CN108798678B - Wear tunnel freezing hole construction technique - Google Patents

Wear tunnel freezing hole construction technique Download PDF

Info

Publication number
CN108798678B
CN108798678B CN201810537485.6A CN201810537485A CN108798678B CN 108798678 B CN108798678 B CN 108798678B CN 201810537485 A CN201810537485 A CN 201810537485A CN 108798678 B CN108798678 B CN 108798678B
Authority
CN
China
Prior art keywords
steel pipe
hole
cement
coring
bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810537485.6A
Other languages
Chinese (zh)
Other versions
CN108798678A (en
Inventor
李锐志
郭永富
任志刚
张立刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANDAN SPECIAL SHAFT SINKING CO Ltd CHINA COAL ENERGY GROUP CO Ltd
China Coal No 1 Construction Co Ltd
Original Assignee
HANDAN SPECIAL SHAFT SINKING CO Ltd CHINA COAL ENERGY GROUP CO Ltd
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANDAN SPECIAL SHAFT SINKING CO Ltd CHINA COAL ENERGY GROUP CO Ltd, China Coal No 1 Construction Co Ltd filed Critical HANDAN SPECIAL SHAFT SINKING CO Ltd CHINA COAL ENERGY GROUP CO Ltd
Priority to CN201810537485.6A priority Critical patent/CN108798678B/en
Publication of CN108798678A publication Critical patent/CN108798678A/en
Application granted granted Critical
Publication of CN108798678B publication Critical patent/CN108798678B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to one kind to wear tunnel freezing hole construction technique.Include the following steps: 1), first to be drilled downwards with drill bit from ground, until in back;2) drill bit, underlying steel pipe, until drilling depth, are extracted;3), the steel pipe is fixed with backfilling cement slurries in drill-hole annulus outside steel pipe;4), coring bit is goed deep into the steel pipe, punches back, occurs coring hole on back, extract coring bit afterwards;5) stone, sand and cement, are first poured into the steel pipe, and coring hole is blocked;6), with cement+waterglass complex, cement-grouting consolidation fills steel tube inner hole, after the solidification of cement+waterglass complex, so that it may bore normal construction freezing hole.

Description

Wear tunnel freezing hole construction technique
Technical field
The present invention relates to a kind of freezing hole construction technique, in particular to one kind wears tunnel freezing hole construction technique.
Background technique
When the inclined shaft freezing borehole wall administers construction, the mode that curtain freezes can be used, since shaft construction is long in time limit, segmentation is frozen Knot is not only to have can guarantee shaft construction safety, but also can reduce construction cost.It is not ganged up mutually between each section to guarantee to be lauched on pit shaft It need to be freezed using end socket hole.End socket hole between each section positioned at drift section need to penetrate the borehole wall and deeply to without water base rock.Construction In the process, since tunnel top is continuous layer of sand, it is rich in water, when penetrating empty section in tunnel tunnel Wai Shui may occur for drilling Sand boil enters in tunnel, causes surface collapse, drilling equipment damage even casualties, while the borehole wall caused by sand is gushed because of water burst in tunnel Bigger destruction.So needing to carry out specially treated to end socket hole before construction penetrates tunnel end socket hole.
Summary of the invention
The shortcomings that in order to overcome the prior art, the present invention provide one kind and wear tunnel freezing hole construction technique.Its method is simple, It can ensure that tunnel wears freezing hole and will not gush the secondary destruction of the borehole wall caused by sand because of water burst, while also can guarantee that freezing hole is normally applied Work.
The technical scheme adopted by the invention to solve the technical problem is that: include the following steps: 1), first to use drill bit from ground Drilling downwards, until going deep into back;2) drill bit, underlying steel pipe, until drilling depth, are extracted;3), outside steel pipe with drilling The steel pipe is fixed in backfilling cement slurries in annular space;4), coring bit is goed deep into the steel pipe, is beaten Back is worn, occurs coring hole on back, extracts coring bit afterwards;5), first poured into the steel pipe stone and Sand blocks coring hole;6), with cement+waterglass complex, cement-grouting consolidation fills steel tube inner hole, to cement+water After the complex solidification of glass, so that it may normal drilling freezing hole.
It is smaller that borehole wall area is destroyed in end socket hole of the present invention, and end socket hole freezing pipe surrounding grout filling is closely knit, secured, reaches End socket hole construction requirement has been arrived, tunnel has thoroughly been solved and wears freezing hole because water burst gushes the secondary destruction of the borehole wall and normal construction caused by sand The spillage problem of freezing hole.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is schematic structural view of the invention.
Specific embodiment
The present invention includes the following steps: 1), first to drill 1 downwards from ground with Φ 245mm drill bit, until 80 in back 4 ~100mm;2) drill bit, is extracted, it is underlyingSteel pipe 3, until drilling depth;3), outer with drilling in steel pipe 3 The steel pipe 3 is fixed in backfilling cement slurries in annular space;4), that the coring bit of Φ 190mm is deeply described In steel pipe 3, back 4 is punched, occurs coring hole on back 4, extracts coring bit afterwards;5), in the steel pipe 3 The mix material of stone and cement is first poured into, material is leaked from coring hole to tunnel 7, forms the material heap 6 of taper, material heap 6 fastly close to coring hole when, stop attal;6), continue to fill by the cement+waterglass complex of steel pipe 3 again, until More than top plate 4 more than 10m, i.e. Process of Leaking Stoppage terminates.In Process of Leaking Stoppage, various additives are added in cement slurry, make its density, Viscosity, setting time and intensity meet leak stopping requirement, form cement plug and carry out leak stopping.Solidify to cement+waterglass complex Afterwards, so that it may normal construction freezing hole.

Claims (4)

1. one kind wears tunnel freezing hole construction technique, it is characterised in that: include the following steps: 1), first with drill bit from ground downwards It drills (1), until in back (4);2) drill bit, underlying steel pipe (3), until drilling depth, are extracted;3), steel pipe (3) outside with brill The steel pipe (3) is fixed in backfilling cement slurries in hole (1) annular space;4), coring bit is goed deep into the steel It manages in (3), punches back (4), back coring hole occurs on (4), extracts coring bit afterwards;5), in the steel Stone, sand and cement are first poured into pipe (3), until close to coring hole;6), with cement+waterglass complex, continue in steel pipe (3) steel pipe is filled in, until charges are more than back (4) 10m, after the solidification of cement+waterglass complex, just It can be with normal construction freezing hole.
2. according to claim 1 wear tunnel freezing hole construction technique, it is characterised in that: the bit diameter of the step 1) For Φ 245mm.
3. according to claim 1 wear tunnel freezing hole construction technique, it is characterised in that: the steel pipe (3) of the step 2) Diameter isWith a thickness of 6mm.
4. according to claim 1 wear tunnel freezing hole construction technique, it is characterised in that: the coring bit of the step 4) Diameter is Φ 190mm.
CN201810537485.6A 2018-05-30 2018-05-30 Wear tunnel freezing hole construction technique Active CN108798678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810537485.6A CN108798678B (en) 2018-05-30 2018-05-30 Wear tunnel freezing hole construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810537485.6A CN108798678B (en) 2018-05-30 2018-05-30 Wear tunnel freezing hole construction technique

Publications (2)

Publication Number Publication Date
CN108798678A CN108798678A (en) 2018-11-13
CN108798678B true CN108798678B (en) 2019-11-26

Family

ID=64089237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810537485.6A Active CN108798678B (en) 2018-05-30 2018-05-30 Wear tunnel freezing hole construction technique

Country Status (1)

Country Link
CN (1) CN108798678B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727505B (en) * 2021-01-29 2023-05-23 金川集团股份有限公司 Treatment method for mine drilling through abandoned roadway

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182463B (en) * 2011-04-12 2013-01-16 中煤邯郸特殊凿井有限公司 Inclined shaft freezing heat insulation method
CN102758631A (en) * 2012-08-02 2012-10-31 兖矿集团有限公司 Freezing method of frozen wall of inclined shaft
CN104453910B (en) * 2013-09-22 2016-08-17 北京中煤矿山工程有限公司 Freezing pipe device under a kind of tiltedly freezing hole
CN105888672B (en) * 2014-09-02 2018-07-27 北京中煤矿山工程有限公司 Freeze pipe device under a kind of oblique freezing hole external clamping
CN204691772U (en) * 2015-05-11 2015-10-07 中煤邯郸特殊凿井有限公司 inclined shaft freezing loop
CN105236867B (en) * 2015-09-28 2018-04-20 中煤特殊凿井有限责任公司 Freezing pipe filling cement mortar and freezing pipe filling process

Also Published As

Publication number Publication date
CN108798678A (en) 2018-11-13

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN107339122B (en) Construction method for treating goaf by steel pipe column
CN108661650A (en) A kind of rich water magmatic body area depth pozo shaft construction method
CN107938650A (en) The method for filling and treating of underground karst cavity
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN101225740A (en) Annular filling method for space between freezing pipe and surrounding rock
CN104762981A (en) Hole forming method of precipitation well
CN103556554B (en) Reinforce the construction method of the drilled pile composite foundation structure of the soft base of embankment
CN107816051A (en) Pressure-bearing property phreatic aquifer deep basal pit combination well dewatering construction method
CN104711973A (en) Construction method for small-diameter pile composite foundation
CN108798678B (en) Wear tunnel freezing hole construction technique
CN108149672A (en) The processing method of underground karst cavity
CN204419114U (en) The hole sealing device of a kind of limestone area prospecting boring
CN106013155A (en) Method for filling up covering layer and processing drilling slurry leakage by grouting consolidation
CN108677959A (en) A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN101929343A (en) Profile steel pulling and grouting method of SMW (Soil Mixing Wall) process
CN105178966A (en) Grouting process for water blocking by wall breaking for mine vertical shafts
CN101255797B (en) Method for mounting blown sand and slip-casting of mine well wall as well as slip-casting pipe
CN103556555B (en) Reinforce the construction method of the nail shape drilled pile composite foundation structure of embankment widening
CN102535462A (en) Method for constructing anchor cable on sand layer
CN212837844U (en) Deep shaft water inrush structure for blocking railway tunnel at underwater target point
CN210564650U (en) Assembled slurry storage device for filling underwater deep closed space
CN107218010A (en) Broken hole drilling sleeve pipe water blockoff bridging plug and doube bridge plug shutoff method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant