CN108755979A - A kind of toilet moistureproof and waterproof processing method - Google Patents
A kind of toilet moistureproof and waterproof processing method Download PDFInfo
- Publication number
- CN108755979A CN108755979A CN201810618110.2A CN201810618110A CN108755979A CN 108755979 A CN108755979 A CN 108755979A CN 201810618110 A CN201810618110 A CN 201810618110A CN 108755979 A CN108755979 A CN 108755979A
- Authority
- CN
- China
- Prior art keywords
- laid
- moistureproof
- concrete
- cement mortar
- processing method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/64—Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
- E04B1/644—Damp-proof courses
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/665—Sheets or foils impervious to water and water vapor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The present invention provides a kind of toilet moistureproof and waterproof processing methods.The toilet moistureproof and waterproof processing method includes the following steps:Mixture is layed on ground;The establishing of mixture upper berth is equipped with the concrete of two-way concrete slab, and magma receives light;It is laid with cement mortar, levelling sloping layer;Brush base treatment agent;Brush water-repellent paint;Spread waterproofing membrane;It is levelling to be laid with cement mortar receipts light, disintegrating slag is laid in cement mortar;It is laid with concrete and sloping layer, the gradient is 1% and slope aspect floor drain;It is laid with cement mortar, levelling sloping layer;It is laid with floor tile wiping seam.Moistureproof and waterproof processing method in toilet provided by the invention increases wettability power by being laid with mixture on ground;It is laid with waterproofing membrane, it is not in pierce through to improve moisture resistant grade, enhances humidity resistance;It is laid with cement mortar, disintegrating slag and concrete on waterproofing membrane, improves moistureproof and waterproof effect;By implementing two rigid two soft modes to the moistureproof and waterproof processing of toilet, the moistureproof and waterproof performance of toilet is improved.
Description
【Technical field】
The present invention relates to building dampproofing water-proofing treatment field more particularly to a kind of toilet moistureproof and waterproof processing methods.
【Background technology】
Building construction is the main place of mankind's activity, the requirement that safety and utility function are most basic is ensured, however, matter
It measures defect and builds the various drawbacks of early ageing and destruction, it is especially universal with construction quality common fault that " ooze, leak, split " is representative
In the presence of bringing many puzzlements to user.Especially, leakage is all sent out in toilet or shower cabinet, has seriously affected people
Normal life.
In the related technology, the moisture-proof water process of toilet generally comprises following method:Cement mortar is laid on ground to look for
Slope layer, slope aspect floor drain simultaneously smooth out;Then water-repellent paint is applied in cement mortar;The hardness of 30mm thickness is laid in cement mortar again
Cement mortar binder course, however, such method it is easy to appear because of water-repellent paint quality problems and waterproof layer process do not reach
It marks and causes infiltration, leak.
Therefore, it is necessary to provide a kind of new toilet moistureproof and waterproof processing method solution above-mentioned technical problem.
【Invention content】
The purpose of the present invention is to provide a kind of toilet moistureproof and waterproof processing methods that moistureproof and waterproof effect is good.
Technical scheme is as follows:
A kind of toilet moistureproof and waterproof processing method, includes the following steps:
Step S1 will be layed in doped with the mixture of lime, flyash and aggregate chips on ground;
Step S2, mixture upper berth establishing is equipped with the concrete of reinforcing bar, then concrete upper epidermis magma is received light;
Step S3 is laid with cement mortar, and levelling sloping layer on the concrete configured with reinforcing bar;
Step S4, after cement mortar solidification, brush base treatment agent;Wait for that brush waterproof applies after the base treatment agent is dry
Expect and extends brush to the height of surrounding wall 200-400mm;
Step S5 after the water-repellent paint is dry, is laid with waterproofing membrane;
Step S6 is laid with cement mortar on the waterproofing membrane, and it is levelling to receive light, is then laid in cement mortar broken
Slag;
Step S7, is laid with concrete and sloping layer on the disintegrating slag, and the gradient is 1% and slope aspect floor drain;
Step S8 is laid with cement mortar, levelling sloping layer on concrete, and the gradient is more than 1% and is less than 2%, ground leak
The gradient is increased to 1.5%-2% and slope aspect floor drain;
Step S9 is laid with floor tile, gap filler wiping seam.
