- CN105600176A CN105600176A CN201510676439.0A CN201510676439A CN105600176A CN 105600176 A CN105600176 A CN 105600176A CN 201510676439 A CN201510676439 A CN 201510676439A CN 105600176 A CN105600176 A CN 105600176A
- Authority
- CN
- China
- Prior art keywords
- stair
- gangboard
- handling
- landing
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The invention relates to a stair board transportation assembly which comprises stairs, stair platforms, stair boards with stair shafts, hoisting rods and fixing plates. Hoisting parts are arranged at both upper and lower ends of the hoisting rods; the fixing plates are arranged on the hoisting rods; the hoisting rods are connected with the stair boards by bolts and the fixing plates; the stair shafts are arranged on the stair boards; and the stairs and the stair platforms are mounted in the stair shafts. The stair board transportation assembly not only solves the difficult problem of carrying out combined transportation by a plurality of stair boards, but also is convenient and rapid to hoist, and is high in safety and reliability.
Description
Technical field
The present invention relates to technical field of buildings, relate in particular to a kind of combined traffic device of gangboard.
Background technology
In high-rise industrialization assembled architecture system, stair, gangboard, landing be all important component wherein itOne. In the building course of assembled architecture, often need stair prefabricated in factory, the gangboard with stair shaft, landing,Be transported to destination by means of transport from highway, railway or water route. If part of above-mentioned member is hung in to means of transport, andNeat pile, with object interval and fixing, while arriving destination, needs again part of above-mentioned member to hang out in means of transport,Because these building element weight are large, quantity is many, whole transporting and hoisting process, very trouble, and activity duration is long, workloadGreatly, also there is potential safety hazard.
Summary of the invention
The object of the invention is in order to overcome the deficiencies in the prior art, provide a kind of lifting rapidly, be convenient to transport, safety canLean on the novel gangboard fortune group that property is high.
The present invention is achieved by the following technical programs:
Gangboard fortune group, comprises stair, landing, the gangboard with stair shaft, handling bar, fixed head, the upper and lower two ends of described handling barBe equipped with handling part, described handling bar is provided with fixed head, and described handling bar is connected with gangboard by bolt, fixed head, described inGangboard is provided with stair shaft, and stair and landing are installed in described stair shaft.
Further, described stair are connected through the hinge in stair shaft one side, when installation, stair rotation can be in place.
Further, the edge of described stair is prefabricated with the bound edge of metal, and the bottom of described gangboard is provided with steel frame, described inThe movable part of hinge links together with bound edge, steel frame respectively, makes to form revolute pair between stair and gangboard and is connected, can be certainlyBy rotating.
Further, the upper and lower side of described handling bar is all provided with container angle, the installation chi of described container angleThe very little handling requirement that meets container.
The present invention has following technique effect:
The present invention is bold in innovation, and belongs to the world pioneering, by stair, landing, combine cleverly with the gangboard of stair shaft, thenBe assembled into a delivery unit by handling bar and fixed head, thoroughly solved that existing building the number of components is many, transport difficulty, fortuneThe difficult problem that defeated cost is high, not only facilitates highway and railway transport, and facilitates steamer sea-freight outlet, does not need to pack into the container.
In addition, stair of the present invention, landing are all placed in stair shaft, and stair are connected through the hinge at stair shaft edge,This combination is not only conducive to reduce whole Transporting volume, saves transport space, the most important thing is, when when construction is at gangboardIn situation about being in place, only stair need be rotated to an angle along hinge, can be in place, not need independent lifting, not needConnect with bolt, solved with front stairs and needed separately repeatedly handling, location and installation is great in constructing amount, speed of application is slow problem.
Compared with loose mail hoisting transportation, the present invention has that assembling speed is fast, lifting convenience, volume compact, take transport skyBetween little, Transport Safety is high, can save cost of transportation, improve conevying efficiency. Especially stair and building can reduce construction timeThe lifting construction amount of ladder platform, improves speed of application.
Brief description of the drawings
Fig. 1 is front view of the present invention.
Fig. 2 is top view of the present invention.
Fig. 3 is the scheme of installation of stair, landing, gangboard.
Fig. 4 is in Fig. 3Place's partial enlarged drawing.
In accompanying drawing: 1-gangboard, 2-stair, 3-landing, 4-stair shaft, 5-hinge, 6-handling bar, 7-handlingPart, 8-fixed head, 9-bound edge, 10-steel frame.
Detailed description of the invention
As Figure 1-4, a kind of gangboard 1 fortune group, comprise stair 2, landing 3, gangboard 1 with stair shaft 4, handling bar 6,Fixed head 8.
Stair 2, landing 3, gangboard 1 with stair shaft 4 can be reinforced concrete structures, can be also pure steel structure,Or steel and concrete structure. On stair 2, landing 3, gangboard 1 with stair shaft 4, be all prefabricated with modulus identical or become multiple relationConnecting hole.
Handling bar 6 adopts the section bar such as steel pipe, square steel, round steel, channel-section steel to make, and every handling bar is equipped with and hangs in two ends Shang Xia 6Fortune part 7, the handling object that described handling part 7 can be suspension ring, container angle or other structures, handling part 7 is by welding, spiral shellTie and connect or other connected modes are fixed on the top and bottom of handling bar 6. In the time that handling part 7 adopts container angle, its peaceHolding position and size should meet international container standard.
Handling bar 6 is provided with multiple connecting holes, and described connecting hole is used for mounting plate 8, described fixed head 8 one end with hangFortune bar 6 is connected, and the other end is connected with the gangboard 1 with stair shaft 4, is used for fixing gangboard 1. Gangboard 1 one end is provided with stair shaft 4, described ladderIn well 4, be provided with stair 2 and landing 3, described stair 2 are connected to stair shaft 4 one sides by hinge 5.
Landing 3 is bolted at stair shaft 4 opposite sides, meanwhile, between stair 2 and landing 3, passes through boltBe connected to each other. It should be pointed out that between landing 3 and stair shaft 4, stair 2 and landing 3 can be also by hinge 5,Rotating dog or removable pin connect.
Handling bar 6 is connected with every gangboard 1 by bolt, fixed head 8. Many gangboards 1 are arranged in parallel, and two ends are solid with boltFix on the fixed head 8 of handling bar 6, keep certain gap between gangboard 1 and gangboard 1, described gap can be used to load otherArticle and small building member. The position activity of fixed head 8 is adjustable, to adapt to the gangboard 1 of different-thickness or the need of different gapWant. It should be noted that in the time of application, between fixed head 8, handling bar 6, between gangboard 1, also can adopt welding or other connectionsFixed form.
This structure is arranged on stair 2 and landing 3 in the stair shaft 4 of gangboard 1 dexterously, and stair 2 are by hingeChain 5 is connected to stair shaft 4 one sides. As shown in Figure 4, the edge of stair 2 is prefabricated with the bound edge 9 of metal, and the bottom of gangboard 1 is provided with steel frameworkFrame 10, the movable part of hinge 5 welds together with bound edge 9, steel frame 10 respectively, makes to form revolute pair between stair 2 and gangboard 1Connect, can rotate freely. In the time of construction, when behind gangboard 1 lifting location, being connected between stair 2 and landing 3 can be torn openUnload, stair 2 natural rotations are to installing table top, and this has just omitted handling, adjusting and the installation of stair 2 in construction and has located theseStep, has greatly improved speed of application, has reduced construction cost. It should be noted that, stair 2 pass through hinge 5 with stair shaft 4 edgesThe mode connecting also can replace with other whirligigs, and as rotating dog etc., the position that hinge 5 connects also can change, and welding alsoCan with boltsly replace.
Above embodiment is explanation of the invention, and non-limiting, and more than just part is given an example. Should be noted that, rightThe technical staff of the industry, simple transformation and the improvement carried out according to general principle of the present invention and structure, includeWithin protection scope of the present invention.
Claims (4)
1. gangboard fortune group, is characterized in that: described gangboard fortune group comprise stair, landing, gangboard with stair shaft, handling bar,Fixed head, the upper and lower two ends of described handling bar are equipped with handling part, and described handling bar is provided with fixed head, and described handling bar passes through spiral shellBolt, fixed head are connected with gangboard, and described gangboard is provided with stair shaft, and stair and landing are installed in described stair shaft.
2. gangboard fortune group according to claim 1, is characterized in that: described stair are connected through the hinge in stair shaft one side,When installation, stair rotation can be in place.
3. gangboard fortune group according to claim 2, is characterized in that: the edge of described stair is prefabricated with the bound edge of metal,The bottom of described gangboard is provided with steel frame, and the movable part of described hinge links together with bound edge, steel frame respectively, make stair withBetween gangboard, form revolute pair and connect, can rotate freely.
4. gangboard fortune group according to claim 1, is characterized in that: the upper and lower side of described handling bar is all provided with containerCorner fittings, the installation dimension of described container angle meets the handling requirement of container.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510676439.0A CN105600176A (en) | 2015-10-20 | 2015-10-20 | Stair board transportation assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510676439.0A CN105600176A (en) | 2015-10-20 | 2015-10-20 | Stair board transportation assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105600176A true CN105600176A (en) | 2016-05-25 |
Family
ID=55980634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510676439.0A Pending CN105600176A (en) | 2015-10-20 | 2015-10-20 | Stair board transportation assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105600176A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2338399Y (en) * | 1998-10-28 | 1999-09-15 | 李永利 | Integral foldable light building |
CN1242460A (en) * | 1998-07-21 | 2000-01-26 | 株式会社横森制作所 | Method for building stairs and its stair-room, and support for stairs |
WO2005118980A3 (en) * | 2004-05-27 | 2006-11-02 | Richard Hayes Sr | Modular multilevel access platform and method for erecting the same |
CN101473097A (en) * | 2006-06-20 | 2009-07-01 | 约翰·克莱门特·普雷斯顿 | Stairway for use on building sites |
CN203986807U (en) * | 2014-07-29 | 2014-12-10 | 东北大学 | A kind of new-type modularization Classroom System |
CN204112696U (en) * | 2014-09-23 | 2015-01-21 | 河北亿安工程技术股份有限公司 | For the electric hoist elevator shaft platform of main building construction |
CN204357026U (en) * | 2014-12-17 | 2015-05-27 | 张跃 | A kind of concrete staircase of light weight |
-
2015
- 2015-10-20 CN CN201510676439.0A patent/CN105600176A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1242460A (en) * | 1998-07-21 | 2000-01-26 | 株式会社横森制作所 | Method for building stairs and its stair-room, and support for stairs |
CN2338399Y (en) * | 1998-10-28 | 1999-09-15 | 李永利 | Integral foldable light building |
WO2005118980A3 (en) * | 2004-05-27 | 2006-11-02 | Richard Hayes Sr | Modular multilevel access platform and method for erecting the same |
CN101473097A (en) * | 2006-06-20 | 2009-07-01 | 约翰·克莱门特·普雷斯顿 | Stairway for use on building sites |
CN203986807U (en) * | 2014-07-29 | 2014-12-10 | 东北大学 | A kind of new-type modularization Classroom System |
CN204112696U (en) * | 2014-09-23 | 2015-01-21 | 河北亿安工程技术股份有限公司 | For the electric hoist elevator shaft platform of main building construction |
CN204357026U (en) * | 2014-12-17 | 2015-05-27 | 张跃 | A kind of concrete staircase of light weight |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103031978B (en) | The auxiliary mounting system vertical for iron tower of power transmission line group and method for assembling thereof | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
KR101928614B1 (en) | Overhead conveying device having column gantries | |
CN201038657Y (en) | Transmission line iron tower climbing machine | |
EP2834183A1 (en) | Bridge crane assembly and a method for installing the same | |
CN102259800A (en) | Lattice boom mast crane and lattice boom mast suspender, has side parts arranged at articulation part, and zone at two or multiple branches and directly or indirectly arranged at articulation part and/or directly or indirectly to side parts | |
CN203113883U (en) | Auxiliary installation system for assembling tower by helicopter | |
CN203715054U (en) | 3,000t combinable lifting balance beam | |
CN105071298A (en) | Foldable operation platform for manned operation on high-voltage lines | |
CN101967902B (en) | Basic guide rail for helicopter assembly transmission line iron tower leg section | |
CN105600176A (en) | Stair board transportation assembly | |
CN202577926U (en) | Fixed operating platform for elevator shaft | |
CN101967903A (en) | Basic guide rail for helicopter assembly transmission line iron tower leg section | |
CN205204600U (en) | Mainboard fortune group | |
CN101139813A (en) | Steel truss of through bridge | |
CN205046488U (en) | Simple and easy work platform of truss -like based on bridge maintenance | |
CN209939173U (en) | Shale gas fracturing continuous automatic sand conveying device | |
CN208068242U (en) | A kind of detachable precast wall body piling bin | |
CN105253457A (en) | Window wall conveying unit | |
CN202785248U (en) | Basket device special for truck crane | |
CN206205768U (en) | Combined type hangs cat ladder | |
CN105253765A (en) | Main board conveying unit | |
CN108104133A (en) | A kind of purlin that can be recycled | |
CN211733634U (en) | Combined roof hoisting weight frame and connecting mechanism comprising same | |
CN201802119U (en) | Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |