CN108898473A - A kind of project transferring method and device - Google Patents

A kind of project transferring method and device Download PDF

Info

Publication number
CN108898473A
CN108898473A CN201810614851.3A CN201810614851A CN108898473A CN 108898473 A CN108898473 A CN 108898473A CN 201810614851 A CN201810614851 A CN 201810614851A CN 108898473 A CN108898473 A CN 108898473A
Authority
CN
China
Prior art keywords
project
money
turn
data
turns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810614851.3A
Other languages
Chinese (zh)
Inventor
张娜
高飞
谢舒伊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tower Co Ltd
Original Assignee
China Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tower Co Ltd filed Critical China Tower Co Ltd
Priority to CN201810614851.3A priority Critical patent/CN108898473A/en
Publication of CN108898473A publication Critical patent/CN108898473A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Technology Law (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The present invention provides a kind of project transferring method and device, this method include:The state of acquisition project;Whether the state for judging the project is preset state;If the state of the project is preset state, share rule according to preset, expense allocation is carried out to the project;It is based on expense allocation as a result, to the project carry out turn money.Project transferring method provided by the invention carries out expense allocation without financial staff manually and turns money, to not only greatly release the workload of financial staff, and can improve project and turn money efficiency, and then saves manpower and time cost for enterprise.

Description

A kind of project transferring method and device
Technical field
The present invention relates to field of communication technology more particularly to a kind of project transferring method and devices.
Background technique
Turn to provide the fixed assets or equipment referred to for having reached predetermined serviceable condition, is included in accounting model It encloses.In the prior art, money is mainly shared in a manner of manual by financial staff and turned to the money that turns of engineering project.So And with the large-scale development of enterprise, portfolio is increasing, and annual engineering project, quantity of fixed assets are huge, if depending on Financial staff shares by hand and turns money by hand, not only results in that financial management work amount is huge, and turns the efficiency of money also by ten Divide lowly, is unable to satisfy the growth requirement of enterprise.
Summary of the invention
The embodiment of the present invention provides a kind of project transferring method and device, and to solve, manual transferring method efficiency is lower to be asked Topic.
In order to solve the above technical problems, the invention is realized in this way:
In a first aspect, be applied to project the embodiment of the invention provides a kind of project transferring method and turn money device, including:
The state of acquisition project;
Whether the state for judging the project is preset state;
If the state of the project is preset state, share rule according to preset, expense point is carried out to the project Booth;
It is based on expense allocation as a result, to the project carry out turn money.
Second aspect, the embodiment of the present invention provide a kind of project turn money device, including:
Module is obtained, for obtaining the state of project;
Judgment module, for judging whether the state of the project is preset state;
Allocation module shares rule according to preset, to the item if the state for the project is preset state Mesh carries out expense allocation;
Turn money module, for based on expense allocation as a result, carrying out turning money to the project.
The third aspect, the embodiment of the present invention provide a kind of project and turn money device, including processor, memory and are stored in institute The computer program that can be run on memory and on the processor is stated, when the computer program is executed by the processor Realize the step in above-mentioned project transferring method.
Fourth aspect, the embodiment of the present invention provide a kind of computer readable storage medium, the computer-readable storage medium Computer program is stored in matter, the computer program realizes the step in above-mentioned project transferring method when being executed by processor Suddenly.
In the embodiment of the present invention, by obtaining the state of project and judging whether the state is preset state and decides whether Starting turns money task to the project, thus share rule according to preset when the state of the project is preset state, To the project carry out expense allocation, and based on expense allocation as a result, to the project carry out turn money.In this way, being reached in project When to preset state, carries out expense allocation manually without financial staff and turn money, to not only greatly release financial staff Workload, and project can be improved and turn money efficiency, and then saved manpower and time cost for enterprise.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, needed in being described below to the embodiment of the present invention Attached drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, For those of ordinary skill in the art, without any creative labor, it can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of flow chart of project transferring method provided in an embodiment of the present invention;
