CN108842637A - Frame built in solid pier pier shaft and solid pier pier construction method - Google Patents

Frame built in solid pier pier shaft and solid pier pier construction method Download PDF

Info

Publication number
CN108842637A
CN108842637A CN201811003885.5A CN201811003885A CN108842637A CN 108842637 A CN108842637 A CN 108842637A CN 201811003885 A CN201811003885 A CN 201811003885A CN 108842637 A CN108842637 A CN 108842637A
Authority
CN
China
Prior art keywords
built
pier
frame
pier shaft
solid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811003885.5A
Other languages
Chinese (zh)
Inventor
郑辉
胡贵松
段君良
宋艳双
蔡晓琨
鲍中华
王谢军
苏林袖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Railway Group Engineering Co. Ltd.
China Railway Sixth Group Co Ltd
Original Assignee
Guangzhou Railway Group Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Railway Group Engineering Co Ltd filed Critical Guangzhou Railway Group Engineering Co Ltd
Priority to CN201811003885.5A priority Critical patent/CN108842637A/en
Publication of CN108842637A publication Critical patent/CN108842637A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

This application involves technical field of bridge construction, more particularly, to frame built in a kind of solid pier pier shaft and the method for carrying out solid pier pier construction using frame built in the solid pier pier shaft.Frame built in the solid pier pier shaft includes frame unit built in more piece, and built-in frame unit described in more piece is sequentially connected with along the vertical direction;The built-in frame unit includes at least four vertical bars, more transverse bar members and Duo Gen diagonal brace rod piece;The vertical bar interval is arranged to form polygonal frame;Two transverse bar members are at least set between any adjacent two vertical bar, and the both ends of the transverse bar member are connected with two vertical bars respectively;Piece diagonal brace rod piece is at least set between any adjacent two vertical bar;And one end of the diagonal brace rod piece is connected with the vertical bar, the other end is connected with the transverse bar member.Frame built in the solid pier pier shaft of the application takes up space small, and single-unit is light-weight, facilitates transhipment and installation, and it is high to be applicable to different piers.

