CN108842807A - A kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type - Google Patents

A kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type Download PDF

Info

Publication number
CN108842807A
CN108842807A CN201810698964.6A CN201810698964A CN108842807A CN 108842807 A CN108842807 A CN 108842807A CN 201810698964 A CN201810698964 A CN 201810698964A CN 108842807 A CN108842807 A CN 108842807A
Authority
CN
China
Prior art keywords
steel
pile
casting
pipe
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810698964.6A
Other languages
Chinese (zh)
Other versions
CN108842807B (en
Inventor
熊汉东
庞双喜
黄桥兴
戴其其
林志航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Third Aviation Bureau Sixth Engineering Xiamen Co ltd
CCCC Third Harbor Engineering Co Ltd
CCCC Third Harbor Engineering Co Ltd Xiamen Branch
Original Assignee
In Sanhang (xiamen) Engineering Co Ltd
China Construction Third Engineering Bureau Co Ltd
CCCC Third Harbor Engineering Co Ltd Xiamen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In Sanhang (xiamen) Engineering Co Ltd, China Construction Third Engineering Bureau Co Ltd, CCCC Third Harbor Engineering Co Ltd Xiamen Branch filed Critical In Sanhang (xiamen) Engineering Co Ltd
Priority to CN201810698964.6A priority Critical patent/CN108842807B/en
Publication of CN108842807A publication Critical patent/CN108842807A/en
Application granted granted Critical
Publication of CN108842807B publication Critical patent/CN108842807B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of construction technologies of the embedding rock single pile of offshore wind power foundation embedded type, including following below scheme:Steel-pipe pile and steel pile casting production, the inserting of steady stake putting up platform, steel pile casting, steel pile casting vibration set, drill, the implantation of borehole cleaning, steel-pipe pile, back cover concrete placings, the rockfill grouting of stake outer wall and recycles steel pile casting;Drilling process includes drilling machine in place, installation drilling rod, slurrying and drilling and forming hole step;Before the drilling and forming hole step for completing drilling process, in order to prevent collapse hole, advanced horizontal high voltage jet grouting pile construction;Construction of High Pressure Jet Grouting Pile includes drilling, lower injection pipe, injection, pile process.Construction technology of the invention, using steady stake platform auxiliary positioning, embedding rock construction is carried out using steel pile casting, it hangs ship using main and auxiliary hang ship cooperation and steel-pipe pile is lifted by crane and be inserted into steel pile casting, it can be improved construction efficiency, the horizontal resistivity and anti-group of ability for effectively improving embedded rock pile, meet the requirement of Structural Design and construction.

Description

A kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type
Technical field
The present invention relates to a kind of construction technologies of the embedding rock single pile of offshore wind power foundation embedded type.
Background technique
Wind power plant basic engineering field at sea, according to different earth formation and characteristic, and according to each rock-soil layer origin cause of formation Type and engineering characteristic carry out comprehensive division, and the single-pile foundation generallyd use includes non-embedding rock single pile, embedding rock single pile and embedded type Embedding rock single pile.The construction of pile foundation is the leading engineering of offshore wind farm project, and for separate land and the depth of water is up to 16m~19m's Off-lying sea carries out the construction of offshore wind farm without shielding region, due to the constraint by natural conditions such as meteorology, trend, waves, and is in Take place frequently region and Fan Equipment of tropical storm has very high requirement to the carrying on basis, withdrawal resistance, deformation, it is therefore desirable to Pile foundation diameter is big, embedded depth is deep, so that blower foundation can bear huge blower tilting moment and bear wave, water flow lotus Load effect, there are also be exactly construction speed duration control it is particularly critical.
Summary of the invention
A kind of embedding rock list of offshore wind power foundation embedded type is provided it is an object of the invention to overcome the deficiencies of existing technologies The construction technology of stake, it can be improved construction efficiency, effectively improves the horizontal resistivity and anti-group of ability of embedded rock pile, meets work The requirement of journey structure design and construction.
The object of the present invention is achieved like this:Involved by a kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type And single pile using diameter 6.7m, 60~80mm of wall thickness steel-pipe pile, squeeze into cataclastic shape strong weathered granite, total embedded depth For 22.9~27.6m, height of pile top 15m, stake bottom about -43~-46m of absolute altitude;
Construction technology of the invention includes following below scheme:Steel-pipe pile and steel pile casting production, steady stake putting up platform, steel pile casting are inserted Dress, steel pile casting vibration set, drill, the implantation of borehole cleaning, steel-pipe pile, back cover concrete placings, the rockfill grouting of stake outer wall and recycle steel pile casting;Its In,
The steel-pipe pile and steel pile casting production process include tube coupling blanking, tube coupling retaining wall on slope, tube coupling roll-forming, pile body Top flange assembly, pile body splicing and corrosion-inhibiting coating coating step;
The steady stake putting up platform process includes the following steps:
1. steady stake platform includes upper and lower platform, four auxiliary process stakes, two positioning process stakes and a set of positioning system; Lower platform and four auxiliary process stakes are positioned by steel-pipe pile relative position at the Longkou of locating platform ship and lower platform, then The inserting piling of four auxiliary process stakes is carried out, then leads to auxiliary process stake and the auxiliary process pipe casing upper and lower part on lower platform Cross steel plate strip firm welding;
2. first removing locating platform ship, then two positioning process stakes of inserting piling, then will be in positioning process stake and lower platform Positioning process pipe casing upper and lower part passes through steel plate strip firm welding;
3. installing upper mounting plate after steel pile casting inserting process;
The steel pile casting inserting process includes the following steps:
1. the lower platform of steady stake platform is processed into guiding body panel, the center for being oriented to body panel is in steel-pipe pile The heart;
2. lifting lug is arranged at 2m below steel pile casting top surface, hangs ship using auxiliary and lift by crane steel pile casting;Steel pile casting is hung by auxiliary Ship is lifted to guiding body panel and slowly falls into, and stops sinking when lower platform of the steel pile casting by guiding body panel, using two Platform horizontal ruler measures the verticality of steel pile casting, after verticality meets the requirements, passes through hydraulic jack in the bottom of guiding body panel It holds tightly, then slowly sinks;
3. when steel pile casting is drowned into mud face intersection, the verticality of measurement review steel pile casting meets the requirements and is further continued for down It is sink to stabilization, then is covered using hydraulic four-axle linkage vibration hammer at the top of steel pile casting, lifts by crane hydraulic four-axle linkage vibration hammer with the auxiliary ship that hangs, It carries out vibration dip to steel pile casting to set, the used in-degree to steel pile casting, which reaches, stops hammer standard, stops the verticality of hammer review steel pile casting, meets Design requirement reinforces steel pile casting and the connection for being oriented to body panel again;
The drilling process includes drilling machine in place, installation drilling rod, slurrying and drilling and forming hole step;
When carrying out drilling machine step in place, hydraulic four-axle linkage vibration hammer is first hung, then set up drilling machine, is bored using hobboing cutter is configured with The gas lift reverse circulation hydraulic power drilling machine of head is locked drilling machine and steel pile casting by pile gripper;
When carrying out installation drilling rod step, drill bit, drilling rod are installed to drilling machine after assembly well on the main deck for hanging ship again On;
Carry out slurrying step when, slurry coat method using do not disperse, low solid phase, highly viscous PHP high performance slurry, first Bentonite slurry is stirred using slurry mixer in mud pit, is then pumped in steel pile casting using slush pump, works as steel pile casting Aperture is crept into after interior mud property index meets construction requirement;
Carry out drilling and forming hole step when, drilling machine starting drilling when, bore diameter is ascending, top loosely soil layer when bore Aperture, bore diameter should be 200mm or more smaller than the internal diameter of steel-pipe pile, and bore diameter should be expanded by encountering the hard lithosphere in lower part, Bore diameter is 100mm~200mm bigger than the internal diameter of steel-pipe pile;
When carrying out the borehole cleaning process, by drilling tool lifting extremely from 30~50cm of bottom hole, slow rotary tools, and supplement high-quality Mud carries out reacting cycle borehole cleaning, while head in retaining hole, prevents collapse hole;
When carrying out steel-pipe pile implantation process, drilling machine is first removed, ship is hung using main and auxiliary hangs by the way of ship cooperates and lift Steel-pipe pile is refuted into upper lifting and soldier piles from pile transport, and ship is hung by master, steel-pipe pile is put into steel pile casting, then passes through positioning system System positions steel-pipe pile to the pile center position of steel pile casting, then holds steel-pipe pile tightly using the jack on lower platform, confirms steel pipe The centre deviation of stake in error, and the verticality for checking steel-pipe pile meet the requirements after hang ship using main and slowly transfer steel-pipe pile, Until steel-pipe pile stops sinking, hydraulic pile hammer is then set at the top of steel-pipe pile, it is hydraulic to beat after steel-pipe pile is sink to certainly and stablizes The small energy of pile monkey slowly hammers stake top tooling flange, and the hit energy of hydraulic pile hammer is ascending, until steel-pipe pile arrival is set Count bottom absolute altitude;
When carrying out the back cover concrete placings process, back cover height is 1.5m, using C40 non-dispersible underwater concrete, and is adopted Three point perfusions, including conduit installation, secondary pile hole cleaning, underwater concreting and strike-on step are carried out with vertical conduit method;
When carrying out the stake outer wall rockfill grouting process, i.e., it is in the milk between the bottom outer wall of steel-pipe pile and ground;
When carrying out the recycling steel pile casting process, steel pile casting is extracted by hydraulic four-axle linkage vibration hammer.
The construction technology of the embedding rock single pile of above-mentioned offshore wind power foundation embedded type, wherein complete the brill of the drilling process Into before pore formation step, in order to prevent collapse hole, advanced horizontal high voltage jet grouting pile construction;Construction of High Pressure Jet Grouting Pile includes drilling, lower injection Pipe, injection, pile process;Drill internal diameter Φ 600mm, and the inner wall 300mm along internal diameter Φ 750mm steel pile casting is circumferentially disposed, adjacent Hole overlaps 100mm;When whirl spraying, injection pressure is 0.6~0.8MPa, and injection flow is 0.8~1.2m3/min;Injection pipe is promoted Speed is 10~15cm/min, and injection pipe revolving speed is 10~15r/min.
The construction technology of the embedding rock single pile of above-mentioned offshore wind power foundation embedded type, wherein carrying out the steel-pipe pile implantation When process, stake top tooling flange should be installed at the top of steel-pipe pile, stake top tooling flange is L tee section structure, by coupling spiral shell Bolt is fitted closely with stake top flange and is connect.
The construction technology of the embedding rock single pile of above-mentioned offshore wind power foundation embedded type, wherein the back cover concrete placings process When conduit installation steps, job platform first is set up at the top of the steel-pipe pile, three internal diameters are installed on the job platform is The conduit of 300mm and the grouting hopper being connect with three with the top of three conduits;Three conduits are in their line of centres The mode of equilateral triangle is arranged in stake holes, and the long flow radius 2.5 for being equal to concrete of each edge of equilateral triangle~ 4.0m, the bottom end of every conduit are 30~50cm apart from stake holes bottom;When carrying out secondary pile hole cleaning step, first by air hose tripping in conduit Interior, air hose top is connected by special joint with the tracheae of air compressor machine, and special joint is connect with conduit;Then conduit is mentioned Certain altitude is played, which determined according to the precipitating thickness at stake holes bottom, and air compressor machine gas supply is then turned on, and gas lift reverse circulation is normal Afterwards, conduit is slowly transferred in circulation, until conduit is transferred to stake holes bottom, sand content is met the requirements in mud to be discharged, i.e., Stake holes bottom sediment is removed clean;When carrying out underwater concreting step, it is pumped in conduit after live mixing concrete, from hole Bottom up pours;When carrying out strike-on step, steel-pipe pile is struck to designed elevation before concrete initial set using hydraulic pile hammer.
The construction technology of the embedding rock single pile of above-mentioned offshore wind power foundation embedded type, wherein carry out the stake outer wall backfill and fill When starching process, four sets of grouting systems are set, and every set grouting system includes four Grouting Pipes and four return pipes;When slip casting first Slip casting is carried out to stake end grouting system, blocks return pipe when return pipe pulp, slip casting is continued to Grouting Pipe, until reaching volume Grouting pressure is determined, after flow rate of grouting is less than 2L/min and maintains 0.5h under specified grouting pressure, or during slip casting suddenly When there is the case where flow rate of grouting increases, grouting pressure is die-offed, stops slip casting and block grouting port.
The construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention is adopted using steady stake platform auxiliary positioning Carry out embedding rock construction with steel pile casting, using it is main hang ship and it is auxiliary hang ship cooperation steel-pipe pile lift by crane to and is inserted into steel pile casting, can be efficient complete At piling construction, it is also equipped with adaptable hammering equipment and drilling device, the posture of monitored over time and adjustment steel-pipe pile, to guarantee Single pile is smooth and is vertically driven into marine rock layer, while taking specific aim measure, and hole wall is kept to stablize, pre- preventing sticking, The appearance of the unusual conditions such as burying not only ensure that the bearing capacity of embedding rock single pile and the stability of pile body, also effectively increase and apply Work efficiency rate, and the horizontal resistivity and anti-group of ability of embedded rock pile are effectively improved, meet Structural Design and construction It is required that.
Detailed description of the invention
Fig. 1 is the flow chart of the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention;
Fig. 2 a is the master for the steady stake platform that the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention uses View;
Fig. 2 b is the floor map of the upper platform in the lower platform of steady stake platform of the invention;
Fig. 2 c is the floor map of lower layer's platform in the lower platform of steady stake platform of the invention;
Fig. 3 is that the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention is carrying out steel-pipe pile implantation process When state diagram;
Fig. 4 is that the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention is carrying out back cover concrete placings process The structural schematic diagram of the grouting system of Shi Caiyong;
Fig. 5 is that the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention is carrying out back cover concrete placings process When conduit layout drawing;
Fig. 6 is that the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention is carrying out the rockfill grouting of stake outer wall The schematic diagram at grouting position when process.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings.
Please refer to Fig. 1 to Fig. 6, list involved in the construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention Stake is squeezed into cataclastic shape strong weathered granite, total embedded depth is 22.9 using the steel-pipe pile of diameter 6.7m, 60~80mm of wall thickness ~27.6m, height of pile top 15m, stake bottom about -43~-46m of absolute altitude.
The construction technology of the embedding rock single pile of offshore wind power foundation embedded type of the invention includes following below scheme:Steel-pipe pile and steel shield Cylinder production, the inserting of steady stake putting up platform, steel pile casting, steel pile casting vibration sets, drills, borehole cleaning, steel-pipe pile are implanted into, back cover concrete placings, stake Outer wall rockfill grouting and recycling steel pile casting.
Steel-pipe pile and steel pile casting production process include tube coupling blanking, tube coupling retaining wall on slope, tube coupling roll-forming, pile body top Flange assembly, pile body splicing and corrosion-inhibiting coating coating step.
Steady stake platform 10 includes upper mounting plate 12, the auxiliary process stake 13, two of lower platform 11, four positioning process stake 14, outer Longkou beam 15 and a set of positioning system being made of 12 100T jack 20;Lower platform 11 is by upper platform 111 and lower layer Platform 112 is constituted, and arranges seven jack 20 around Longkou on upper platform 111, lower layer's platform 112 is around Longkou and and upper layer Seven jack 20 on platform 111 arrange five jack 20 with being staggered;Outer Longkou beam 15 is pacified after steel-pipe pile 100 enters Longkou Mounted in the Longkou of upper platform 111 (see Fig. 2 a to Fig. 2 c).
Steady stake putting up platform process includes the following steps:
1. steady stake platform includes upper and lower platform, four auxiliary process stakes, two positioning process stakes and a set of by 12 100T The positioning system of jack composition;Lower platform and four auxiliary process stakes pass through steel pipe at the Longkou of locating platform ship and lower platform Stake relative position is positioned, then carries out the inserting piling of four auxiliary process stakes, then by auxiliary process stake with it is auxiliary on lower platform Assistant engineer skill pipe casing upper and lower part passes through steel plate strip firm welding;
2. first removing locating platform ship, then two positioning process stakes of inserting piling, then will be in positioning process stake and lower platform Positioning process pipe casing upper and lower part passes through steel plate strip firm welding;
3. upper mounting plate is installed after steel pile casting inserting process, to carry out embedding rock construction.
Steel pile casting inserting process includes the following steps:
1. the lower platform of steady stake platform is processed into guiding body panel, the center for being oriented to body panel is in steel-pipe pile The heart;
2. lifting lug is arranged at 2m below steel pile casting top surface, hangs ship using auxiliary and lift by crane steel pile casting;Steel pile casting is hung by auxiliary Ship is lifted to guiding body panel and slowly falls into, and stops sinking when lower platform of the steel pile casting by guiding body panel, using two Platform horizontal ruler measures the verticality of steel pile casting, after verticality meets the requirements, passes through hydraulic jack in the bottom of guiding body panel It holds tightly, then slowly sinks;
3. when steel pile casting is drowned into mud face intersection, the verticality of measurement review steel pile casting meets the requirements and is further continued for down It is sink to stabilization, then is covered using hydraulic four-axle linkage vibration hammer at the top of steel pile casting, lifts by crane hydraulic four-axle linkage vibration hammer with the auxiliary ship that hangs, It carries out vibration dip to steel pile casting to set, the used in-degree to steel pile casting, which reaches, stops hammer standard, stops the verticality of hammer review steel pile casting, meets Design requirement reinforces steel pile casting and the connection for being oriented to body panel again.
Drilling process includes drilling machine in place, installation drilling rod, slurrying and drilling and forming hole step;
When carrying out drilling machine step in place, hydraulic four-axle linkage vibration hammer is first hung, then set up drilling machine, is bored using hobboing cutter is configured with The gas lift reverse circulation hydraulic power drilling machine of head is locked drilling machine and steel pile casting by pile gripper, and guarantee drill bit of drilling machine center and On same plumb line, deviation is not greater than 10cm at the center of steel pile casting;
When carrying out installation drilling rod step, when rough drill, drill bit is made of heavy balancer and stem;Drill bit, drilling rod are equal It is installed on drilling machine again after assembly is good on the main deck for hanging ship, in drilling process, the second section drilling rod and subsequent drilling rod are direct It is installed on the main platform for hanging ship;
Carry out slurrying step when, slurry coat method using do not disperse, low solid phase, highly viscous PHP high performance slurry, first Bentonite slurry is stirred using slurry mixer in mud pit, is then pumped in steel pile casting using slush pump, works as steel pile casting Aperture is crept into after interior mud property index meets construction requirement;
Carry out drilling and forming hole step when, using mud off, at the same should the moisturizing into steel pile casting in time, keep steel pile casting in Outer head difference;Drilling machine starting drilling when, bore diameter is ascending, top loosely soil layer when bore aperture, bore diameter should compare The small 200mm or more of the internal diameter of steel-pipe pile, to guarantee the vertical bearing capacity of steel pile casting, encountering the hard lithosphere in lower part should expand Bore diameter, bore diameter are 100mm~200mm bigger than the internal diameter of steel-pipe pile;