Preferably, in step sl, the hole bottom for the foundation pit that the ground reserves for the element soil or floor on ground, when described
When ground is element soil, first by rammed earth.
Preferably, in step sl, the mixed proportion of the mixture of lime, flyash and aggregate chips is 5:5:90, laying
Height is 150mm-250mm.
Preferably, the height that the mixture of lime, flyash and aggregate chips is laid with is 200mm.
Preferably, in step s 2, the laying depth of concrete is 70mm-90mm.
Preferably, in step s 4, the waterproofing membrane is polyvinyl chloride film, polypropylene film, polystyrene film
Or one kind in polyethylene film, the thickness of the waterproofing membrane is 0.4mm-0.8mm.
Preferably, in step S3, S6 and S8, the mixed proportion of cement mortar is 1:3, the cement mortar it is most thin
Place's laying depth is 15mm-25mm.
Preferably, the disintegrating slag is Aerated Concrete disintegrating slag or mixed proportion is 1:One kind in 8 cement haydite.
Preferably, in the step s 7, concrete is the pea gravel concreten that the isocratic grade of intensity is C15, concrete thinnest part
Thickness be 30mm.
Preferably, in step s 5, further include evening up the waterproofing membrane in process of deployment, and make the waterproof
Film at least extends to wall.
Moistureproof and waterproof processing method in toilet provided by the invention on ground by being laid with lime, flyash and aggregate chips
Mixture increases wettability power, to effectively raise moisture protection;Water-repellent paint is painted in cement mortar again and is laid with
The good waterproofing membrane of humidity resistance, the case where waterproofing membrane will not being made to pierce through in the case where improving moisture resistant grade, effectively
Enhance humidity resistance;Again by being laid with cement mortar, disintegrating slag and concrete on waterproofing membrane, increase the waterproof number of plies with
And the thickness of each layer is increased, to effectively raise the effect of moistureproof and waterproof;Pass through the concrete and cement mortar of arrangement of reinforcement
And water-repellent paint and waterproofing membrane are used cooperatively, and to the moistureproof and waterproof processing of toilet implement armored concrete, cement bonded sand
Two rigid treatment process of slurry, and implement the two soft treatment process for being coated with water-repellent paint and waterproofing membrane, it is effective to improve
The moistureproof and waterproof performance of toilet, to effectively raising the quality in house.
【Description of the drawings】
Fig. 1 is a kind of flow chart of toilet moistureproof and waterproof processing method provided by the invention.
【Specific implementation mode】
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Referring to Fig. 1, being a kind of flow chart of toilet moistureproof and waterproof processing method provided by the invention.The toilet is anti-
Damp method for waterproofing includes the following steps:
Step S1 will be layed in doped with the mixture of lime, flyash and aggregate chips on ground, lime, flyash and stone
The mixed proportion of the mixture of bits is 5:5:90, the height of laying is 150mm-250mm, i.e., the laying height of the described mixture can
Think 150mm, 200mm or 250mm, specifically, in the present embodiment, the mixture laying of lime, flyash and aggregate chips
Height is 200mm, due to increasing the wettability power of mixture, to effectively raise moisture-proof grade.The stone being laid with
The mixture of ash, flyash and aggregate chips can effectively draw the moisture risen from ground, and the main component of lime is calcium oxide,
With very strong moisture absorption, water imbibition, therefore the moisture risen from ground can be adsorbed, prevent moisture from rising to upper the one of ground
Layer, plays good dampproof effect.
It should be mentioned that the base that the ground is reserved by the element soil on ground or second building or more architecture storey
The hole bottom in hole, when the ground is element soil, as the first of building construction building specifically uses first by the rammed earth on ground
To plain soil base carry out it is smooth, compacting and receive light processing, ensure element soil surface securely, without bright water and leakage.Strong rammer element soil
Ground can reduce the hole of soil, reduce the probability that moisture is risen by plain soil toward the native last layer of element, effectively raise moisture-proof
Ability;Foundation bearing capacity can be improved simultaneously, overcomes the collapsibility of plain soil to a certain extent, so that ground is obtained hard well
Change.
Step S2, ground upper berth establishing is equipped with the concrete of two-way concrete slab, then concrete upper epidermis magma is received light,
Two-way concrete slab is first specially set up on the ground, then pours into concrete on two-way concrete slab, to reinforce the effect of moistureproof and waterproof
Fruit.The thickness of the concrete equipped with two-way concrete slab is 70mm-90mm, that is, the thickness for being furnished with the concrete of two-way concrete slab can be
70mm, 75mm, 80mm, 85mm or 90mm.Specifically, in the present embodiment, the thickness of the concrete is 80mm;It is existing to do
In method, the thickness of armored concrete is generally 40mm, because concrete itself has the effect of good moistureproof and waterproof, and thickeies thick
After degree, dampproof effect is more preferable.
Specifically, in the present embodiment, the strength grade of concrete is C15,6@250 of model Ф of reinforcing bar.
Step S3 is configured on the concrete of two-way concrete slab and is laid with cement mortar and levelling sloping layer, wherein cement mortar
Mixed proportion be 1:3, the laying height of thinnest part is 15mm-25mm, i.e., the laying depth of cement mortar can be 15mm,
16mm, 17mm, 18mm, 19mm, 20mm, 21mm, 22mm, 23mm, 24mm or 25mm, specifically, in the present embodiment, cement
The laying depth of mortar thinnest part is 20mm.
Step S6 brushes one layer of base treatment agent in cement mortar, waits for the base treatment after waiting for cement mortar solidification
Brush water-repellent paint and extend brush to the height of surrounding wall 200-400mm after agent is dry, i.e., the described water-repellent paint is coated on wall
The height of body be from the upper surface of cement mortar to the vertical height of the wall, and be 200mm-400mm, the water-repellent paint
The height brushed in the wall can be 200mm, 250mm, 300mm, 350mm and 400mm and without being limited thereto, in order to improve wall
The waterproofing grade in face can also improve the height of the waterproof material on wall, or brush is on entire metope.Specifically,
In the present embodiment, the water-repellent paint brush is 300mm in the height of the wall.Specifically, in the present embodiment, the base
Inorganic agent is the dilution of water-repellent paint, i.e., before brushing the water-repellent paint, brushes the dilution of one layer of water-repellent paint to enhance
Bonding force between cement mortar and the water-repellent paint being coated onto.
The water-repellent paint is in acrylate waterproof paint, polymer cement waterproof paint or polyurethane water-proof paint
One kind, specifically, in the present embodiment, the water-repellent paint is polyurethane water-proof paint.
Step S5 after the water-repellent paint is dry, is laid with waterproofing membrane.The waterproofing membrane be polyvinyl chloride film,
One kind in polypropylene film, polystyrene film or polyethylene film, specifically, in the present embodiment, the waterproof is thin
Film is polyethylene film.The thickness of the waterproofing membrane is 0.4mm-0.8mm, i.e., the thickness of the described waterproofing membrane can be
0.4mm, 0.5mm, 0.6mm, 0.7mm or 0.8mm, specifically, in the present embodiment, the thickness of the waterproofing membrane is
0.4mm.In process of deployment, the waterproofing membrane is evened up, and the waterproofing membrane is made at least extend to wall, i.e., it is described anti-
The boundary of water film is abutted with wall, be can also be to be folded to wall certain altitude at the waterproofing membrane angle of rotation, in this way may be used
The phenomenon that effectively to avoid waterproofing membrane from not covering to ground.Wherein, the waterproofing membrane is laid on looking for after S3 steps
After flat and in the cement mortar brushed with the base treatment agent and the water-repellent paint, the waterproofing membrane is avoided by plain soil
The risk that aggregate chips punctures, has effectively played the performance of the waterproofing membrane waterproof, and then improves the work(of damp proofing of ground waterproof
Energy.
Step S6 is laid with cement mortar on the waterproofing membrane, and it is levelling to receive light, is then laid in cement mortar broken
Slag.Wherein, the mixed proportion of cement mortar is 1:3, the laying height of thinnest part is 15mm-25mm, the i.e. laying of cement mortar
Thickness can be 15mm, 16mm, 17mm, 18mm, 19mm, 20mm, 21mm, 22mm, 23mm, 24mm or 25mm, specifically,
In the present embodiment, the laying depth of cement mortar thinnest part is 20mm.Specifically, the disintegrating slag is Aerated Concrete disintegrating slag or 1:8
One kind in cement haydite.
Step S7, is laid with concrete and sloping layer on the disintegrating slag, and the gradient is 1% and slope aspect floor drain;The concrete is
The isocratic grade of intensity is the pea gravel concreten of C15, and the thickness of concrete thinnest part is 30mm.
Step S8 is laid with cement mortar, levelling sloping layer on concrete, and the gradient is more than 1% and is less than 2%, ground leak
The gradient is increased to 1.5%-2% and slope aspect floor drain, i.e. leak increases the gradient to 1.5%, 1.6%, 1.7%, 1.8%, 1.9%
Or the one of which gradient in 2%, be conducive to accelerate flow velocity of the flow to floor drain, ponding probability reduced, to improve
The effect of waterproof.Wherein, the mixed proportion of cement mortar is 1:3, the laying height of thinnest part is 15mm-25mm, i.e. cement bonded sand
The laying depth of slurry can be 15mm, 16mm, 17mm, 18mm, 19mm, 20mm, 21mm, 22mm, 23mm, 24mm or 25mm,
Specifically, in the present embodiment, the laying depth of cement mortar thinnest part is 20mm.
Step S9 is laid with floor tile, and gap filler is rubbed into the gap between floor tile, specifically, the gap filler is water
Mud.
Moistureproof and waterproof processing method in toilet provided by the invention on ground by being laid with lime, flyash and aggregate chips
Mixture increases wettability power, to effectively raise moisture protection;Water-repellent paint is painted in cement mortar again and is laid with
The good waterproofing membrane of humidity resistance, the case where waterproofing membrane will not being made to pierce through in the case where improving moisture resistant grade, effectively
Enhance humidity resistance;Again by being laid with cement mortar, disintegrating slag and concrete on waterproofing membrane, increase the waterproof number of plies with
And the thickness of each layer is increased, to effectively raise the effect of moistureproof and waterproof;Pass through the concrete and cement mortar of arrangement of reinforcement
And water-repellent paint and waterproofing membrane are used cooperatively, and to the moistureproof and waterproof processing of toilet implement armored concrete, cement bonded sand
Two rigid treatment process of slurry, and implement the two soft treatment process for being coated with water-repellent paint and waterproofing membrane, it is effective to improve
The moistureproof and waterproof performance of toilet, to effectively raising the quality in house.
Above-described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art
For, without departing from the concept of the premise of the invention, improvement can also be made, but these belong to the protection model of the present invention
It encloses.
Claims (10)
1. a kind of toilet moistureproof and waterproof processing method, which is characterized in that include the following steps:
Step S1 will be layed in doped with the mixture of lime, flyash and aggregate chips on ground;
Step S2, mixture upper berth establishing is equipped with the concrete of reinforcing bar, then concrete upper epidermis magma is received light;
Step S3 is laid with cement mortar, and levelling sloping layer on the concrete configured with reinforcing bar;
Step S4, after cement mortar solidification, brush base treatment agent;Wait for that brush water-repellent paint is simultaneously after the base treatment agent is dry
Extend brush to the height of surrounding wall 200-400mm;
Step S5 after the water-repellent paint is dry, is laid with waterproofing membrane;
Step S6 is laid with cement mortar on the waterproofing membrane, and it is levelling to receive light, and disintegrating slag is then laid in cement mortar;
Step S7, is laid with concrete and sloping layer on the disintegrating slag, and the gradient is 1% and slope aspect floor drain;
Step S8 is laid with cement mortar, levelling sloping layer on concrete, and the gradient is more than 1% and is less than 2%, the increasing of ground leak
The gradient is to 1.5%-2% and slope aspect floor drain;
Step S9 is laid with floor tile, gap filler wiping seam.
2. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in step sl, describedly
Base is the hole bottom for the foundation pit that the plain native or floor on ground reserves, when the ground is element soil, first by rammed earth.
3. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in step sl, lime, powder
The mixed proportion of the mixture of coal ash and aggregate chips is 5:5:90, the height of laying is 150mm-250mm.
4. moistureproof and waterproof processing method in toilet according to claim 3, which is characterized in that lime, flyash and aggregate chips
Mixture be laid with height be 200mm.
5. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in step s 2, concrete
Laying depth be 70mm-90mm.
6. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in step s 4, described anti-
Water film is one kind in polyvinyl chloride film, polypropylene film, polystyrene film or polyethylene film, and the waterproof is thin
The thickness of film is 0.4mm-0.8mm.
7. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in step S3, S6 and S8
In, the mixed proportion of cement mortar is 1:3, the thinnest part laying depth of the cement mortar is 15mm-25mm.
8. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that the disintegrating slag is that Aerated Concrete is broken
Slag or mixed proportion are 1:One kind in 8 cement haydite.
9. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in the step s 7, concrete
The thickness of the pea gravel concreten for being C15 for the isocratic grade of intensity, concrete thinnest part is 30mm.
10. moistureproof and waterproof processing method in toilet according to claim 1, which is characterized in that in step s 5, further include
In process of deployment, the waterproofing membrane is evened up, and the waterproofing membrane is made at least extend to wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810618110.2A CN108755979A (en) | 2018-06-15 | 2018-06-15 | A kind of toilet moistureproof and waterproof processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810618110.2A CN108755979A (en) | 2018-06-15 | 2018-06-15 | A kind of toilet moistureproof and waterproof processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108755979A true CN108755979A (en) | 2018-11-06 |
Family
ID=64021720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810618110.2A Pending CN108755979A (en) | 2018-06-15 | 2018-06-15 | A kind of toilet moistureproof and waterproof processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108755979A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409747A (en) * | 2019-07-26 | 2019-11-05 | 广东天濠建设工程有限公司 | Ground waterproof construction method |
CN111379397A (en) * | 2018-12-28 | 2020-07-07 | 关雄高 | Decoration process with house water seepage and humidity preventing function |
CN112900870A (en) * | 2021-01-22 | 2021-06-04 | 湖南宝家云建筑工程管理有限公司 | Damp-proof and waterproof construction method and structure for toilet |
CN112942832A (en) * | 2021-02-03 | 2021-06-11 | 湖南宝家云建筑工程管理有限公司 | Building main body structure building method |
CN114351882A (en) * | 2022-02-22 | 2022-04-15 | 江苏兴厦建设工程集团有限公司 | Graphite molding polyphenyl board heat preservation sound insulation structure suitable for room with water |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002256684A (en) * | 2001-03-05 | 2002-09-11 | Toppan Printing Co Ltd | Floor material |
KR20100077133A (en) * | 2010-05-26 | 2010-07-07 | 이은자 | Woody electric heating panel |
CN103835418A (en) * | 2012-11-27 | 2014-06-04 | 陈祥凤 | Thermal-insulation and moisture-proof bathroom floor |
CN205577352U (en) * | 2016-03-21 | 2016-09-14 | 江苏兴厦建设工程集团有限公司 | Board bathroom caisson falls |
CN107059947A (en) * | 2017-06-20 | 2017-08-18 | 上海微晶防水材料有限公司 | Villa basement waterproofing moistureproof and mildewproof construction technology |
-
2018
- 2018-06-15 CN CN201810618110.2A patent/CN108755979A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002256684A (en) * | 2001-03-05 | 2002-09-11 | Toppan Printing Co Ltd | Floor material |
KR20100077133A (en) * | 2010-05-26 | 2010-07-07 | 이은자 | Woody electric heating panel |
CN103835418A (en) * | 2012-11-27 | 2014-06-04 | 陈祥凤 | Thermal-insulation and moisture-proof bathroom floor |
CN205577352U (en) * | 2016-03-21 | 2016-09-14 | 江苏兴厦建设工程集团有限公司 | Board bathroom caisson falls |
CN107059947A (en) * | 2017-06-20 | 2017-08-18 | 上海微晶防水材料有限公司 | Villa basement waterproofing moistureproof and mildewproof construction technology |
Non-Patent Citations (2)
Title |
---|
MJZ1116: ""防水施工方案"", <百度文库HTTPS://WENKU.BAIDU.COM/VIEW/3B7989EB856A561252D36F65.HTML> * |
左边0林: ""建筑施工图设计指引——建筑"", 《百度文库 HTTPS://WENKU.BAIDU.COM/VIEW/04AC9995524DE518964B7DEB.HTML》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111379397A (en) * | 2018-12-28 | 2020-07-07 | 关雄高 | Decoration process with house water seepage and humidity preventing function |
CN110409747A (en) * | 2019-07-26 | 2019-11-05 | 广东天濠建设工程有限公司 | Ground waterproof construction method |
CN112900870A (en) * | 2021-01-22 | 2021-06-04 | 湖南宝家云建筑工程管理有限公司 | Damp-proof and waterproof construction method and structure for toilet |
CN112942832A (en) * | 2021-02-03 | 2021-06-11 | 湖南宝家云建筑工程管理有限公司 | Building main body structure building method |
CN114351882A (en) * | 2022-02-22 | 2022-04-15 | 江苏兴厦建设工程集团有限公司 | Graphite molding polyphenyl board heat preservation sound insulation structure suitable for room with water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108755979A (en) | A kind of toilet moistureproof and waterproof processing method | |
CN207499173U (en) | A kind of waterproof construction based on cement based penetration crystallization type water proofing paint layer | |
CN107190844A (en) | The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall | |
CN102776897B (en) | Wash apron anti-settling anti-cracking construction method and structure | |
CN108867894B (en) | Waterproof standard construction process for finely decorated kitchen and toilet | |
CN106894431B (en) | Hypogee pit body waterproof construction precipitation processing method under a kind of water resource enriched environment | |
CN101418641A (en) | Obligate pore construction method for construction floor | |
CN108797651A (en) | A kind of basement bottom board percolating water repairerment system | |
CN109505314A (en) | A kind of waterproof and dampproof paving structure of underground garage and its construction technology | |
CN106869304A (en) | Outer wall of basement waterproof construction and construction method in a kind of confined space | |
CN204753848U (en) | Construct outdoor floor movement joint department leak protection water structure | |
CN108797931A (en) | A kind of damp proofing of ground processing method | |
CN207812699U (en) | A kind of waterproof construction on toilet doorway | |
CN111042310A (en) | Basement bottom plate structure and construction method thereof | |
CN109881794A (en) | A kind of swimming pool waterproof construction | |
KR101112579B1 (en) | Non exposure environment multi functional multiple waterproofing system | |
CN104818835B (en) | Toilet threshold stone waterproof structure and construction method | |
CN209025235U (en) | Garage Dampproof water-drainage structure | |
CN208380086U (en) | A kind of toilet internal drainage standpipe through-flooring structure | |
CN103498476B (en) | Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method | |
CN208167997U (en) | Waterproof construction at a kind of toilet threshold | |
CN112482806A (en) | Ancient city wall repairing engineering top sea sleeker waterproof construction method | |
CN208072478U (en) | A kind of mass concrete bottom plate basement waterproofing system | |
CN204609233U (en) | Washroom threshold stone waterproof construction | |
CN107327118A (en) | A kind of house floor heating heat supply kitchen and toilet waterproof construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |
|
RJ01 | Rejection of invention patent application after publication |