabricated concrete slab sleeper 1
With being correspondingly connected with for longitudinal reinforcement 102.
In above preferred embodiment, the connection between adjacent two prefabricated concrete slab sleeper 1 passes through at the end of each prefabricated concrete slab sleeper 1
Pre-buried longitudinal reinforcement 102 is realized on face, this is one of embodiment of the present invention preferred embodiment, but is not unique setting
Mode, such as in a further advantageous embodiment, by being correspondingly arranged sleeve on the end face of each prefabricated concrete slab sleeper 1, so that two is pre-
After concrete slab sleeper 1 processed is correspondingly arranged on rail inferior portion basis 3, sleeve on two prefabricated 1 opposite flanks of concrete slab sleeper respectively to just, after
And in each group to longitudinal reinforcement is correspondingly arranged in positive sleeve, so that one end of longitudinal reinforcement is correspondingly connected in a prefabricated sleeper
On sleeve on 1 side of plate, the other end is connected on another prefabricated 1 side of concrete slab sleeper on corresponding sleeve, so that two
Prefabricated concrete slab sleeper 1 can be correspondingly connected with by the Corresponding matching of multiple groups sleeve and longitudinal reinforcement to realize, right respectively in every group of sleeve
Longitudinal reinforcement should be connected with.
Certainly, the longitudinal reinforcement on prefabricated 1 end face of concrete slab sleeper or sleeve can also pass through other shapes by pre-buried setting
Formula is configured, and connecting plate such as is arranged on the end face of prefabricated concrete slab sleeper 1, then that one end of longitudinal reinforcement or sleeve is corresponding
It is welded on connecting plate and realizes positioning.
In order to adapt to the demand in vibration damping location, damping layer 6, damping layer are set between in-situ layer 2 and rail inferior portion basis 3
It is not fixed between 6 and self-compacting concrete layer 2 and reinforced concrete earthen backfill layer 3, train fortune is buffered by the setting of damping layer 6
The vibration that row generates.Preferably, damping layer can support pattern for point support, strip support or face, and damping layer 6 is poured after being set to
Layer lower part, pours after-pouring layer and damping layer 6 constitutes unified structure, improves the mass of vibration of track, can in order to easy for construction
It is levelling to be carried out to infrastructure first to perform last layer, then damping layer is directly set, adjust track plates system, pass through
The vibration that the setting buffering train operation of damping layer 6 generates.
Several pieces of prefabricated concrete slab sleepers or precast track plate longitudinal gap are arranged, and lateral the two of part or all of spacer region
Connection fill part 402 is respectively set in end, and some or all of spacer region is equipped with limit component 4, further, limit component
It can be one or more that quantity, which is arranged, this can be carried out preferably according to the setting form or actual needs of limit component, and
Along the orbital direction of non-fragment orbit, the spacer region between each prefabricated concrete slab sleeper 1 can be respectively provided with limit component, or be spaced in part
Limit component is set in area, this can be carried out preferably according to actual needs, and this will not be repeated here.
Limit component 4 includes limit steel bar 401 and spacing collar 403, and connection fill part 402 is by connecting adjacent two pieces
Longitudinal connecting member 102 at plate body, realization adjacent two boards body 101 is connected it is integral, connection fill part 402 be set to it is cast-in-place
On layer 2 and damping layer 6, so that it be made to be suitable for the upper and lower displacement that vibration generates, limit steel bar 401 and spacing collar 403
Mating connection fill part 402 is arranged, wherein limit steel bar 401 and the matching setting of spacing collar 402, in joint gap
It is interior to form whole vertical implant infrastructure, by with connect the cooperation realization of fill part 402 it is horizontal and vertical on limit, vertically
The structure that implant infrastructure and rail inferior portion basic 3 piecemeal activities connects, i.e., in limit steel bar 401 and spacing collar 403 one and
Rail inferior portion basis 3 is fixedly connected, another is flexibly connected with rail inferior portion basis, without forming entirely fixed connection structure,
So that guarantee is vertically upper movable, to preferably buffer while vertical implant infrastructure realizes horizontal and vertical limit
The vibration that train operation generates.
The embodiment one of limit component 4, as shown in figure 4, spacing collar 403 is fixed in connection fill part 402, limit
The height of position sleeve 403 and the height for connecting fill part 402 are concordant, between 403 bottom of spacing collar and rail inferior portion basis 3
It is not connected to, connection fill part 402 is later period pouring structure, places spacing collar in the gap before pouring between protrusion
403, and pour and to form the height connection fill part 402 concordant with spacing collar 403;Limit steel bar 401 is set to spacing collar
In 403, and its bottom is fixed in rail inferior portion basis 3, to realize horizontal and vertical limit, bottom and rail inferior portion basis 3
Be fixedly connected mode have it is several, it is preferable that 401 bottom of limit steel bar and rail inferior portion basis 3 is threadedly coupled realization fixation.
Further, embodiment two, as shown in figure 5, limit steel bar 401 is that its head of T-type stop screw is set to limit sleeve
The top of cylinder 403, and be not connected between its head and spacing collar 403 and connection fill part 402, therefore without limitation on even
Moving up and down for fill part 402 is connect, to buffer the vibration of train operation generation, while realizing horizontal and vertical limit.It is real
Example three is applied, as shown in fig. 6, limit steel bar 401 or inverted T shaped stop screw, bottom is set in rail inferior portion basis 3 and realizes limit
The fixation of reinforcing bar 401, the top of limit steel bar 401 with connect fill part and spacing collar 403 is not connected to be slidably connected.
The example IV of limit component 4 as shown in fig. 7, limit steel bar 401 is set in connection fill part 402, and limits
The top of reinforcing bar 401 is fixedly connected with fill part 402 is connect, and the bottom of limit steel bar 401 and the interval of damping layer 6 are arranged, limit
The bottom of position reinforcing bar 401 is higher than damping layer 6;Spacing collar 403 is fixed on rail inferior portion basis 3, spacing collar 403 with connect
Fill part 402 is not fixed connection, is equipped with distance sleeve 404, limit sleeve between spacing collar 403 and connection fill part 402
Cylinder is slidably connected with distance sleeve 404, and the height of spacing collar 403 is lower than the height of connection fill part 401, limit steel bar
401 are placed in spacing collar 403, and the limit steel bar 401 and the matching of spacing collar 403 in connection fill part 402 are realized
Transverse direction and vertical spacing, while being realized in connection fill part 402 by connection limit steel bar 401 and 6 interval height of damping layer
Lower movement, to buffer the vibration of train operation generation.
As shown in figure 8, as another aspect of the present invention, prefabricated sleeper plate-type ballastless track for vibration damping location
Assembly method includes the following steps:
The prefabricated concrete slab sleeper 1 manufactured in factory is carried to construction site, the prefabricated concrete slab sleeper edge of predetermined quantity by S1
Initial adjustment positioning is carried out after route longitudinal arrangement;
S2 is linked together the prefabricated concrete slab sleeper 1 by multiple longitudinal connecting members 102, carries out accurate adjustment positioning;
Multiple limit steel bars, limit steel bar housing is arranged in S3 on the basis of the rail inferior portion of part or all of spacer region
If placing spacing collar, it is provided in the spacer region of longitudinal connecting member and limit component at the same time, in the transverse ends of spacer region
Cast in situs armored concrete respectively, package cover the longitudinal connecting member, the limit steel bar, the spacing collar;Solidification
After form the connection fill part, four are integrally formed and realize limit simultaneously and connect;Part or all of, not set described
The transverse ends of the spacer region of limit steel bar distinguish cast in situs filler, and package covers the longitudinal connecting member;By primary
It is cast-in-place to be completed at the same time integration, laterally/longitudinal limit and allow vertical flexible deformation, thus several pieces of prefabricated rails
Board for pillow are assembled to form the track element of predetermined length and form same force structure body;
Alternatively,
Multiple spacing collars are set on the basis of the rail inferior portion of part or all of spacer region, are placed in spacing collar
Limit steel bar, spacing collar are arranged protection outside, are provided in the spacer region of longitudinal connecting member and limit component, are being spaced at the same time
The transverse ends in area distinguish cast in situs armored concrete, and package covers the longitudinal connecting member, the limit steel bar, the limit
Position sleeve;The connection fill part is formed after solidification, four are integrally formed realization while limiting and connecting;In part or entirely
Portion, the not set spacing collar the transverse ends of spacer region distinguish cast in situs armored concrete, package covering is described vertical
To connector;It is completed at the same time the vertical flexible deformation of integration, the limit of laterally/longitudinal direction and permission by once cast-in-place, from
And several pieces of prefabricated concrete slab sleepers are assembled to form the track element of predetermined length and form same force structure body.
Assembled sleeper platy ballastless track structure and its assembly method in the present invention, the structure letter of non-fragment orbit
Single, assembly method is easy, by way of setting ballastless track structure to multiple concrete slab sleepers and mutually assembling, thus quick assembling
Ballastless track structure is obtained, the application environment of subway is effectively applicable to.Concrete slab sleeper in the present invention, by pre-formed, then
The assembly of ballastless track structure is completed by way of assembly, assembling form is simple, and assembly efficiency is high, and no tiny fragments of stone, coal, etc. rail can be substantially improved
The assembly efficiency of road structure shortens the period of assembly, and by being correspondingly arranged longitudinal connect on the both sides of the face of prefabricated concrete slab sleeper
Fitting effectively realizes the connection of concrete slab sleeper so that can be correspondingly connected with by longitudinal connecting member between two concrete slab sleepers;By two
Concrete slab sleeper position interconnected is correspondingly arranged limit component, is limited, is effectively ensured to the lengthwise position of concrete slab sleeper by it
The stability of track operation, it is ensured that the running precision of track, and limit component and longitudinal connecting member can be integrally formed
The limit and connection of concrete slab sleeper are realized simultaneously, are substantially shortened the setting period of concrete slab sleeper, are promoted the setting efficiency of non-fragment orbit
Wherein, 401 bottom of limit steel bar is fixed in rail inferior portion basis, and the mode being connected through a screw thread is fixed or led to
The mode poured is crossed to fix, limit steel bar 401 is sheathed in spacing collar 403, spacing collar 403 with connect fill part 402
It is fixedly connected.
Wherein, vertical separation, limit steel bar 401 and company are equipped between the bottom of limit steel bar 401 and rail inferior portion basis 3
The connection of fill part 402 is connect, spacing collar 403 is fixedly connected with rail inferior portion basis 3, limit steel bar 401 and spacing collar 403
It is slidably connected, so that limit steel bar 401 is moved up and down with connection fill part 402 with buffering vibration.
Preferably, connection fill part 402 is armored concrete, and connects fill part 402 and use cast in situs coagulation
Earth process.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to
The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include
Within protection scope of the present invention.