Before carrying out drilling and forming hole step, in order to prevent collapse hole, advanced horizontal high voltage jet grouting pile construction, Construction of High Pressure Jet Grouting Pile Including drilling, lower injection pipe, injection, pile process;Drill internal diameter Φ 600mm, along the inner wall of internal diameter Φ 750mm steel pile casting 300mm is circumferentially disposed, and adjacent holes overlap 100mm;When whirl spraying, injection pressure be 0.6~0.8MPa, injection flow be 0.8~ 1.2m3/min;It is 10~15cm/min that injection pipe, which promotes speed, and injection pipe revolving speed is 10~15r/min.
When carrying out borehole cleaning process, by drilling tool lifting extremely from 30~50cm of bottom hole, slow rotary tools, and high-quality mud is supplemented Slurry carries out reacting cycle borehole cleaning, while head in retaining hole, prevents collapse hole;
When carrying out steel-pipe pile implantation process, steel pile casting internal drilling and borehole cleaning to designed elevation, and after the completion of whole hole is checked and accepted Shut down in time and remove drilling rod, first remove drilling machine, it is main hang ship and it is auxiliary hang that ship is in place, hang ship and the auxiliary side hanging ship cooperation and lifting using main Steel-pipe pile is refuted upper lifting and soldier piles from pile transport by formula, and master hangs ship and connect with the main lifting lug on steel-pipe pile top, auxiliary to hang ship and steel-pipe pile The turn lifting lug of lower part connects, and hangs ship by master and steel-pipe pile is put into steel pile casting, then positions steel-pipe pile 100 to steel and protects The pile center position of cylinder 300, then steel-pipe pile is held tightly using the jack on lower platform, confirm the centre deviation of steel-pipe pile in error It is interior, and the verticality for checking steel-pipe pile meet the requirements after hang ship using main and slowly transfer steel-pipe pile, until steel-pipe pile stops sinking, Then hydraulic pile hammer is set at the top of steel-pipe pile, after steel-pipe pile is sink to certainly and stablizes, the small energy of hydraulic pile hammer is slowly hammered Stake top tooling flange, stake top tooling flange are L tee section structure, are fitted closely and are connect with stake top flange by attachment bolt, made Hydraulic pile hammer hammers on stake top tooling flange, to protect stake top flange to be damaged when beating;Hydraulic pile hammer is hit It is ascending to beat energy, until steel-pipe pile reaches design bottom absolute altitude;Pile body verticality is paid close attention in pile driving process, it is ensured that steel pipe The verticality of stake is within 3 ‰ (see Fig. 3);
When carrying out back cover concrete placings process, back cover height is 1.5m, using C40 non-dispersible underwater concrete, and using vertical Straight catheter method carries out three point perfusions, including conduit installation, secondary pile hole cleaning, underwater concreting and strike-on step;
When conduit installation steps, job platform is first set up at the top of steel-pipe pile, is installed in three on the job platform Diameter be 300mm conduit 30 and with three and the sequentially connected grouting interior hopper 31 in the top of three conduits 30 and outer hopper 32 (see Fig. 4 and Fig. 5);Three conduits 30 are arranged in stake holes in their line of centres mode in equilateral triangle, and equilateral three Long 2.5~the 4.0m of flow radius for being equal to concrete of angular each edge, the bottom end of every conduit 30 apart from stake holes bottom be 30~ 50cm;
When carrying out secondary pile hole cleaning step, first by air hose tripping in conduit, air hose top passes through special joint and air compressor machine Tracheae connects, and special joint is connect with conduit;Then conduit is lifted into certain altitude, which is according to the heavy of stake holes bottom Shallow lake thickness determines, is then turned on air compressor machine gas supply, after gas lift reverse circulation is normal, conduit is slowly transferred in circulation, until conduit Decentralization is to stake holes bottom, and sand content is met the requirements in mud to be discharged, i.e., stake holes bottom sediment is removed clean;
When carrying out underwater concreting step, it is pumped in conduit after live mixing concrete, is up poured from bottom hole;
When carrying out strike-on step, steel-pipe pile is struck to designed elevation before concrete initial set using vibration hammer.
When carrying out stake outer wall rockfill grouting process, i.e., be in the milk between the bottom outer wall and ground of steel-pipe pile 100 (see Fig. 6);Four sets of grouting systems are set, and every set grouting system includes four Grouting Pipes and four return pipes;First to stake when slip casting The grouting system of end carries out slip casting, blocks return pipe when return pipe pulp, continues slip casting to Grouting Pipe, until reaching specified Grouting pressure, flow rate of grouting goes out suddenly less than 2L/min and after maintaining 0.5h, or during slip casting under specified grouting pressure When the case where existing flow rate of grouting increases, grouting pressure is die-offed, stops slip casting and block grouting port.
The construction technology of offshore wind power foundation embedded type embedded rock pile of the invention is used using steady stake platform auxiliary positioning Steel pile casting carries out embedding rock construction, using it is main hang ship and it is auxiliary hang ship cooperation steel-pipe pile lifted by crane to and is inserted into steel pile casting, can efficiently complete Piling construction is also equipped with adaptable hammering equipment and drilling device, the posture of monitored over time and adjustment steel-pipe pile, to guarantee list Stake is smooth and is vertically driven into marine rock layer, while taking specific aim measure, and hole wall is kept to stablize, and pre- preventing sticking buries The appearance of the unusual conditions such as brill, not only ensure that the bearing capacity of non-embedding rock single pile and the stability of pile body, also effectively increases and apply Work efficiency rate, and the horizontal resistivity and anti-group of ability of embedded rock pile are effectively improved, meet Structural Design and construction It is required that.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or modification, therefore all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (5)

1. a kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type, single pile uses diameter 6.7m, 60~80mm of wall thickness Steel-pipe pile, squeeze into cataclastic shape strong weathered granite, total embedded depth is 22.9~27.6m, height of pile top 15m, stake bottom About -43~-46m of absolute altitude;The construction technology includes following below scheme:Steel-pipe pile and steel pile casting production, steady stake putting up platform, steel shield Cylinder inserting, steel pile casting vibration sets, drills, the implantation of borehole cleaning, steel-pipe pile, back cover concrete placings, the rockfill grouting of stake outer wall and recycle steel pile casting; It is characterized in that,
The steel-pipe pile and steel pile casting production process include tube coupling blanking, tube coupling retaining wall on slope, tube coupling roll-forming, pile body top Flange assembly, pile body splicing and corrosion-inhibiting coating coating step;
The steady stake putting up platform process includes the following steps:
1. steady stake platform includes upper and lower platform, four auxiliary process stakes, two positioning process stakes and a set of positioning system;It is lower flat Platform and four auxiliary process stakes are positioned by steel-pipe pile relative position at the Longkou of locating platform ship and lower platform, then are carried out Then auxiliary process pipe casing upper and lower part in auxiliary process stake and lower platform is passed through steel by the inserting piling of four auxiliary process stakes Lath firm welding;
2. first removing locating platform ship, then two positioning process stakes of inserting piling, then by the positioning on positioning process stake and lower platform Technique pipe casing upper and lower part passes through steel plate strip firm welding;
3. installing upper mounting plate after steel pile casting inserting process;
The steel pile casting inserting process includes the following steps:
1. the lower platform of steady stake platform is processed into guiding body panel, the center for being oriented to body panel is the center of steel-pipe pile;
2. lifting lug is arranged at 2m below steel pile casting top surface, hangs ship using auxiliary and lift by crane steel pile casting;Steel pile casting is risen by the auxiliary ship that hangs It is hung to guiding body panel and slowly falls into, stop sinking when lower platform of the steel pile casting by guiding body panel, using two water Leveling ruler measures the verticality of steel pile casting, after verticality meets the requirements, is held tightly in the bottom of guiding body panel by hydraulic jack, Slowly sink again;
3. when steel pile casting is drowned into mud face intersection, the verticality of measurement review steel pile casting meets the requirements and is further continued for sinking down into Stablize, then covered using hydraulic four-axle linkage vibration hammer at the top of steel pile casting, hydraulic four-axle linkage vibration hammer is lifted by crane with the auxiliary ship that hangs, to steel Casing carries out vibration dip and sets, and the used in-degree to steel pile casting, which reaches, stops hammer standard, stops the verticality of hammer review steel pile casting, meets design It is required that reinforcing steel pile casting again and being oriented to the connection of body panel;
The drilling process includes drilling machine in place, installation drilling rod, slurrying and drilling and forming hole step;
When carrying out drilling machine step in place, hydraulic four-axle linkage vibration hammer is first hung, then set up drilling machine, using being configured with roller cutter bit Gas lift reverse circulation hydraulic power drilling machine is locked drilling machine and steel pile casting by pile gripper;
When carrying out installation drilling rod step, drill bit, drilling rod are installed on drilling machine after assembly well on the main deck for hanging ship again;
Carry out slurrying step when, slurry coat method using do not disperse, low solid phase, highly viscous PHP high performance slurry, first in mud Bentonite slurry is stirred using slurry mixer in stock tank, is then pumped in steel pile casting using slush pump, when in steel pile casting Aperture is crept into after mud property index meets construction requirement;
Carry out drilling and forming hole step when, drilling machine starting drilling when, bore diameter is ascending, top loosely soil layer when bore it is small Hole, bore diameter should be 200mm or more smaller than the internal diameter of steel-pipe pile, and bore diameter should be expanded by encountering the hard lithosphere in lower part, bore Bore dia is 100mm~200mm bigger than the internal diameter of steel-pipe pile;
When carrying out the borehole cleaning process, by drilling tool lifting extremely from 30~50cm of bottom hole, slow rotary tools, and high-quality mud is supplemented Slurry carries out reacting cycle borehole cleaning, while head in retaining hole, prevents collapse hole;
When carrying out steel-pipe pile implantation process, first remove drilling machine, using it is main hang ship and it is auxiliary hang ship cooperate lift by the way of by steel Tubular pole refutes upper lifting and soldier piles from pile transport, and hangs ship by master and steel-pipe pile is put into steel pile casting, then will by positioning system Steel-pipe pile is positioned to the pile center position of steel pile casting, then holds steel-pipe pile tightly using the jack on lower platform, confirms steel-pipe pile Centre deviation in error, and the verticality for checking steel-pipe pile meet the requirements after hang ship using main and slowly transfer steel-pipe pile, until Steel-pipe pile stops sinking, and hydraulic pile hammer is then set at the top of steel-pipe pile, after steel-pipe pile is sink to certainly and stablizes, hydraulic pile hammer Small energy slowly hammers stake top tooling flange, and the hit energy of hydraulic pile hammer is ascending, until steel-pipe pile reaches design bottom Absolute altitude;
When carrying out the back cover concrete placings process, back cover height is 1.5m, using C40 non-dispersible underwater concrete, and using vertical Straight catheter method carries out three point perfusions, including conduit installation, secondary pile hole cleaning, underwater concreting and strike-on step;
When carrying out the stake outer wall rockfill grouting process, i.e., it is in the milk between the bottom outer wall of steel-pipe pile and ground;
When carrying out the recycling steel pile casting process, steel pile casting is extracted by hydraulic four-axle linkage vibration hammer.
2. the construction technology of the embedding rock single pile of offshore wind power foundation embedded type according to claim 1, which is characterized in that complete Before the drilling and forming hole step of the drilling process, in order to prevent collapse hole, advanced horizontal high voltage jet grouting pile construction;Construction of High Pressure Jet Grouting Pile Including drilling, lower injection pipe, injection, pile process;Drill internal diameter Φ 600mm, along the inner wall of internal diameter Φ 750mm steel pile casting 300mm is circumferentially disposed, and adjacent holes overlap 100mm;When whirl spraying, injection pressure be 0.6~0.8MPa, injection flow be 0.8~ 1.2m3/min;It is 10~15cm/min that injection pipe, which promotes speed, and injection pipe revolving speed is 10~15r/min.
3. the construction technology of the embedding rock single pile of offshore wind power foundation embedded type according to claim 1, which is characterized in that into When the row steel-pipe pile is implanted into process, stake top tooling flange should be installed at the top of steel-pipe pile, stake top tooling flange is L tee section Structure is fitted closely with stake top flange by attachment bolt and is connect.
4. the construction technology of the embedding rock single pile of offshore wind power foundation embedded type according to claim 1, which is characterized in that described When the conduit installation steps of back cover concrete placings process, job platform first is set up at the top of the steel-pipe pile, in the job platform It is upper that the conduit and the grouting hopper connecting with three with the top of three conduits that three internal diameters are 300mm are installed;Three conduits with The mode that their line of centres is in equilateral triangle is arranged in stake holes, and each edge length of equilateral triangle is equal to concrete 2.5~4.0m of flow radius, the bottom end of every conduit are 30~50cm apart from stake holes bottom;When carrying out secondary pile hole cleaning step, first will In air hose tripping in conduit, air hose top is connected by special joint with the tracheae of air compressor machine, and special joint is connect with conduit; Then conduit is lifted into certain altitude, which determined according to the precipitating thickness at stake holes bottom, and air compressor machine gas supply, gas are then turned on Lift reacting cycle it is normal after, slowly transfer conduit in circulation, until conduit is transferred to stake holes bottom, sand content in mud to be discharged It meets the requirements, i.e., stake holes bottom sediment is removed clean;When carrying out underwater concreting step, it is pumped to after live mixing concrete In conduit, up poured from bottom hole;When carrying out strike-on step, steel-pipe pile is struck before concrete initial set using hydraulic pile hammer To designed elevation.
5. the construction technology of the embedding rock single pile of offshore wind power foundation embedded type according to claim 1, which is characterized in that carry out When the stake outer wall rockfill grouting process, four sets of grouting systems are set, and every set grouting system includes four Grouting Pipes and four Return pipe;When slip casting first to stake end grouting system carry out slip casting, block return pipe when return pipe pulp, to Grouting Pipe after Continuous slip casting, until reach specified grouting pressure, after flow rate of grouting is less than 2L/min and maintains 0.5h under specified grouting pressure, or When occurring the case where flow rate of grouting increases, grouting pressure is die-offed suddenly during slip casting, stops slip casting and block grouting port.
CN201810698964.6A 2018-06-29 2018-06-29 Construction process of offshore wind power foundation implanted rock-socketed single pile Active CN108842807B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810698964.6A CN108842807B (en) 2018-06-29 2018-06-29 Construction process of offshore wind power foundation implanted rock-socketed single pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810698964.6A CN108842807B (en) 2018-06-29 2018-06-29 Construction process of offshore wind power foundation implanted rock-socketed single pile

Publications (2)

Publication Number Publication Date
CN108842807A true CN108842807A (en) 2018-11-20
CN108842807B CN108842807B (en) 2020-07-31

Family

ID=64199873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810698964.6A Active CN108842807B (en) 2018-06-29 2018-06-29 Construction process of offshore wind power foundation implanted rock-socketed single pile

Country Status (1)

Country Link
CN (1) CN108842807B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930605A (en) * 2019-02-25 2019-06-25 上海智平基础工程有限公司 A kind of method that pile foundation construction removes sediment
CN110130343A (en) * 2019-05-09 2019-08-16 中铁四局集团第二工程有限公司 Steel casing planting construction method suitable for deep water bare rock condition
CN110777780A (en) * 2019-10-25 2020-02-11 天津大学 Concrete pipe pile offshore pile sinking construction method
CN111058439A (en) * 2019-12-23 2020-04-24 青岛森建基础工程有限公司 Construction method of immersed tube rock-socketed cast-in-place pile
CN111236215A (en) * 2020-02-13 2020-06-05 中交第三航务工程局有限公司 Rock-socketed construction process of large-diameter steel pipe inclined pile of offshore wind power high-rise pile cap foundation
CN112900479A (en) * 2021-01-27 2021-06-04 中交第三航务工程局有限公司宁波分公司 Construction method of implanted single-pile foundation of ocean tidal current energy generator set
CN113957900A (en) * 2021-09-26 2022-01-21 广东华蕴海上风电科技有限公司 Grouting and bottoming implementation method for large-diameter rock-socketed single pile
CN114370041A (en) * 2021-12-30 2022-04-19 中国能源建设集团广东省电力设计研究院有限公司 Basic platform of offshore converter station
CN114482110A (en) * 2021-12-29 2022-05-13 湖南省正邦建设工程有限公司 Steel casing group pile concrete expanded foundation construction device and construction method
CN114837178A (en) * 2022-06-09 2022-08-02 上海博强重工集团有限公司 Installation method of wind power foundation pile
CN114892646A (en) * 2022-06-16 2022-08-12 深圳市市政工程总公司 Construction method for rotary excavation bored pile in cofferdam
CN114960635A (en) * 2022-06-09 2022-08-30 中交第二航务工程勘察设计院有限公司 Implanted steel pipe pile self-anchoring structure and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100232878A1 (en) * 2009-03-10 2010-09-16 Vitaly Boris Feygin Universal Framed Cofferdam
CN103924585A (en) * 2014-05-06 2014-07-16 江苏蓝潮海洋风电工程建设有限公司 Novel method for constructing wind power rock-embedded pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100232878A1 (en) * 2009-03-10 2010-09-16 Vitaly Boris Feygin Universal Framed Cofferdam
CN103924585A (en) * 2014-05-06 2014-07-16 江苏蓝潮海洋风电工程建设有限公司 Novel method for constructing wind power rock-embedded pile

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
张跃辉: "超大直径钢管桩近海施工关键技术", 《中国港湾建设》 *
朱立群: "高压旋喷桩在钻孔桩塌孔与串孔漏浆处理中的应用", 《价值工程》 *
李志义等: "《秦沈客运专线施工技术》", 31 October 2005, 中国铁道出版社 *
闫富有等: "《地下工程施工》", 31 December 2011, 黄河水利出版社 *
顾孙平等: "《建筑基桩通论》", 31 January 2016, 同济大学出版社 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930605A (en) * 2019-02-25 2019-06-25 上海智平基础工程有限公司 A kind of method that pile foundation construction removes sediment
CN110130343A (en) * 2019-05-09 2019-08-16 中铁四局集团第二工程有限公司 Steel casing planting construction method suitable for deep water bare rock condition
CN110777780A (en) * 2019-10-25 2020-02-11 天津大学 Concrete pipe pile offshore pile sinking construction method
CN111058439B (en) * 2019-12-23 2022-03-08 青岛森建基础工程有限公司 Construction method of immersed tube rock-socketed cast-in-place pile
CN111058439A (en) * 2019-12-23 2020-04-24 青岛森建基础工程有限公司 Construction method of immersed tube rock-socketed cast-in-place pile
CN111236215A (en) * 2020-02-13 2020-06-05 中交第三航务工程局有限公司 Rock-socketed construction process of large-diameter steel pipe inclined pile of offshore wind power high-rise pile cap foundation
CN112900479A (en) * 2021-01-27 2021-06-04 中交第三航务工程局有限公司宁波分公司 Construction method of implanted single-pile foundation of ocean tidal current energy generator set
CN113957900A (en) * 2021-09-26 2022-01-21 广东华蕴海上风电科技有限公司 Grouting and bottoming implementation method for large-diameter rock-socketed single pile
CN114482110A (en) * 2021-12-29 2022-05-13 湖南省正邦建设工程有限公司 Steel casing group pile concrete expanded foundation construction device and construction method
CN114482110B (en) * 2021-12-29 2024-06-11 湖南省正邦建设工程有限公司 Steel pile casing pile group concrete enlarged foundation construction device and construction method
CN114370041A (en) * 2021-12-30 2022-04-19 中国能源建设集团广东省电力设计研究院有限公司 Basic platform of offshore converter station
CN114837178A (en) * 2022-06-09 2022-08-02 上海博强重工集团有限公司 Installation method of wind power foundation pile
CN114960635A (en) * 2022-06-09 2022-08-30 中交第二航务工程勘察设计院有限公司 Implanted steel pipe pile self-anchoring structure and construction method thereof
CN114892646A (en) * 2022-06-16 2022-08-12 深圳市市政工程总公司 Construction method for rotary excavation bored pile in cofferdam

Also Published As

Publication number Publication date
CN108842807B (en) 2020-07-31

Similar Documents

Publication Publication Date Title
CN108842807A (en) A kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type
CN102454167B (en) The construction method of especially big & deep open caisson
CN108842806A (en) A kind of construction technology of the non-embedding rock single pile of offshore wind power foundation
CN102720140B (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN102691294A (en) Construction method of underground continuous wall
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN109056706A (en) A kind of Karst Geological Landscape poured pile base construction method
CN106638640A (en) Modular coffer construction method for concrete without subsealing in the geologic condition of stratum
CN112663600A (en) Construction method of cast-in-situ bored pile for water-rich sandy stratum
CN113550340A (en) Construction method of deepwater foundation of double-wall steel cofferdam without sealing bottom under deepwater rock entering condition
CN106320333A (en) Row type water cast-in-place pile device and construction method
CN104047542A (en) Pipe hammer system of percussion drill for rock-socketed inclined pile and impact construction method of rock-socketed inclined pile
CN110158579A (en) A kind of bored pile construction method
CN102561404A (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN113737780A (en) Underwater rock-socketed concrete pile and construction method thereof
CN112281880A (en) Construction method of complex stratum long spiral hole-leading inserting-driving locking opening steel pipe pile cofferdam
CN109306706B (en) Main and auxiliary barrel seabed injection device and construction method thereof
CN206143760U (en) Ally oneself with formula of arranging bored concrete pile device on water
CN108625388A (en) A kind of sleeve combination formula large diameter single pile foundation and its construction method suitable for Shallow Bedrock geological conditions
CN205444192U (en) Bridge stake is towards pile driving construction system
WO2022116916A1 (en) Construction method for pulling out concrete pipe pile on water and pile pulling-out tool
CN102277981B (en) Underwater drilling and cutting construction method of reinforced concrete structure
CN114517475A (en) Micro-disturbance formed steel pipe cement composite pile and pile forming method thereof
CN104727305B (en) Boring high-pressure slip-casting uplift pile construction method
CN209816867U (en) A supporting construction for peripheral foundation ditch of existing building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 200032 No. 139, Xuhui District, Shanghai, Pingjiang Road

Patentee after: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee after: CCCC Third Aviation Bureau Sixth Engineering (Xiamen) Co.,Ltd.

Patentee after: XIAMEN BRANCH OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Address before: 200032 No. 139, Xuhui District, Shanghai, Pingjiang Road

Patentee before: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee before: CCCC Sanya (Xiamen) Engineering Co.,Ltd.

Patentee before: XIAMEN BRANCH OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.