Description

Frame built in solid pier pier shaft and solid pier pier construction method
Technical field
This application involves technical field of bridge construction, more particularly, to frame built in a kind of solid pier pier shaft and utilize this solid The method that frame built in pier pier shaft carries out solid pier pier construction.
Background technique
Bridge pier height is generally higher, and traditional pier construction method is tied up generally by scaffold is set up on the outside of pier shaft It wire-ties, assembled formwork, and then completes the construction of pier shaft bricklaying.However, scaffold take up space when building it is larger, expend when Between it is long, and each bridge pier be both needed to repeat set up, will affect the completion of duration.
Summary of the invention
It is carried out the purpose of the present invention is to provide frame built in a kind of solid pier pier shaft and using frame built in the solid pier pier shaft The method of solid pier pier construction, need to be taken outside bridge pier when solving Bridge Pier Construction assembling reinforcement, assembled formwork in the prior art Scaffold is built, the technical issues of larger, consuming time is long that takes up space is caused.
The present invention provides frame built in a kind of solid pier pier shaft, including frame unit built in more piece, built-in frame list described in more piece Member is sequentially connected with along the vertical direction;
The built-in frame unit includes at least four vertical bars, more transverse bar members and Duo Gen diagonal brace rod piece;
The vertical bar interval is arranged to form polygonal frame;At least it is arranged two between any adjacent two vertical bar Transverse bar member described in root, and the both ends of the transverse bar member are connected with two vertical bars respectively;
Piece diagonal brace rod piece, and one end of the diagonal brace rod piece are at least set between any adjacent two vertical bar It is connected with the vertical bar, the other end of the diagonal brace rod piece is connected with the transverse bar member.
Further, the built-in frame unit further includes reinforcing member, and the vertical spaced set of reinforcing member is in phase Between adjacent two vertical bars, and the both ends of the reinforcing member are connected with the transverse bar member respectively;
One end of the diagonal brace rod piece is connected with the vertical bar, the other end of the diagonal brace rod piece and the reinforcement Rod piece is connected with the junction of the transverse bar member.
Further, the diagonal brace rod piece of built-in frame unit described in two adjacent sections and the tie point of the transverse bar member exist One end be connected on same vertical line.
Further, the both ends horizontal of the vertical bar is provided with fixation steel plate, is provided on the fixation steel plate more A bolt hole;The adjacent built-in frame unit is mutually fixedly connected by the fixation steel plate.
Further, it is provided with support plate on the built-in frame unit, and circular described on frame unit built in the top layer Support plate is provided with guardrail.
Further, the built-in frame unit further includes ladder;The ladder is set to the built-in frame along the vertical direction The side of unit.
Further, the built-in frame cell side face, which corresponds to, is arranged someone hole at the ladder.
Further, the height of the built-in frame unit is 2m.
Further, the vertical bar is ∠ 100mm × 100mm × 6mm angle steel;The transverse bar member is ∠ 63mm The angle steel of × 63mm × 4mm;The diagonal brace rod piece is ∠ 63mm × 63mm × 4mm angle steel.
It is solid using frame progress built in solid pier pier shaft described in any of the above-described technical solution that present invention also provides a kind of The method of pier pier construction, includes the following steps:
Step 100, surveying and locating;
Bridge pier direction across bridge center of arc vertex is released on cushion cap face using total station, along bridge to point before and after pier center, straight Four angle points of line segment, and pop up pier shaft outer contour and template outer contour;
Step 200, concrete dabbing;
Grooving is carried out to cushion cap face along contour line using cutting machine, then carries out concrete surface dabbing;
Frame built in step 300, pier shaft is installed;
According to the height of pier shaft and pier neck size, designs the structure snd size of frame unit built in solid pier pier shaft and build weldering It connects, then will be placed on pier shaft built in solid pier pier shaft;
Step 400, reinforcing bar binding;
Using frame built in pier shaft as job platform, pier shaft reinforcing bar is bound upwards in turn by pier shaft bottom;
Step 500, template installation;
Template uses over-form construction;When overmolded, on most upper section template indwelling pier shaft, following template is turned to most upper It saves on template;Template repeats to construct, and makes inside and outside arc plate full configuration, and inner and outer template is fixed in the form of to pull rod;
Step 600, built-in frame are hung out;
Reinforcing bar binding, template after the installation is completed, built-in frame is hung out using crane;
Step 700, concrete placings;
Filling concrete uninterruptedly continuously is carried out to pier shaft, completes the construction of solid pier shaft.
Compared with prior art, the application has the beneficial effect that:
Frame built in solid pier pier shaft provided by the present application includes frame unit built in more piece, and built-in frame unit described in more piece is along perpendicular Histogram is to being sequentially connected with.On the one hand built-in frame unit is taken up space small as standard knot by standard knot, single-unit is light-weight, side Just transhipment and installation;On the one hand it is applicable to different pier height by the way that the built-in frame unit of different joint numbers is arranged, therefore can expired Requirement of the foot to different pier shaft height;The assembly and disassembly of frame unit built in another aspect more piece enable in solid pier pier shaft It is reusable to set frame.
Specifically, the built-in frame unit includes at least four vertical bars, more transverse bar members and Duo Gen diagonal brace rod piece;
Vertical bar is arranged to form polygonal frame as main framing, the vertical bar interval;Preferably, vertical bar Quantity be four, four vertical bars form rectangular frames.
Two transverse bar members, and the both ends of the transverse bar member are at least set between any adjacent two vertical bar It is mutually fixedly connected with two vertical bars respectively;Preferably, it is arranged described in two between any adjacent two vertical bar Transverse bar member, wherein the both ends of a transverse bar member are mutually fixedly connected with the upper end of vertical bar, the two of another transverse bar member End is mutually fixedly connected with the lower end of vertical bar, forms basicly stable frame body.
For the stability for further enhancing frame body, be at least arranged between any adjacent two vertical bar one it is described tiltedly Strut member, and one end of the diagonal brace rod piece is mutually fixedly connected with the vertical bar, the other end of the diagonal brace rod piece with should The transverse bar member between adjacent two vertical bars is mutually fixedly connected;That is diagonal brace rod piece, vertical bar and corresponding transverse direction Rod piece forms stable triangular structure, enhances the stability of whole frame body.
Frame built in the solid pier pier shaft of the offer of the application is suitable for railroad bridge two-wire nose circle shape entity Zhi Dun and Po Dun Construction.When construction, the height and size of frame unit built in the solid pier pier shaft of Demand Design are built according to pier shaft first, it will be built-in Each structural member of frame unit mutually welds, and is later fixedly connected with frame built in multiple pier shafts, forms frame built in solid pier pier shaft;Again will It is placed on pier built in solid pier pier shaft, is bound using the reinforcing bar that frame built in solid pier pier shaft carries out a section pier shaft as workbench It is installed with template, hangs out frame built in pier shaft later, complete the construction of the section pier shaft;After the completion of the section pier shaft is built, then will be real It is placed on the pier shaft of completion built in heart pier pier shaft, carries out the reinforcing bar binding and template installation of next section pier shaft;Repeat above-mentioned mistake Journey, until solid pier pier shaft integral constructing is completed.
Frame built in solid pier pier shaft provided by the present application is taking up space small, and single-unit is light-weight, facilitates transhipment and installation, can It is high suitable for different piers, and the collision of transport of materials can be avoided using internal frame.
The construction method provided by the present application for carrying out solid pier pier construction using frame built in the solid pier pier shaft is applied Work technique is more easy, time saving, laborsaving, and working security is high, and the bridge pier quality of construction is high.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is structural schematic diagram of the frame unit under the first visual angle built in odd number section provided by the embodiments of the present application;
Fig. 2 is structural schematic diagram of the frame unit under the second visual angle built in odd number section provided by the embodiments of the present application;
Fig. 3 is structural schematic diagram of the frame unit under the first visual angle built in even number section provided by the embodiments of the present application;
Fig. 4 is structural schematic diagram of the frame unit under the second visual angle built in even number section provided by the embodiments of the present application;
Fig. 5 is knot of the frame unit under the first visual angle built in frame top layer built in solid pier pier shaft provided by the embodiments of the present application Structure schematic diagram;
Fig. 6 is the enlarged drawing in Fig. 5 at A;
Fig. 7 is knot of the frame unit under the second visual angle built in frame top layer built in solid pier pier shaft provided by the embodiments of the present application Structure schematic diagram;
Fig. 8 is the structural representation of the fixation steel plate at the vertical bar both ends of built-in frame unit provided by the embodiments of the present application Figure;
Fig. 9 is overall structure diagram of the frame under the first visual angle built in solid pier pier shaft provided by the embodiments of the present application;
Figure 10 is overall structure diagram of the frame under the second visual angle built in solid pier pier shaft provided by the embodiments of the present application;
Figure 11 is that frame built in solid pier pier shaft provided by the embodiments of the present application is placed in structural schematic diagram on pier shaft when constructing;
Figure 12 is frame unit built in frame top layer built in solid pier pier shaft provided by the embodiments of the present application under third visual angle Structural schematic diagram.
Appended drawing reference:
Frame unit built in 1-, 101- vertical bar, 102- transverse bar member, 103- diagonal brace rod piece, 104- reinforcing member, 105- Lateral rod piece, 106- fixation steel plate, 107- support plate, 108- guardrail, 109- ladder, frame built in the solid pier pier shaft of 2-, 3- pier shaft.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.
The component for the embodiment of the present invention for usually describing and showing in attached drawing here can be with a variety of different configurations To arrange and design.Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below and is wanted The scope of the present invention of protection is sought, but is merely representative of selected embodiment of the invention.
Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Referring to frame built in the solid pier pier shaft of Fig. 1 to Figure 12 description according to some embodiments of the invention and utilize the reality The method that frame built in heart pier pier shaft constructs to solid pier pier shaft.
Embodiments herein provides frame 2 built in a kind of solid pier pier shaft, as shown in Figures 1 to 4, including built in more piece Frame unit 1, frame unit 1 is sequentially connected with along the vertical direction built in more piece;
Built-in frame unit 1 includes at least four vertical bars 101, more transverse bar members 102 and Duo Gen diagonal brace rod piece 103;
The setting of the interval of vertical bar 101 forms polygonal frame;At least it is arranged between any adjacent two vertical bar 101 Two transverse bar members 102, and the both ends of transverse bar member 102 are connected with two vertical bars 101 respectively;
A piece diagonal brace rod piece 103, and the one of diagonal brace rod piece 103 are at least set between any adjacent two vertical bar 101 End is connected with vertical bar 101, and the other end of diagonal brace rod piece 103 is connected with transverse bar member 102.
Frame 2 built in solid pier pier shaft provided by the embodiments of the present application includes frame unit 1 built in more piece, frame unit built in more piece 1 is sequentially connected with along the vertical direction.Built-in frame unit 1 is used as standard knot, is on the one hand taken up space by standard knot small, single-unit weight Gently, facilitate transhipment and installation;On the one hand it is applicable to different pier height by the way that the built-in frame unit 1 of different joint numbers is arranged, therefore It can satisfy the requirement to different pier shaft height;The assembly and disassembly of frame unit 1 enable to solid built in another aspect more piece Frame 2 is reusable built in pier pier shaft.
Specifically, built-in frame unit 1 includes at least four vertical bars 101, more transverse bar members 102 and Duo Gen hound Part 103;
Vertical bar 101 is used as main framing, and the setting of the interval of vertical bar 101 forms polygonal frame;Preferably, vertical bar The quantity of part 101 is four, and four vertical bars 101 form rectangular frame.
Two transverse bar members 102, and the two of transverse bar member 102 are at least set between any adjacent two vertical bar 101 End is fixedly connected with two 101 phases of vertical bar respectively;Preferably, two are arranged between any adjacent two vertical bar 101 Transverse bar member 102, wherein the both ends of a transverse bar member 102 are mutually fixedly connected with the upper end of vertical bar 101, another transverse direction The both ends of rod piece 102 are mutually fixedly connected with the lower end of vertical bar 101, form basicly stable frame body.
For the stability for further enhancing frame body, as shown in Figures 1 to 4, between any adjacent two vertical bar 101 A piece diagonal brace rod piece 103 is at least set, and one end of diagonal brace rod piece 103 is fixedly connected with 101 phase of vertical bar, diagonal brace rod piece 102 phase of transverse bar member between 103 other end, two vertical bars 101 adjacent with this is fixedly connected;I.e. diagonal brace rod piece 103, Vertical bar 101 and corresponding transverse bar member 102 form stable triangular structure, enhance the stability of whole frame body.
Preferably, as shown in figure 11, between the transverse bar member 102 of the upper end of built-in frame unit 1 two and the transverse direction of lower end two Lateral rod piece 105 is additionally provided between rod piece 102, lateral rod piece 105 is along suitable bridge to horizontal spaced set in two of upper end Between two transverse bar members 102 of between transverse bar member 102 and lower end, and the both ends of lateral rod piece 105 cross with both ends respectively It is welded to 102 phase of rod piece, further enhances the strength and stability of built-in frame unit 1, to enhance in entire solid pier pier shaft Set the strength and stability of frame 2.
Preferably, as shown in figure 11, when the quantity of vertical bar 101 makes built-in frame integrally rectangular for four, edge Two diagonal brace rod pieces 103, two diagonal brace rod pieces are provided between two vertical bars 101 of the length direction of frame built in rectangle 103, which correspond respectively to two 101 phases of vertical bar, is fixedly connected, and the extending direction of two diagonal brace rod pieces 103 is along built-in frame Longitudinal axis direction is symmetrical arranged.One is provided between two vertical bars 101 of the width direction of frame built in rectangle tiltedly Strut member 103.The design can farthest reduce bracket self weight under the premise of guaranteeing built-in frame overall stability.
Frame 2 is suitable for the straight pier of railroad bridge two-wire nose circle shape entity built in the solid pier pier shaft that embodiments herein provides And the construction of slope pier.When construction, the height and ruler of 2 unit 1 of frame built in the solid pier pier shaft of Demand Design are built according to pier shaft 3 first It is very little, each structural member of built-in frame unit 1 is mutually welded, frame unit 1 built in multiple pier shafts is fixedly connected later, forms solid pier Frame 2 built in pier shaft;As shown in figure 3, frame 2 built in solid pier pier shaft is placed on pier shaft 3 again, it is with frame 2 built in solid pier pier shaft Workbench carries out the reinforcing bar binding and template installation of a section pier shaft 3, hangs out frame built in pier shaft later, completes the section pier shaft 3 It builds;It is placed on the pier shaft 3 of completion after the completion of the section pier shaft 3 is built, then by frame 2 built in solid pier pier shaft, carries out next section The reinforcing bar binding and template installation of pier shaft 3;It repeats the above process, until solid 3 integral constructing of pier pier shaft is completed.
Frame 2 built in solid pier pier shaft provided by the embodiments of the present application is suitable for the construction of the solid pier of bridge, is particularly suitable for Railroad bridge two-wire nose circle shape entity Zhi Dun and Po Dun.Frame 2 built in the solid pier pier shaft of the application uses the construction of integral assembling Mode compares conventional steel frame, materials'use is less, reduces scaffolder's on the one hand using built-in frame unit 1 as standard knot Quantity, cost savings are significant;On the one hand assembly is carried out by directlying adopt standard knot, greatlys save bracket and sets up the time, and It takes up space small, avoids place limitation, subtract and simplify strutting system, save the use of timbering material, reduce costs, contract The short construction time, work efficiency is quickly improved at double.On the other hand, single-unit is light-weight, facilitates transhipment and installation, is applicable to Different piers is high, and the collision of transport of materials can be avoided using built-in frame.
In one embodiment of the application, it is preferable that as shown in figures 1 and 3, built-in frame unit 1 further includes reinforcing rod Part 104, the vertical spaced set of reinforcing member 104 is between adjacent two vertical bars 101, and the both ends of reinforcing member 104 It is connected respectively with transverse bar member 102;
One end of diagonal brace rod piece 103 is connected with vertical bar 101, the other end and reinforcing member 104 of diagonal brace rod piece 103 It is connected with the junction of transverse bar member 102.
For the strength and stability for further enhancing built-in frame unit 1, in this embodiment, built-in frame unit 1 further includes Reinforcing member 104,104 spaced set of reinforcing member is between adjacent two vertical bars 101, and reinforcing member 104 is along vertical Direction setting, and the transverse bar member 102 between two vertical bars 101 adjacent with this is connected respectively at the both ends of reinforcing member 104 It connects, forms stable frame.
In one embodiment of the application, it is preferable that as shown in figure 9, the diagonal brace rod piece of frame unit 1 built in two adjacent sections 103 with the tie point of transverse bar member 102 on same vertical line.
In this embodiment, the diagonal brace rod piece 103 of frame unit 1 built in two adjacent sections and the tie point of transverse bar member 102 exist Guarantee the uniformity of each 103 stress of diagonal brace rod piece on same vertical line, to enhance the stability of built-in frame entirety.
Preferably, as shown in Figure 1 to Figure 4 and shown in Fig. 9, in the splicing of multiple built-in frame units 1, with frame unit built in the bottom 1 is first segment, and frame built in a section on 1 upper layer of frame unit built in the bottom is the second section, according to this labeling method, frame built in pier shaft Odd number section built in frame unit 1 along direction across bridge two diagonal brace rod pieces 103 be in " eight words " type structure, the even number section of frame built in pier shaft Built-in frame unit 1 is in " eight word " type structure, and frame unit 1 built in two adjacent sections along two diagonal brace rod pieces 103 of direction across bridge Diagonal brace rod piece 103 and the tie point of transverse bar member 102 are on same vertical line, to form the support construction of stable and uniform.
In one embodiment of the application, it is preferable that as shown in Fig. 5, Fig. 6 and Fig. 8, the both ends water of vertical bar 101 It is flat to be provided with fixation steel plate 106, multiple bolts hole are provided on fixation steel plate 106;Adjacent built-in frame unit 1 passes through fixation steel plate 106 phases are fixedly connected.
In this embodiment, the both ends of vertical bar 101 are respectively arranged with horizontal fixation steel plate 106, on fixation steel plate 106 It is provided with multiple bolts hole;The corresponding vertical bar 101 of two neighboring built-in frame unit 1 passes through the fixation steel plate 106 of end It is connected, and passes through corresponding bolt hole by fixing screws and keep two neighboring 101 phase of vertical bar solid by nut fastening Fixed connection.Multiple built-in frame units 1 are sequentially connected with to form frame 2 built in solid pier pier shaft along the vertical direction.
Preferably, fixation steel plate 106 is using the steel plate with a thickness of 1cm, its size can be having a size of 20 × 20cm, but have Body size is selected according to different structures, is not specifically limited herein.
In one embodiment of the application, it is preferable that as depicted in figure 5 and figure 12, be provided with support on built-in frame unit 1 Plate 107, and support plate 107 is provided with guardrail 108 on frame unit 1 built in top layer.
In this embodiment, support plate 107 is provided on built-in frame unit 1, support plate 107 gives staff's construction station The platform of vertical walking living.Preferably, the vertical bridge of built-in frame unit 1 completely spreads support plate 107, support plate 107 to small mileage, big mileage It is 35cm for width, with a thickness of the embossed steel plates of 3mm, is also added on the basis of guaranteeing to construction personnel's offer stable support The non-skid property of staff's construction.
It is additionally provided with guardrail 108 around support plate 107 on frame unit 1 built in top layer, for in frame unit 1 built in top layer The staff of upper work plays protective action.
In one embodiment of the application, it is preferable that as shown in Fig. 1 to 4 and Fig. 9 and Figure 10, built-in frame unit 1 is also wrapped Include ladder 109;Ladder 109 is set to the side of built-in frame unit 1 along the vertical direction.
In this embodiment, the side of built-in frame unit 1 is additionally provided with ladder 109, the i.e. direction across bridge along built-in frame unit 1 Ladder 109 up and down is arranged in side, climbs for staff;Ladder 109 is arranged along the vertical direction, and ladder 109 and support plate 107 are connected, and so that staff is climbed up support plate 107 along ladder 109 and work.
Preferably, as shown in Figure 9 and Figure 10, when multiple built-in frame units 1, which are sequentially connected, to be connect, each built-in frame unit 1 Ladder 109 is also sequentially connected with, and is formed a complete continuous ladder 109, is climbed convenient for staff.
Preferably, ladder 109 is welded using the spiral of φ 22, when increasing staff's climbing using spiral Non-skid property.
In one embodiment of the application, it is preferable that corresponded on built-in 1 side of frame unit and someone is set at ladder 109 Hole.
Built-in 1 side of frame unit, which corresponds to, is arranged someone hole at ladder 109, staff climbing during can by people hole into Enter in the support plate 107 inside built-in frame unit 1, to work.
In one embodiment of the application, it is preferable that the height of built-in frame unit 1 is 2m.
The height that the application designs built-in frame unit 1 is 2m, i.e., carries out processing arrangement by mono- standard knot of 2m, take up space Small, single-unit is light-weight, facilitates transhipment and installation, and it is high to be applicable to different piers.
In one embodiment of the application, it is preferable that vertical bar 101 is ∠ 100mm × 100mm × 6mm angle steel; Transverse bar member 102 and diagonal brace rod piece 103 are ∠ 63mm × 63mm × 4mm angle steel.
In this embodiment, vertical bar 101 uses ∠ 100mm × 100mm × 6mm angle steel as main framing, laterally Rod piece 102 uses ∠ 63mm × 63mm × 4mm angle steel, and diagonal brace rod piece 103 also uses ∠ 63mm × 63mm × 4mm angle steel simultaneously Triangle rock-steady structure is formed with vertical bar 101 and the welding of transverse bar member 102, above structure size can guarantee that entirety is steady Bracket self weight is reduced under the premise of qualitatively, reduces single-unit weight, facilitates transhipment and installation.
Preferably, the lateral rod piece 105 that above-described embodiment is mentioned also uses ∠ 63mm × 63mm × 4mm angle steel, with cross It is identical with the specification of diagonal brace rod piece 103 to rod piece 102, it is convenient for material centralized purchasing.
Embodiments herein additionally provides a kind of constructing device, built in the solid pier pier shaft including any of the above-described embodiment Frame 2.
Present invention also provides a kind of constructing devices, frame 2 built in the solid pier pier shaft including any of the above-described embodiment, due to Constructing device includes frame 2 built in solid pier pier shaft, thus whole beneficial effects with frame 2 built in solid pier pier shaft, herein not It repeats one by one again.
Embodiments herein additionally provide a kind of solid pier pier shaft using above-described embodiment built in frame 2 carry out solid pier Pier construction process flow, is suitable for railroad bridge two-wire nose circle shape entity Zhi Dun and Po Dun, and technological principle is using in pier shaft Frame is set as operation platform, substitutes pier construction scaffold;In conjunction with template outrigger, work efficiency is improved, it is horizontal to improve standardized management.
Construction technology process is surveying and locating → concrete dabbing → pier shaft Inner frame installation → reinforcing bar binding → template installation → internal frame hangs out → concrete placings.
Specifically, construction method includes the following steps:
Step 100, surveying and locating;
Bridge pier direction across bridge center of arc vertex is released on cushion cap face using total station, along bridge to point before and after pier center, straight Four angle points of line segment amount to 8 points, and pop up pier shaft outer contour and template outer contour;
Step 200, concrete dabbing;
Grooving is carried out to cushion cap face along contour line using cutting machine, then carries out concrete surface dabbing;
Wherein cushion cap face dabbing, which is used, carries out grooving along contour line using cutting machine, and depth about 2cm carries out concrete surface afterwards Dabbing;When artificial chiseling, concrete strength is not less than 2.5MPa;Then it is not less than 10MPa when mechanical dabbing, is carried out after dabbing clear Reason;At bridge pier merogenesis, to guarantee that seam crossing is smooth, when lower section concreting, pours top surface absolute altitude and went out template top about 0.5- 1cm carries out trimming along template top using angle grinder, and inside uses air compressor machine dabbing or artificial chiseling;
Frame built in step 300, pier shaft is installed;
According to the height of pier shaft 3 and pier neck size, designs the structure snd size of 2 unit 1 of frame built in solid pier pier shaft and take Welding is built, then frame 2 built in solid pier pier shaft is placed on pier shaft 3;
It is illustrated by taking the pier of entity slope as an example.Entity slope pier pier neck is having a size of 7.8m*1.8m, built-in frame planar dimension 5.7m × 1.5m, main framing use 4 ∠ 100mm × 100mm × 6mm angle steel, diagonal brace, lateral part using ∠ 63mm × The angle steel of 63mm × 4mm;Frame built in fashioned iron is processed by mono- section of 2m, and direction across bridge arranges 16 light of φ by spacing 30cm at the top of every section Round bar, vertical bridge completely spread 35cm wide 3mm embossed steel plates as workbench to small mileage, big mileage and direction across bridge left and right side;? Direction across bridge side arranges that size is not less than 60cm × 60cm into Ren Dong, and the ladder 109 as made of 22 reinforcement welding of φ is arranged, and climbs 109 every grade of vertical spacing 40cm, horizontal spacing 50cm of ladder;
Step 400, reinforcing bar binding;
Using frame built in pier shaft as job platform, pier shaft reinforcing bar is bound upwards in turn by pier shaft bottom;
Step 500, template installation;
Template uses over-form construction;When overmolded, on most upper section template indwelling pier shaft, following template is turned to most upper It saves on template;Template repeats to construct, and makes inside and outside arc plate full configuration, and inner and outer template is fixed in the form of to pull rod;
Pier is template used and bracket must have enough rigidity, strength and stability, can bear newly-laid concrete enough Gravity, lateral pressure and load.On the basis of falsework is supported in reliably, and there are enough bearing area and drainage measure;
Interlayer ladder is set on the outside of template, using ladder is logical above and below size mileage side is staggered between every layer of job platform Row, ladder are process from vertical Liang Gen 63 × 6mm+ of ∟ Heng Xiang ∟ 50 × 5mm angle steel, and one of spacing 21.6cm of ladder step, top Using the above round steel of diameter 25mm, it is processed into inverted U, on projecting and upper one layer of angle bar frame;
Step 600, built-in frame are hung out;
It binds with template after the installation is completed in reinforcing bar, is integrally hung out built-in frame using crane;If pier shaft 3 is excessively high, can divide Section is hung out;
Step 700, concrete placings;
Filling concrete uninterruptedly continuously is carried out to pier shaft, completes the construction of solid pier shaft.
Specifically, the perfusion of Bridge Pier concrete guarantees continuous uninterrupted construction, and perfusion pier concrete freely inclines Drop height degree is no more than 2m, more than when using sliding slot, tumbling barrel or deceleration cylinder reduce the degree of falling that freely inclines, reduce segregation phenomenon to the greatest extent; The perfusion of pier concrete wants horizontal slice to carry out, and concrete slump controls within 70~100mm, and lift height control exists Within 30cm, poker vibrator vibrates.
It should be noted that being installed in above-mentioned work progress in frame built in application pier shaft to carry out reinforcing bar binding and template When, step 300 to step 700 repeats, and frame 2 built in solid pier pier shaft is placed on pier first, with solid Dun Dun Frame 2 built in body is the reinforcing bar binding and template installation that workbench carries out a section pier shaft, hangs out frame built in pier shaft later, completing should Save the construction of pier shaft;It is placed on the pier shaft of completion, carries out after the completion of the section pier shaft is built, then by frame 2 built in solid pier pier shaft The reinforcing bar binding and template installation of next section pier shaft;It repeats the above process, until solid pier pier shaft integral constructing is completed.
Construction method provided by the embodiments of the present application has following features:
1. placing shelf structure is simple in, and main framing uses angle steel welding fabrication, and ladder 109 is welded using round steel up and down for side, Top surface spreads embossed steel plates as job platform, single-unit length 2m, though volume is small, has the function of independent use;
2. setting up simple, work efficiency height using frame construction built in pier shaft.Built-in frame single-unit length is 2m, light-weight;In every section It sets frame and is bolted fixation using M22 × 60, it is easy for installation, the time is saved, work efficiency improves significant;
3. using frame construction save the cost built in pier shaft;The engineering method, installation few using steel compared to conventional steel scaffold It is required it is artificial less, the set-up time it is short, cost savings.
4. complying with standard manages;Built-in frame is used uniformly angle steel production, and standard knot is used uniformly mono- section of 2m, completely uses Unified standard is constructed, and unified coordination and administration are convenient for.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, those skilled in the art should understand that:Its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. frame built in a kind of solid pier pier shaft, which is characterized in that including frame unit built in more piece, built-in frame unit edge described in more piece Vertical direction is sequentially connected with;
The built-in frame unit includes at least four vertical bars, more transverse bar members and Duo Gen diagonal brace rod piece;
The vertical bar interval is arranged to form polygonal frame;Two institutes are at least set between any adjacent two vertical bar Transverse bar member is stated, and the both ends of the transverse bar member are connected with two vertical bars respectively;
Piece diagonal brace rod piece, and one end of the diagonal brace rod piece and institute are at least set between any adjacent two vertical bar It states vertical bar to be connected, the other end of the diagonal brace rod piece is connected with the transverse bar member.
2. frame built in solid pier pier shaft according to claim 1, which is characterized in that the built-in frame unit further includes reinforcing Rod piece, the vertical spaced set of reinforcing member is between adjacent two vertical bars, and the two of the reinforcing member End is connected with the transverse bar member respectively;
One end of the diagonal brace rod piece is connected with the vertical bar, the other end and the reinforcing member of the diagonal brace rod piece It is connected with the junction of the transverse bar member.
3. frame built in solid pier pier shaft according to claim 1, which is characterized in that built-in frame unit described in two adjacent sections The diagonal brace rod piece and the tie point of the transverse bar member one end be connected on same vertical line.
4. frame built in solid pier pier shaft according to claim 1, which is characterized in that the both ends horizontal of the vertical bar is set It is equipped with fixation steel plate, multiple bolts hole are provided on the fixation steel plate;The adjacent built-in frame unit passes through the fixed steel Plate is mutually fixedly connected.
5. frame built in solid pier pier shaft according to claim 1, which is characterized in that be provided with branch on the built-in frame unit Fagging, and the support plate is provided with guardrail on built-in frame unit described in top layer.
6. frame built in solid pier pier shaft according to claim 5, which is characterized in that the built-in frame unit further includes climbing Ladder;The ladder is set to the side of the built-in frame unit along the vertical direction.
7. frame built in solid pier pier shaft according to claim 6, which is characterized in that the built-in frame cell side face corresponds to institute It states and someone hole is set at ladder.
8. frame built in solid pier pier shaft according to claim 1, which is characterized in that the height of frame unit is built in described 2m。
9. frame built in solid pier pier shaft according to claim 1, which is characterized in that the vertical bar be ∠ 100mm × The angle steel of 100mm × 6mm;The transverse bar member is the reinforcing bar of φ 16;The diagonal brace rod piece is the angle ∠ 63mm × 63mm × 4mm Steel.
10. a kind of side for carrying out solid pier pier construction using frame built in the described in any item solid pier pier shafts of claim 1 to 9 Method, which is characterized in that include the following steps:
Step 100, surveying and locating;
Bridge pier direction across bridge center of arc vertex is released on cushion cap face using total station, along bridge to point, straightway before and after pier center Four angle points, and pop up pier shaft outer contour and template outer contour;
Step 200, concrete dabbing;
Grooving is carried out to cushion cap face along contour line using cutting machine, then carries out concrete surface dabbing;
Frame built in step 300, pier shaft is installed;
According to the height of pier shaft and pier neck size, designs the structure snd size of frame unit built in solid pier pier shaft and builds welding, Then it will be placed on pier shaft built in solid pier pier shaft;
Step 400, reinforcing bar binding;
Using frame built in pier shaft as job platform, pier shaft reinforcing bar is bound upwards in turn by pier shaft bottom;
Step 500, template installation;
Template uses over-form construction;When overmolded, on most upper section template indwelling pier shaft, following template is turned into most upper section mould On plate;Template repeats to construct, and makes inside and outside arc plate full configuration, and inner and outer template is fixed in the form of to pull rod;
Step 600, built-in frame are hung out;
Reinforcing bar binding, template after the installation is completed, built-in frame is hung out using crane;
Step 700, concrete placings;
Filling concrete uninterruptedly continuously is carried out to pier shaft, completes the construction of solid pier shaft.
CN201811003885.5A 2018-08-30 2018-08-30 Frame built in solid pier pier shaft and solid pier pier construction method Pending CN108842637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811003885.5A CN108842637A (en) 2018-08-30 2018-08-30 Frame built in solid pier pier shaft and solid pier pier construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811003885.5A CN108842637A (en) 2018-08-30 2018-08-30 Frame built in solid pier pier shaft and solid pier pier construction method

Publications (1)

Publication Number Publication Date
CN108842637A true CN108842637A (en) 2018-11-20

Family

ID=64188751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811003885.5A Pending CN108842637A (en) 2018-08-30 2018-08-30 Frame built in solid pier pier shaft and solid pier pier construction method

Country Status (1)

Country Link
CN (1) CN108842637A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282008A (en) * 2004-03-29 2005-10-13 Eito Kogyo Kk Concrete slab construction method, reinforcement material support tool used in concrete construction, binding pin tool and lightening buried body
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN203247506U (en) * 2013-04-28 2013-10-23 中铁十二局集团第二工程有限公司 Bridge high-pier construction creeping formwork internal formwork lifting frame
CN204139619U (en) * 2014-07-24 2015-02-04 中建钢构有限公司 For the support that huge post lifting is installed
CN104842449A (en) * 2015-05-17 2015-08-19 天津第一市政公路工程有限公司 Detachable stationary type steel reinforcement framework binding pedestal and assembly and use method thereof
CN205636497U (en) * 2016-04-18 2016-10-12 中铁港航局集团有限公司 Pier shaft template and operation platform integration system
CN205839599U (en) * 2016-06-12 2016-12-28 中交一公局第二工程有限公司 Pier stud reinforcing bar location auxiliary moulding bed
CN107178037A (en) * 2017-05-31 2017-09-19 中交二公局第工程有限公司 The outer frame connecting structure of trestle vase-shaped column-type pier pier shaft and its construction technology
CN208762886U (en) * 2018-08-30 2019-04-19 中铁六局集团有限公司 Frame and constructing device built in solid pier pier shaft

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282008A (en) * 2004-03-29 2005-10-13 Eito Kogyo Kk Concrete slab construction method, reinforcement material support tool used in concrete construction, binding pin tool and lightening buried body
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN203247506U (en) * 2013-04-28 2013-10-23 中铁十二局集团第二工程有限公司 Bridge high-pier construction creeping formwork internal formwork lifting frame
CN204139619U (en) * 2014-07-24 2015-02-04 中建钢构有限公司 For the support that huge post lifting is installed
CN104842449A (en) * 2015-05-17 2015-08-19 天津第一市政公路工程有限公司 Detachable stationary type steel reinforcement framework binding pedestal and assembly and use method thereof
CN205636497U (en) * 2016-04-18 2016-10-12 中铁港航局集团有限公司 Pier shaft template and operation platform integration system
CN205839599U (en) * 2016-06-12 2016-12-28 中交一公局第二工程有限公司 Pier stud reinforcing bar location auxiliary moulding bed
CN107178037A (en) * 2017-05-31 2017-09-19 中交二公局第工程有限公司 The outer frame connecting structure of trestle vase-shaped column-type pier pier shaft and its construction technology
CN208762886U (en) * 2018-08-30 2019-04-19 中铁六局集团有限公司 Frame and constructing device built in solid pier pier shaft

Similar Documents

Publication Publication Date Title
CN106013455B (en) A kind of manufacture of Prefabricated composite steel reinforcement cage component assembly method, reinforced concrete structure body method of construction
CN102493360B (en) Reinforced concrete arch bridge construction method
CN105971274A (en) Cantilever support frame formwork system and construction method thereof
CN105143570B (en) Building structure and construction method for same
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
TW201704594A (en) A module for a structure
CN108625486A (en) A kind of across frame structure edge support node structure of steel bar girder plate
CN211369053U (en) Frame construction end support node structure is striden to reinforcing bar truss plate
CN110700101A (en) Spliced template for pouring pier and construction method thereof
CN108086585A (en) A kind of non-combined shear wall of assembled integral sandwich heat preservation and its construction technology
CN108625489A (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN206052964U (en) Prefabricated composite steel reinforcement cage component and structure
CN108951429A (en) The method of frame and hollow pier pier construction built in hollow pier pier shaft
CN102767282B (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN208762886U (en) Frame and constructing device built in solid pier pier shaft
CN208472973U (en) A kind of detachable reinforcing steel truss plate end support node structure
CN101148910B (en) Reinforced composite dismounting-free die building construction method
CN107882328A (en) The construction method of large span steel truss overhung construction
CN208472972U (en) A kind of steel bar girder plate end connecting joint structure
CN208009635U (en) The prefabricated stirrup cage of frame structure bean column node of U-shaped fixing muscle is set
CN113818362A (en) Non-landing super-long assembly type bracket and hanging basket integrated structure and construction method
CN108625488A (en) A kind of detachable reinforcing steel truss plate end support node structure and construction method
JPH06173339A (en) Constructing method for joining section for column/beam
CN208472976U (en) A kind of across frame structure edge support node structure of steel bar girder plate
CN208777183U (en) Frame and constructing device built in hollow pier pier shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190103

Address after: 100036 Wanshou Road, Haidian District, Beijing, No. 2

Applicant after: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Applicant after: Guangzhou Railway Group Engineering Co. Ltd.

Address before: 511400 Unit 101, Building 18, Tian'an Headquarters Center, 555 North Panyu Avenue, Donghuan Street, Panyu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Railway Group Engineering Co. Ltd.

TA01 Transfer of patent application right