CN1088491C - Method for building stairs and its stair-room, and support for stairs - Google Patents

Method for building stairs and its stair-room, and support for stairs Download PDF

Info

Publication number
CN1088491C
CN1088491C CN98122478A CN98122478A CN1088491C CN 1088491 C CN1088491 C CN 1088491C CN 98122478 A CN98122478 A CN 98122478A CN 98122478 A CN98122478 A CN 98122478A CN 1088491 C CN1088491 C CN 1088491C
Authority
CN
China
Prior art keywords
staircase
mentioned
stair
reinforcing bar
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN98122478A
Other languages
Chinese (zh)
Other versions
CN1242460A (en
Inventor
横森精文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yokomori Manufacturing Co Ltd
Original Assignee
Yokomori Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yokomori Manufacturing Co Ltd filed Critical Yokomori Manufacturing Co Ltd
Publication of CN1242460A publication Critical patent/CN1242460A/en
Application granted granted Critical
Publication of CN1088491C publication Critical patent/CN1088491C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F2011/1885Handrails or balusters characterized by the use of specific materials
    • E04F2011/1891Handrails or balusters characterized by the use of specific materials mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/1893Handrails or balusters characterized by the use of specific materials mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

To improve the safety and efficiency of operation by ensuring a working space on stairs by burying supporting columns for building the stairs into the wall of a stairhall in the construction of the stairs prior to a building frame. Receiving beams 12 and temporary beams 17 are installed to supporting columns 10 erected in parallel on the floor side of a stairhall to be built, braces are mounted among both beams, and a supporting frame 14 is prepared. A supporting frame 15 having the same structure is constructed on the stair landing side opposed to the floor side, and a supportor 24 is manufactured. Steel-framed stairs 8 are installed temporarily among the receiving beams 12 of both supporting frames 14, 15. Scaffolding boards 28, 29 for operation are mounted temporarily among the temporary beams 17 and the steel- framed stairs 8, and used as working passages for building a building frame. The bar arrangement of the wall of the stairhall and forms are constructed in the same manner as conventional devices, concrete is placed and the supporting columns 10 are buried into the wall of the stairhall. When the scaffolding boards 28, 29 are removed, the temporary beams 17 are also taken off, and the stairs and the stairhall are built.

Description

The construction method of stair and staircase and the supporting arrangement of stair
The present invention relates to the construction method and the stair supporting arrangement that is used in this construction method of stair and staircase, it is the stair of constructing earlier before constructing body in the staircase that is enclosed in that steel concrete is made or the concrete structure that steel-reinforced concrete is made.
Just proposed in the past various before constructing body earlier in the concrete structure steel concrete manufacturing or the steel-reinforced concrete manufacturing, set up the stair of formal setting, come as the operation stair, construct the job practices that operation is used for body.
In the job practices before above-mentioned, in order to construct staircase, on the simple and easy scaffold temporary assembly stair, be arranged on scaffolding board on this simple and easy scaffold, at this moment, simple and easy scaffold takies stair, and the problem that can not guarantee effective working space is arranged.
The present invention inscribe between existing and makes in order to solve above-mentioned prior art, its objective is provide a kind of and can guarantee that bigger working space is arranged on the stair, job safety also can improve the stair of operating efficiency and the construction method and the employed in the method supporting arrangement of staircase.
The present invention is when constructing staircase, utilizes the pillar be embedded in the staircase wall, the supporting beam that sets up stair is fixed on the above-mentioned pillar, and can unload be installed on the pillar and address the above problem beam is set temporarily.
The stair of the present invention of also be, making in order to achieve the above object and the construction method of staircase, it is to be used for the method for reinforcing bar stair 8 and staircase 30 of constructing concrete building, the structure of this concrete structure is that reinforcing bar stair 8 are arranged in the staircase 30, said method is characterised in that: it be above the concrete floor 26 of the benchmark floor of concrete pouring, construct the concrete body of direct one deck of said reference floor before, construct reinforcing bar stair 8 and staircase 30 with following (A)-(F) operation earlier;
(A) as predetermined staircase corner part, the pillar 10 with a story height, 10a respectively among the staircase wall of each two ground side that are embedded in staircase side by side and with predetermined staircase ground side landing side staircase wall vis-a-vis among, also erectly be arranged on the concrete floor 26 of said reference floor;
(B) as predetermined staircase corner part, the two ends of the supporting beam 12 that can support reinforcing bar stair 8 are fixed on the position of two first floor height on the pillar 10 that side by side, erectly is arranged on the staircase ground side, and the two ends that beam 17 is set temporarily are installed between the height of the concrete floor 26 of the said reference floor on the pillar 10 and fixing above-mentioned supporting beam 12 roughly half is highly located;
(C), the two ends that beam 17a is set temporarily are installed in two side by side, erectly are arranged on and being fixed on the corresponding position of height on above-mentioned two pillars 10 that uprightly are arranged on ground side side by side of the pillar 10a of staircase ground side landing side vis-a-vis with above-mentioned supporting beam 12 as the corner part of predetermined staircase; The two ends of supporting beam 12a are fixed on above-mentioned pillar 10a, 10a with beam 17 be set temporarily be installed on the corresponding position of height on above-mentioned two pillars 10 that uprightly are arranged on ground side side by side;
(D) reinforcing bar stair 8 are erected at the concrete floor 26 of benchmark floor and are fixed between the supporting beam 12a on two pillar 10a of landing side and are fixed on the supporting beam 12a on two pillar 10a of landing side and are fixed between the supporting beam 12 on two pillars 10 of ground side, are built into reinforcing bar stair 8 thus;
(E) be installed in beam 17 being set temporarily and being fixed between above-mentioned reinforcing bar stair 8 sides of being set up on the supporting beam 12a on two pillar 10a of landing side, the scaffolding board 28 that operation is used is set temporarily on two pillars 10 of ground side;
(F) use above-mentioned reinforcing bar stair 8 that are built into and operation with arrangement of reinforcement and mould plate that hand frame plate 28 carries out the staircase wall construct, with concrete pouring in mould plate and construct staircase 30.
The construction method of above-mentioned reinforcing bar stair 8 that are made of (A)~(F) operation and staircase 30 is the methods when constructing a floor on the concrete floor 26 of benchmark floor.
The present invention also proposes to construct the reinforcing bar stair of many floors and the method for staircase.When the reinforcing bar stair 8 of constructing many floors and staircase 30, replace above-mentioned (A)~(F) operation, construct with following (G)~(L) operation.
(G) as predetermined staircase corner part, among the per respectively two staircase walls that are embedded in the staircase ground side side by side of the pillar 10 with many story heights, 10a and with predetermined staircase ground side landing side staircase wall vis-a-vis among, and erectly be arranged on the concrete floor 26 of said reference floor;
(H) every a story height two ends of the supporting beam 12 that can support reinforcing bar stair 8 are fixed on two side by side, erectly be arranged on the pillar 10 as the staircase ground side of being scheduled to the staircase corner part, and at the roughly height place of half by the story height above the concrete floor 26 of said reference floor, the two ends that beam 17 is set temporarily are installed on above-mentioned two pillars 10, again every a story height be fixed to the height place of the substantial middle between the supporting beam 12 of adjacency up and down of the above-mentioned supporting beam 12 on two pillars 10, the two ends that beam 17 is set temporarily are installed on above-mentioned two pillars 10;
(I) the two ends that beam 17a is set temporarily be installed in two side by side, erectly be arranged on as on the pillar 10a of the landing side at the turning of predetermined staircase, and above-mentioned supporting beam 12 is fixed on two corresponding positions of height on the pillar 10 that uprightly is arranged on ground side side by side, above-mentioned landing side and staircase ground side are vis-a-vis; The two ends of supporting beam 12a be fixed on above-mentioned pillar 10a, be installed on two corresponding height and positions of height on the pillar 10 that uprightly is arranged on ground side side by side with the above-mentioned beam 17 that is provided with temporarily;
(J) reinforcing bar stair 8 are erected at the concrete floor 26 of benchmark floor and are fixed between the supporting beam 12a on two pillar 10a of landing side, are fixed on the supporting beam 12a on two pillar 10a of landing side and are fixed between the supporting beam 12 on two pillars 10 of ground side and are fixed on the supporting beam 12 on two pillars 10 of ground side and are fixed between the supporting beam 12a on two pillar 10a of landing side, constitute reinforcing bar stair 8 thus;
(K) scaffolding board 28 that operation is used is set temporarily being installed in beam 17 being set and being erected between reinforcing bar stair 8 sides on the supporting beam 12a on two pillars 10 of ground side temporarily, above-mentioned supporting beam 12a be fixed on two pillar 10a of landing side and be on this bearing post 10a, be installed on the corresponding height and position of height on the pillar 10 with the above-mentioned beam 17 that is provided with temporarily.And be installed in beam 17a being set temporarily and being erected between reinforcing bar stair 8 sides on the supporting beam 12 on two pillar 10a of landing side, be provided with on two pillars 10 that scaffolding board 28, above-mentioned supporting beam 12 that operation uses be fixed on ground side temporarily and be in and be installed on the corresponding position of height on the pillar 10a with the above-mentioned beam 17a that is provided with temporarily.
(L) scaffolding board 28, the arrangement of reinforcement that carries out the staircase wall and the mould plate construction of using above-mentioned reinforcing bar stair 8 that are built into and operation to use, with concrete pouring in mould plate and construct staircase 30,
In the construction method of above said stair and staircase, beam 17 is set temporarily, 17a is by the installation component 16 that is fixed on pillar 10, the 10a, and be exposed to the position of reinforcing bar stair 8 sides from predetermined staircase 30 wall surfaces and be installed on pillar 10, the 10a, this is provided with beam 17,17a after constructing staircase 30 temporarily, is unloaded by the installation component 16 from above-mentioned pillar 10,10a.
Pillar 10,10a can erectly be embedded in the sidewall 33 with the introduction direction of reinforcing bar stair 8 staircase 30 arranged side by side in addition.
Above-mentioned staircase 30 is except having the staircase of wall around stair, also comprise at least facing to 2 (direct of travels of stair 2,2 perhaps vertical faces) with direct of travel on the staircase of the sort of structure of wall is arranged.In addition, on wall, also can offer the opening of the usefulness of coming in and going out.
The present invention also proposes employed stair supporting arrangement in the construction method of above-mentioned stair and staircase.Wherein, employed stair supporting arrangement is to be made of following structure in the construction method of the reinforcing bar stair 8 of constructing a floor that are made of above-mentioned (A)~(F) operation and staircase 30.Be that it is by 15 combinations of supporting frame 14 and supporting frame and constitute, the structure of above-mentioned supporting frame 14 is to open at sky to accommodate the two ends of receiving on two pillars 10 that a story height is arranged that the compartment of terrain of transverse width of reinforcing bar stair 8 uprightly is provided with side by side and fixing the supporting beam 12 that can support reinforcing bar stair 8 at a story height place; And a story height roughly half highly locate, on above-mentioned two pillars 10, the two ends that beam 17 is set temporarily can be installed with unloading by installation component 16; The structure of above-mentioned supporting frame 15 be with above-mentioned supporting frame 14 skies open with the corresponding interval of length of the direct of travel of reinforcing bar stair 8, side by side the upright two pillar 10a that a story height is arranged that are provided with above-mentioned two pillars 10 that supporting beam 12 are fixed on supporting frame 14 on the corresponding position of height on fixing the two ends of supporting beam 12a; The above-mentioned beam 17,17a of temporarily being provided with is to be installed on pillar 10, the 10a in the position of reinforcing bar stair 8 sides of exposing from the surface of predetermined staircase 30 walls.
The supporting arrangement of being constructed employed stair in the construction method of the reinforcing bar stair 8 of many floors and staircase 30 by (G)~(L) operation is to be made of following structure.Promptly, it is by 15 combinations of supporting frame 14 and supporting frame and constitute, the structure of above-mentioned supporting frame 14 is to open the compartment of terrain of the transverse width that can accommodate reinforcing bar stair 8, the two ends of fixing the supporting beam 12 that can support reinforcing bar stair 8 on the position of a story height on upright two pillars 10 that many story heights are arranged that are provided with side by side at sky; And the story height place on above-mentioned two pillars 10 fixing supporting beam 12 two ends height roughly half height and position and at the substantial middle height place of the supporting beam 12,12 of the adjacency up and down that is being fixed every a story height, the two ends that beam 17 is set can be installed with unloading temporarily by installation component 16; The structure of above-mentioned supporting frame 15 be with above-mentioned supporting frame 14 skies open on two pillar 10a that many story heights are arranged that the corresponding compartment of terrain of length with the direct of travel of reinforcing bar stair 8 uprightly is provided with side by side, with the above-mentioned root pillar 10 that supporting beam 12 is fixed on supporting frame 14 on the corresponding position of height on, by installation component 16, the two ends that beam 17a is set temporarily can be installed with unloading, and with the above-mentioned two ends of fixing supporting beam 12a on the corresponding position of height that is provided with on two pillars 10 that beam 17 is installed in supporting frame 14 temporarily; The above-mentioned beam 17,17a of temporarily being provided with is to be installed on pillar 10, the 10a exposing in the position of reinforcing bar stair 8 sides with the surface of predetermined staircase 30 walls.
In the supporting arrangement of above-mentioned 2 kinds of stair, the supporting beam 12 of adjacency up and down and be provided with between the beam 17 temporarily and up and down adjacency supporting beam 12a and be provided with between the beam 17a temporarily and can tie rod 21 be installed with unloading, make the upper and lower end parts of above-mentioned tie rod 21 be in supporting beam 12,12a and interior side's the predetermined distance part at the both ends of beam 17,17a be set temporarily.
Fig. 1 is employed reinforcing bar stair in the embodiment of the invention, and Fig. 1 (a) is a vertical view, the elevation of Fig. 1 (b).
Fig. 2 is the vertical view of the stair supporting arrangement that proposes of the present invention.
Fig. 3 is the stair supporting arrangement that the present invention proposes, and is the figure of supporting arrangement that explanation is used for many floors, and Fig. 3 (a) is the elevation of scaffold that constitutes a side of supporting arrangement, and Fig. 3 (b) is the elevation that constitutes the scaffold of supporting arrangement opposite side.
Fig. 4 is the schematic diagram that is used for illustrating the state on the pillar that the supporting beam of supporting arrangement is fixed on, and Fig. 4 (a) is the elevation that amplifies, and Fig. 4 (b) is the A-A line sectional view of Fig. 4 (a).
Fig. 5 be used for illustrating supporting arrangement the schematic diagram that beam is installed in the state on the pillar is set temporarily, Fig. 5 (a) is the elevation that amplifies, Fig. 5 (b) is the B-B line sectional view of Fig. 5 (a).
Fig. 6 is used for illustrating the reinforcing bar stair are erected at the brief strabismus map that the state of scaffolding board on the supporting arrangement of the present invention, also is set temporarily.
Fig. 7 constructs the stair in the process and the amplification plan view of staircase with the present invention.
Fig. 8 is the reinforcing bar stair constructed with the present invention and the amplification plan view of staircase.
Fig. 9 (a), Fig. 9 (b) and Fig. 9 (c) are the approximate vertical views of explanation construction method of the present invention.
Below, with reference to above-mentioned accompanying drawing most preferred embodiment of the present invention is described.
(1) structure of reinforcing bar stair
Used reinforcing bar stair 8 are by going downstairs 3 and go upstairs and 6 constitute as the stair of a floor in present embodiment, go downstairs 3 to be made of stair portion 1 and landing 2; Go upstairs 6 by stair portion 4 and (stair) landing 5 formations.Landing 7 (referring to Fig. 1) in the middle of constituting by go downstairs 3 landing 2 and 6 the landing 5 of going upstairs.3 the 1 lower end 1a of stair portion of going downstairs is configured on the floor of benchmark floor, and the upper end 4b of 6 the stair portion 4 of going upstairs is configured on the floor of the direct last layer of benchmark floor.
(2) structure of the supporting arrangement of stair
As the corner part of constructing predetermined staircase, when constructing predetermined staircase, the ground side between the stair ladder, two pillars 10 uprightly are embedded in the wall portion of staircase side by side.The height of these two pillars 10 is taken as the height of regulation, and the height of for example getting into predetermined stair partition portion is (if construct a floor, the height of the floor as usefulness H among Fig. 1 (b) shown in then; If construct multilayer, then be) as using the several times of the story height shown in the H among Fig. 1 (b).
The both ends 13,13 that can support the supporting beam 12 of reinforcing bar stair are separately fixed on the position of the fastening predetermined reinforcing bar stair end in two pillars 10 (with reference to Fig. 4 (a)).Wherein, if height one story height of two pillars 10 then is fixed to the both ends 13,13 of supporting beam 12 the height position of a floor shown in Fig. 9 (a); If the height of two pillars 10,10 is height of many floors, then shown in Fig. 3 (a), the both ends 13,13 of many supporting beams 12,12 are separately fixed at the height place of each floor.
Then, the installation component 16,16 with flange 18a in two pillars 10, be separately fixed on half height and position of the story height on the pillar 10.Then, configuration is provided with beam 17 temporarily between above-mentioned flange 18a, there is flange 18 at these both ends that beam is set temporarily, with bolt, nut the flange 18a that is fixed on the pillar 10 are fixed (referring to Fig. 5 (a) and (b)) with the flange 18 that is provided with on the beam 17 temporarily.Since be with bolt, nut form fixing, thereby just can be installed in the both ends that beam 17 is set temporarily between pillar 10 and the pillar 10 with unloading and be on half position of an above-mentioned story height.Have at pillar 10 under the occasion of many story heights, by the height of each floor, on pillar 10, fix many supporting beams 12 as described above, in abutting connection with the height place of the substantial middle of the height and position of the supporting beam of fixing 12, the both end sides that beam 17 similarly will be set temporarily can be installed on the pillar 10 with unloading up and down.
An above-mentioned so-called story height roughly half height and position, in Fig. 1 (b), be meant with the height about highly half shown in the H in abutting connection with the height and position of the substantial middle of the height and position of the supporting beam 12 fixed of ground up and down; In Fig. 3 (a), be meant in the many supporting beams 12 that are fixed on the pillar 10, the height of the intermediate degree of the supporting beam 12 of adjacency up and down.These roughly the height of half height, substantial middle by going downstairs 3 and go upstairs and 6 have what kind of height dimension respectively and determine, promptly, because when a story height H being regarded as one regularly, 3 height dimension increases if go downstairs, 6 the height dimension of then going upstairs just dwindles, thereby the height of above-mentioned roughly half height, substantial middle compares with half height just in time, becomes a little the height by upside; If go downstairs on the contrary 3 reduced height, then because 6 the height dimension of going upstairs increases, thereby the height of above-mentioned roughly half height, substantial middle compares with half height just in time, become a little height by downside.
As mentioned above, when constructing staircase,, constituted the supporting frame 14 (with reference to Fig. 3 (a)) that is embedded in the staircase wall in the ground side of staircase.
As mentioned above, make stair side surperficial corresponding of flange 18, the residing position of 18a and predetermined staircase wall.Promptly, beam 17 being set temporarily is to be installed on the pillar 10 exposing in the position of stair side from the surface of the reinforcing bar stair side of predetermined staircase wall.
Then, as the staircase corner part, when constructing predetermined staircase, in the staircase wall of the landing side relative, uprightly bury two pillar 10a underground side by side with the staircase ground side, with being installed on the pillar 10a that formation supporting frame 14 similarly can unload the two ends of supporting beam 12a, constitute supporting frame 15 thus.
The difference of supporting frame 14 and supporting frame 15 only is in this, promptly, in supporting frame 15, with supporting frame 14 in fixed bearing beam 12 the height and position corresponding section, beam 17a will be set temporarily be installed on the pillar 10a; With the installation in the supporting frame 14 be provided with temporarily beam 17a the corresponding height of height place, supporting beam 12a is fixed on the pillar 10a.
As mentioned above, upright side by side respectively pillar 10 and the pillar 10 that is provided with must be opened the horizontal amplitude (L that can hold the reinforcing bar stair 8 shown in Fig. 1 (a) by sky 1) upright the setting.The pillar 10a of supporting frame 15 and the interval of pillar 10a also will separate equally.
As described above, the supporting frame 14 that constitutes respectively and supporting frame 15 skies are opened length L with reinforcing bar stair 8 direct of travels 2(with reference to Fig. 1 (a)) relative interval, promptly, make and in Fig. 2, use L 3Shown length at interval in, can accommodate among Fig. 1 (a) by L 2Shown in the length compartment of terrain supporting frame 14 and supporting frame 15 (with reference to Fig. 6) erectly are set side by side.
As mentioned above, constitute the supporting arrangement of stair of the present invention.
13 places, end at supporting beam 12,12a, with predetermined corresponding position, staircase wall surface position on fixing closure plate 20 (with reference to Fig. 4 (a) and (b)), common, above-mentioned each root supporting beam 12,12a and using shaped steel, because supporting beam 12,12a connect the wall mould plate that concrete pouring is used, thereby process easily for the mould plate that makes this part, closure plate 20 is set.Though only represent supporting beam 12 on Fig. 4 (a) and (b), also fixing closure plate 20 on same position at supporting beam 12a place.
In the present embodiment, the supporting beam 12 of the adjacency up and down in supporting frame 14,15 and beam 17, supporting beam 12a are set temporarily and are provided with between the beam 17a temporarily is installed with tie rod 21 (referring to Fig. 3, Fig. 4, Fig. 5) across.Between tie rod 21, adorning turnbuckle (not having expression among the figure), may adjust the length of tie rod 21 by it.
Only in framework C tie rod is being set on the supporting frame 15, the upside of framework C has supporting beam 12a, downside and has beam 17a is set temporarily.Though on the less framework of other load burden, tie rod 21 is omitted (referring to Fig. 3 (b)), also can all in the framework tie rod 21 (not having expression among the figure) be set all.
And for example shown in Fig. 4 (a), Fig. 5 (a), the end 22 of tie rod 21 is installed in supporting beam 12,12a respectively, and the staircase wall surface distance from predetermined that beam 17,17a are set temporarily is the position of L.Though Fig. 4 (a), Fig. 5 (a) only represent supporting beam 12, beam 17 are set temporarily, to supporting beam 12a, beam 17a to be set also be same temporarily.Here distance L be place at this position scaffolding board, operating personnel with it as path and can be by the distance at this position, though to get usually about 50cm from the safety consideration, in order to place 1 scaffolding board, about minimum desirable 30cm.
Can be according to different conveying situations, it is (being generally about 3~4m of specific length that above-mentioned pillar 10,10a are resolved into every, make generally that it is corresponding with prefabricated story height), in conjunction with the end, fixing flange 11,11 (referring to Fig. 3 (a) and (b)).And tie rod 21 is avoided the position of this decomposition certainly.Can be with the pillar 10,10a, supporting beam 12, the 12a that disperse, beam 17,17a, tie rod 21 etc. are set temporarily and make member, be transported into the building site, constitute supporting arrangement 21 with bolt, nut assembling back.
Though be that the section configuration of above-mentioned pillar 10,10a is made shape in the wall that can be embedded in staircase when constructing in such scheme, but make the occasion that double reinforcement disposes, the section configuration that can between two reinforcing bars, hold on the wall thickness direction of then making at the reinforcing bar that wall is used.Be under the occasion of D at wall thickness for example, the bore of reinforcing bar is about 1.5cm * two piece, and the overburden cover of affix reinforcing bar is about a position, 3cm * 2, section configuration must be made can be contained in below " D-9cm " on the wall thickness direction.For example, wall thickness is the occasion of 18cm, and the length of the section of pillar 10 on the wall thickness direction is below the 9cm, preferably gets into below the 6cm.In addition, under single reinforcing bar configuration occasion, to consider reinforcing bar and overburden cover too, section configuration be made the shape that can not hinder configuration reinforcement in wall.
In the present embodiment, owing on supporting frame 14,15, used tie rod 21, thereby the section configuration of necessity of pillar 10,10a is dwindled, it can be made the shape in the wall that can easily be embedded in staircase.
On the other hand, under the occasion in the section configuration with pillar 10,10a expands the wall that to a certain degree still can easily be embedded in staircase to, perhaps when not using tie rod 21, still can guarantee tie rod can be omitted under the occasion of certain intensity.
(3) stair and staircase constructs
1. on the good concrete benchmark floor concrete floor 26 of cast, supporting arrangement 24 is set erectly, with pillar 10,10a be fixed on benchmark floor concrete floor 26 (or down one deck pillar 10,10a upper end in conjunction with end flange 11,11,11,11) on.
Usually supporting arrangement 24 uprightly is set to the height (referring to Fig. 9 (a)) of the reinforcing bar stair that can construct first floor.If but supporting arrangement 24 is more than the height of a floor, then also can be according to the construction degree at scene, supporting arrangement 24 is made height more than 2 layers or 3 layers; If supporting that can be suitable, it is such also can to make whole floors (being 6 floors in Fig. 3) height overall.
Preferably make the upper end of pillar 10,10a be projected into the top (referring to Fig. 9 (a)) of predetermined concrete floor 35 in conjunction with height and position with flange 11.
Interval between interval between interval between pillar 10 and 10, pillar 10a and the 10a, the supporting frame 14 and 15 is adjusted to makes its big or small corresponding with the reinforcing bar stair of constructing.
In the present embodiment, tie rod 21,21 is installed in across supporting frame 14,15 adjacency up and down supporting beam 12 and beam 17, supporting beam 12a be set temporarily and be provided with between the beam 17a temporarily.The parbuckle screw of at this moment available each tie rod 21 and a supporting structure add the size that frame 14,15 is adjusted to regulation.
2. in order reinforcing bar stair 8 are set up and are fixed between the supporting beam 12a of the supporting beam 12 of supporting frame 14 of supporting arrangement 24 and supporting frame 15, landing 2,5 is interfixed and landing 7 in the middle of forming.And the lower edge 1a of bottom the stair portion 1 on 3 that goes downstairs is fixed on benchmark floor concrete floor 26 (supporting beam 12 of next floor that perhaps has been provided with) goes up (Fig. 9 (b)).Also can adjust the turnbuckle of each tie rod 21,21 as required.
Assembling during supporting arrangement 24 and usual method similarly fasten the fixed straightening of the professional etiquette of going forward side by side temporarily, formally tightened up then.
Construct reinforcing bar stair 8 with above-mentioned operation.
When constructing above-mentioned supporting arrangement 24, pillar 10,10a, supporting beam 12,12a with having decomposed are provided with plate 17,17a, tie rod 21 etc. temporarily and are transported into the building site as member, just can be built into supporting arrangement 24 with bolt, nut assembling.Because at this moment each member all is little section, the energy weight reduction, thereby do not use special heavy-duty machinery just can carry out operation.
3. follow, the scaffolding board 28 that operation is used is arranged on reinforcing bar stair 8 sides temporarily and is provided with between the beam 17 temporarily, the latter is installed on the supporting frame 14, and reinforcing bar stair 8 are to be erected on the supporting beam 12a, and this supporting beam 12a is fixed on temporarily being provided with on the beam 17 corresponding height positions with above-mentioned of supporting frame 15.Specifically, the scaffolding board 28 that operation is used is arranged between the end 17b and middle landing 7 that beam 17 is set temporarily of supporting frame 14 temporarily, and is fastened (referring to Fig. 9 (b)) temporarily.Equally, beam 17a is set temporarily and is erected at and operation is set with scaffolding board 28 between reinforcing bar stair 8 sides on the supporting beam 12 temporarily what install on the supporting frame 15, above-mentioned supporting beam 12 is to be fixed on temporarily being provided with on the corresponding height of the beam 17a position with above-mentioned of supporting frame 14.Specifically, the scaffolding board 28 that operation is used is arranged between the side of the end 17c that beam 17a is set temporarily of supporting frame 15 and floor (the upper end 4b of the bottom 1a of 3 the stair portion 1 of going downstairs, 6 the stair portion 4 of going upstairs) temporarily, and temporary fixed (referring to Fig. 6, Fig. 7) in addition.
Wherein, an end of scaffolding board 28, promptly with the part of that end below being configured in reinforcing bar stair 8 that is placed on the end opposition side that temporarily is provided with on beam 17, the 17a, this end is being supported with slinging (referring to Fig. 9 (b)) from reinforcing bar stair 8.In addition.The pars intermedia of scaffolding board 28 produce deflection part, also it is supported with slinging from reinforcing bar stair 8.
In addition, in order to improve operation, also can directly the scaffolding board 29 that appends be arranged between the scaffolding board 28 in that beam 17,17a side are set temporarily temporarily, perhaps can obliquely the scaffolding board 29 that appends be arranged on scaffolding board 28 temporarily and be provided with between the pars intermedia of beam 17,17a (referring to Fig. 6, Fig. 7) temporarily.
Scaffolding board 28 is arranged on the peripheral side (staircase side) (referring to Fig. 6, Fig. 7) of stair.
4. on benchmark floor concrete floor 26, construct reinforcing bar, the mould plate that the staircase wall is used, simultaneously and construct concrete mould template, the reinforcing bar of other parts that are used for constructing body.At this moment can be the stair activity 3,6 of the above-mentioned reinforcing bar stair of having constructed 8 path that use as operation or that carry material to use.
And can use scaffolding board 28 and reinforcing bar stair 8 for constructing the staircase wall.
The available operational method in the past of constructing of the mould plate of staircase wall, reinforcing bar is constructed, and the operator is technical skills and operation safely especially.Again because 8,8 on reinforcing bar stair are supporting with supporting frame 14,15, so needn't combine with the sidewall 33 (referring to Fig. 7) of staircase, also available with the in the past same operating type of assembling of pushing the pipe bracket that the wall mould plate uses carries out.Especially longitudinally pipe bracket and mould plate though reinforcing bar stair 8 are arranged, are gone up in this section still and can be supported by ground along the vertical direction continuously.
In addition, though the end 13,13 of supporting beam 12,12a connects the internal mold template of staircase sidewalls 33 usefulness as mentioned above,, can simplify the mould plate processing operation that connects part by closure plate 20 is set.
5. as described above concrete pouring in the mould plate of constructing, find concrete curing after, mould plate and various support are all laid down.
After this, construct the concrete floor 35 (ground) (referring to Fig. 9 (c)) of another layer.Also constructed by the staircase 30 that the wall 32 and the sidewall 33 of the wall 31 of ground side, middle landing side constitutes.At this moment pillar 10,10a being embedded in the wall of staircase, is to be embedded in the sidewall 33 in this embodiment.
Construct staircase with above-mentioned operation.
The dress work of staircase wall 31,32,33 also can utilize the scaffolding board 28 that is arranged on reinforcing bar stair 8 temporarily and is provided with on beam 17, the 17a temporarily to carry out.
If after having constructed staircase as described above, then scaffolding board 28 is laid down.Under the situation that scaffolding board 29 is installed in order to improve operation, also scaffolding board 29 is laid down.Also removing by the flange 18 of the flange that beam 17,17a are set 18,18a and the pillar 10 of bolt, nut combination, 10a side, bonding state between the 18a temporarily, beam 17 is set temporarily, 17a lays down.Also tie rod 21,21 is laid down.But, when unloading tie rod 21, need factors such as intensity according to job site situation and supporting arrangement, the phase carries out in due course.Above-mentioned being provided with in the operation that beam 17,17a and tie rod 21 be used in the reinforcing bar stair of constructing more the top floor, staircase again of unloading temporarily.
Also can not unload beam 17,17a are set temporarily, tie rod 21 is embedded in the both in the wall of staircase and (does not have expression among the figure).
6. after this, above constructing more when the reinforcing bar stair of floor, staircase, with above-mentioned similarly, assembling directly goes up mould plate, the reinforcing bar of a floor, constructs the concrete floor 36 (referring to Fig. 9 (c)) that pushes up a last floor.At this moment, the pillar 10 of supporting frame 14,15,10a interconnect ground by flange 11,11 and erectly are provided with upward.
Carry out as described above, finish constructing of reinforcing bar stair and staircase in the constructing of body of concrete structure in advance.
Though top reference accompanying drawing most preferred embodiment of the present invention is illustrated, the present invention is not limited to this embodiment, also may make the change of all styles of in the described technical conceive scope of claim.
For example, can make other structures to the structure of the reinforcing bar stair 8 in the foregoing description.That is, also go upstairs 6, go downstairs in 3, with the structure that landing is connected with ground side, in addition, can make further separated structures to stair portion 1 and landing 2 (stair portion 4 and landing 5).In addition, also can make the stair (above-mentioned any diagram that all do not have) that do not turn back stair but directly advance.
Because the present invention erectly is embedded in pillar among the staircase wall of ground side when constructing staircase side by side, the supporting beam of supporting stair is fixed on this pillar, and can be installed on this pillar beam is set temporarily, constitute a side supporting frame; with unloading Same arranged side by side among the staircase wall that erectly is embedded in the landing side pillar when constructing staircase, the supporting beam of supporting stair is fixed on the pillar the corresponding position of depth of beam is set temporarily with installation above-mentioned side's supporting frame, and can be installed on the above-mentioned pillar and the corresponding position of fixed bearing depth of beam above-mentioned side's supporting frame beam is set temporarily with unloading, constitute the opposing party's supporting frame thus; Owing to using these two supporting frame skies are driven the upright side by side supporting arrangement that the stair that constitute are set in predetermined distance ground, thereby have and to construct the effect of building the reinforcing bar stair of formal setting with regard to formation before building body.Broad working space can also be aspect stair, guaranteed thus, constructing of concrete structure can be safely and carried out efficiently.
Because in above-mentioned supporting arrangement, pillar is made the section configuration that can not hinder wall configuration steel disk and be embedded in the staircase wall, thereby pillar can support to the reinforcing bar stair at least that to construct body just passable, the section configuration that can dwindle pillar.Because its result can alleviate the weight of supporting arrangement, thereby has the effect that can improve the operating efficiency that conveying is provided with etc.
Owing to be provided with beam be set temporarily, thereby can be arranged on the scaffolding board that operation is used temporarily and be provided with on the beam temporarily, can cut down significantly must frame take or be arranged on reinforcing bar stair top object is set temporarily, can further guarantee operational security, and operating efficiency can be provided.Again because be provided with on the pillar of supporting frame that beam can be installed in the formation supporting arrangement with unloading temporarily, so after the operation of stipulating, can unload beam is set temporarily, can be being provided with in the operation that beam uses the reinforcing bar stair of constructing more the top floor, staircase again that this unloads temporarily.
Under the occasion that tie rod is used on the supporting arrangement, can further dwindle the section configuration of pillar, can easily bearing post be buried underground in the staircase wall.The installation site of upper and lower end parts that here can be by making tie rod is guaranteed the working space between pillar and the tie rod, and can be improved operating efficiency respectively from supporting beam, the predetermined distance part of side in the both ends of beam is set temporarily.

Claims (7)

1. the construction method of stair and staircase, it is to be used for the reinforcing bar stair (8) of constructing concrete building and staircase (30), above-mentioned reinforcing bar stair (8) are arranged in the staircase (30), said method is characterised in that: it be the top of the concrete floor (26) of the benchmark floor of concrete pouring, constructing the said reference floor directly above the concrete body of one deck before, construct reinforcing bar stair (8) and staircase (30) with following (A)-(F) operation earlier;
(A) as predetermined staircase corner part, the pillar with a story height (10,10a) respectively among the staircase wall of each two ground side that are embedded in staircase side by side, and with the staircase ground side halfpace side staircase wall of being scheduled to vis-a-vis among, also erectly be arranged on the concrete floor (26) of said reference floor;
(B) as predetermined staircase corner part, the two ends of the supporting beam that can support reinforcing bar stair (8) (12) are fixed on the position of two first floor height on the pillar (10) that side by side, erectly is arranged on the staircase ground side, and the two ends that beam (17) is set temporarily are installed between the height of the concrete floor (26) of the said reference floor on the pillar (10,10) and fixing above-mentioned supporting beam (12) roughly half is highly located;
(C), the two ends that beam (17a) is set temporarily are installed in two arranged side by side erectly being arranged on and being fixed on the corresponding position of height on above-mentioned two pillars (10) that uprightly are arranged on ground side side by side with above-mentioned supporting beam (12) of the pillar (10a) of staircase ground side halfpace side vis-a-vis as the corner part of predetermined staircase; The two ends of supporting beam (12a) are fixed on above-mentioned pillar (10a) with beam (17) be set temporarily be installed on the corresponding position of height on above-mentioned two pillars (10) that uprightly are arranged on ground side side by side;
(D) reinforcing bar stair (8) are erected at the concrete slab (26) of benchmark floor and are fixed between the supporting beam (12a) on two pillars (10a) of halfpace side and are fixed on the supporting beam (12a) on two pillars (10a) of halfpace side and are fixed between the supporting beam (12) on two pillars (10) of ground side, are built into reinforcing bar stair (8) thus;
(E) be installed in beam (17) being set temporarily and being fixed between above-mentioned reinforcing bar stair (8) side of being set up on the supporting beam (12a) on two pillars (10a) of halfpace side, the scaffolding board (28) that operation is used is set temporarily on two pillars (10) of ground side;
(F) use above-mentioned reinforcing bar stair (8) that are built into and operation with arrangement of reinforcement and mould plate that scaffolding board (28) carries out the staircase wall construct, with concrete pouring in mould plate and construct staircase (30).
2. the construction method of stair and staircase, it is used for the reinforcing bar stair (8) and the staircase (30) of constructing concrete building, the structure of this concrete structure is arranged on reinforcing bar stair (8) in the staircase (30), said method is characterised in that: it is before the concrete body of the top last layer of constructing the said reference floor, in the top of the concrete floor (26) of the benchmark floor of concrete pouring, construct reinforcing bar stair (8) and staircase (30) with following (G)~(L) operation earlier;
(G) as predetermined staircase corner part, the pillar with many story heights (10,10a) respectively among each two staircase walls that are embedded in the staircase ground side side by side and with predetermined staircase ground side halfpace side staircase wall vis-a-vis among, and erectly be arranged on the concrete slab (26) of said reference floor;
(H) every a story height, the two ends of the supporting beam that can support reinforcing bar stair (8) (12) are fixed on two side by side, erectly be arranged on the pillar (10) as the staircase ground side of being scheduled to the staircase corner part, and at the roughly height place of half by a story height of the top of the concrete floor (26) of said reference floor, the two ends that beam (17) will be set temporarily are installed on above-mentioned two pillars (10), again every a story height be fixed to the height place of the substantial middle between the supporting beam (12) of adjacency up and down of the above-mentioned supporting beam (12) on two pillars (10), the two ends that beam (17) is set temporarily are installed on the above-mentioned pillar (10);
(I) the two ends that beam (17a) is set temporarily be installed in two side by side, erectly be arranged on as on the pillar (10a) of the halfpace side at the turning of predetermined staircase, and above-mentioned supporting beam (12) is fixed on two corresponding positions of height on the pillar (10) that uprightly is arranged on ground side side by side, above-mentioned halfpace side and staircase ground side are vis-a-vis; The two ends of supporting beam (12a) be fixed on above-mentioned pillar (10a), be installed on two corresponding height and positions of height on the pillar (10) that uprightly is arranged on ground side side by side with the above-mentioned beam (17) that is provided with temporarily;
(J) reinforcing bar stair (8) are erected at the concrete floor (26) of benchmark floor and are fixed between the supporting beam (12a) on two pillars (10a) of halfpace side, be fixed on the supporting beam (12a) on two pillars of halfpace side (10a) and be fixed between the supporting beam (12) on two pillars of ground side (10), and be fixed on the supporting beam (12) on two pillars of ground side (10) and be fixed between the supporting beam (12a) on two pillars of halfpace side (10a), constitute reinforcing bar stair (8) thus;
(K) scaffolding board 28 that operation is used is set temporarily being installed in being provided with between reinforcing bar stair (8) side of being set up on beam (17) and the supporting beam (12a) on two pillars (10) of ground side temporarily, above-mentioned supporting beam (12a) is fixed on two pillars (10a) of halfpace side, and be on this bearing post (10a), be installed on the corresponding height and position of height on the pillar (10) with the above-mentioned beam (17) that is provided with temporarily.And the scaffolding board (28) that operation is used being set temporarily being installed in beam (17a) being set and being erected between reinforcing bar stair (8) side on the supporting beam (12) on two pillars (10a) of halfpace side temporarily, above-mentioned supporting beam (12) is fixed on being installed on the corresponding position of height on the pillar (10a) with the above-mentioned beam (17a) that is provided with temporarily on two pillars (10) of ground side;
(L) scaffolding board (28), the arrangement of reinforcement that carries out the staircase wall and the mould plate that uses above-mentioned reinforcing bar stair (8) that are built into and operation to use constructed, with concrete pouring in mould plate and construct staircase (30).
3. as the described stair of claim 1 or 2 and the construction method of staircase, it is characterized in that: beam (17,17a) is set temporarily is by the installation component (16) that is fixed on pillar (10,10a), exposing from predetermined former staircase (30) wall surface in the position of reinforcing bar stair (8) side and be installed on the pillar (10,10a), this is provided with temporarily that beam (17,17a) unloads from the installation component (16) of above-mentioned pillar (10,10a) constructing staircase (30).
4. the construction method of stair as claimed in claim 1 or 2 and staircase is characterized in that: pillar (10,10a) is in the sidewall (33) that erectly is embedded in the direct of travel of reinforcing bar stair (8) staircase (30) arranged side by side.
5. the supporting arrangement of stair, it is characterized in that: it is by the combination of supporting frame (14) and supporting frame (15) and constitute, the structure of above-mentioned supporting frame (14) be sky open can accommodate receive reinforcing bar stair (8) transverse width the interval, fixing the two ends of the supporting beam (12) that can support reinforcing bar stair (8) on the position of 1 story height of upright two pillars (10) that a story height is arranged that are provided with side by side; And a story height roughly half is highly located, goes up at above-mentioned two pillars (10), by installation component (16) two ends that beam (17) are set temporarily can be installed with unloading; The structure of above-mentioned supporting frame (15) is to open the corresponding interval of length with the direct of travel of reinforcing bar stair (8) with above-mentioned supporting frame (14) sky, upright side by side two pillars (10a) that a story height is arranged that are provided with on the corresponding position of height on above-mentioned two pillars (10) that supporting beam (12) are fixed on supporting frame (14), by installation component (16) can be installed with unloading be provided with temporarily beam (17a) with the above-mentioned corresponding position of height that temporarily is provided with on two pillars (10) that beam (17) is installed in supporting frame (14) on fixing the two ends of supporting beam (12a); The above-mentioned beam (17,17a) that temporarily is provided with is to expose from the surface of predetermined staircase (30) wall to be installed in the position of reinforcing bar stair (8) side on the pillar (10,10a).
6. the supporting arrangement of stair, it is characterized in that: it is by the combination of supporting frame (14) and supporting frame (15) and constitute, the structure of above-mentioned supporting frame (14) is to open on two pillars (10) that many story heights are arranged of the interval of the transverse width that can accommodate reinforcing bar stair (8), upright setting side by side, at the two ends of fixing the supporting beam (12) that can support reinforcing bar stair (8) on the position of a story height at sky; And fixing on roughly half height and position of height at two ends of supporting beam (12) at the story height place on above-mentioned two pillars (10) and on the substantial middle height and position of the supporting beam (12) of the adjacency up and down of fixing, the two ends that beam (17) are set temporarily can be installed with unloading by installation component (16) every a story height; The structure of above-mentioned supporting frame (15) is to open the corresponding interval of length with the direct of travel of reinforcing bar stair (8) with above-mentioned supporting frame (14) sky, on upright side by side two pillars (10a) that many story heights are arranged that are provided with, with above-mentioned two pillars (10) that supporting beam (12) are fixed on supporting frame (14) on the height opposite position on, by installation component (16), the two ends that beam (17a) is set temporarily can be installed with unloading, and with above-mentioned the corresponding position of height that is provided with on two pillars (10) that beam (17) is installed in supporting frame (14) temporarily on, fixing the two ends of supporting beam (12a); The above-mentioned beam (17,17a) that temporarily is provided with is to expose in the position of reinforcing bar stair (8) side from the surface of predetermined staircase (30) wall to be installed on the pillar (10,10a).
7. as the supporting arrangement of claim 5 or 6 described stair, it is characterized in that: at the supporting beam (12) of adjacency up and down be provided with between the beam (17) and the supporting beam of adjacency (12a) and be provided with between the beam (17a) tie rod (21) can be installed with unloading up and down temporarily temporarily, the upper and lower end parts of above-mentioned tie rod (21) be in supporting beam (12,12a's and square predetermined distance part in the two ends of beam (17,17a) is set temporarily.
CN98122478A 1998-07-21 1998-11-17 Method for building stairs and its stair-room, and support for stairs Expired - Fee Related CN1088491C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP20498698A JP3569861B2 (en) 1998-07-21 1998-07-21 Construction method of stairs and staircase, staircase support device, and staircase structure
JP204986/98 1998-07-21

Publications (2)

Publication Number Publication Date
CN1242460A CN1242460A (en) 2000-01-26
CN1088491C true CN1088491C (en) 2002-07-31

Family

ID=16499591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN98122478A Expired - Fee Related CN1088491C (en) 1998-07-21 1998-11-17 Method for building stairs and its stair-room, and support for stairs

Country Status (4)

Country Link
JP (1) JP3569861B2 (en)
KR (1) KR100305141B1 (en)
CN (1) CN1088491C (en)
HK (1) HK1025372A1 (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3421298B2 (en) * 2000-03-14 2003-06-30 友也 太田 Internal stairs for buildings and method of construction
KR100930281B1 (en) * 2001-01-25 2009-12-09 가부시키가이샤 요코모리 세이사쿠쇼 Attachment bracket of steel stairway and attachment device and attachment method of steel stairway
JP4016130B2 (en) * 2002-04-02 2007-12-05 株式会社横森製作所 Stair structure and staircase construction method
KR100464594B1 (en) * 2002-06-17 2005-01-03 두하요코모리주식회사 The method of constructing the prefabricated step on reinforced concrete building
KR100459613B1 (en) * 2002-08-10 2004-12-03 대림산업 주식회사 Continuous construction of core wall for precasted concrete staircase
CN102383609B (en) * 2011-08-18 2013-08-14 南通四建集团有限公司 Construction method for semi-rigid stair well and steel stair
CN102912977A (en) * 2012-11-06 2013-02-06 南通建筑工程总承包有限公司 Mold used for pouring shaped stair
CN103821361B (en) * 2014-03-03 2016-03-02 永升建设集团有限公司 Stair studding formwork construction method is built in the gradation improved
CN104196265A (en) * 2014-09-02 2014-12-10 叶金有 Combined plug-in type safe ladder for road bridge construction
CN105600176A (en) * 2015-10-20 2016-05-25 张跃 Stair board transportation assembly
CN106869421A (en) * 2017-01-10 2017-06-20 中国建筑第八工程局有限公司 Assembled stairs structure and its installation method
CN107939068A (en) * 2017-12-25 2018-04-20 中铁四局集团第二工程有限公司 A kind of foundation pit hangs lane device
CN109057146A (en) * 2018-09-28 2018-12-21 中冶建工集团有限公司 A kind of method for rapidly mounting of assembled steel frame secondary beam
CN109235656B (en) * 2018-10-19 2019-12-27 一科能源科技(天津)有限公司 Installation method of prefabricated staircase in modular building
CN109441088B (en) * 2018-11-09 2024-03-22 上海建工二建集团有限公司 Steel structure operation platform for super high-rise building core tube construction
CN112482677A (en) * 2020-11-24 2021-03-12 广州市恒盛建设工程有限公司 Construction method of pre-installed type non-support stair

Also Published As

Publication number Publication date
KR20000010491A (en) 2000-02-15
KR100305141B1 (en) 2001-09-24
HK1025372A1 (en) 2000-11-10
JP3569861B2 (en) 2004-09-29
JP2000038841A (en) 2000-02-08
CN1242460A (en) 2000-01-26

Similar Documents

Publication Publication Date Title
CN1088491C (en) Method for building stairs and its stair-room, and support for stairs
KR100755213B1 (en) Connector and stair assembly
JPS62253833A (en) Slab beam mold frame structure and method for forming concrete slab beam using said structure
CN112900764A (en) Light assembled stair with steel bar truss
CN1055787A (en) Multistory building framework and the building that is constituted thereof
WO1991019055A1 (en) A method of erecting a foundation structure for a building substructure
CN1058542C (en) Construction of stair
CN1192150C (en) Modular structure
JPH0860825A (en) Construction method of staircase
CN1281821C (en) Foundation structure, components therefor and method of constructing a foundation
JPH0593448A (en) Standardized step module
JP2001254495A (en) Internal stairway for building, and building method therefor
JPH10306457A (en) Foundation block
CN2539781Y (en) Building module
CN1228516C (en) Multi-layer parking lot made of reinforced concrete and method of construction thereof
KR200373457Y1 (en) A stairway for variable system
JP4061611B2 (en) PCa stairs mounting structure, PCa stairs mounting method, PCa stairs
KR102211218B1 (en) A Construction Method for Pre-Constructing Staircase and Constructing Materials Used therein
JP2004204508A (en) Construction method of staircase, and form for staircase
JP2000352169A (en) Inner stair for building, its construction method and assembly jig for erection therefor
JP3944870B2 (en) Method for constructing staircase with staircase and unit staircase used in this construction method
JPS6049740B2 (en) How to build stairs
RU2275452C2 (en) Composite reinforced concrete motor road bridge span structure
JPH07127210A (en) Construction of stairs and unit stairs
KR200378206Y1 (en) Handrail for an assembly type steel ladder

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20020731

Termination date: 20111117