CN108910430A - 一种减重型大梁门框拼装后转运工艺 - Google Patents
一种减重型大梁门框拼装后转运工艺 Download PDFInfo
- Publication number
- CN108910430A CN108910430A CN201810292604.6A CN201810292604A CN108910430A CN 108910430 A CN108910430 A CN 108910430A CN 201810292604 A CN201810292604 A CN 201810292604A CN 108910430 A CN108910430 A CN 108910430A
- Authority
- CN
- China
- Prior art keywords
- doorframe
- crossbeam
- technique
- assembled
- weight reduced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Wing Frames And Configurations (AREA)
Abstract
本发明公开了一种减重型减重型大梁门框拼装后转运工艺,经过抬高大梁门框、大梁门框在平板车上的放置和大梁门框的运转工艺步骤,完成减重型大梁门框拼装后转运工艺;本发明的优点在于:本发明通过在大梁门框下端部放置两根支腿门框转运龙门胎架,并且在胎架两侧焊接工艺撑杆,能够有效的保证大梁门框在转运过程中的质量问题,避免出现大梁门框结构薄弱处变形问题,进一步提高大梁门框的转运过程中的产品质量的完整性。
Description
技术领域
本发明涉及一种转运工艺,具体涉及一种减重型大梁门框拼装后转运工艺。
背景技术
轨道吊是起重机械的一种,包括对称设置在两侧的支腿门框以及横设在两支腿门框上的大梁门框,但是,大梁门框在转运过程中容易出现严重的形变,从而影响了大梁门框的质量。
发明内容
针对现有技术的缺陷和不足,本发明的目的在于提供一种结构简单、设计合理、使用方便的减重型大梁门框拼装后转运工艺。
为实现上述目的,本发明采用的技术方案是:一种减重型大梁门框拼装后转运工艺,其创新点在于:经过抬高大梁门框、大梁门框在平板车上的放置和大梁门框的运转工艺步骤,完成减重型大梁门框拼装后转运工艺;具体步骤如下:
(1)抬高大梁门框:将已经拼装好的大梁门框在转运前,进行整体的抬高,使大梁门框底板与地面具有一定的距离;
(2)大梁门框在平板车上的放置:在大梁门框转运前,将两根支腿门框转运龙门胎架放置在大梁的下方,然后在支腿门框转运龙门胎架的两侧焊接有工艺撑杆,在大梁与支腿门框转运龙门胎架之间放置有枕木,然后将平板车行驶到支腿门框转运龙门胎架的底端部两侧,开始抬升,抬升到位后,在支腿门框转运龙门胎架上大梁外侧每处装焊两件卡马,并用木块垫实;
(3)大梁门框的运转:大梁门框转运时,保证两端的平板车动作相一致,速度均匀缓慢,即可完成减重型大梁门框拼装后转运工艺。
进一步的,所述步骤(1)中的大梁门框整体抬高,所述大梁门框底板与地面的距离为2300mm。
进一步的,所述工艺撑杆由钢管、板件A和板件B组成,所述板件A焊接在钢管的左右两端,所述板件B焊接在板件A的中间位置处。
本发明有益效果为:本发明通过在大梁门框下端部放置两根支腿门框转运龙门胎架,并且在胎架两侧焊接工艺撑杆,能够有效的保证大梁门框在转运过程中的质量问题,避免出现大梁门框结构薄弱处变形问题,进一步提高大梁门框的转运过程中的产品质量的完整性。
附图说明
图1为本发明拼装后的整体结构示意图;
图2为本发明的工艺撑杆的结构示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合具体实施方式对本发明进行进一步详细说明。应当理解,此处所描述的具体实施方式仅用以解释本发明,并不用于限定本发明。
如图1-2所示,一种减重型大梁门框拼装后转运工艺,经过抬高大梁门框、大梁门框5在平板车上的放置和大梁门框5的运转工艺步骤,完成大梁门框5拼装后转运工艺;具体步骤如下:
(1)抬高大梁门框:将已经拼装好的大梁门框5在转运前,进行整体的抬高,使大梁门框底板与地面具有一定的距离;
(2)大梁门框5在平板车上的放置:在大梁门框5转运前,将两根支腿门框转运龙门胎架1放置在大梁门框5的下方,然后在支腿门框转运龙门胎架1的两侧焊接有工艺撑杆4,在大梁门框5与支腿门框转运龙门胎架1之间放置有枕木2,然后将平板车行驶到支腿门框转运龙门胎架1的底端部两侧,开始抬升,抬升到位后,在支腿门框转运龙门胎架1上大梁外侧每处装焊两件卡马3,并用木块垫实;
(3)大梁门框5的运转:大梁门框5转运时,保证两端的平板车动作相一致,速度均匀缓慢,即可完成减重型大梁门框拼装后转运工艺。
步骤(1)中的大梁门框5整体抬高,大梁底板与地面的距离为2300mm。
工艺撑杆4由钢管41、板件A43和板件B42组成,板件A43焊接在钢管41的左右两端,板件B42焊接在板件A43的中间位置处。
本发明通过在大梁门框5下端部放置两根支腿门框转运龙门胎架1,并且在胎架两侧焊接工艺撑杆4,能够有效的保证大梁门框5在转运过程中的质量问题,避免出现大梁门框结构薄弱处变形问题,进一步提高大梁门框5的转运过程中的产品质量的完整性。
以上所述,仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其它修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围当中。
Claims (3)
1.一种减重型大梁门框拼装后转运工艺,其特征在于:经过抬高大梁门框、大梁门框在平板车上的放置和大梁门框的运转工艺步骤,完成减重型大梁门框拼装后转运工艺;具体步骤如下:
(1)抬高大梁门框:将已经拼装好的大梁门框在转运前,进行整体的抬高,使大梁门框底板与地面具有一定的距离;
(2)大梁门框在平板车上的放置:在大梁门框转运前,将两根支腿门框转运龙门胎架放置在大梁的下方,然后在支腿门框转运龙门胎架的两侧焊接有工艺撑杆,在大梁与支腿门框转运龙门胎架之间放置有枕木,然后将平板车行驶到支腿门框转运龙门胎架的底端部两侧,开始抬升,抬升到位后,在支腿门框转运龙门胎架上大梁外侧每处装焊两件卡马,并用木块垫实;
(3)大梁门框的运转:大梁门框转运时,保证两端的平板车动作相一致,速度均匀缓慢,注意在经过90度大转弯和有较大斜坡处需将速度再降低,即可完成减重型大梁门框拼装后转运工艺。
2.根据权利要求1所述的一种减重型大梁门框拼装后转运工艺,其特征在于:所述步骤(1)中的大梁门框整体抬高,所述大梁门框底板与地面的距离为2300mm。
3.根据权利要求1所述的一种减重型大梁门框拼装后转运工艺,其特征在于:所述工艺撑杆由钢管、板件A和板件B组成,所述板件A焊接在钢管的左右两端,所述板件B焊接在板件A的中间位置处。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810292604.6A CN108910430A (zh) | 2018-03-30 | 2018-03-30 | 一种减重型大梁门框拼装后转运工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810292604.6A CN108910430A (zh) | 2018-03-30 | 2018-03-30 | 一种减重型大梁门框拼装后转运工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108910430A true CN108910430A (zh) | 2018-11-30 |
Family
ID=64402787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810292604.6A Pending CN108910430A (zh) | 2018-03-30 | 2018-03-30 | 一种减重型大梁门框拼装后转运工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108910430A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110732848A (zh) * | 2019-10-31 | 2020-01-31 | 南通振华重型装备制造有限公司 | 一种超大型轨道吊拉杆制作工艺 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2048805A (en) * | 1979-05-21 | 1980-12-17 | Head Wrightson Mach | Method and apparatus for supporting and moving heavy loads in an elevated position |
KR20100119174A (ko) * | 2009-04-30 | 2010-11-09 | (주)일진에너지 | 견인 및 배열 장치 |
CN102912736B (zh) * | 2012-11-07 | 2015-03-04 | 中铁六局集团有限公司 | 桁架拱桥的立拼装施工方法 |
CN205686850U (zh) * | 2016-06-23 | 2016-11-16 | 上海振华重工(集团)股份有限公司 | 转运装置 |
CN107401288A (zh) * | 2017-07-26 | 2017-11-28 | 南通振华重型装备制造有限公司 | 一种升压站吊装转运工艺 |
-
2018
- 2018-03-30 CN CN201810292604.6A patent/CN108910430A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2048805A (en) * | 1979-05-21 | 1980-12-17 | Head Wrightson Mach | Method and apparatus for supporting and moving heavy loads in an elevated position |
KR20100119174A (ko) * | 2009-04-30 | 2010-11-09 | (주)일진에너지 | 견인 및 배열 장치 |
CN102912736B (zh) * | 2012-11-07 | 2015-03-04 | 中铁六局集团有限公司 | 桁架拱桥的立拼装施工方法 |
CN205686850U (zh) * | 2016-06-23 | 2016-11-16 | 上海振华重工(集团)股份有限公司 | 转运装置 |
CN107401288A (zh) * | 2017-07-26 | 2017-11-28 | 南通振华重型装备制造有限公司 | 一种升压站吊装转运工艺 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110732848A (zh) * | 2019-10-31 | 2020-01-31 | 南通振华重型装备制造有限公司 | 一种超大型轨道吊拉杆制作工艺 |
CN110732848B (zh) * | 2019-10-31 | 2021-07-09 | 上海振华重工(集团)股份有限公司南通分公司 | 一种超大型轨道吊拉杆制作工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107777312A (zh) | 一种裁断胎面翻转、装车装置 | |
CN108910430A (zh) | 一种减重型大梁门框拼装后转运工艺 | |
CN104308401B (zh) | H型钢焊接组立装卸输送*** | |
CN207434484U (zh) | 一种自动翻钢卷车 | |
CN104477745A (zh) | 高层养猪运输机 | |
CN204355775U (zh) | 钢管无声收集装置 | |
CN206826998U (zh) | 一种板材托盘加装装置 | |
CN207646615U (zh) | 一种新型架桥机 | |
CN206589756U (zh) | 一种自卸半挂车辅助举升稳定机构 | |
CN214492982U (zh) | 一种涂料原料转运车 | |
CN205341887U (zh) | 转运中型金属铸件的装置 | |
CN107054735A (zh) | 板材托盘加装装置 | |
CN212125170U (zh) | 一种升降式新型家具搬运车 | |
CN207312404U (zh) | 法兰传输装置 | |
CN207466745U (zh) | 纺织各车间之间的经轴转运机构 | |
CN105216842A (zh) | 一种家具搬运车 | |
CN204602901U (zh) | 一种钻杆校直机上卸料装置 | |
CN215101597U (zh) | 一种侧边可通车门式起重机 | |
CN204162371U (zh) | 一种块状物转运车 | |
CN205588543U (zh) | 一种热力管道生产设备 | |
CN110540150A (zh) | 一种转角式叉运车装置 | |
CN207580879U (zh) | 一种便携式车用玻璃卸载装置 | |
CN219314469U (zh) | 一种用于电动沙发生产的运输装置 | |
CN216659990U (zh) | 一种10kV配网砼电杆新型便捷运输车 | |
CN207209242U (zh) | 一种适用于成品灌装饮料的输送装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |
|
RJ01 | Rejection of invention patent application after publication |