CN108842746A - A kind of method of architectural engineering pit monitoring - Google Patents

A kind of method of architectural engineering pit monitoring Download PDF

Info

Publication number
CN108842746A
CN108842746A CN201810694915.5A CN201810694915A CN108842746A CN 108842746 A CN108842746 A CN 108842746A CN 201810694915 A CN201810694915 A CN 201810694915A CN 108842746 A CN108842746 A CN 108842746A
Authority
CN
China
Prior art keywords
monitoring
architectural engineering
pit
data
engineering pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810694915.5A
Other languages
Chinese (zh)
Inventor
李志鸢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Water Resources and Electric Engineering College
Original Assignee
Chongqing Water Resources and Electric Engineering College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Water Resources and Electric Engineering College filed Critical Chongqing Water Resources and Electric Engineering College
Priority to CN201810694915.5A priority Critical patent/CN108842746A/en
Publication of CN108842746A publication Critical patent/CN108842746A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention discloses a kind of methods of architectural engineering pit monitoring, include the following steps:Reconnaissance trip and collection related data are arranged to and inputted architectural engineering pit monitoring system, compiles pit retaining monitoring scheme according to detection requirement and specification, regulation regulation;To point layout, Water And Earth Pressures monitoring element, sensor, inclinometer pipe and delaminating deposition pipe, the physical parameter of monitoring building enclosure deformation and internal force, strata deformation and ground settlement are buried;Early warning value degree is preset, early warning value includes deformation or interior force and its rate of change;The project data of collection site terminal automatic collection monitoring, and data are uploaded automatically, then, central processing unit is analyzed and processed according to the data of upload, forming curves chart and monitoring report;The chart-information and monitoring report of formation are stored to memory module, history of forming record;Curve chart and monitoring report are printed by print module.This method energy real-time monitoring simultaneously accurately and timely reflects architectural engineering pit state in which.

Description

A kind of method of architectural engineering pit monitoring
Technical field
The invention belongs to building foundation pit studying technological domains, and in particular to a kind of method of architectural engineering pit monitoring.
Background technique
With the fast development of China's economic society, residential housing has also obtained the present high level of unprecedented development and has lived Residence has become the theme of building residential project development, and pit retaining monitoring work is also more and more common.Pit retaining monitoring mainly includes:Branch Protection structure, related natural environment, construction operating condition, underground aqueous condition, bottom of foundation ditch and surrounding soil, surrounding are built(Structure)Build object, week Exclosure underground pipelines and underground installation, around important road, other objects that should be monitored.
Currently, in the prior art, there are many monitoring technology and process of signal transmission modes, but can't reach real-time prison The purpose of survey cannot accurately and timely reflect architectural engineering pit state in which.
Summary of the invention
The present invention provides a kind of method of architectural engineering pit monitoring accurately and timely.
Its technical solution is:
A kind of method of architectural engineering pit monitoring, includes the following steps:
Reconnaissance trip and collection related data are arranged and input architectural engineering pit monitoring system by step 1, according to monitoring It is required that and specification, regulation regulation compile pit retaining monitoring scheme;
Step 2, to point layout, embedded Water And Earth Pressures monitoring element, sensor, inclinometer pipe and delaminating deposition pipe, monitoring are gone along with sb. to guard him The physical parameter of malformation and internal force, strata deformation and ground settlement;
Step 3 presets early warning value degree according to engineering concrete condition, and early warning value includes deformation or interior force and its variation speed Rate;
The project data that step 4, collection site terminal automatic collection monitor, and it is automatic by wireless transmission or network transmission mode Data are uploaded, then, central processing unit is analyzed and processed according to the data of upload, forming curves chart and monitoring report;
To memory module, history of forming record is conveniently checked and is analyzed for step 5, the chart-information formed and monitoring report storage;
Step 6 prints curve chart and monitoring report by print module.
Further, in step 2, the monitoring physical parameter includes horizontal displacement monitoring, vertical displacement monitoring, deep horizontal Displacement monitoring, inclination monitoring, Crack Monitoring, Internal force of support structure monitoring, Monitoring on Earth Pressure, monitoring pore water pressure, underground water Position monitoring, axis force of anchor monitoring.
Further, the horizontal displacement monitoring carries out automating round-the-clock real-time monitoring using Light deformation instrumentation radar;
The method that vertical displacement monitoring uses geometrical standard or liquid multi-point leveling;
Deeply mixing cement-soil pile monitoring using in wall or the soil body pre-buried inclinometer pipe, each depth horizontal position observed by inclinometer The method of shifting.
Further, in step 2,3 datum marks is buried and form horizontal displacement monitoring reference net.
Further, in step 2,3 datum marks is buried and form level-control net.
Beneficial effects of the present invention:
The method monitored using architectural engineering pit of the invention, can be realized automatic collection, the real-time Transmission of monitoring data, lead to Data analysis is crossed, all kinds of change curves and figure is formed, visualizes Monitoring Result.In this method use process, the reaction time It can be controlled within the scope of 1s, sample frequency is fully able to accomplish real-time monitoring up to 100Hz, provides informationization for engineering construction It supports.
Detailed description of the invention
Fig. 1 is the method flow diagram of architectural engineering pit monitoring.
Specific embodiment
Present invention will be explained in further detail with specific embodiment with reference to the accompanying drawing.
Referring to Fig.1, a kind of method of architectural engineering pit monitoring, includes the following steps:
Reconnaissance trip and collection related data are arranged and input architectural engineering pit monitoring system by step 1, according to monitoring It is required that and specification, regulation regulation compile pit retaining monitoring scheme;
Step 2, to point layout, embedded Water And Earth Pressures monitoring element, sensor, inclinometer pipe and delaminating deposition pipe, monitoring are gone along with sb. to guard him The physical parameter of malformation and internal force, strata deformation and ground settlement;
Step 3 presets early warning value degree according to engineering concrete condition, and early warning value includes deformation or interior force and its variation speed Rate;
The project data that step 4, collection site terminal automatic collection monitor, and it is automatic by wireless transmission or network transmission mode Data are uploaded, then, central processing unit is analyzed and processed according to the data of upload, forming curves chart and monitoring report;
To memory module, history of forming record is conveniently checked and is analyzed for step 5, the chart-information formed and monitoring report storage;
Step 6 prints curve chart and monitoring report by print module.
In step 2, the monitoring physical parameter includes horizontal displacement monitoring, vertical displacement monitoring, deeply mixing cement-soil pile prison Survey, inclination monitoring, Crack Monitoring, Internal force of support structure monitoring, Monitoring on Earth Pressure, monitoring pore water pressure, water table measure, Axis force of anchor monitoring.
The horizontal displacement monitoring carries out automating round-the-clock real-time monitoring using Light deformation instrumentation radar;
The method that vertical displacement monitoring uses geometrical standard or liquid multi-point leveling;
Deeply mixing cement-soil pile monitoring using in wall or the soil body pre-buried inclinometer pipe, each depth horizontal position observed by inclinometer The method of shifting.
In step 2, buries 3 datum marks and form horizontal displacement monitoring reference net.
In step 2, buries 3 datum marks and form level-control net.
The method monitored using architectural engineering pit of the invention can be realized the automatic collection of monitoring data, pass in real time It is defeated, it is analyzed by data, forms all kinds of change curves and figure, visualize Monitoring Result.It is demonstrated experimentally that this method used Cheng Zhong, reaction time can be controlled within the scope of 1s, and sample frequency is fully able to accomplish real-time monitoring, build for engineering up to 100Hz If providing information-based support.
The foregoing is only a preferred embodiment of the present invention, the scope of protection of the present invention is not limited to this, it is any ripe Know those skilled in the art within the technical scope of the present disclosure, the letter for the technical solution that can be become apparent to Altered or equivalence replacement are fallen within the protection scope of the present invention.

Claims (5)

1. a kind of method of architectural engineering pit monitoring, which is characterized in that include the following steps:
Reconnaissance trip and collection related data are arranged and input architectural engineering pit monitoring system by step 1, according to monitoring It is required that and specification, regulation regulation compile pit retaining monitoring scheme;
Step 2, to point layout, embedded Water And Earth Pressures monitoring element, sensor, inclinometer pipe and delaminating deposition pipe, monitoring are gone along with sb. to guard him The physical parameter of malformation and internal force, strata deformation and ground settlement;
Step 3 presets early warning value degree according to engineering concrete condition, and early warning value includes deformation or interior force and its variation speed Rate;
The project data that step 4, collection site terminal automatic collection monitor, and it is automatic by wireless transmission or network transmission mode Data are uploaded, then, central processing unit is analyzed and processed according to the data of upload, forming curves chart and monitoring report;
To memory module, history of forming record is conveniently checked and is analyzed for step 5, the chart-information formed and monitoring report storage;
Step 6 prints curve chart and monitoring report by print module.
2. the method for architectural engineering pit monitoring according to claim 1, which is characterized in that in step 2, the monitoring object Reason parameter includes horizontal displacement monitoring, vertical displacement monitoring, deeply mixing cement-soil pile monitoring, inclination monitoring, Crack Monitoring, supporting knot Structure Internal Force Monitoring, Monitoring on Earth Pressure, monitoring pore water pressure, water table measure, axis force of anchor monitoring.
3. the method for architectural engineering pit monitoring according to claim 2, which is characterized in that the horizontal displacement monitoring is adopted It is carried out automating round-the-clock real-time monitoring with Light deformation instrumentation radar;
The method that vertical displacement monitoring uses geometrical standard or liquid multi-point leveling;
Deeply mixing cement-soil pile monitoring using in wall or the soil body pre-buried inclinometer pipe, each depth horizontal position observed by inclinometer The method of shifting.
4. the method for architectural engineering pit monitoring according to claim 1, which is characterized in that in step 2, bury 3 bases Horizontal displacement monitoring reference net is formed on schedule.
5. the method for architectural engineering pit monitoring according to claim 1, which is characterized in that in step 2, bury 3 bases Level-control net is formed on schedule.
CN201810694915.5A 2018-06-29 2018-06-29 A kind of method of architectural engineering pit monitoring Pending CN108842746A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810694915.5A CN108842746A (en) 2018-06-29 2018-06-29 A kind of method of architectural engineering pit monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810694915.5A CN108842746A (en) 2018-06-29 2018-06-29 A kind of method of architectural engineering pit monitoring

Publications (1)

Publication Number Publication Date
CN108842746A true CN108842746A (en) 2018-11-20

Family

ID=64200648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810694915.5A Pending CN108842746A (en) 2018-06-29 2018-06-29 A kind of method of architectural engineering pit monitoring

Country Status (1)

Country Link
CN (1) CN108842746A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109765341A (en) * 2019-01-25 2019-05-17 重庆水利电力职业技术学院 A kind of structure monitoring system for civil engineering
CN110030974A (en) * 2019-04-11 2019-07-19 杭州瑞纽宝科技有限公司 A kind of convenient and fast inclinometer, pit retaining monitoring system and pit retaining monitoring method
CN110336983A (en) * 2019-07-15 2019-10-15 中国建筑西南勘察设计研究院有限公司 A kind of Excavation Monitoring system based on virtual reality technology
CN110927362A (en) * 2019-12-09 2020-03-27 黄河交通学院 Civil engineering building monitoring system
CN111102932A (en) * 2019-12-13 2020-05-05 中国二十冶集团有限公司 Automatic inspection method and system for foundation pit safety
CN111101549A (en) * 2020-01-07 2020-05-05 北京国泰佳业科技发展有限公司 Real-time bearing capacity limit monitoring method and system for retaining wall
CN111139877A (en) * 2020-01-07 2020-05-12 北京国泰佳业科技发展有限公司 Foundation pit real-time bearing capacity limit monitoring method and system
CN111576508A (en) * 2020-06-02 2020-08-25 惠安建设监理有限公司 Foundation pit monitoring system applied to construction supervision and detection method
CN112878333A (en) * 2021-01-04 2021-06-01 中冶南方武汉建筑设计有限公司 Intelligent support system and method integrating monitoring and early warning
CN113218445A (en) * 2021-04-07 2021-08-06 苏现锋 Method for monitoring foundation pit of constructional engineering
CN113700052A (en) * 2021-08-11 2021-11-26 河北省建筑工程质量检测中心有限公司 System for building engineering foundation pit monitoring
CN113720382A (en) * 2021-08-20 2021-11-30 中铁十四局集团大盾构工程有限公司 Dynamic inverse analysis calculation and fusion algorithm based intelligent monitoring system
CN113931238A (en) * 2021-10-15 2022-01-14 中交天津港湾工程研究院有限公司 Method for monitoring position of potential slip surface of foundation pit slope
CN115031889A (en) * 2022-04-21 2022-09-09 中国公路工程咨询集团有限公司 Pore water pressure monitoring method and device, electronic equipment and storage medium
CN115075308A (en) * 2022-07-01 2022-09-20 新疆鑫长宇信息科技有限公司 Deep settlement displacement monitoring system and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200734974A (en) * 2006-03-10 2007-09-16 E Ten Information Sys Co Ltd Remote Monitoring System
CN103835764A (en) * 2014-01-16 2014-06-04 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit safety monitoring and early warning system
CN106245690A (en) * 2016-08-08 2016-12-21 浙江绩丰岩土技术股份有限公司 Round-the-clock all the period of time foundation ditch automatic monitoring early warning system and monitoring and pre-alarming method thereof
CN106522187A (en) * 2016-11-09 2017-03-22 南京市测绘勘察研究院有限公司 Foundation pit monitoring information management system
CN107023043A (en) * 2017-05-26 2017-08-08 中国十七冶集团有限公司 A kind of deep foundation pit supporting construction monitoring and pre-alarming method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200734974A (en) * 2006-03-10 2007-09-16 E Ten Information Sys Co Ltd Remote Monitoring System
CN103835764A (en) * 2014-01-16 2014-06-04 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit safety monitoring and early warning system
CN106245690A (en) * 2016-08-08 2016-12-21 浙江绩丰岩土技术股份有限公司 Round-the-clock all the period of time foundation ditch automatic monitoring early warning system and monitoring and pre-alarming method thereof
CN106522187A (en) * 2016-11-09 2017-03-22 南京市测绘勘察研究院有限公司 Foundation pit monitoring information management system
CN107023043A (en) * 2017-05-26 2017-08-08 中国十七冶集团有限公司 A kind of deep foundation pit supporting construction monitoring and pre-alarming method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴振君等: "分布式基坑监测信息管理与预警***的研制", 《岩土力学》 *
赵绍敏等: "浅析基坑检测技术的应用", 《建材与装饰》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109765341A (en) * 2019-01-25 2019-05-17 重庆水利电力职业技术学院 A kind of structure monitoring system for civil engineering
CN110030974A (en) * 2019-04-11 2019-07-19 杭州瑞纽宝科技有限公司 A kind of convenient and fast inclinometer, pit retaining monitoring system and pit retaining monitoring method
CN110336983A (en) * 2019-07-15 2019-10-15 中国建筑西南勘察设计研究院有限公司 A kind of Excavation Monitoring system based on virtual reality technology
CN110927362B (en) * 2019-12-09 2022-03-04 黄河交通学院 Civil engineering building monitoring system
CN110927362A (en) * 2019-12-09 2020-03-27 黄河交通学院 Civil engineering building monitoring system
CN111102932A (en) * 2019-12-13 2020-05-05 中国二十冶集团有限公司 Automatic inspection method and system for foundation pit safety
CN111101549A (en) * 2020-01-07 2020-05-05 北京国泰佳业科技发展有限公司 Real-time bearing capacity limit monitoring method and system for retaining wall
CN111139877A (en) * 2020-01-07 2020-05-12 北京国泰佳业科技发展有限公司 Foundation pit real-time bearing capacity limit monitoring method and system
CN111576508A (en) * 2020-06-02 2020-08-25 惠安建设监理有限公司 Foundation pit monitoring system applied to construction supervision and detection method
CN112878333A (en) * 2021-01-04 2021-06-01 中冶南方武汉建筑设计有限公司 Intelligent support system and method integrating monitoring and early warning
CN113218445A (en) * 2021-04-07 2021-08-06 苏现锋 Method for monitoring foundation pit of constructional engineering
CN113700052A (en) * 2021-08-11 2021-11-26 河北省建筑工程质量检测中心有限公司 System for building engineering foundation pit monitoring
CN113720382A (en) * 2021-08-20 2021-11-30 中铁十四局集团大盾构工程有限公司 Dynamic inverse analysis calculation and fusion algorithm based intelligent monitoring system
CN113720382B (en) * 2021-08-20 2024-05-03 中铁十四局集团大盾构工程有限公司 Calculation and fusion algorithm based on dynamic inverse analysis and intelligent monitoring system
CN113931238A (en) * 2021-10-15 2022-01-14 中交天津港湾工程研究院有限公司 Method for monitoring position of potential slip surface of foundation pit slope
CN115031889A (en) * 2022-04-21 2022-09-09 中国公路工程咨询集团有限公司 Pore water pressure monitoring method and device, electronic equipment and storage medium
CN115075308A (en) * 2022-07-01 2022-09-20 新疆鑫长宇信息科技有限公司 Deep settlement displacement monitoring system and construction method thereof

Similar Documents

Publication Publication Date Title
CN108842746A (en) A kind of method of architectural engineering pit monitoring
KR102036150B1 (en) The System for Sensing a Soil Settlement in Civil Engineering and Building Structures Constructed on the Ground in a Specific Area and Controlling Method for the Same
CN108195723B (en) Permeation grouting test system and method for reinforcing loose gravel soil
BR112018001709B1 (en) INSPECTION SYSTEM TO MEASURE THE CONDITION OF AT LEAST THE WALL OF A GROUND OPENING
CN109709308B (en) Water-mining type ground crack physical model test device and test method
CN110705095A (en) Karst ground collapse analysis method
CN204676517U (en) The in situ shear wave testing arrangement of ocean formation
CN106480871B (en) A kind of automation settlement monitoring device and method being applicable in Yu Haiyang's land reclamation construction usage
CN112348312A (en) Evaluation and early warning system for influence of construction vibration on surrounding environment
CN107100213A (en) Soil disturbance monitoring system and monitoring method of the bridge construction of pile groups to adjacent piles
CN108592872B (en) Dynamic construction method for shallow excavation weak protection of unilateral high slope
CN106759542A (en) The deformation monitoring of deep basal pit and the method for Deformation Prediction
US9638593B2 (en) Sinkhole detection systems and methods
CN109682347B (en) Method for measuring expansion amount at different depths in water meeting process of expansive soil
Xu et al. Study on the loess immersion test of Metro Line 2 in Xi’an, Shaanxi Province, China
Krkač et al. Continuous monitoring of the Kostanjek landslide
Franklin The monitoring of structures in rock
CN111928817B (en) Deep pit foundation engineering monitoring system and method adopting multi-ring-support settlement horizontal monitoring points
CN113091826A (en) Multifunctional device for monitoring geological environment of coal mining subsidence area
CN208763077U (en) A kind of concrete perfusion liquid level position monitor
CN107964990B (en) Non-excavation thickness measuring device and thickness measuring method for buried concrete slab
CN206609418U (en) Building settlement tilts integrated monitoring device
Ning et al. Case Study: Geotechnical Instrumentation and Monitoring of Alaskan Way Viaduct Replacement Project
CN212866081U (en) Device for monitoring pile forming quality of cast-in-place pile at complex stratum
CN105806286B (en) Basic point implanted reservoir dam displacement monitoring method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181120

RJ01 Rejection of invention patent application after publication