CN108757023A - A method of exploiting displacement coal column using spoil strip filling - Google Patents
A method of exploiting displacement coal column using spoil strip filling Download PDFInfo
- Publication number
- CN108757023A CN108757023A CN201810742798.5A CN201810742798A CN108757023A CN 108757023 A CN108757023 A CN 108757023A CN 201810742798 A CN201810742798 A CN 201810742798A CN 108757023 A CN108757023 A CN 108757023A
- Authority
- CN
- China
- Prior art keywords
- spoil
- filling
- coal
- stripe cell
- coal column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000006073 displacement reaction Methods 0.000 title claims abstract description 8
- 239000002699 waste material Substances 0.000 claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 239000010881 fly ash Substances 0.000 claims abstract description 8
- 239000002002 slurry Substances 0.000 claims description 15
- 238000005065 mining Methods 0.000 claims description 12
- 238000009423 ventilation Methods 0.000 claims description 9
- 238000003801 milling Methods 0.000 claims description 7
- 239000002956 ash Substances 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 239000000446 fuel Substances 0.000 claims description 4
- 239000000178 monomer Substances 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 230000003245 working effect Effects 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 2
- 238000002156 mixing Methods 0.000 claims description 2
- 238000011084 recovery Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000945 filler Substances 0.000 description 2
- 239000002351 wastewater Substances 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The present invention relates to a kind of methods for exploiting displacement coal column using spoil strip filling, belong to Waste disposal, mine coal-cutting method field, more particularly to a kind of method of the electrical integrated enterprise's comprehensive utilization of waste materials of coal.Spoil is discarded using fly ash in electric power plant, haline water and mine, replaces underground coal column, improves resource recovery and economic benefit.
Description
Technical field
The invention belongs to coal mining technology fields, and in particular to a kind of to replace coal column using pit waste filling mining
Method.
Background technology
Currently, China " under three " press coal amount huge, the coal-mining method under building, under railway and under water body is referred to as " three
Under " mine, surface subsidence, generally manages goaf top plate using placement method in order to control.By the difference of coal-mining method, filling
Method has house column type filling mining and longwall filling mining;By the difference of filler, there are waste filling, paste body filling and height
Several placement methods such as water filler filling.
Down-hole spoil quantum of output is huge, and a large amount of flyash, the haline water of mating power plant's generation, coal are electrical integrated in addition
Enterprise need to handle a large amount of waste, waste water every year, at present processing method generally existing processing capacity it is limited, can not integrated treatment,
The problems such as cost is excessively high and violates environmental protection policy, it is therefore necessary to seek a kind of method of comprehensive utilization of efficient green.
Traditional placement method cannot achieve the comprehensive utilization of fly ash in electric power plant, haline water and mine spoil, novel filling side
Method need to meet while integrated treatment waste, waste water, realize the replacement exploitation of coal column, improve resource recovery, increase economical
Benefit.
Invention content
The present invention provides a kind of methods for exploiting displacement coal column using spoil strip filling, while pit waste utilizes
Underground coal column can be replaced, improve resource recovery and economic benefit.
Using following steps:
1)The transportation roadway dug in advance, cut eye, air return lane constitutes ventilation circuit, form full exhaust ventilation.If coal column is divided into
Dry exploitation band, rationally determines stripe cell length and width, and number consecutively is in order according to buried depth and mining height(1),
(2),(3),(4),(5)…….
2)Stripe cell is exploited using continuous milling machine, is exploited successively(1),(3),(5),(7)... unit.Continuous milling machine uses certainly
Dynamic mode of coalingging, is completed the reprinting and transport of bastard coal by mine shuttle car, rubber conveyer, when coal mining, needs local fan ventilation.Band
Unit mine after, top plate and two help according to design of its support using roof-bolter carry out bolting with wire mesh.
3)Stripe cell first closes transportation roadway end seal with after two stope drift active workings perforations, and fire dam uses mode of building a wall, and
In outer side back plank, monomer is beaten with proof strength.Ground spoil is dropped naturally through waste shaft, is buffered through waste bin, and spoil is passed through
Belt conveyor reaches filling band, is then shed, is accumulated in stripe cell extraction space from return air heading using throwing cash machine
Spoil.
4)After the completion of throwing cash, stripe cell air return lane end seal is closed using the same manner, PE Grouting Pipes are reserved on wall, are
Ensure that slurries are full of spoil crack, fully connect top, in the filling pre-buried two groups of high-low-position Grouting Pipes of unit.
5)At ground slurry preparing station by flyash, haline water in mass ratio 1:1~1:Pulverized fuel ash slurry, pipeline is made in 0.6 proportioning
It is delivered near underground filling point, in underground, suitable position filling pumps curing agent slurries processed, the two in mass ratio 1:1~1:0.6
Proportioning is right successively after mixer mixes(1),(3),(5),(7)... unit is filled.
6)It waits for(1),(3),(5),(7)... it is then right after unit strength of filling mass reaches requirement(2),(4),(6),
(8)... unit repeats 2)-5)Step, 2)Step and 3),4),5)Step can be synchronized in different units and be carried out.
7)And so on, until stripe cell exploitation, the filling of entire coal column finish.
The beneficial effects of the invention are as follows:
1, a large amount for the treatment of of Power flyash, haline water and mine discard spoil, reduce ground stacking and pollution environment.
2, the mine resource rate of recovery is improved, mine service-life is extended.
3, by surface settlement control in prescribed limit, ground is avoided to move, increases economic benefit.
Description of the drawings
Fig. 1 is the System planes arrangement schematic diagram of the present invention;
Fig. 2 is the system space arrangement schematic diagram of the present invention.
Fig. 3 is Grouting Pipe arrangement diagrammatic cross-section.
In figure:1, transportation roadway;2, eye is cut;3, air return lane;4, continuous milling machine;5, roof-bolter;6, mine shuttle car;7, adhesive tape conveys
Machine;8, it builds a wall;9, spoil belt conveyor;10, cash machine is thrown;11, filling piping;12, filling pump;13, obturation;14, spoil
Well;15, downhole gangue storehouse;16, ground slurry preparing station;17, mixer;18, PE Grouting Pipes.
Specific implementation mode
Below in conjunction with attached drawing 1-3, the invention will be further described.It is a kind of to utilize spoil strip filling exploitation displacement coal column
Method, the scheme exploited using underground coal mine strip filling, specific implementation mode is as follows:
1)The transportation roadway 1 dug in advance, cut eye 2, air return lane 3 constitutes ventilation circuit, form full exhaust ventilation.Coal column is divided into
Several exploitation bands rationally determine stripe cell length and width, and number consecutively is in order(1),(2),(3),(4),
(5)…….
2)Stripe cell is exploited using continuous milling machine, is exploited successively(1),(3),(5),(7)... unit.Continuous milling machine 4 uses
Automatic loading of coal mode is completed the reprinting and transport of bastard coal by mine shuttle car 6, rubber conveyer 7, when coal mining, needs local fan ventilation.
Stripe cell mine after, top plate and two help according to design of its support using roof-bolter 5 carry out bolting with wire mesh.
3)Stripe cell first closes transportation roadway end seal with after two stope drift active workings perforations, and fire dam uses 8 modes of building a wall,
And in outer side back plank, beat monomer with proof strength.Ground spoil is dropped naturally through waste shaft 14, is buffered through waste bin 15, is led to
It crosses spoil belt conveyor 9 and reaches filling band, then produced in space toward stripe cell from return air heading using throwing cash machine 10
It sheds, accumulate spoil.
4)After the completion of throwing cash, stripe cell air return lane end seal is closed using the same manner, PE Grouting Pipes 18 are reserved on wall,
It is full of spoil crack for guarantee slurries, fully connects top, in the filling pre-buried two groups of high-low-position Grouting Pipes of unit.
5)At ground slurry preparing station 16 by flyash, haline water in mass ratio 1:1~1:Pulverized fuel ash slurry is made in 0.6 proportioning, manages
Road 11 is delivered near underground filling point, suitable position filling 12 curing agent slurries processed of pump, the two in mass ratio 1 in underground:1
~1:0.6 proportioning is right successively after the mixing of mixer 17(1),(3),(5),(7)... unit is filled.
6)It waits for(1),(3),(5),(7)... it is then right after 13 intensity of unit obturation reaches requirement(2),(4),(6),
(8)... unit repeats 2)-5)Step, 2)Step and 3),4),5)Step can be synchronized in different units and be carried out.
7)And so on, until stripe cell exploitation, the filling of entire coal column finish.
Claims (3)
1. a kind of method for exploiting displacement coal column using spoil strip filling, which is characterized in that use following steps:
1)The transportation roadway dug in advance, cut eye, air return lane constitutes ventilation circuit, form full exhaust ventilation;If coal column is divided into
Dry exploitation band, rationally determines stripe cell length and width, and number consecutively is in order according to buried depth and mining height(1),
(2),(3),(4),(5)……;
2)Stripe cell is exploited using continuous milling machine, is exploited successively(1),(3),(5),(7)... unit;Continuous milling machine is using automatic dress
Coal mode is completed the reprinting and transport of bastard coal by mine shuttle car, rubber conveyer, when coal mining, needs local fan ventilation;Stripe cell
After coal mining, top plate and two help according to design of its support using roof-bolter carry out bolting with wire mesh;
3)Stripe cell first closes transportation roadway end seal, fire dam uses mode of building a wall, and outside with after two stope drift active workings perforations
Side back plank beats monomer with proof strength;Ground spoil is dropped naturally through waste shaft, is buffered through waste bin, and spoil belt is passed through
Conveyer reaches filling band, is then shed in stripe cell extraction space from return air heading using throwing cash machine, accumulates spoil;
4)After the completion of throwing cash, stripe cell air return lane end seal is closed using the same manner, PE Grouting Pipes are reserved on wall, to ensure
Slurries are full of spoil crack, fully connect top, in the filling pre-buried two groups of high-low-position Grouting Pipes of unit;
5)Flyash, haline water are made pulverized fuel ash slurry at ground slurry preparing station, near Pipeline transport to underground filling point, in well
Lower suitable position filling pumps curing agent slurries processed, and the two is right successively after mixer mixes(1),(3),(5),(7)... it is single
Member is filled;
6)It waits for(1),(3),(5),(7)... it is then right after unit strength of filling mass reaches requirement(2),(4),(6),(8)……
Unit repeats 2)-5)Step, 2)Step and 3),4),5)Step can be synchronized in different units and be carried out;
7)And so on, until stripe cell exploitation, the filling of entire coal column finish.
2. the method according to claim 1 for exploiting displacement coal column using spoil strip filling, which is characterized in that step 5)
In, the flyash, haline water mass ratio be 1:1~1:0.6.
3. the method according to claim 1 for exploiting displacement coal column using spoil strip filling, which is characterized in that step 5)
In, the mixing quality ratio of the pulverized fuel ash slurry and curing agent slurries is 1:1~1:0.6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810742798.5A CN108757023A (en) | 2018-07-09 | 2018-07-09 | A method of exploiting displacement coal column using spoil strip filling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810742798.5A CN108757023A (en) | 2018-07-09 | 2018-07-09 | A method of exploiting displacement coal column using spoil strip filling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108757023A true CN108757023A (en) | 2018-11-06 |
Family
ID=63972714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810742798.5A Pending CN108757023A (en) | 2018-07-09 | 2018-07-09 | A method of exploiting displacement coal column using spoil strip filling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108757023A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109322669A (en) * | 2018-12-04 | 2019-02-12 | 新疆大学 | The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method |
CN109538290A (en) * | 2019-01-18 | 2019-03-29 | 湖北宜化江家墩矿业有限公司 | A kind of slurry pressure immersion filling process |
CN110374598A (en) * | 2019-07-22 | 2019-10-25 | 中国矿业大学 | The method of artificial ore pillar collaboration waste filling displacement surface plant protection coal pillar |
CN111894589A (en) * | 2020-08-21 | 2020-11-06 | 郝万东 | Green filling replacement mining method for industrial waste |
CN111927541A (en) * | 2020-08-20 | 2020-11-13 | 大地工程开发(集团)有限公司 | Continuous mining and continuous gangue filling strip filling high-pressure grouting mining method |
WO2021008212A1 (en) * | 2019-07-15 | 2021-01-21 | 中国矿业大学 | High-pressure water-powered precise coal crushing and filling mining method in inclined coal seam |
CN112282836A (en) * | 2020-10-22 | 2021-01-29 | 陕西中建永鑫建设工程有限公司 | Gangue filling material, filling method and mine filling system |
CN113653492A (en) * | 2021-10-21 | 2021-11-16 | 煤炭科学研究总院 | Method for preventing rock burst in filling mining |
CN114183140A (en) * | 2021-12-07 | 2022-03-15 | 山东科技大学 | Mining and filling method for coal pillar in advanced replacement section |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1079453A (en) * | 1993-06-30 | 1993-12-15 | 新泰市光明煤矿 | Coal gangue slurry liquid |
CN1963149A (en) * | 2006-11-17 | 2007-05-16 | 中国矿业大学 | Mining method for replacement of banded coal under building by waste rock |
CN102128051A (en) * | 2011-03-11 | 2011-07-20 | 中国矿业大学 | Method for filling gob area with attal in coal mine underhole |
CN103104287A (en) * | 2013-01-28 | 2013-05-15 | 山东科技大学 | Stripe gob filling repeated-mining method |
CN104775817A (en) * | 2015-03-05 | 2015-07-15 | 内蒙古裕兴矿业有限公司 | All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings |
WO2015161771A1 (en) * | 2014-04-25 | 2015-10-29 | 中国矿业大学 | Matching method for equipment for solid-filling coal face of coal mine |
CN107237634A (en) * | 2017-06-29 | 2017-10-10 | 中国矿业大学 | A kind of resource exhaustion mine block leaves coal column classified reclaiming method |
-
2018
- 2018-07-09 CN CN201810742798.5A patent/CN108757023A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1079453A (en) * | 1993-06-30 | 1993-12-15 | 新泰市光明煤矿 | Coal gangue slurry liquid |
CN1963149A (en) * | 2006-11-17 | 2007-05-16 | 中国矿业大学 | Mining method for replacement of banded coal under building by waste rock |
CN102128051A (en) * | 2011-03-11 | 2011-07-20 | 中国矿业大学 | Method for filling gob area with attal in coal mine underhole |
CN103104287A (en) * | 2013-01-28 | 2013-05-15 | 山东科技大学 | Stripe gob filling repeated-mining method |
WO2015161771A1 (en) * | 2014-04-25 | 2015-10-29 | 中国矿业大学 | Matching method for equipment for solid-filling coal face of coal mine |
CN104775817A (en) * | 2015-03-05 | 2015-07-15 | 内蒙古裕兴矿业有限公司 | All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings |
CN107237634A (en) * | 2017-06-29 | 2017-10-10 | 中国矿业大学 | A kind of resource exhaustion mine block leaves coal column classified reclaiming method |
Non-Patent Citations (4)
Title |
---|
张建国: "建筑物下条带开采煤柱矸石置换技术研究", 煤炭科技, no. 1, pages 67 - 69 * |
曹忠,王恒: "建下条带保护煤柱矸石充填置换开采技术研究", 搞好矿区环境保护 建立和谐生态型矿区论文集, pages 35 - 40 * |
汪晨光: "地下采空区充填灌浆施工技术", 农业科技与信息, vol. 2, no. 14, pages 149 - 152 * |
王水利,陈延涛,徐营等: "薄煤层沿空留巷围岩控制技术研究", 煤矿开采, vol. 20, no. 6, pages 52 - 55 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109322669A (en) * | 2018-12-04 | 2019-02-12 | 新疆大学 | The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method |
CN109322669B (en) * | 2018-12-04 | 2021-02-02 | 新疆大学 | Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining |
CN109538290A (en) * | 2019-01-18 | 2019-03-29 | 湖北宜化江家墩矿业有限公司 | A kind of slurry pressure immersion filling process |
CN112780336B (en) * | 2019-01-18 | 2023-03-31 | 湖北宜化江家墩矿业有限公司 | Pressure leaching type filling mining process |
CN112780336A (en) * | 2019-01-18 | 2021-05-11 | 湖北宜化江家墩矿业有限公司 | Pressure leaching type filling mining process |
WO2021008212A1 (en) * | 2019-07-15 | 2021-01-21 | 中国矿业大学 | High-pressure water-powered precise coal crushing and filling mining method in inclined coal seam |
CN110374598B (en) * | 2019-07-22 | 2021-03-02 | 中国矿业大学 | Method for replacing industrial square protective coal pillar by artificial ore pillar in cooperation with gangue filling |
CN110374598A (en) * | 2019-07-22 | 2019-10-25 | 中国矿业大学 | The method of artificial ore pillar collaboration waste filling displacement surface plant protection coal pillar |
CN111927541A (en) * | 2020-08-20 | 2020-11-13 | 大地工程开发(集团)有限公司 | Continuous mining and continuous gangue filling strip filling high-pressure grouting mining method |
CN111927541B (en) * | 2020-08-20 | 2022-02-15 | 大地工程开发(集团)有限公司 | Continuous mining and continuous gangue filling strip filling high-pressure grouting mining method |
CN111894589A (en) * | 2020-08-21 | 2020-11-06 | 郝万东 | Green filling replacement mining method for industrial waste |
CN112282836A (en) * | 2020-10-22 | 2021-01-29 | 陕西中建永鑫建设工程有限公司 | Gangue filling material, filling method and mine filling system |
CN113653492A (en) * | 2021-10-21 | 2021-11-16 | 煤炭科学研究总院 | Method for preventing rock burst in filling mining |
CN113653492B (en) * | 2021-10-21 | 2021-12-31 | 煤炭科学研究总院 | Method for preventing rock burst in filling mining |
CN114183140A (en) * | 2021-12-07 | 2022-03-15 | 山东科技大学 | Mining and filling method for coal pillar in advanced replacement section |
CN114183140B (en) * | 2021-12-07 | 2023-11-17 | 山东科技大学 | Mining and filling method for advanced replacement section coal pillar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108757023A (en) | A method of exploiting displacement coal column using spoil strip filling | |
WO2021068691A1 (en) | Strong-weak-strong clean mining and full filling method for coal mine | |
WO2018176892A1 (en) | Network integrated and coordinated control system and method for thin coal seam comprehensive mining and gas control | |
CN109882239B (en) | Open-pit end slope coal-pressing radial filling mining method | |
CN102305069B (en) | Technology and equipment for separating coal and gangue and refilling gangue | |
CN102705002B (en) | Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method | |
CN112377247B (en) | In-situ grouting filling method for in-situ separation of coal mine underground gangue | |
CN102230396A (en) | Filling method capable of exploring while filling coal mine goaf | |
CN105317438B (en) | The pre- coal-mining method for adopting the broken top coal of layering in the middle part of a kind of super high seam | |
CN109826665A (en) | A kind of spoil and high-water material mixed filling method | |
CN106499396B (en) | Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method | |
CN111691885B (en) | Efficient filling mining method for ultra-thick coal seam | |
CN101915100B (en) | Loess-filling coal-mining method in a coal mine | |
CN110410076B (en) | Filling mining method for recovering left coal pillars in goaf of old house pillar | |
CN202266260U (en) | Technical equipment for separating coal from gangue and backfilling gangue | |
CN112963149B (en) | High-efficiency full-mining and full-filling mining method for near-horizontal thick coal seam | |
CN105041319A (en) | Mine colliery lane manless working face and filling mining method | |
CN112096449A (en) | Coal mine goaf paste strip grouting combined filling mining method | |
CN109630112B (en) | N00 mining method of cut top filling | |
CN104088662A (en) | Construction method of gob-side entry retaining wall of solid filling coal mining | |
CN103147792A (en) | Drift type coal mining filling method | |
CN108035769A (en) | A kind of microorganism is modified filling coal mining method | |
CN108301833B (en) | Full negative pressure short wall filling coal mining method | |
CN104763467B (en) | Obturation and its placement method and system for Hazard in Deep Metal Mines goaf | |
CN116537786A (en) | Mining method for filling and replacing coal pillars without lifting gangue |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |