CN107401288A - 一种升压站吊装转运工艺 - Google Patents
一种升压站吊装转运工艺 Download PDFInfo
- Publication number
- CN107401288A CN107401288A CN201710619184.3A CN201710619184A CN107401288A CN 107401288 A CN107401288 A CN 107401288A CN 201710619184 A CN201710619184 A CN 201710619184A CN 107401288 A CN107401288 A CN 107401288A
- Authority
- CN
- China
- Prior art keywords
- booster stations
- transhipment
- lifting
- flat car
- hydraulic flat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/06—Separating, lifting, removing of buildings; Making a new sub-structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明公开了一种升压站吊装转运工艺,依次经过吊装和转运,具体步骤包括:吊装:先通过吊装设备将升压站整体吊起,然后在升压站的底部均匀设置圆筒胎架,每个圆筒胎架与升压站之间都设置一块垫木;转运:将液压平板车放置在升压站的底部,而且每个液压平板车与升压站之间都放置方木。其优点在于:本发明能够通过液压平板车整体转运出车间,从而大大缩短生产周期,降低时间成本,减少后期的拼接时间和人力成本,而且在转运过程中增加了配重,配重通过钢丝绳固定悬挂在伸出的结构梁上,防止偏重问题影响转运,而且为了防止钢丝绳在转运过程中的滑动,钢丝绳与结构梁之间增加斜枕木。
Description
技术领域
本发明涉及转运技术领域,特别是一种升压站吊装转运工艺。
背景技术
大唐滨海海上升压站上部结构为四层钢结构房体,结构总高度约25m,最大截面尺寸43.2m×33.6m,结构总重达3200t。上部结构上下层之间通过立柱、次柱、斜撑进行支撑,并通过舱壁板分隔成各个功能区域。一层结构相对简单,无特定功能区域;二层最为重要,布置有主变室、GIS室、水泵房、开关室、配电室等;三层布置有柴油机房、通风机房、蓄电池室等;四层(顶层)布有一些室外天线和1台悬臂吊。
钢结构将结构制作放在车间内进行,车间内设备齐全,施工环境好,且受天气影响小,能有满足正常的施工周期需要。上部模块1~4层最大截面尺寸为43.2m×33.6m,根据公司基地生产能力(结构车间门宽37m,冲砂油漆车间门宽24m),各层无法在车间内做成整体,最终通过液压平板车整体转运出车间,至少缩短半个月以上的生产周期。
发明内容
本发明的目的克服现有技术的不足,提供一种高效的升压站吊装转运工艺。
本发明解决其技术问题所采取的技术方案是:
一种升压站吊装转运工艺,其创新点在于,依次经过吊装和转运,具体步骤包括:
1)吊装:先通过吊装设备将升压站整体吊起,然后在升压站的底部均匀设置圆筒胎架,每个圆筒胎架与升压站之间都设置一块垫木;
2)转运:将液压平板车放置在升压站的底部,而且每个液压平板车与升压站之间都放置方木。
进一步的,所述步骤1中,所述圆筒胎架的开档间隙大于5m。
进一步的,所述步骤2中,转运过程中相应的增加配重和斜枕木。
本发明的有益效果如下:
本发明能够通过液压平板车整体转运出车间,从而大大缩短生产周期,降低时间成本,减少后期的拼接时间和人力成本,而且在转运过程中增加了配重,配重通过钢丝绳固定悬挂在伸出的结构梁上,防止偏重问题影响转运,而且为了防止钢丝绳在转运过程中的滑动,钢丝绳与结构梁之间增加斜枕木。
具体实施方式
本发明解决其技术问题所采取的技术方案是:
一种升压站吊装转运工艺,依次经过吊装和转运,具体步骤包括:
1)吊装:先通过吊装设备将升压站整体吊起,然后在升压站的底部均匀设置圆筒胎架,每个圆筒胎架与升压站之间都设置一块垫木,圆筒胎架的开档间隙大于5m,方便液压平板车驶入;
2)转运:将液压平板车放置在升压站的底部,而且每个液压平板车与升压站之间都放置方木,而且在转运过程中增加了配重,配重通过钢丝绳固定悬挂在伸出的结构梁上,防止偏重问题影响转运,而且为了防止钢丝绳在转运过程中的滑动,钢丝绳与结构梁之间增加斜枕木。
以上所述是本发明的优选实施方式,不能以此来限定本发明之权利范围。应当指出,对于本技术领域的普通技术人员来说,对本发明的技术方案进行修改或者等同替换,都不脱离本发明的保护范围。
Claims (3)
1.一种升压站吊装转运工艺,其特征在于,依次经过吊装和转运,具体步骤包括:
1)吊装:先通过吊装设备将升压站整体吊起,然后在升压站的底部均匀设置圆筒胎架,每个圆筒胎架与升压站之间都设置一块垫木;
2)转运:将液压平板车放置在升压站的底部,而且每个液压平板车与升压站之间都放置方木。
2.根据权利要求1所述的一种升压站吊装转运工艺,其特征在于,所述步骤1中,所述圆筒胎架的开档间隙大于5m。
3.根据权利要求1所述的一种升压站吊装转运工艺,其特征在于,所述步骤2中,转运过程中相应的增加配重和斜枕木。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710619184.3A CN107401288A (zh) | 2017-07-26 | 2017-07-26 | 一种升压站吊装转运工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710619184.3A CN107401288A (zh) | 2017-07-26 | 2017-07-26 | 一种升压站吊装转运工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107401288A true CN107401288A (zh) | 2017-11-28 |
Family
ID=60401490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710619184.3A Pending CN107401288A (zh) | 2017-07-26 | 2017-07-26 | 一种升压站吊装转运工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107401288A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108657754A (zh) * | 2018-03-30 | 2018-10-16 | 南通振华重型装备制造有限公司 | 一种大梁及端梁整体结构的转运工装及转运方法 |
CN108910430A (zh) * | 2018-03-30 | 2018-11-30 | 南通振华重型装备制造有限公司 | 一种减重型大梁门框拼装后转运工艺 |
CN110937424A (zh) * | 2019-12-18 | 2020-03-31 | 南通泰胜蓝岛海洋工程有限公司 | 海上升压站上部运输方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102912736A (zh) * | 2012-11-07 | 2013-02-06 | 中铁六局集团有限公司 | 桁架拱桥的立拼装施工方法 |
KR20140121170A (ko) * | 2013-04-05 | 2014-10-15 | (주)범강 | 건설용 리프트 시공 또는 해체장치 및 건설용 리프트 시공 또는 해체방법 |
CN105108708A (zh) * | 2015-09-21 | 2015-12-02 | 上海振华重工集团(南通)有限公司 | 一种克令吊拆卸工艺 |
CN105149965A (zh) * | 2015-09-21 | 2015-12-16 | 上海振华重工集团(南通)有限公司 | 一种克令吊总装工艺 |
-
2017
- 2017-07-26 CN CN201710619184.3A patent/CN107401288A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102912736A (zh) * | 2012-11-07 | 2013-02-06 | 中铁六局集团有限公司 | 桁架拱桥的立拼装施工方法 |
KR20140121170A (ko) * | 2013-04-05 | 2014-10-15 | (주)범강 | 건설용 리프트 시공 또는 해체장치 및 건설용 리프트 시공 또는 해체방법 |
CN105108708A (zh) * | 2015-09-21 | 2015-12-02 | 上海振华重工集团(南通)有限公司 | 一种克令吊拆卸工艺 |
CN105149965A (zh) * | 2015-09-21 | 2015-12-16 | 上海振华重工集团(南通)有限公司 | 一种克令吊总装工艺 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108657754A (zh) * | 2018-03-30 | 2018-10-16 | 南通振华重型装备制造有限公司 | 一种大梁及端梁整体结构的转运工装及转运方法 |
CN108910430A (zh) * | 2018-03-30 | 2018-11-30 | 南通振华重型装备制造有限公司 | 一种减重型大梁门框拼装后转运工艺 |
CN110937424A (zh) * | 2019-12-18 | 2020-03-31 | 南通泰胜蓝岛海洋工程有限公司 | 海上升压站上部运输方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107401288A (zh) | 一种升压站吊装转运工艺 | |
CN106245779A (zh) | 基于uhpc材料的整体预制模块化建筑施工工艺及*** | |
CN204185120U (zh) | 移动式设备就位小车 | |
CN101994318A (zh) | 用于钢筋笼垂直转体吊装的抬架、吊装***及吊装方法 | |
CN108868161B (zh) | 一种超高层建筑结构外附着落地式塔吊交错施工方法 | |
CN203728398U (zh) | 带起吊翻转功能的运输装置 | |
CN105460736A (zh) | 一种安全升降运货电梯*** | |
CN203947758U (zh) | 新型液压自动爬升卸料平台 | |
CN201825670U (zh) | 用于发电机定子的起吊装置 | |
CN207632359U (zh) | 架槽机扁担梁空中偏转翻身换位装置 | |
CN207047703U (zh) | 一种梁片预应力张拉千斤顶就位简易装置 | |
CN216105672U (zh) | 一种双层转运天车 | |
CN205294547U (zh) | 一种安全升降运货电梯装置 | |
CN102398849A (zh) | 履带吊整体下船坞的方法 | |
CN201786012U (zh) | 烟囱悬架 | |
CN205894715U (zh) | 一种封闭结构下轻型钢结构半自动自爬升吊装机构 | |
CN201962679U (zh) | 用于钢筋笼垂直转体吊装的抬架及吊装*** | |
CN201793331U (zh) | 钢管平移吊车 | |
CN206783133U (zh) | 一种用于风电塔筒的起吊搬运工作的塔筒搬运机 | |
CN203319508U (zh) | 大型薄壁钢制安全壳的起吊辅助件 | |
CN206569924U (zh) | 一种用于起重机机房的可变行程高低梁行车 | |
CN202152441U (zh) | 桥面提升站 | |
CN207069447U (zh) | 一种新型双层电缆安装平台 | |
CN206751210U (zh) | 可移动轨道多线起吊装置 | |
CN204847994U (zh) | 一种平坦场地风机设备卸车专用装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171128 |