Fig. 2 is the flow chart of another project transferring method provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram that a kind of project provided in an embodiment of the present invention turns money device;
Fig. 4 is the structural schematic diagram that another project provided in an embodiment of the present invention turns money device;
Fig. 5 is the structural schematic diagram that another project provided in an embodiment of the present invention turns money device;
Fig. 6 is the structural schematic diagram that another project provided in an embodiment of the present invention turns money device;
Fig. 7 is the structural schematic diagram that another project provided in an embodiment of the present invention turns money device;
Fig. 8 is the structural schematic diagram that another project provided in an embodiment of the present invention turns money device.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
It is a kind of flow chart of project transferring method provided in an embodiment of the present invention referring to Fig. 1, Fig. 1, turns applied to project Device is provided, as shown in Figure 1, the described method comprises the following steps:
Step 101, the state for obtaining project.
In the present embodiment, the project, which turns money device, can be understood as having the wealth that the function of providing from turn is carried out to project Business system.When project is carried out in customer relation management (Customer Relationship Management, abbreviation CRM) system It delivers after checking and accepting, the project is in delivery acceptance phase, and the delivery of the project can be checked and accepted shape by the crm system State and the delivery reception time of record are pushed to engineering production management system (Power Production Management System, abbreviation PMS), the PMS can further store the delivery acceptance phase of the project into target database;If The project only needs internal check and accept without delivery, then after the project is checked and accepted inside PMS progress, the PMS meeting The inside acceptance phase of the project is stored into the target database;In addition, being tested if the project does not carry out inside also It receives and delivers and check and accept, then the crm system or the PMS can store the particular state that the project is presently in the mesh It marks in database.In this way, can be according to its status information of the progress real-time update of the project in the target database.
Therefore, in the step, the state of above-mentioned acquisition project can be obtains the project from the target database State, specifically can be and the target database accessed to obtain the state of the project by Web Service, can also be with It is the state for the project that timing scan is got from the target database in advance, such as:In advance from the number of targets It according to the state for obtaining the project in library and notes down, then the state of the project described in the preset duration run-down.
Whether step 102, the state for judging the project are preset state.
After the state for getting the project, can judge whether the state of the project is preset state, with Determine whether the project can start to turn money.Wherein, the preset state can be preset corresponding with the project meet Turn the state of money entry condition, such as:If the project, which needs to deliver to check and accept, can just carry out turning money, the default shape later State can be delivery acceptance phase;If the project can carry out turning money after inside is checked and accepted, the preset state be can be Internal acceptance phase.
In the present embodiment, by judging whether the state of the project is preset state, whether can determine the project Into the state that can turn money, so as to the result according to judgement decide whether to start that the project is carried out to turn money, in institute When the state for stating project is the preset state, to subsequent turn of money process of the project implementation.
If step 103, the state of the project be preset state, share rule according to preset, to the project into Row expense allocation.
In the present embodiment, if the state of the project is preset state, rule can be shared according to preset, to described Project carries out expense allocation, wherein the rule of sharing can be the pre-set rule how to be shared the project Then.Specifically, since different projects includes different class of assets, and same class of assets assemble different main equipment, In the case where auxiliary material and service, different rules of sharing can be respectively corresponded, therefore, the project turns can be preparatory in money device Provided with each class of assets, in the case where assembling different main equipment, auxiliary material and service, institute is corresponding shares rule, from And when carrying out expense allocation to the project, situation can be assembled according to the specific asset of the project, determine the project Included each class of assets institute is corresponding to share rule, and shares rule according to identified, carries out to the project Expense allocation.
Such as:The class of assets that certain project includes has ground tower, if ground tower is equipped with several main equipments, a number of Auxiliary material and several services, then it is corresponding default to share rule to set auxiliary material and service fee to main by value pro rata distribution It is standby upper;If ground tower is equipped with several main equipments and a number of auxiliary material, corresponding default rule of sharing is by auxiliary material Expense is by value pro rata distribution to main equipment;If ground tower is equipped with several main equipments and several services, accordingly Default rule of sharing is by service fee by value pro rata distribution to main equipment, etc..
It should be noted that the preset rule of sharing is not limited to the rule of expense allocation described in above description, It specifically can be the expense allocation rule being configured according to practical situations or user demand.
Step 104, based on expense allocation as a result, to the project carry out turn money.
It, can be based on expense allocation as a result, turning to the project after carrying out expense allocation to the project Money specifically can be the expense allocation of each class of assets based on the project as a result, the expense to each class of assets carries out Statistics, and switch to fixed assets, to obtain turn money data of the project.
In the embodiment of the present invention, above-mentioned project, which turns money device, can be any equipment with storaging medium, such as:It calculates Machine (Computer), tablet computer (Tablet Personal Computer) or laptop computer (Laptop Computer) Equal terminal devices.
Project transferring method in the present embodiment, by obtaining the state of project and judging whether the state is preset state Money task is turned to the project to decide whether to start, thus when the state of the project is preset state, according to default Share rule, to the project carry out expense allocation, and based on expense allocation as a result, to the project carry out turn money.This Sample carries out expense allocation manually without financial staff and turns money, to not only greatly discharge when project reaches preset state The workload of financial staff, and project can be improved and turn money efficiency, and then save manpower and time cost for enterprise.
Referring to fig. 2, Fig. 2 is the flow chart of another project transferring method provided in an embodiment of the present invention, is applied to project Turn money device, on the basis of the present embodiment embodiment shown in Fig. 1, to it is based on expense allocation as a result, to the project into The step of row turn money, is refined, so as to based on expense allocation as a result, generating assets card and turning to provide voucher, further Reduce the workload of financial staff.As shown in Fig. 2, the described method comprises the following steps:
Step 201, the state for obtaining project.
The specific embodiment of the step may refer to the embodiment of step 101 in embodiment of the method shown in FIG. 1, be It avoids repeating, which is not described herein again.
Whether step 202, the state for judging the project are preset state.
The specific embodiment of the step may refer to the embodiment of step 102 in embodiment of the method shown in FIG. 1, be It avoids repeating, which is not described herein again.
If step 203, the state of the project be preset state, share rule according to preset, to the project into Row expense allocation.
The specific embodiment of the step may refer to the embodiment of step 103 in embodiment of the method shown in FIG. 1, be It avoids repeating, which is not described herein again.
Optionally, before step 203, the method also includes:
Based on each materiel code and Services Code obtained after being encoded in advance to project goods and materials and service, to the item Mesh carries out assets assembly.
In the embodiment, before carrying out sharing turn money to the project, assets dress can also be carried out to the project Match, without manually assembling, further saves human cost, improve assembly efficiency.It specifically, can be according to actually answering With situation, the goods and materials used required in project and service are encoded in advance, so that each goods and materials there are corresponding goods and materials Coding, each single item service have corresponding Services Code.
Wherein, it when being encoded to project goods and materials and service, can be encoded based on unified coding rule, example Such as:The hierarchical structure that " class-item-mesh-section-subclass-subitem-specific item " can be used is encoded, wherein " class-item-mesh-section " four A field can indicate Asset Attributes, and " subclass-subitem-specific item " three fields can indicate the physical feature of assets, and each field is equal The expression of 2 bit digitals can be used.Below with reference to table 1, one goods and materials " three towers " are encoded with an example way:
30 meters of the tower height of certain three tower, wind pressure 0.65, three layers of platform, every layer of 3 meters of spacing and every layer of 6 pairs of pole, outward flange With outer ladder, encoded according to the hierarchical structure of aforementioned " class-item-mesh-section-subclass-subitem-specific item ", for details, reference can be made under Table 1, and seen from table 1, the materiel code of three tower is " 01010103010101 ".
1 three tower materiel code of table
It is then possible to assets assembly be carried out to the project, described in determination using these materiel codes and Services Code Project includes which assets, specifically selected goods and materials or the service of each assets.It more specifically, can be in the PMS to institute The project of stating set up the project, implemented, being completed and assets assembly after, according to the assets of the PMS assemble as a result, to the project carry out Assets assembly.
In this way, in the embodiment, by can further save human cost to project progress assets assembly, And assembly efficiency is improved, and by encoding to goods and materials and service, it is ensured that more rapidly and accurately assemble described Goods and materials and service included by assets included by project and each assets.
It should be noted that when being shared the project, turning money, it is possible to use it is described in advance to project goods and materials and The materiel code and Services Code that service obtains after being encoded, thereby may be ensured that assembled in the project, share and During turning money, it is based on identical materiel code and Services Code.
Certainly, it in the embodiment, is equally applicable in embodiment shown in FIG. 1, and can reach identical beneficial to effect Fruit.
Step 204 delivers data as a result, being formed based on expense allocation.
In the present embodiment, data can be delivered as a result, being formed based on expense allocation, specifically can be based on the project Each class of assets expense allocation as a result, being counted to the expense of each class of assets, each class of assets obtained after statistics Cost data be the delivery data.
Step 205 is based on the delivery data, generates assets card.
After obtaining the delivery data, the delivery data can be based on, assets card is generated, it specifically, can be with It is pre-configured with assets card template, the assets card template and the delivery data are then based on, to each of the project A class of assets generates an assets card respectively.Such as:It, will be respectively if the project includes N number of different class of assets Delivery data based on each class of assets generate an assets card, finally obtain N assets cards, every assets card On can have recorded corresponding class of assets title respectively, deliver the information such as data.
It should be noted that step 204 and step 205 need to guarantee the consistency of data after execution in the present embodiment, that is, walk A turn money data for the assets card on piece record generated in delivery data and step 205 obtained in rapid 204 need to be consistent.If holding After row, step 204 is consistent with data obtained in step 205, then can be to data obtained in step 204 and step 205 It is submitted, to be transferred to step 206;If data obtained in step 204 and step 205 are inconsistent, then can be to step after executing Rapid 204 and step 205 obtained in data carry out rollback, to execute step 204 and step 205 again, until step 204 and step Data obtained in rapid 205 are consistent.This way it is possible to avoid because the uncontrollable factors such as unstable networks lead to step 204 and step There is inconsistent situation in data in rapid 205, and then avoid the occurrence of wrong data.
Step 206 confirms the assets card, and generates turn money voucher after validation.
In the step, the project, which turns money device, can be automatically confirmed that assets card generated, without wealth Business personnel's manual confirmation specifically can be and check the assets card, such as:The assets card can be checked Whether turn money data of upper record are consistent with delivery data are formed by, or turn money number of the verification assets card on piece record According to whether with it is expected consistent, or the verification assets card on piece record whether turn money data wrong etc..
It can be generated after confirming to the assets card and turn money voucher, can be specifically pre-configured with and turn money voucher mould Plate is then based on turn money data of described turn of money voucher templates and assets card on piece record, and generation is described to be turned to provide voucher, In, it can record turn money data of all classes of assets included by the project on described turn of money voucher, such as:Described turn money with It can record the amount of money that the project pays on the master on card, the amount of money paid in auxiliary material and other respective services expenses Gross expenditure etc..In this way, generated turn of money voucher cannot be only used for as the voucher for completing to carry out turning to provide to the project, And user is facilitated intuitively to learn turn money data of the project and turn money state.
Optionally, step 206 includes:
The money data that turn of assets card on piece record are compared with the expected money data that turn;
If turn money data of the assets card on piece record are consistent with the expected money data that turn, generation turns a money voucher.
In the embodiment, after generating the assets card, what the assets card on piece can be recorded turns money data It is compared with the expected money data that turn, whether turn money data to confirm the assets card on piece record are effective, wherein described pre- Phase, which turns money data, can be the project turn money construction situation of the device based on the project, according to preconfigured computation rule Calculated turn of money data.
If to turn money data consistent for turn money data and the expection of assets card on piece record, can be generated turn to provide with Card can not generate first if turn money data and the expection turn money data of assets card on piece record are inconsistent and turn to provide Voucher, and can be reminded with output error, turn money with the expection with the money data that turn for prompting assets card on piece described in user to record Data are inconsistent.
In this way, in the embodiment, by by the assets card on piece record turn money data and it is expected turn money data into Row comparison, and assets card on piece record turn money data and it is expected turn to generate under money data unanimous circumstances turn money with Card, so as to be further ensured that the correctness for turning money data of the project.
Optionally, it is described by assets card on piece record turn money data and it is expected turn after a money data compare, The method also includes:
If turn money data of the assets card on piece record and the expected money data that turn are inconsistent, to the assets card on piece The money data that turn of record carry out rollback with delivery data are formed by, to carry out turning money to the project again.
In the embodiment, if being compared in the money data that turn for recording the assets card on piece with the expected money data that turn Afterwards, confirm that turn money data and the expected money data that turn of the assets card on piece record are inconsistent, then it can be to the assets card Data progress rollback is delivered in turning to provide data and being formed by for upper record, that is, wipes turn money data of the assets card on piece record Be formed by delivery data, and can be reminded with output error, to prompt this turn of money data of user, there are mistakes, need to repair again The project is carried out again after just to turn money.
In this way, assets card on piece record turn money data and it is expected turn money data it is inconsistent when, by described The money data that turn of assets card on piece record carry out rollback with delivery data are formed by, it is ensured that turn to the project Obtained turn of money data have consistency and correctness when money.
Optionally, after step 206, the method also includes:
When the quantity of the project is at least two, if carrying out turning money to the destination item at least two projects Failure, then complete to the project at least two projects in addition to the destination item turn money and then it is secondary to described Destination item carries out turning money.
In the embodiment, when the quantity of the project is at least two, i.e., at least two projects are turned simultaneously When money, compensation mechanism can establish, if specially carrying out turning money failure to the destination item at least two projects, Complete to the project at least two projects in addition to the destination item turn money and then it is secondary to the destination item into Row turns money, wherein the destination item can be any one of at least two projects mesh, even to described at least two Any one of project mesh carries out turning to provide failure, then turns money and then the secondary item to fail to turn money to sundry item in completion Mesh carries out turning money;Described turn of money unsuccessfully can be in the either phase processing failure for turn to the destination item money, such as: It obtains project status failure, expense allocation failure or turns money unsuccessfully etc..
Such as:Three projects are carried out simultaneously to turn money, it, can be if one of project is turning money phase process failure After turn money for completing other two project, the state for turning the project that money fails is obtained again, and executes subsequent state judgement, expense With sharing and turning to provide process, to complete to turn money to the project of this turn money failure.
In this way, in the embodiment, when turn money to multiple projects simultaneously, if wherein one or more projects occur The case where turning money failure can turn money to the project for turning money failure completing turn money and then secondary starting to sundry item Task avoids certain projects after turning money failure because not so as to guarantee turn money success rate of projects to a certain extent It carries out turning money and influencing project process again in time.
It should be noted that project transferring method provided in an embodiment of the present invention can be applied not only to individually to some project Turn the scene of money, can also be applied to that simultaneously multiple projects turn with the scene of money, and each project can use Identical turn of money process, in this way, turn money, the project transferring method manually compared to the prior art can not only greatly reduce Human input cost, and can greatly shorten the deadline for turning money.
Certainly, it in the embodiment, is equally applicable in embodiment shown in FIG. 1, and can reach identical beneficial to effect Fruit.
In the present embodiment, on the basis of embodiment shown in Fig. 1, to based on expense allocation as a result, to the project Refined the step of turning money, so as to based on expense allocation as a result, generating assets card and turning money voucher, into one Step reduces the workload of financial staff.In addition, also adding plurality of optional on the basis of the present embodiment embodiment shown in Fig. 1 Embodiment, these optional embodiments can be combined with each other realization, can also be implemented separately, and be attained by release wealth The workload of business personnel, and improve the technical effect that project turns money efficiency.
It is the structural schematic diagram that a kind of project provided in an embodiment of the present invention turns money device referring to Fig. 3, Fig. 3, such as Fig. 3 institute Show, project turns money device 300 and includes:
Module 301 is obtained, for obtaining the state of project;
Judgment module 302, for judging whether the state of the project is preset state;
Allocation module 303 shares rule according to preset, to institute if the state for the project is preset state It states project and carries out expense allocation;
Turn money module 304, for based on expense allocation as a result, carrying out turning money to the project.
Optionally, as shown in figure 4, described turn of money module 304 includes:
Unit 3041 is formed, delivers data as a result, being formed for based on expense allocation;
First generation unit 3042 generates assets card for being based on the delivery data;
Second generation unit 3043 for confirming to the assets card, and generates turn money voucher after validation.
Optionally, as shown in figure 5, second generation unit 3043 includes:
Contrast subunit 30431 turns money data and is expected a turn money data to carry out for record the assets card on piece Comparison;
Subelement 30432 is generated, if turn money data for assets card on piece record are consistent with the expected money data that turn, It then generates and turns money voucher.
Optionally, as shown in fig. 6, second generation unit 3043 further includes:
Rollback subelement 30433, if different for turn money data of assets card on piece record and expected turn of money data Cause then carries out rollback with delivery data are formed by the money data that turn of assets card on piece record, again to the item Mesh carries out turning money.
Optionally, as shown in fig. 7, the project turn money device 300 further includes:
Load module 305, for based on each materiel code obtained after being encoded in advance to project goods and materials and service with Services Code carries out assets assembly to the project.
Optionally, as shown in figure 8, the project turn money device 300 further includes:
Compensating module 306, for when the quantity of the project be at least two when, if at least two projects Destination item carries out turning money failure, then completes to turn money to the project at least two projects in addition to the destination item And then it is secondary to the destination item carry out turn money.
Project, which turns money device 300, can be realized each mistake that project in the embodiment of the method for Fig. 1 to Fig. 2 turns money device realization Journey, to avoid repeating, which is not described herein again.The project of the embodiment of the present invention turns money device 300 can be by the shape of acquisition project State simultaneously judges whether the state is that preset state to decide whether to start turns money task to the project, thus in the project State when being preset state, share rule according to preset, expense allocation carried out to the project, and based on expense allocation As a result, carrying out turning money to the project.In this way, carrying out expense point manually without financial staff when project reaches preset state Booth and turn money to not only greatly release the workload of financial staff, and can improve project and turn money efficiency, and then be enterprise Save manpower and time cost.
The embodiment of the present invention also provides a kind of project turn money device, including processor, memory store on a memory simultaneously The computer program that can be run on the processor, the computer program realize that above-mentioned project turns capital when being executed by processor Each process of method embodiment, and identical technical effect can be reached, to avoid repeating, which is not described herein again.
The embodiment of the present invention also provides a kind of computer readable storage medium, and meter is stored on computer readable storage medium Calculation machine program, the computer program realize each process of above-mentioned project transferring method embodiment, and energy when being executed by processor Reach identical technical effect, to avoid repeating, which is not described herein again.Wherein, the computer readable storage medium, such as only Read memory (Read-Only Memory, abbreviation ROM), random access memory (Random Access Memory, abbreviation RAM), magnetic or disk etc..
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art The part contributed out can be embodied in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form belongs within protection of the invention.

Claims (14)

1. a kind of project transferring method is applied to project and turns money device, which is characterized in that including:
The state of acquisition project;
Whether the state for judging the project is preset state;
If the state of the project is preset state, share rule according to preset, expense allocation is carried out to the project;
It is based on expense allocation as a result, to the project carry out turn money.
2. the method according to claim 1, wherein it is described based on expense allocation as a result, to the project into Row turns money, including:
It is based on expense allocation to deliver data as a result, being formed;
Based on the delivery data, assets card is generated;
The assets card is confirmed, and generates turn money voucher after validation.
3. according to the method described in claim 2, it is characterized in that, described confirm the assets card, and confirming It generates afterwards and turns money voucher, including:
The money data that turn of assets card on piece record are compared with the expected money data that turn;
If turn money data of the assets card on piece record are consistent with the expected money data that turn, generation turns a money voucher.
4. according to the method described in claim 3, it is characterized in that, it is described by the assets card on piece record turn money data with It is expected that after a turn money data compare, the method also includes:
If turn money data of the assets card on piece record and the expected money data that turn are inconsistent, to assets card on piece record Turn money data and be formed by deliver data carry out rollback, with again to the project carry out turn money.
5. method according to claim 1 to 4, which is characterized in that it is described to share rule according to preset, it is right Before the project carries out expense allocation, the method also includes:
Based on each materiel code and Services Code obtained after being encoded in advance to project goods and materials and service, to the project into The assembly of row assets.
6. method according to claim 1 to 4, which is characterized in that described based on expense allocation as a result, right The project carries out after turning money, the method also includes:
When the quantity of the project is at least two, if carrying out turning money mistake to the destination item at least two projects Lose, then complete to the project at least two projects in addition to the destination item turn money and then it is secondary to the mesh Mark project carries out turning money.
7. a kind of project turns money device, which is characterized in that including:
Module is obtained, for obtaining the state of project;
Judgment module, for judging whether the state of the project is preset state;
Allocation module, if for the project state be preset state, share rule according to preset, to the project into Row expense allocation;
Turn money module, for based on expense allocation as a result, carrying out turning money to the project.
8. project according to claim 7 turns money device, which is characterized in that described turn of money module include:
Unit is formed, delivers data as a result, being formed for based on expense allocation;
First generation unit generates assets card for being based on the delivery data;
Second generation unit for confirming to the assets card, and generates turn money voucher after validation.
9. project according to claim 8 turns money device, which is characterized in that second generation unit includes:
Contrast subunit, the money data that turn for recording the assets card on piece are compared with the expected money data that turn;
Subelement is generated, if turn money data for assets card on piece record are consistent with the expected money data that turn, generation turns Provide voucher.
10. project according to claim 9 turns money device, which is characterized in that second generation unit further includes:
Rollback subelement, if inconsistent for turn money data of assets card on piece record and the expected money data that turn, to institute The money data that turn for stating assets card on piece record carry out rollback with delivery data are formed by, to turn again to the project Money.
11. project according to any one of claims 7 to 10 turns money device, which is characterized in that the project turns money dress It sets and further includes:
Load module, for being compiled based on each materiel code and service that are obtained after being encoded in advance to project goods and materials and service Code carries out assets assembly to the project.
12. project according to any one of claims 7 to 10 turns money device, which is characterized in that the project turns money dress It sets and further includes:
Compensating module, for when the quantity of the project be at least two when, if to the target item at least two projects Mesh carries out turning money failure, then after completing to turn money of the project at least two projects in addition to the destination item, The destination item is carried out again to turn money.
13. a kind of project turns money device, which is characterized in that including processor, memory and be stored on the memory and can The computer program run on the processor realizes such as claim when the computer program is executed by the processor Step in project transferring method described in any one of 1 to 6.
14. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes such as project transferring method described in any one of claims 1 to 6 when the computer program is executed by processor In step.
CN201810614851.3A 2018-06-14 2018-06-14 A kind of project transferring method and device Pending CN108898473A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810614851.3A CN108898473A (en) 2018-06-14 2018-06-14 A kind of project transferring method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810614851.3A CN108898473A (en) 2018-06-14 2018-06-14 A kind of project transferring method and device

Publications (1)

Publication Number Publication Date
CN108898473A true CN108898473A (en) 2018-11-27

Family

ID=64345121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810614851.3A Pending CN108898473A (en) 2018-06-14 2018-06-14 A kind of project transferring method and device

Country Status (1)

Country Link
CN (1) CN108898473A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084707A (en) * 2019-04-04 2019-08-02 阿里巴巴集团控股有限公司 Fee deduction treatment method, apparatus, electronic equipment and storage medium
CN112330097A (en) * 2020-10-15 2021-02-05 远光软件股份有限公司 Project completion settlement method and device and electronic equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101447067A (en) * 2007-11-28 2009-06-03 上海市电力公司 Method for controlling capital transfer of power system
CN102821379A (en) * 2011-06-08 2012-12-12 华为技术有限公司 Charging repricing method and charging repricing device
CN103473628A (en) * 2013-08-20 2013-12-25 国家电网公司 Method for controlling automatic fund transferring system
CN104835034A (en) * 2015-06-07 2015-08-12 张忠义 Register and transfer methods capable of automatically transferring money

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101447067A (en) * 2007-11-28 2009-06-03 上海市电力公司 Method for controlling capital transfer of power system
CN102821379A (en) * 2011-06-08 2012-12-12 华为技术有限公司 Charging repricing method and charging repricing device
CN103473628A (en) * 2013-08-20 2013-12-25 国家电网公司 Method for controlling automatic fund transferring system
CN104835034A (en) * 2015-06-07 2015-08-12 张忠义 Register and transfer methods capable of automatically transferring money

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084707A (en) * 2019-04-04 2019-08-02 阿里巴巴集团控股有限公司 Fee deduction treatment method, apparatus, electronic equipment and storage medium
CN112330097A (en) * 2020-10-15 2021-02-05 远光软件股份有限公司 Project completion settlement method and device and electronic equipment

Similar Documents

Publication Publication Date Title
CN109426952B (en) Block chain structure
Bada et al. Towards a green blockchain: A review of consensus mechanisms and their energy consumption
CN111382456B (en) Proposal message processing method, device, equipment and storage medium
CN108200203A (en) Block catenary system based on double-layer network
CN108282539A (en) Decentralization storage system based on double-layer network
CN108053042A (en) A kind of outage information is reported and submitted and delivery system
CN110223040A (en) Project management method, device, electronic equipment and storage medium
CN102999820B (en) A kind of assets management method for electric system and system
CN110264156A (en) A kind of project management method, device, electronic equipment and storage medium
CN111563786A (en) Virtual power plant regulation and control platform based on block chain and operation method
CN109087208A (en) Data processing method, device, computer equipment and storage medium before borrowing
CN109658050A (en) A kind of management method and equipment of wage report
CN105931094A (en) Mobile internet terminal-based service system
CN110471931A (en) A kind of digital asset trade identity maintaining method based on transaction in assets chain
CN108898473A (en) A kind of project transferring method and device
CN112801802B (en) Method, system and equipment for supervising financial special funds based on block chain
Eisele et al. Blockchains for transactive energy systems: Opportunities, challenges, and approaches
KR20200042149A (en) Company investment system based on block-chain and controlling method thereof
CN103020873A (en) Automatic transferring method and system for electric system
CN111931471A (en) Form collection method and device, electronic equipment and storage medium
Citanna et al. Incentive efficient price systems in large insurance economies with adverse selection
CN109460972A (en) Real estate intelligence register method, computer installation, computer readable storage medium
CN109685641A (en) A kind of information processing method and device
CN117993789B (en) Performance management method, device, equipment and storage medium based on task decomposition
US20160193527A1 (en) Managing challenge events

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 101, floors 1-3, building 14, North District, yard 9, dongran North Street, Haidian District, Beijing 100029

Applicant after: CHINA TOWER Co.,Ltd.

Address before: 100142 19th floor, 73 Fucheng Road, Haidian District, Beijing

Applicant before: CHINA TOWER Co.,Ltd.