CN108757023A - A method of exploiting displacement coal column using spoil strip filling - Google Patents

A method of exploiting displacement coal column using spoil strip filling Download PDF

Info

Publication number
CN108757023A
CN108757023A CN201810742798.5A CN201810742798A CN108757023A CN 108757023 A CN108757023 A CN 108757023A CN 201810742798 A CN201810742798 A CN 201810742798A CN 108757023 A CN108757023 A CN 108757023A
Authority
CN
China
Prior art keywords
spoil
filling
coal
stripe cell
coal column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810742798.5A
Other languages
Chinese (zh)
Inventor
柏建彪
卞卡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD
China University of Mining and Technology CUMT
Original Assignee
YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD, China University of Mining and Technology CUMT filed Critical YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD
Priority to CN201810742798.5A priority Critical patent/CN108757023A/en
Publication of CN108757023A publication Critical patent/CN108757023A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention relates to a kind of methods for exploiting displacement coal column using spoil strip filling, belong to Waste disposal, mine coal-cutting method field, more particularly to a kind of method of the electrical integrated enterprise's comprehensive utilization of waste materials of coal.Spoil is discarded using fly ash in electric power plant, haline water and mine, replaces underground coal column, improves resource recovery and economic benefit.

Description

A method of exploiting displacement coal column using spoil strip filling
Technical field
The invention belongs to coal mining technology fields, and in particular to a kind of to replace coal column using pit waste filling mining Method.
Background technology
Currently, China " under three " press coal amount huge, the coal-mining method under building, under railway and under water body is referred to as " three Under " mine, surface subsidence, generally manages goaf top plate using placement method in order to control.By the difference of coal-mining method, filling Method has house column type filling mining and longwall filling mining;By the difference of filler, there are waste filling, paste body filling and height Several placement methods such as water filler filling.
Down-hole spoil quantum of output is huge, and a large amount of flyash, the haline water of mating power plant's generation, coal are electrical integrated in addition Enterprise need to handle a large amount of waste, waste water every year, at present processing method generally existing processing capacity it is limited, can not integrated treatment, The problems such as cost is excessively high and violates environmental protection policy, it is therefore necessary to seek a kind of method of comprehensive utilization of efficient green.
Traditional placement method cannot achieve the comprehensive utilization of fly ash in electric power plant, haline water and mine spoil, novel filling side Method need to meet while integrated treatment waste, waste water, realize the replacement exploitation of coal column, improve resource recovery, increase economical Benefit.
Invention content
The present invention provides a kind of methods for exploiting displacement coal column using spoil strip filling, while pit waste utilizes Underground coal column can be replaced, improve resource recovery and economic benefit.
Using following steps:
1)The transportation roadway dug in advance, cut eye, air return lane constitutes ventilation circuit, form full exhaust ventilation.If coal column is divided into Dry exploitation band, rationally determines stripe cell length and width, and number consecutively is in order according to buried depth and mining height(1), (2),(3),(4),(5)…….
2)Stripe cell is exploited using continuous milling machine, is exploited successively(1),(3),(5),(7)... unit.Continuous milling machine uses certainly Dynamic mode of coalingging, is completed the reprinting and transport of bastard coal by mine shuttle car, rubber conveyer, when coal mining, needs local fan ventilation.Band Unit mine after, top plate and two help according to design of its support using roof-bolter carry out bolting with wire mesh.
3)Stripe cell first closes transportation roadway end seal with after two stope drift active workings perforations, and fire dam uses mode of building a wall, and In outer side back plank, monomer is beaten with proof strength.Ground spoil is dropped naturally through waste shaft, is buffered through waste bin, and spoil is passed through Belt conveyor reaches filling band, is then shed, is accumulated in stripe cell extraction space from return air heading using throwing cash machine Spoil.
4)After the completion of throwing cash, stripe cell air return lane end seal is closed using the same manner, PE Grouting Pipes are reserved on wall, are Ensure that slurries are full of spoil crack, fully connect top, in the filling pre-buried two groups of high-low-position Grouting Pipes of unit.
5)At ground slurry preparing station by flyash, haline water in mass ratio 1:1~1:Pulverized fuel ash slurry, pipeline is made in 0.6 proportioning It is delivered near underground filling point, in underground, suitable position filling pumps curing agent slurries processed, the two in mass ratio 1:1~1:0.6 Proportioning is right successively after mixer mixes(1),(3),(5),(7)... unit is filled.
6)It waits for(1),(3),(5),(7)... it is then right after unit strength of filling mass reaches requirement(2),(4),(6), (8)... unit repeats 2)-5)Step, 2)Step and 3),4),5)Step can be synchronized in different units and be carried out.
7)And so on, until stripe cell exploitation, the filling of entire coal column finish.
The beneficial effects of the invention are as follows:
1, a large amount for the treatment of of Power flyash, haline water and mine discard spoil, reduce ground stacking and pollution environment.
2, the mine resource rate of recovery is improved, mine service-life is extended.
3, by surface settlement control in prescribed limit, ground is avoided to move, increases economic benefit.
Description of the drawings
Fig. 1 is the System planes arrangement schematic diagram of the present invention;
Fig. 2 is the system space arrangement schematic diagram of the present invention.
Fig. 3 is Grouting Pipe arrangement diagrammatic cross-section.
In figure:1, transportation roadway;2, eye is cut;3, air return lane;4, continuous milling machine;5, roof-bolter;6, mine shuttle car;7, adhesive tape conveys Machine;8, it builds a wall;9, spoil belt conveyor;10, cash machine is thrown;11, filling piping;12, filling pump;13, obturation;14, spoil Well;15, downhole gangue storehouse;16, ground slurry preparing station;17, mixer;18, PE Grouting Pipes.
Specific implementation mode
Below in conjunction with attached drawing 1-3, the invention will be further described.It is a kind of to utilize spoil strip filling exploitation displacement coal column Method, the scheme exploited using underground coal mine strip filling, specific implementation mode is as follows:
1)The transportation roadway 1 dug in advance, cut eye 2, air return lane 3 constitutes ventilation circuit, form full exhaust ventilation.Coal column is divided into Several exploitation bands rationally determine stripe cell length and width, and number consecutively is in order(1),(2),(3),(4), (5)…….
2)Stripe cell is exploited using continuous milling machine, is exploited successively(1),(3),(5),(7)... unit.Continuous milling machine 4 uses Automatic loading of coal mode is completed the reprinting and transport of bastard coal by mine shuttle car 6, rubber conveyer 7, when coal mining, needs local fan ventilation. Stripe cell mine after, top plate and two help according to design of its support using roof-bolter 5 carry out bolting with wire mesh.
3)Stripe cell first closes transportation roadway end seal with after two stope drift active workings perforations, and fire dam uses 8 modes of building a wall, And in outer side back plank, beat monomer with proof strength.Ground spoil is dropped naturally through waste shaft 14, is buffered through waste bin 15, is led to It crosses spoil belt conveyor 9 and reaches filling band, then produced in space toward stripe cell from return air heading using throwing cash machine 10 It sheds, accumulate spoil.
4)After the completion of throwing cash, stripe cell air return lane end seal is closed using the same manner, PE Grouting Pipes 18 are reserved on wall, It is full of spoil crack for guarantee slurries, fully connects top, in the filling pre-buried two groups of high-low-position Grouting Pipes of unit.
5)At ground slurry preparing station 16 by flyash, haline water in mass ratio 1:1~1:Pulverized fuel ash slurry is made in 0.6 proportioning, manages Road 11 is delivered near underground filling point, suitable position filling 12 curing agent slurries processed of pump, the two in mass ratio 1 in underground:1 ~1:0.6 proportioning is right successively after the mixing of mixer 17(1),(3),(5),(7)... unit is filled.
6)It waits for(1),(3),(5),(7)... it is then right after 13 intensity of unit obturation reaches requirement(2),(4),(6), (8)... unit repeats 2)-5)Step, 2)Step and 3),4),5)Step can be synchronized in different units and be carried out.
7)And so on, until stripe cell exploitation, the filling of entire coal column finish.

Claims (3)

1. a kind of method for exploiting displacement coal column using spoil strip filling, which is characterized in that use following steps:
1)The transportation roadway dug in advance, cut eye, air return lane constitutes ventilation circuit, form full exhaust ventilation;If coal column is divided into Dry exploitation band, rationally determines stripe cell length and width, and number consecutively is in order according to buried depth and mining height(1), (2),(3),(4),(5)……;
2)Stripe cell is exploited using continuous milling machine, is exploited successively(1),(3),(5),(7)... unit;Continuous milling machine is using automatic dress Coal mode is completed the reprinting and transport of bastard coal by mine shuttle car, rubber conveyer, when coal mining, needs local fan ventilation;Stripe cell After coal mining, top plate and two help according to design of its support using roof-bolter carry out bolting with wire mesh;
3)Stripe cell first closes transportation roadway end seal, fire dam uses mode of building a wall, and outside with after two stope drift active workings perforations Side back plank beats monomer with proof strength;Ground spoil is dropped naturally through waste shaft, is buffered through waste bin, and spoil belt is passed through Conveyer reaches filling band, is then shed in stripe cell extraction space from return air heading using throwing cash machine, accumulates spoil;
4)After the completion of throwing cash, stripe cell air return lane end seal is closed using the same manner, PE Grouting Pipes are reserved on wall, to ensure Slurries are full of spoil crack, fully connect top, in the filling pre-buried two groups of high-low-position Grouting Pipes of unit;
5)Flyash, haline water are made pulverized fuel ash slurry at ground slurry preparing station, near Pipeline transport to underground filling point, in well Lower suitable position filling pumps curing agent slurries processed, and the two is right successively after mixer mixes(1),(3),(5),(7)... it is single Member is filled;
6)It waits for(1),(3),(5),(7)... it is then right after unit strength of filling mass reaches requirement(2),(4),(6),(8)…… Unit repeats 2)-5)Step, 2)Step and 3),4),5)Step can be synchronized in different units and be carried out;
7)And so on, until stripe cell exploitation, the filling of entire coal column finish.
2. the method according to claim 1 for exploiting displacement coal column using spoil strip filling, which is characterized in that step 5) In, the flyash, haline water mass ratio be 1:1~1:0.6.
3. the method according to claim 1 for exploiting displacement coal column using spoil strip filling, which is characterized in that step 5) In, the mixing quality ratio of the pulverized fuel ash slurry and curing agent slurries is 1:1~1:0.6.
CN201810742798.5A 2018-07-09 2018-07-09 A method of exploiting displacement coal column using spoil strip filling Pending CN108757023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810742798.5A CN108757023A (en) 2018-07-09 2018-07-09 A method of exploiting displacement coal column using spoil strip filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810742798.5A CN108757023A (en) 2018-07-09 2018-07-09 A method of exploiting displacement coal column using spoil strip filling

Publications (1)

Publication Number Publication Date
CN108757023A true CN108757023A (en) 2018-11-06

Family

ID=63972714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810742798.5A Pending CN108757023A (en) 2018-07-09 2018-07-09 A method of exploiting displacement coal column using spoil strip filling

Country Status (1)

Country Link
CN (1) CN108757023A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322669A (en) * 2018-12-04 2019-02-12 新疆大学 The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method
CN109538290A (en) * 2019-01-18 2019-03-29 湖北宜化江家墩矿业有限公司 A kind of slurry pressure immersion filling process
CN110374598A (en) * 2019-07-22 2019-10-25 中国矿业大学 The method of artificial ore pillar collaboration waste filling displacement surface plant protection coal pillar
CN111894589A (en) * 2020-08-21 2020-11-06 郝万东 Green filling replacement mining method for industrial waste
CN111927541A (en) * 2020-08-20 2020-11-13 大地工程开发(集团)有限公司 Continuous mining and continuous gangue filling strip filling high-pressure grouting mining method
WO2021008212A1 (en) * 2019-07-15 2021-01-21 中国矿业大学 High-pressure water-powered precise coal crushing and filling mining method in inclined coal seam
CN112282836A (en) * 2020-10-22 2021-01-29 陕西中建永鑫建设工程有限公司 Gangue filling material, filling method and mine filling system
CN113653492A (en) * 2021-10-21 2021-11-16 煤炭科学研究总院 Method for preventing rock burst in filling mining
CN114183140A (en) * 2021-12-07 2022-03-15 山东科技大学 Mining and filling method for coal pillar in advanced replacement section

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1079453A (en) * 1993-06-30 1993-12-15 新泰市光明煤矿 Coal gangue slurry liquid
CN1963149A (en) * 2006-11-17 2007-05-16 中国矿业大学 Mining method for replacement of banded coal under building by waste rock
CN102128051A (en) * 2011-03-11 2011-07-20 中国矿业大学 Method for filling gob area with attal in coal mine underhole
CN103104287A (en) * 2013-01-28 2013-05-15 山东科技大学 Stripe gob filling repeated-mining method
CN104775817A (en) * 2015-03-05 2015-07-15 内蒙古裕兴矿业有限公司 All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings
WO2015161771A1 (en) * 2014-04-25 2015-10-29 中国矿业大学 Matching method for equipment for solid-filling coal face of coal mine
CN107237634A (en) * 2017-06-29 2017-10-10 中国矿业大学 A kind of resource exhaustion mine block leaves coal column classified reclaiming method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1079453A (en) * 1993-06-30 1993-12-15 新泰市光明煤矿 Coal gangue slurry liquid
CN1963149A (en) * 2006-11-17 2007-05-16 中国矿业大学 Mining method for replacement of banded coal under building by waste rock
CN102128051A (en) * 2011-03-11 2011-07-20 中国矿业大学 Method for filling gob area with attal in coal mine underhole
CN103104287A (en) * 2013-01-28 2013-05-15 山东科技大学 Stripe gob filling repeated-mining method
WO2015161771A1 (en) * 2014-04-25 2015-10-29 中国矿业大学 Matching method for equipment for solid-filling coal face of coal mine
CN104775817A (en) * 2015-03-05 2015-07-15 内蒙古裕兴矿业有限公司 All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings
CN107237634A (en) * 2017-06-29 2017-10-10 中国矿业大学 A kind of resource exhaustion mine block leaves coal column classified reclaiming method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张建国: "建筑物下条带开采煤柱矸石置换技术研究", 煤炭科技, no. 1, pages 67 - 69 *
曹忠,王恒: "建下条带保护煤柱矸石充填置换开采技术研究", 搞好矿区环境保护 建立和谐生态型矿区论文集, pages 35 - 40 *
汪晨光: "地下采空区充填灌浆施工技术", 农业科技与信息, vol. 2, no. 14, pages 149 - 152 *
王水利,陈延涛,徐营等: "薄煤层沿空留巷围岩控制技术研究", 煤矿开采, vol. 20, no. 6, pages 52 - 55 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322669A (en) * 2018-12-04 2019-02-12 新疆大学 The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method
CN109322669B (en) * 2018-12-04 2021-02-02 新疆大学 Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining
CN109538290A (en) * 2019-01-18 2019-03-29 湖北宜化江家墩矿业有限公司 A kind of slurry pressure immersion filling process
CN112780336B (en) * 2019-01-18 2023-03-31 湖北宜化江家墩矿业有限公司 Pressure leaching type filling mining process
CN112780336A (en) * 2019-01-18 2021-05-11 湖北宜化江家墩矿业有限公司 Pressure leaching type filling mining process
WO2021008212A1 (en) * 2019-07-15 2021-01-21 中国矿业大学 High-pressure water-powered precise coal crushing and filling mining method in inclined coal seam
CN110374598B (en) * 2019-07-22 2021-03-02 中国矿业大学 Method for replacing industrial square protective coal pillar by artificial ore pillar in cooperation with gangue filling
CN110374598A (en) * 2019-07-22 2019-10-25 中国矿业大学 The method of artificial ore pillar collaboration waste filling displacement surface plant protection coal pillar
CN111927541A (en) * 2020-08-20 2020-11-13 大地工程开发(集团)有限公司 Continuous mining and continuous gangue filling strip filling high-pressure grouting mining method
CN111927541B (en) * 2020-08-20 2022-02-15 大地工程开发(集团)有限公司 Continuous mining and continuous gangue filling strip filling high-pressure grouting mining method
CN111894589A (en) * 2020-08-21 2020-11-06 郝万东 Green filling replacement mining method for industrial waste
CN112282836A (en) * 2020-10-22 2021-01-29 陕西中建永鑫建设工程有限公司 Gangue filling material, filling method and mine filling system
CN113653492A (en) * 2021-10-21 2021-11-16 煤炭科学研究总院 Method for preventing rock burst in filling mining
CN113653492B (en) * 2021-10-21 2021-12-31 煤炭科学研究总院 Method for preventing rock burst in filling mining
CN114183140A (en) * 2021-12-07 2022-03-15 山东科技大学 Mining and filling method for coal pillar in advanced replacement section
CN114183140B (en) * 2021-12-07 2023-11-17 山东科技大学 Mining and filling method for advanced replacement section coal pillar

Similar Documents

Publication Publication Date Title
CN108757023A (en) A method of exploiting displacement coal column using spoil strip filling
WO2021068691A1 (en) Strong-weak-strong clean mining and full filling method for coal mine
WO2018176892A1 (en) Network integrated and coordinated control system and method for thin coal seam comprehensive mining and gas control
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN102305069B (en) Technology and equipment for separating coal and gangue and refilling gangue
CN102705002B (en) Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN112377247B (en) In-situ grouting filling method for in-situ separation of coal mine underground gangue
CN102230396A (en) Filling method capable of exploring while filling coal mine goaf
CN105317438B (en) The pre- coal-mining method for adopting the broken top coal of layering in the middle part of a kind of super high seam
CN109826665A (en) A kind of spoil and high-water material mixed filling method
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN111691885B (en) Efficient filling mining method for ultra-thick coal seam
CN101915100B (en) Loess-filling coal-mining method in a coal mine
CN110410076B (en) Filling mining method for recovering left coal pillars in goaf of old house pillar
CN202266260U (en) Technical equipment for separating coal from gangue and backfilling gangue
CN112963149B (en) High-efficiency full-mining and full-filling mining method for near-horizontal thick coal seam
CN105041319A (en) Mine colliery lane manless working face and filling mining method
CN112096449A (en) Coal mine goaf paste strip grouting combined filling mining method
CN109630112B (en) N00 mining method of cut top filling
CN104088662A (en) Construction method of gob-side entry retaining wall of solid filling coal mining
CN103147792A (en) Drift type coal mining filling method
CN108035769A (en) A kind of microorganism is modified filling coal mining method
CN108301833B (en) Full negative pressure short wall filling coal mining method
CN104763467B (en) Obturation and its placement method and system for Hazard in Deep Metal Mines goaf
CN116537786A (en) Mining method for filling and replacing coal pillars without lifting gangue

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination