CN108708578A - A kind of flexible portable distribution box protection canopy and installation and application - Google Patents

A kind of flexible portable distribution box protection canopy and installation and application Download PDF

Info

Publication number
CN108708578A
CN108708578A CN201810665002.0A CN201810665002A CN108708578A CN 108708578 A CN108708578 A CN 108708578A CN 201810665002 A CN201810665002 A CN 201810665002A CN 108708578 A CN108708578 A CN 108708578A
Authority
CN
China
Prior art keywords
column
otic placode
distribution box
firmness
upper beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810665002.0A
Other languages
Chinese (zh)
Inventor
徐晓胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810665002.0A priority Critical patent/CN108708578A/en
Publication of CN108708578A publication Critical patent/CN108708578A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • E04H1/1238Shelters for engines, e.g. electrical meter housings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Patch Boards (AREA)

Abstract

The invention discloses a kind of flexible portable distribution box protection canopy and installation and applications, including two front columns and two rear columns, front column and rear column top are fixedly connected sequentially by upper beam, two front column bottom ends are connected by bottom end rail, the upper beam parallel beneath is provided with cross bar, it is provided with two door pillars between front column, protective door is provided between two door pillars;Front column and rear column bottom are both provided with fixed plate, and mounting hole is provided in fixed plate, and brill ground bolt is equipped in mounting hole;Distribution box protection canopy structure design advantages of simple of the present invention, it is easy to install and use, it can flexibly be built according to the actual demand of outdoor study, and movement is convenient, and recycling can be maintained after, reuses, it is few that distribution box protection canopy builds consumptive material, production cost is reduced, in addition, its good warning effect, with high safety, distribution box protection canopy is furnished with door lock, is easy to use management, powerful guarantee is provided for the safety of outdoor study.

Description

A kind of flexible portable distribution box protection canopy and installation and application
Technical field
The present invention relates to outdoor study field of engineering technology, especially a kind of flexible portable distribution box protection canopy and installation Application method.
Background technology
In recent years, with the development of the social economy, outdoor study development especially increases, including building outdoor study, traffic police Outdoor study, environmental sanitation outdoor study, agriculture double rush for harvesting and sowing operation, ground observation operation, mobile personnel's outdoor study etc., with mechanization It is continuously improved, machine applications are outdoors in operation using extremely wide, and machine work be unable to do without electric power support, in operation process In, it will usually some temporary distribution boxes are used, temporary distribution box is generally located near operating location, due in operation process In, staff is easy accidentally to encounter controller switching equipment, and there are some potential safety problemss;And some settings can be set outside distribution box Easy protection canopy is set, and the protection canopy of current distribution box is typically all to add fastener mode to be taken using traditional steel pipe If time-consuming and laborious when setting up, not only unsightly but also the safety management cost of project is also added, and the protection set up Canopy is difficult to recycle and reuse, therefore, exploitation is a kind of not only built distribution box protection canopy that is quick but also can recycling and reusing at For problem in the urgent need to address.
Invention content
The purpose of the invention is to overcome a kind of flexible portable distribution box protection canopy of above-mentioned technical disadvantages offer and peace Application method is filled, distribution box protection canopy structure design advantages of simple of the present invention is easy to install and use, can be according to the reality of outdoor study Border demand is flexibly built, and movement is convenient, and recycling can be maintained after, is reused, and it is few that distribution box protection canopy builds consumptive material, is dropped Low production cost, in addition, its good warning effect, there is high safety, distribution box protection canopy to be furnished with door lock, be easy to use Management, powerful guarantee is provided for the safety of outdoor study.
The present invention solve the technical solution that uses of technical problem for:A kind of flexible portable distribution box protection canopy and installation make With method, including two front columns 1 and two rear columns 2, front column 1 and 2 top of rear column are fixed by upper beam 3 successively Connection, two 1 bottom ends of front column are connected by bottom end rail 4, and 3 parallel beneath of the upper beam is provided with cross bar 12, front column 1 it Between be provided with two door pillars 6, be provided with protective door 5 between two door pillars 6;Front column 1 and 2 bottom of rear column are both provided with Fixed plate 7 is provided with mounting hole 11 in fixed plate 7, and brill ground bolt is equipped in mounting hole 11;5 one end of the protective door is logical It crosses hinge to connect with a door pillar 6, the other end is provided with lockset and by lockset and the snap fit on another door pillar 6 Connection;It is both provided between the front column 1 and rear column 2, between front column 1 and door pillar 6, between two rear columns 2 anti- Protecting wire net 9,9 edge of the protection network are provided with frame 10;It is respectively provided on the front column 1, rear column 2 and door pillar 6 Have multiple otic placodes 8, on otic placode 8 setting be equipped with fixing bolt 14 in the mounting hole 13 there are two mounting hole 13;It is described More chord members 15 are provided between cross bar 12 and upper beam 3,15 both ends of the chord member are fixed by welding in 12 He of cross bar respectively On upper beam 3;
The upper beam 3, bottom end rail 4 and door pillar 6 by the fixing bolt 14 on otic placode 8 and otic placode 8 respectively with two Front column 1, two rear column 2, cross bar 12 are fixedly connected;
The frame 10 by the fixing bolt 14 on otic placode 8 and otic placode 8 respectively with two front columns, 1, two rear column 2, Door pillar 6 is fixedly connected;
It is rectangular that the front column 1, rear column 2, door pillar 6, cross bar 12, upper beam 3, bottom end rail 4, which are set as cross section, Square tubular column;
Its installation and application comprises the following steps that:
(1)Material prepares:
By front column 1, rear column 2, door pillar 6, cross bar 12, upper beam 3, bottom end rail 4, protective door 5, frame 10 and protection network 9 equal materials are lifted into using position;
(2)Weld otic placode:
The welding position of two front columns, 1, two rear column 2 is the both ends and from bottom to top 1/4 of its adjacent two sides Locate, at 1/2, at 3/4, firm welding checks firmness, spare after reaching standards for safe use;
The welding position of door pillar is the both ends of its two long side surface, a long side surface from bottom to top at 1/8, at 3/4, welding jail Gu check firmness, it is spare after reaching standards for safe use;
(3)It is welded and fixed plate:
Fixed plate 7 is fixedly welded on front column 1,2 bottom end of rear column, firm welding checks firmness, reaches safe handling It is spare after standard;
(4)Weld protection network:
Corresponding protection network 9 is measured and intercepted according to demand, and frame 10 is fixedly welded on 9 edge of each protection network, Firm welding checks firmness, spare after reaching standards for safe use;
(5)Material is installed:
Preceding facade installation
By step(2)Two qualified front columns 1 of middle welding connect both ends by upper beam 3, bottom end rail 4, form rectangle frame, lead to Upper beam 3, bottom end rail 4 are fixed on two 1 both ends of front column by the fixing bolt 14 crossed on otic placode 8, are checked firmness, are reached It is spare to after standards for safe use;
Hinge and lock will be fixedly installed respectively on two door pillars 6, protective door 5 is fixed on a door pillar 6 by hinge On, and connect with another door pillar 6 with lock by lockset, measure size, by two 6 bottom ends of door pillar by otic placode 8 with And the fixing bolt 14 on otic placode 8 is fixed on bottom end rail 4, checks firmness, it is spare after reaching standards for safe use;
The protection network 9 for being welded with frame 10 for choosing size qualification, 9 both ends of protection network are stood by front column 1 and door respectively The fixing bolt 14 on otic placode 8 and otic placode 8 on column 6 is fixed on front column 1, on door pillar 6, checks firmness, reaches It is spare after standards for safe use;
Facade is installed afterwards
By step(2)Qualified two rear columns, 2 top of middle welding is connected by upper beam 3, passes through the fixing bolt on otic placode 8 14 are fixed on upper beam 3 on two rear columns 2, check firmness, spare after reaching standards for safe use;
9 both ends of protection network are passed through the otic placode 8 on rear column 2 by the protection network 9 for being welded with frame 10 for choosing size qualification respectively And the fixing bolt 14 on otic placode 8 is fixed on rear column 2, checks firmness, it is spare after reaching standards for safe use;
Preceding facade combines installation with rear facade
By stepWith stepThe preceding facade that installation is complete is connect by two upper beams 3 respectively with rear facade, upper beam 3 It is fixed on two front columns 1 and two rear columns 2 by the fixing bolt 14 on otic placode 8, checks firmness, reach safety It is spare after standard;
The protection network 9 for being welded with frame 10 for choosing size qualification, protection network 9 is fixed between front column 1 and rear column 2, Protection network 9 is fixed on front column 1 with after by the otic placode 8 on front column 1 and rear column 2 and the fixing bolt 14 on otic placode 8 On column 2, firmness is checked, it is spare after reaching standards for safe use;
It reinforces and is installed with protection
By stepCross bar 12 is installed in the lower section of all upper beams 3 in the frame that installation is complete, and 12 both ends of cross bar pass through otic placode 8 And the fixing bolt 14 on otic placode 8 is fixedly connected with front column 1, rear column 2 and door pillar 6, checks firmness, reaches safety It is spare after standard;
15 both ends of chord member are fixed by welding on upper beam 3 and cross bar 12, firmness is checked, installs, as originally Invention distribution box protection canopy;
(6)Application method:
After the distribution box protection canopy overall inspection installed, it is qualified to examine, and on the outside of lifting to distribution box, and distribution box is set On the inside of distribution box protection canopy, the mounting hole in the fixed plate 7 bored ground bolt and welded by front column 1,2 bottom of rear column is used Entire distribution box protection canopy is fixed on ground by 11;
Distribution box protection canopy is entered using key by protective door 5 by professional, forbids climbing, in use, suspension safety post Show, outside forbids staying amateur staff.
Advantageous effect possessed by the present invention is:
Distribution box protection canopy structure design advantages of simple of the present invention, it is easy to install and use, it can be according to the actual demand of outdoor study It flexibly builds, and movement is convenient, and recycling can be maintained after, recycling, it is few that distribution box protection canopy builds consumptive material, reduces life Cost is produced, in addition, its good warning effect, there is high safety, distribution box protection canopy to be furnished with door lock, be easy to use management, Powerful guarantee is provided for the safety of outdoor study.
Description of the drawings
Accompanying drawing 1 is the structural representation of the present invention.
Attached drawing 2 is the preceding elevational schematic view of the present invention.
Attached drawing 3 is the rear elevational schematic view of the present invention.
Attached drawing 4 is fixed plate, bottom end rail and the front column connection diagram of the present invention.
Attached drawing 5 is the fixed plate schematic diagram of the present invention.
Attached drawing 6 is the otic placode schematic diagram of the present invention.
Attached drawing 7 is the otic placode connection diagram of the present invention.
Specific implementation mode
1-7 is described below the present invention below in conjunction with the accompanying drawings.
As shown in figs. 1-7, the present invention includes two front columns 1 and two rear columns 2, and front column 1 and 2 top of rear column are equal It is fixedly connected sequentially by upper beam 3, two 1 bottom ends of front column are connected by bottom end rail 4, and 3 parallel beneath of the upper beam is set It is equipped with cross bar 12, two door pillars 6 are provided between front column 1, protective door 5 is provided between two door pillars 6;Front column 1 It is both provided with fixed plate 7 with 2 bottom of rear column, mounting hole 11 is provided in fixed plate 7, brill ground spiral shell is equipped in mounting hole 11 Bolt;5 one end of the protective door is connect by hinge with a door pillar 6, the other end be provided with lockset and by lockset with it is another Snap fit connection on root door pillar 6;Between the front column 1 and rear column 2, between front column 1 and door pillar 6, two Protection network 9 is both provided between rear column 2,9 edge of the protection network is provided with frame 10;The front column 1 is stood afterwards Multiple otic placodes 8 are both provided on column 2 and door pillar 6, there are two mounting hole 13, the mounting hole 13 is interior to be coordinated for setting on otic placode 8 It is provided with fixing bolt 14;More chord members 15 are provided between the cross bar 12 and upper beam 3,15 both ends of the chord member lead to respectively It crosses and is weldingly fixed on cross bar 12 and upper beam 3;
The upper beam 3, bottom end rail 4 and door pillar 6 by the fixing bolt 14 on otic placode 8 and otic placode 8 respectively with two Front column 1, two rear column 2, cross bar 12 are fixedly connected;
The frame 10 by the fixing bolt 14 on otic placode 8 and otic placode 8 respectively with two front columns, 1, two rear column 2, Door pillar 6 is fixedly connected;
It is rectangular that the front column 1, rear column 2, door pillar 6, cross bar 12, upper beam 3, bottom end rail 4, which are set as cross section, Square tubular column.
Its installation and application comprises the following steps that:
By front column 1, rear column 2, door pillar 6, cross bar 12, upper beam 3, bottom end rail 4, protective door 5, frame 10 and protection network 9 equal materials are lifted into using position;
Weld otic placode:The welding position of two front columns, 1, two rear column 2 is for the both ends of its adjacent two sides and under And at upper 1/4, at 1/2, at 3/4, firm welding checks firmness, spare after reaching standards for safe use;Door pillar Welding position be the both ends of its two long side surface, a long side surface from bottom to top at 1/8, at 3/4, firm welding checks secured journey Degree, it is spare after reaching standards for safe use;
It is welded and fixed plate:Fixed plate 7 is fixedly welded on front column 1,2 bottom end of rear column, firm welding checks firmness, It is spare after reaching standards for safe use;
Weld protection network:Corresponding protection network 9 is measured and intercepted according to demand, and frame 10 is fixedly welded on each protection network 9 Edge, firm welding check firmness, spare after reaching standards for safe use;
Material is installed:
Preceding facade installation
Two qualified front columns 1 of welding are connected into both ends by upper beam 3, bottom end rail 4, rectangle frame are formed, by otic placode 8 Fixing bolt 14 upper beam 3, bottom end rail 4 are fixed on two 1 both ends of front column, check firmness, reaching safety makes It is spare after standard;
Hinge and lock will be fixedly installed respectively on two door pillars 6, protective door 5 is fixed on a door pillar 6 by hinge On, and connect with another door pillar 6 with lock by lockset, measure size, by two 6 bottom ends of door pillar by otic placode 8 with And the fixing bolt 14 on otic placode 8 is fixed on bottom end rail 4, checks firmness, it is spare after reaching standards for safe use;
9 both ends of protection network are passed through front column 1, door pillar 6 by the protection network 9 for being welded with frame 10 for choosing size qualification respectively On otic placode 8 and the fixing bolt 14 on otic placode 8 be fixed on front column 1, on door pillar 6, check firmness, reach safety It is spare after standard;
Facade is installed afterwards
Qualified two rear columns, 2 top of welding be connected by upper beam 3, by the fixing bolt 14 on otic placode 8 by upper cross Beam 3 is fixed on two rear columns 2, checks firmness, spare after reaching standards for safe use;
Choose size qualification the protection network 9 for being welded with frame 10, by 9 both ends of protection network respectively by 2 upper ear plate 8 of rear column with And the fixing bolt 14 on otic placode 8 is fixed on rear column 2, checks firmness, it is spare after reaching standards for safe use;
Preceding facade combines installation with rear facade
By stepWith stepThe preceding facade that installation is complete is connect by two upper beams 3 respectively with rear facade, upper beam 3 It is fixed on two front columns 1 and two rear columns 2 by the fixing bolt 14 on otic placode 8, checks firmness, reach safety It is spare after standard;
The protection network 9 for being welded with frame 10 for choosing size qualification, protection network 9 is fixed between front column 1 and rear column 2, Protection network 9 is fixed on front column 1 with after by the otic placode 8 on front column 1 and rear column 2 and the fixing bolt 14 on otic placode 8 On column 2, firmness is checked, it is spare after reaching standards for safe use;
It reinforces and is installed with protection
By stepCross bar 12 is installed in the lower section of all upper beams 3 in the frame that installation is complete, and 12 both ends of cross bar pass through otic placode 8 And the fixing bolt 14 on otic placode 8 is fixedly connected with front column 1, rear column 2 and door pillar 6, checks firmness, reaches safety It is spare after standard;
15 both ends of chord member are fixed by welding on upper beam 3 and cross bar 12, firmness is checked, installs, as originally Invention distribution box protection canopy;
Distribution box protection canopy application method of the present invention:
After the distribution box protection canopy overall inspection installed, it is qualified to examine, and on the outside of lifting to distribution box, and distribution box is set On the inside of distribution box protection canopy, the mounting hole in the fixed plate 7 bored ground bolt and welded by front column 1,2 bottom of rear column is used Entire distribution box protection canopy is fixed on ground by 11;
Distribution box protection canopy is entered using key by protective door 5 by professional, forbids climbing, in use, suspension safety post Show, outside forbids staying amateur staff.

Claims (1)

1. a kind of flexible portable distribution box protection canopy and installation and application, it is characterised in that:Including two front columns 1 and two Root rear column 2, front column 1 and 2 top of rear column are fixedly connected sequentially by upper beam 3, under two 1 bottom ends of front column pass through Crossbeam 4 connects, and 3 parallel beneath of the upper beam is provided with cross bar 12, two door pillars 6, two doors are provided between front column 1 Protective door 5 is provided between column 6;Front column 1 and 2 bottom of rear column are both provided with fixed plate 7, are provided in fixed plate 7 solid Determine hole 11, brill ground bolt is equipped in mounting hole 11;5 one end of the protective door is connect by hinge with a door pillar 6, separately One end is provided with lockset and is connect with the snap fit on another door pillar 6 by lockset;The front column 1 and rear column 2 Between, between front column 1 and door pillar 6, protection network 9,9 edge of the protection network are both provided between two rear columns 2 Place is provided with frame 10;It is both provided with multiple otic placodes 8 on the front column 1, rear column 2 and door pillar 6, is provided on otic placode 8 Two mounting holes 13 are equipped with fixing bolt 14 in the mounting hole 13;It is provided between the cross bar 12 and upper beam 3 More chord members 15,15 both ends of the chord member are fixed by welding in respectively on cross bar 12 and upper beam 3;
The upper beam 3, bottom end rail 4 and door pillar 6 by the fixing bolt 14 on otic placode 8 and otic placode 8 respectively with two Front column 1, two rear column 2, cross bar 12 are fixedly connected;
The frame 10 by the fixing bolt 14 on otic placode 8 and otic placode 8 respectively with two front columns, 1, two rear column 2, Door pillar 6 is fixedly connected;
It is rectangular that the front column 1, rear column 2, door pillar 6, cross bar 12, upper beam 3, bottom end rail 4, which are set as cross section, Square tubular column;
Its installation and application comprises the following steps that:
(1)Material prepares:
By front column 1, rear column 2, door pillar 6, cross bar 12, upper beam 3, bottom end rail 4, protective door 5, frame 10 and protection network 9 equal materials are lifted into using position;
(2)Weld otic placode:
The welding position of two front columns, 1, two rear column 2 be its adjacent two sides both ends and from bottom to top at 1/4, At 1/2, at 3/4, firm welding checks firmness, spare after reaching standards for safe use;
The welding position of door pillar is the both ends of its two long side surface, a long side surface from bottom to top at 1/8, at 3/4, welding jail Gu check firmness, it is spare after reaching standards for safe use;
(3)It is welded and fixed plate:
Fixed plate 7 is fixedly welded on front column 1,2 bottom end of rear column, firm welding checks firmness, reaches safe handling It is spare after standard;
(4)Weld protection network:
Corresponding protection network 9 is measured and intercepted according to demand, and frame 10 is fixedly welded on 9 edge of each protection network, Firm welding checks firmness, spare after reaching standards for safe use;
(5)Material is installed:
Preceding facade installation
By step(2)Two qualified front columns 1 of middle welding connect both ends by upper beam 3, bottom end rail 4, form rectangle frame, lead to Upper beam 3, bottom end rail 4 are fixed on two 1 both ends of front column by the fixing bolt 14 crossed on otic placode 8, are checked firmness, are reached It is spare to after standards for safe use;
Hinge and lock will be fixedly installed respectively on two door pillars 6, protective door 5 is fixed on a door pillar 6 by hinge On, and connect with another door pillar 6 with lock by lockset, measure size, by two 6 bottom ends of door pillar by otic placode 8 with And the fixing bolt 14 on otic placode 8 is fixed on bottom end rail 4, checks firmness, it is spare after reaching standards for safe use;
9 both ends of protection network are passed through front column 1, door pillar 6 by the protection network 9 for being welded with frame 10 for choosing size qualification respectively On otic placode 8 and the fixing bolt 14 on otic placode 8 be fixed on front column 1 and door pillar 6, check firmness, reach It is spare after standards for safe use;
Facade is installed afterwards
By step(2)Qualified two rear columns, 2 top of middle welding is connected by upper beam 3, passes through the fixing bolt on otic placode 8 14 are fixed on upper beam 3 on two rear columns 2, check firmness, spare after reaching standards for safe use;
9 both ends of protection network are passed through the otic placode 8 on rear column 2 by the protection network 9 for being welded with frame 10 for choosing size qualification respectively And the fixing bolt 14 on otic placode 8 is fixed on rear column 2, checks firmness, it is spare after reaching standards for safe use;
Preceding facade combines installation with rear facade
By stepWith stepThe preceding facade that installation is complete is connect by two upper beams 3 respectively with rear facade, and upper beam 3 is logical The fixing bolt 14 crossed on otic placode 8 is fixed on two front columns 1 and two rear columns 2, checks firmness, and reaching safety makes It is spare after standard;
The protection network 9 for being welded with frame 10 for choosing size qualification, protection network 9 is fixed between front column 1 and rear column 2, Protection network 9 is fixed on front column 1 with after by the otic placode 8 on front column 1 and rear column 2 and the fixing bolt 14 on otic placode 8 On column 2, firmness is checked, it is spare after reaching standards for safe use;
It reinforces and is installed with protection
By stepIn the frame that installation is complete all upper beams 3 lower section install cross bar 12,12 both ends of cross bar by otic placode 8 with And the fixing bolt 14 on otic placode 8 is fixedly connected with front column 1, rear column 2 and door pillar 6, checks firmness, reaching safety makes It is spare after standard;
15 both ends of chord member are fixed by welding on upper beam 3 and cross bar 12, firmness is checked, installs, as originally Invention distribution box protection canopy;
(6)Application method:
After the distribution box protection canopy overall inspection installed, it is qualified to examine, and on the outside of lifting to distribution box, and distribution box is set On the inside of distribution box protection canopy, the mounting hole in the fixed plate 7 bored ground bolt and welded by front column 1,2 bottom of rear column is used Entire distribution box protection canopy is fixed on ground by 11;
Distribution box protection canopy is entered using key by protective door 5 by professional, forbids climbing, in use, suspension safety post Show, outside forbids staying amateur staff.
CN201810665002.0A 2018-06-26 2018-06-26 A kind of flexible portable distribution box protection canopy and installation and application Pending CN108708578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810665002.0A CN108708578A (en) 2018-06-26 2018-06-26 A kind of flexible portable distribution box protection canopy and installation and application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810665002.0A CN108708578A (en) 2018-06-26 2018-06-26 A kind of flexible portable distribution box protection canopy and installation and application

Publications (1)

Publication Number Publication Date
CN108708578A true CN108708578A (en) 2018-10-26

Family

ID=63873078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810665002.0A Pending CN108708578A (en) 2018-06-26 2018-06-26 A kind of flexible portable distribution box protection canopy and installation and application

Country Status (1)

Country Link
CN (1) CN108708578A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748196A (en) * 2019-09-20 2020-02-04 中铁建工集团有限公司 Block terminal protection canopy for building site safety protection
CN112412170A (en) * 2020-11-21 2021-02-26 江苏赛愽智能制造研究院有限公司 Protective fence for casting workshop

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201953070U (en) * 2010-12-20 2011-08-31 中国建筑一局(集团)有限公司 Reusable fabricated processing shed for construction site
CN202925957U (en) * 2012-12-17 2013-05-08 南通市达欣工程股份有限公司 Instrumentalized extension-type safety protection shed
CN203113845U (en) * 2013-02-05 2013-08-07 中国建筑第七工程局有限公司 Protective shed of distribution box
US20140283463A1 (en) * 2013-03-15 2014-09-25 Suncast Technologies, Llc Blow molded modular shed
CN205935793U (en) * 2016-06-21 2017-02-08 江苏中南建筑产业集团有限责任公司 Cartridge formula mixer protection canopy
CN107269013A (en) * 2017-07-07 2017-10-20 杭州江润科技有限公司 A kind of across active service highway continuous beam protection booth structure and its construction method
CN206971834U (en) * 2017-06-29 2018-02-06 深圳市群安达建筑科技有限公司 Pin-connected panel electronic box protection canopy

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201953070U (en) * 2010-12-20 2011-08-31 中国建筑一局(集团)有限公司 Reusable fabricated processing shed for construction site
CN202925957U (en) * 2012-12-17 2013-05-08 南通市达欣工程股份有限公司 Instrumentalized extension-type safety protection shed
CN203113845U (en) * 2013-02-05 2013-08-07 中国建筑第七工程局有限公司 Protective shed of distribution box
US20140283463A1 (en) * 2013-03-15 2014-09-25 Suncast Technologies, Llc Blow molded modular shed
CN205935793U (en) * 2016-06-21 2017-02-08 江苏中南建筑产业集团有限责任公司 Cartridge formula mixer protection canopy
CN206971834U (en) * 2017-06-29 2018-02-06 深圳市群安达建筑科技有限公司 Pin-connected panel electronic box protection canopy
CN107269013A (en) * 2017-07-07 2017-10-20 杭州江润科技有限公司 A kind of across active service highway continuous beam protection booth structure and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748196A (en) * 2019-09-20 2020-02-04 中铁建工集团有限公司 Block terminal protection canopy for building site safety protection
CN112412170A (en) * 2020-11-21 2021-02-26 江苏赛愽智能制造研究院有限公司 Protective fence for casting workshop

Similar Documents

Publication Publication Date Title
CN207847228U (en) A kind of overturning-preventing concrete wire pole
CN108708578A (en) A kind of flexible portable distribution box protection canopy and installation and application
CN206032726U (en) Modular pipe truss coal transporting trestle
CN105672759A (en) Portable safety protective fence
CN107268853A (en) A kind of full bolts assemblies formula steel skeleton light-duty plate and preparation method thereof
CN102233506B (en) Preassembly-free manufacturing process for main beam of large gantry crane
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN207406012U (en) Construction lift tool formula overhangs escape way
CN105804416A (en) Connecting structure for prefabricated assembling type building tower crane
CN205558325U (en) Multi -functional quick installation and recovery protection canopy
CN107965170A (en) Distribution box protection canopy with assembling type base
CN210421888U (en) Novel building safety net connecting piece
CN212742909U (en) Integrated wallboard prefabricated house
CN107035222A (en) A kind of civil engineering building fence
CN204098224U (en) Detachable concrete prefabricated wall plate structure house
CN203497900U (en) Rail type elevator shaft protecting door
CN205840516U (en) A kind of construction guardrail
CN208701692U (en) The suspension device of interim deep basal pit for stake support structure
CN206779778U (en) Draw and insert-type overhead welding platform
CN206971834U (en) Pin-connected panel electronic box protection canopy
CN211666427U (en) Assembled face limit protective apparatus
CN221321724U (en) High-strength protective net
CN207960030U (en) Distribution box protection canopy with assembling type base
CN219840529U (en) Door frame and door opening connecting and fixing device
CN206053414U (en) Distribution Board for Construction Site protection canopy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181026