Prior art keywords
underwater
cementingization
waterborne
cementing material
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810822477.6A
Other languages
Chinese (zh)
Other versions
CN108755576B (en
Inventor
陈汉宝
金峰
周虎
陈松贵
刘海成
刘海源
周元德
黄杜若
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Tianjin Research Institute for Water Transport Engineering MOT
Original Assignee
Tsinghua University
Tianjin Research Institute for Water Transport Engineering MOT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University, Tianjin Research Institute for Water Transport Engineering MOT filed Critical Tsinghua University
Priority to CN201810822477.6A priority Critical patent/CN108755576B/en
Publication of CN108755576A publication Critical patent/CN108755576A/en
Application granted granted Critical
Publication of CN108755576B publication Critical patent/CN108755576B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of levee construction monsoon phase means of defence based on cementingization block stone, belongs to the protection field of breakwater, including the first step:Determine construction time breakwater in the position that the monsoon phase needs to protect;Second step:By throwing protective position block masonry be cementing object, determine the filling compactness of block stone;Third walks:Determine the match ratio of cementing material;4th step:For the underwater sites, high molecular weight water soluble polymer lysate is put into the seawater, while pouring into a mould the underwater cementing material, form underwater cementingization plate;5th step:For position waterborne, the cementing material waterborne is poured into a mould, the portion void between stone filling of conducting oneself with dignity by cementing material waterborne forms cementingization plate waterborne.This invention simplifies breakwater provisional protection working procedures, improve construction efficiency, reduce cost.

Description

A kind of levee construction monsoon phase means of defence based on cementingization block stone
Technical field
The invention belongs to the protection fields of breakwater, are related to breakwater temporary preventive measure, more particularly to a kind of based on glue The levee construction monsoon phase means of defence of knotization block stone.
Background technology
The construction period of breakwater is often up to several years, and in the marine site of monsoon control, wave condition is divided into monsoon phase and non- The monsoon phase, in the non-monsoon phase, wave height is smaller, is the main period of levee construction, and in the monsoon phase, wave height is larger, often not Breakwater operation on the sea condition can be met, at the same time, for unfinished operation side, since block stone weight is smaller, no The impact of monsoon phase severe sea condition can be resisted, it is therefore desirable to which provisional protection is carried out to unfinished operation side.
Common temporary preventive measure has steel-wire stone protection, the protection of artificial armour, the protection of steel truss protective cover etc., The cardinal principle of above-mentioned safeguard procedures is to protect unfinished operation side, protection knot using the safeguard structure of weight bigger The installation of structure needs larger construction machinery, moreover, after the monsoon phase, breakwater could be carried out after need to removing safeguard structure Propulsion, the dismounting of safeguard structure is also required to expend a large amount of manpower and materials and occupies the more construction period.Therefore, how Design that a kind of speed of application is fast, breakwater monsoon phase safeguard procedures of free removal become urgent problem.
Invention content
The problem to be solved in the present invention is to be to provide a kind of levee construction monsoon phase protection based on cementingization block stone Method, speed of application is fast, free removal, simplifies breakwater provisional protection working procedure, improves construction efficiency, reduce cost.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of breakwater based on cementingization block stone Construction monsoon phase means of defence, including the first step:Determine construction time breakwater in the position that the monsoon phase needs to protect, it would be desirable to anti- The position of shield is divided into underwater sites and position waterborne;
Second step:By throwing protective position block masonry be cementing object, determine the filling compactness of block stone;
Third walks:The match ratio for determining the underwater cementing material that the underwater sites use, determines what above water used The match ratio of cementing material waterborne;
4th step:For the underwater sites, high molecular weight water soluble polymer lysate is put into the seawater, is poured into a mould simultaneously The underwater cementing material, by the gap between underwater cementing material dead weight stone filling, described block of stone and the underwater glue Knot material forms underwater cementingization plate;
5th step:For position waterborne, the cementing material waterborne is poured into a mould, by cementing material waterborne dead weight stone filling Between portion void, form cementingization plate waterborne.
Further, described block of stone is breakwater bed course stone or dike cardiolith.
Further, the bed course stone weight is 1000-2000kg, and dike cardiolith weight is 100-1000kg.
Further, the protective position is the dike head or levee body of construction time breakwater.
Further, the underwater cementingization plate and underwater cementingization plate filling compactness ranging from 30%-70%.
Further, the underwater cementing material and the cementing material waterborne are self-compacting concrete, self-compacting mortar Or one kind in self-compaction net slurry, the slump test value of the underwater cementing material and the cementing material waterborne are more than or equal to 210mm, divergence test value are more than or equal to 540mm.
Further, the high molecular weight water soluble polymer lysate can pass through road pumping or the side of Waterborne construction craft Formula is launched, the paved surface of the high molecular weight water soluble polymer lysate launched face domain and be more than the maximum cross-section of described block of stone Domain.
Further, the underwater cementing material is transported to described piece of underwater stone surface by conduit or pumping.
Further, the cementing material waterborne by pumping or concrete tank pipeline to described block of stone waterborne Surface.
Further, the cementing material waterborne and underwater cementing material are permeable glue.
Compared with prior art, the invention has the advantages and positive effects that:The present invention make full use of throwing exist The block stone of protective position using high fluidity cementing material and is cast in the gap of block stone, by adjusting cementing material Match ratio, control it is cementing after block stone thickness, form cementing permeable safeguard structure, be a kind of to be prevented based on cementingization block stone Wave dike monsoon phase safeguard procedures, the invention simplify breakwater provisional protection working procedure, improve construction efficiency, reduce cost, And speed of application is fast, free removal, saves material.
Description of the drawings
The attached drawing for constituting the part of the present invention is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of structure of the levee construction monsoon phase means of defence application state based on cementingization block stone of the present invention Schematic diagram.
Reference numeral:
1- cementing materials waterborne;2- high molecular weight water soluble polymer lysates;3- block stones;4- protective positions;The underwater glue of 5- Tie material.
Specific implementation mode
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as pair The limitation of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, it is not understood to indicate or imply phase To importance or implicitly indicate the quantity of indicated technical characteristic.The feature for defining " first ", " second " etc. as a result, can To express or implicitly include one or more this feature.In the description of the present invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
Specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
As shown in Figure 1, the present invention is a kind of levee construction monsoon phase means of defence based on cementingization block stone, including the One step:Determine construction time breakwater in the position that the monsoon phase needs to protect, it would be desirable to which the position of protection is divided into underwater sites and water Upper bit;
Second step:By throwing protective position 4 block stone 3 as cementing object, determine the filling compactness of block stone 3;
Third walks:The match ratio for determining the underwater cementing material 5 that underwater sites use determines that above water uses waterborne The match ratio of cementing material 1;
4th step:For underwater sites, high molecular weight water soluble polymer lysate 2 is put into the seawater, while pouring water filling Lower cementing material 5, by the gap between the dead weight stone filling 3 of underwater cementing material 5, block stone 3 is formed with underwater cementing material Underwater cementingization plate;
5th step:For position waterborne, cementing material 1 waterborne is poured into a mould, by cementing material 1 waterborne dead weight stone filling 3 Between portion void, form cementingization plate waterborne.
Preferably, block stone 3 is breakwater bed course stone or dike cardiolith, both materials can promote bearing capacity, reduce settling amount, And good water permeability, interstitial hydraulic pressure below can be made to dissipate rapidly, avoid breakwater plastic failure, and block stone 3 can be accelerated The raising of the consolidation and its intensity of lower soft layer;It is highly preferred that bed course stone weight is 1000-2000kg, dike cardiolith weight is 100-1000kg, weight is big, stablizes, and protective is good.
Preferably, protective position 4 is the dike head or levee body of construction time breakwater, this is by water impact maximum and most frequent Region, belong to rapid wear error area, therefore targetedly protected, whole stability can be promoted.
Preferably, underwater cementingization plate and underwater cementingization plate fill compactness ranging from 30%-70%, preferably 52%, whole intensity is stablized the most.
Preferably, underwater cementing material 5 and cementing material waterborne 1 are self-compacting concrete, self-compacting mortar or self-compaction The slump test value of one kind in net slurry, underwater cementing material 5 and cementing material waterborne 1 is more than or equal to 210mm, divergence examination It tests value and is more than or equal to 540mm.
Preferably, high molecular weight water soluble polymer lysate 2 can be thrown by way of road pumping or Waterborne construction craft It puts, the paved surface domain of high molecular weight water soluble polymer lysate 2 launched face domain and be more than the maximum cross-section of block stone 3, it is ensured that underwater Cementing material 5 can be combined preferably with underwater block stone 3, avoid being influenced cementing process by seawater substance.
Preferably, underwater cementing material 5 is transported to underwater 3 surface of block stone by conduit or pumping, can also pass through other Underwater mode of movement is completed, and can guarantee that underwater cementing material 5 smoothly reaches preset piece of 3 surface of stone;It is highly preferred that waterborne Cementing material 1 by pumping or concrete tank pipeline arrive 3 surface of block stone waterborne, by the way of concrete tank letter It is single, and amount of storage is big.
Preferably, cementing material 1 and underwater cementing material 5 waterborne are permeable glue and are high fluidity glue, are easy perfusion, Ensure good water penetration, during water flowing, moisture can be in time by 3 gap of block stone, to molding cementing plate waterborne It is substantially reduced with the impact force of underwater cementing plate, promotes the stability of total.
It in practical work process, is carried out in strict accordance with above step, it is ensured that links reach preset parameter value, tool The advantages such as free removal after having convenient construction is simple, saving material, safety guarantee rate high and the monsoon phase.
One embodiment of the present invention has been described in detail above, but the content be only the present invention preferable implementation Example should not be construed as limiting the practical range of the present invention.It is all according to all the changes and improvements made by the present patent application range Deng should all still fall within the scope of the patent of the present invention.

Claims (10)

1. a kind of levee construction monsoon phase means of defence based on cementingization block stone, it is characterised in that include the following steps:
The first step:Determine construction time breakwater in the position that the monsoon phase needs to protect, it would be desirable to which the position of protection is divided into underwater portion Position and position waterborne;
Second step:By throwing protective position block masonry be cementing object, determine the filling compactness of block stone;
Third walks:The match ratio for determining the underwater cementing material that the underwater sites use determines that above water uses waterborne The match ratio of cementing material;
4th step:For the underwater sites, high molecular weight water soluble polymer lysate is put into the seawater, while described in cast Underwater cementing material, by the gap between underwater cementing material dead weight stone filling, described block of stone and the underwater agglutination material Matter forms underwater cementingization plate;
5th step:For position waterborne, the cementing material waterborne is poured into a mould, by between cementing material waterborne dead weight stone filling Portion void, form cementingization plate waterborne.
2. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:Described block of stone is breakwater bed course stone or dike cardiolith.
3. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 2, feature It is:The bed course stone weight is 1000-2000kg, and dike cardiolith weight is 100-1000kg.
4. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The protective position is the dike head or levee body of construction time breakwater.
5. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The underwater cementingization plate and underwater cementingization plate filling compactness ranging from 30%-70%.
6. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The underwater cementing material and the cementing material waterborne are self-compacting concrete, self-compacting mortar or self-compaction net slurry In one kind, the slump test value of the underwater cementing material and the cementing material waterborne is more than or equal to 210mm, divergence Test value is more than or equal to 540mm.
7. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The high molecular weight water soluble polymer lysate can be launched by way of road pumping or Waterborne construction craft, described The paved surface domain of high molecular weight water soluble polymer lysate launched face domain and be more than the maximum cross-section of described block of stone.
8. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The underwater cementing material is transported to described piece of underwater stone surface by conduit or pumping.
9. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The cementing material waterborne is by pumping or concrete tank pipeline to described piece of stone surface waterborne.
10. a kind of levee construction monsoon phase means of defence based on cementingization block stone according to claim 1, feature It is:The cementing material waterborne and underwater cementing material are permeable glue.
CN201810822477.6A 2018-07-24 2018-07-24 Method for protecting breakwater during construction of monument based on cemented block stone Active CN108755576B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810822477.6A CN108755576B (en) 2018-07-24 2018-07-24 Method for protecting breakwater during construction of monument based on cemented block stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810822477.6A CN108755576B (en) 2018-07-24 2018-07-24 Method for protecting breakwater during construction of monument based on cemented block stone

Publications (2)

Publication Number Publication Date
CN108755576A true CN108755576A (en) 2018-11-06
CN108755576B CN108755576B (en) 2023-05-30

Family

ID=63971053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810822477.6A Active CN108755576B (en) 2018-07-24 2018-07-24 Method for protecting breakwater during construction of monument based on cemented block stone

Country Status (1)

Country Link
CN (1) CN108755576B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605315A (en) * 2021-07-30 2021-11-05 海南大学 Seawall construction device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200992694Y (en) * 2006-12-18 2007-12-19 辽河石油勘探局 Artificial island winter downtime protection net device
CN103556639A (en) * 2013-10-09 2014-02-05 清华大学 Construction method for underwater non-dispersible cement-based self-compaction material
JP2016211312A (en) * 2015-05-13 2016-12-15 田中 和雄 Construction of hybrid tsunami embankment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200992694Y (en) * 2006-12-18 2007-12-19 辽河石油勘探局 Artificial island winter downtime protection net device
CN103556639A (en) * 2013-10-09 2014-02-05 清华大学 Construction method for underwater non-dispersible cement-based self-compaction material
JP2016211312A (en) * 2015-05-13 2016-12-15 田中 和雄 Construction of hybrid tsunami embankment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605315A (en) * 2021-07-30 2021-11-05 海南大学 Seawall construction device

Also Published As

Publication number Publication date
CN108755576B (en) 2023-05-30

Similar Documents

Publication Publication Date Title
CN103938512B (en) The inverted construction method of existing highway is worn under a kind of newly-built road
CN108411802A (en) A kind of underwater method for repairing pile foundation and scour hole
CN106958208A (en) A kind of novel reinforced method of double curvature arched bridge
CN204371354U (en) The compound supporting and protection structure of a kind of Karst Tunnel
CN107700345A (en) A kind of wet seam anticorrosion construction method of steel-concrete combination beam and purposes
CN105350526B (en) Method for setting up steel platform
CN115853538A (en) Method for forming tenon-and-mortise type pipe sheet tunnel in water-rich sandy silt and muddy clay stratum
CN102002950A (en) Liquid division slip casting reinforcing method for subsurface structure construction joints
CN108755576A (en) A kind of levee construction monsoon phase means of defence based on cementingization block stone
CN104612142B (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN110344448A (en) A kind of blocking method of the deep hole perfusion grouting material of basement bottom board large-scale water leakage
CN103850692A (en) Shield construction protection method for annular flyover
CN107100137A (en) The integrated antiseepage processing method of hamburger type dyke
CN208899409U (en) A kind of levee construction monsoon phase safeguard structure based on cementingization block stone
CN108930249A (en) A kind of permeable breakwater based on cementingization enrockment
CN208545728U (en) A kind of telescopic mud-rock flow blocking dam
CN208701605U (en) A kind of permeable breakwater based on cementingization enrockment
CN205825948U (en) Marine jackstone dike sedimentation and the measurement apparatus of jackstone thickness
CN105220695B (en) Compact sandy-pebble layer dynamic grouting curing construction method
JP2015059362A (en) Earthquake strengthening structure for pier
CN202787211U (en) Low-strength rigid pile-permeable concrete pile novel dual compound foundation
CN209603196U (en) Sole plate post-poured strip structure
CN203144968U (en) Concrete slab expansion joint
CN205296064U (en) River channel revetment reinforcing structure
CN205712076U (en) Construction pile body structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant