CN108691544A - A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine - Google Patents

A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine Download PDF

Info

Publication number
CN108691544A
CN108691544A CN201810344687.9A CN201810344687A CN108691544A CN 108691544 A CN108691544 A CN 108691544A CN 201810344687 A CN201810344687 A CN 201810344687A CN 108691544 A CN108691544 A CN 108691544A
Authority
CN
China
Prior art keywords
ore
cutting groove
ore body
barren rock
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810344687.9A
Other languages
Chinese (zh)
Inventor
罗鸿
张永贵
安明炜
邹涛
范孝富
胡建智
王腾飞
邓杰仁
古贝伊
简云林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kailin Group Co Ltd
Original Assignee
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kailin Group Co Ltd filed Critical Guizhou Kailin Group Co Ltd
Priority to CN201810344687.9A priority Critical patent/CN108691544A/en
Publication of CN108691544A publication Critical patent/CN108691544A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine, this method is based on the method for mining by the way of filling, be directed to ore body vacation top it is thicker and development and thinner thickness ore body, the method carries out at twice during constructing cutting groove, barren rock cutting groove of constructing first pushes up the construction of barren rock cutting groove in vacation and finishes a bottom ore later for the ore explosion creation compensation space of bottom and the scope of freedom, false top, then production ore are first taken off during rooming.The method effective solution is directed to the technical barrier of the thick false top ore body ore back production in non-metal deposition type mine;It avoids ore on-site personnel in exploitation process from entering the risk for having the top plate danger of inbreak at any time, increases the safety of personnel and equipment in mineral building exploitation process;Ore recovery ratio is substantially increased simultaneously, accelerates mineral building back production progress.

Description

A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine
Technical field
The invention belongs to mining engineering technical fields, and in particular to a kind of underground mining in non-metal deposition type mine is thick false Push up lean ore body mining methods.
Background technology
Currently, in the existing mining condition in non-metal deposition type mine, especially false climax be development and thicker delays Inclined orebody, the one of the security risk and Ore quality control that ore faces in exploitation process always puzzlement mineral industry are big Problem.Since ore vacation top comparative development is broken, the fast development in mine is restrict, while in operations such as rock drilling, explosion, powder charges In flow, personnel and the equipment usually operation in higher slice ore has the environment of inbreak risk at any time, security risk is big, and ore returns Yield is substantially reduced.
Chinese patent (publication number CN 107227957A) discloses a kind of slight slope and thin ore body compartment dry back-filling mining method Technique adjusts sequence and the filling direction of mining, improves and delay to inclination by way of setting back production unit and filling The ore body collecting efficiency in direction, but there is no solve because the development of ore vacation top is relatively crushed the safety faced in exploitation process Risk and Ore quality control problem.
Invention content
In order to solve the above technical problems, the present invention provides a kind of thick false top of the underground mining in non-metal deposition type mine is thin The thick false top lean ore body mining methods of underground mining of ore body mining methods, the non-metal deposition type mine avoid being based on mining with stowing The security risk of the ore of method false top inbreak in exploitation process, ensures ore matter while safe and efficient production ore Amount.
The present invention is achieved by the following technical programs.
A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine provided by the invention, including with Lower step:
Step 1:Divide mineral building, along orebody trend by ore body division be several stage casings, if each stage casing is divided into dry pan Area, each panel are divided into several layerings, and each layering is divided into several mineral buildings;
Step 2:In-vein preparatory work is constructed, i.e. by rooming and corresponding higher slice mineral building construction in-vein preparatory work tunnel;
Step 3:Construction top plate barren rock cutting groove, perpendicular to orebody trend construction top plate barren rock cutting groove;
Step 4:Construction ore cutting groove, uses borehole drilling trolley to play bottom ore cutting groove;
Step 5:Mineral building back production first carries out explosion to vacation top barren rock, recycles scraper to transport barren rock, wait for that barren rock goes out Production ore, ore repeat the above action after having gone out again after complete, up to back production to the back production boundary of mineral building;
Step 6:It builds barricade by laying bricks or stones, filling counterfort is built by laying bricks or stones in in-vein preparatory work tunnel after mineral building to back production boundary;
Step 7:Filling fills mineral building goaf using barren rock and filling slurry;
Step 8:Step 2 is repeated to step 7, until mineral building is fully completed exploitation and backfill.
Further, it carries out constructing using gas leg type drill jumbo when the construction of barren rock cutting groove in step 3.
Further, it carries out constructing using shallow bore hole trolley when the construction of barren rock cutting groove in step 3.
Further, the thickness of the ore body is 4-6m.
Further, the slanting angle of ore body is 30-55 °.
Further, in step 1, when carrying out mineral building division, the layer height of the ore body is 10m.
Further, in step 3, construct top plate barren rock cutting groove when, the width of the barren rock cutting groove is 4m.
Further, in step 3, construct top plate barren rock cutting groove when, the height of the barren rock cutting groove is less than 25m.
Further, in step 4, construct ore cutting groove when, the height of the ore cutting groove is less than 25m.
The beneficial effects of the present invention are:Implementation through the invention, during constructing cutting groove, barren rock of first constructing Cutting groove, then ore cutting groove of constructing solve the problems, such as that roof control is complicated in gently inclined orebody, in production ore In the process, what operating personnel entered is that the stope that false top has been taken off carries out operation, substantially increases personnel and equipment in back production Safety in the process;Simultaneously because having taken off ore body vacation top in advance, substantially increasing the rate of extraction of ore and effectively having ensured Ore quality improves the economic benefit of thick false top lean ore body mining.
Description of the drawings
Fig. 1 is the thick false top lean ore body mining methods section signal of the underground mining in non-metal deposition type of the present invention mine Figure structure schematic representation;
Fig. 2 is the mineral building cloth of the thick false top lean ore body mining methods of the underground mining in non-metal deposition type of the present invention mine Set schematic diagram;
Fig. 3 is the thick false top lean ore body mining methods filling signal of the underground mining in non-metal deposition type of the present invention mine Figure;
Fig. 4 is back production side in the thick false top lean ore body mining methods of the underground mining in non-metal deposition type of the present invention mine Boundary, the false position relationship schematic diagram for pushing up cutting groove and ore body.
Specific implementation mode
Be described further below technical scheme of the present invention, but claimed range be not limited to it is described.
As shown in Figs 1-4, the thick false top lean ore body mining methods of the underground mining in a kind of non-metal deposition type mine, including with Lower step:
Step 1:Divide mineral building, along orebody trend by ore body division be several stage casings, if each stage casing is divided into dry pan Area, each panel are divided into several layerings, and each layering is divided into several mineral buildings;
Step 2:In-vein preparatory work is constructed, i.e. by rooming and corresponding higher slice mineral building construction in-vein preparatory work tunnel;
Step 3:Construction top plate barren rock cutting groove, perpendicular to orebody trend construction top plate barren rock cutting groove;For its bottom Compensation space and the scope of freedom are created in ore explosion;
Step 4:Construction ore cutting groove, uses borehole drilling trolley to play bottom ore cutting groove;
Step 5:Mineral building back production first carries out explosion to vacation top barren rock, recycles scraper to transport barren rock, wait for that barren rock goes out Production ore, ore repeat the above action after having gone out again after complete, up to back production to the back production boundary of mineral building;
Step 6:It builds barricade by laying bricks or stones, filling counterfort is built by laying bricks or stones in in-vein preparatory work tunnel after mineral building to back production boundary;
Step 7:Filling fills mineral building goaf using barren rock and filling slurry;
Step 8:Step 2 is repeated to step 7, until mineral building is fully completed exploitation and backfill.
Further, it carries out constructing using gas leg type drill jumbo when the construction of barren rock cutting groove in step 3.
Further, it carries out constructing using shallow bore hole trolley when the construction of barren rock cutting groove in step 3.
Further, the thickness of the ore body is 4-6m.
Further, the slanting angle of ore body is 30-55 °.
Further, in step 1, when carrying out mineral building division, the layer height of the ore body is 10m.Due to ore body compared with Thin, layer height should not be too large or too small, waste when the excessive back production it will cause ore body, too small, can greatly increase construction Amount reduces mining efficiency
Further, in step 3, construct top plate barren rock cutting groove when, the width of the barren rock cutting groove is 4m.By Relatively thin in the mineral ore part of ore body, excessive barren rock cutting groove can largely effect on the ore removal rate of ore, and too small barren rock is cut Slot can cause the waste of ore body again.
Further, in step 3, construct top plate barren rock cutting groove when, the height of the barren rock cutting groove is less than 25m.
Further, in step 4, construct ore cutting groove when, the height of the ore cutting groove is less than 25m.Pass through Rationally setting barren rock cutting groove and ore cutting groove, are effectively guaranteed the rate of extraction of ore and the product of acquired ore Matter.
The present invention is by barren rock cutting groove of during constructing cutting groove, first constructing, then ore cutting groove of constructing, effectively Solve the problems, such as that roof control is complicated in gently inclined orebody, during production ore, what operating personnel entered is false top The stope taken off carries out operation, substantially increases the safety of personnel and equipment in exploitation process;Simultaneously because in advance Ore body vacation top has been taken off, the rate of extraction of ore is substantially increased and has effectively ensured ore quality, has improved thick false top lean ore body The economic benefit of mining.

Claims (9)

1. a kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine, it is characterised in that including following step Suddenly:
Step 1:Mineral building is divided, by ore body division is several stage casings along orebody trend, each stage casing is divided into several panels, often A panel is divided into several layerings, and each layering is divided into several mineral buildings;
Step 2:In-vein preparatory work is constructed, i.e. by rooming and corresponding higher slice mineral building construction in-vein preparatory work tunnel;
Step 3:Construction top plate barren rock cutting groove, perpendicular to orebody trend construction top plate barren rock cutting groove;
Step 4:Construction ore cutting groove, uses borehole drilling trolley to play bottom ore cutting groove;
Step 5:Mineral building back production first carries out explosion to vacation top barren rock, recycles scraper to transport barren rock, wait for that barren rock has gone out it Production ore, ore repeat the above action after having gone out again afterwards, up to back production to the back production boundary of mineral building;
Step 6:It builds barricade by laying bricks or stones, filling counterfort is built by laying bricks or stones in in-vein preparatory work tunnel after mineral building to back production boundary;
Step 7:Filling fills mineral building goaf using barren rock and filling slurry;
Step 8:Step 2 is repeated to step 7, until mineral building is fully completed exploitation and backfill.
2. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:It carries out constructing using gas leg type drill jumbo when the construction of barren rock cutting groove in step 3.
3. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:It carries out constructing using shallow bore hole trolley when the construction of barren rock cutting groove in step 3.
4. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:The thickness of the ore body is 4-6m.
5. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:The slanting angle of ore body is 30-55 °.
6. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:In step 1, when carrying out mineral building division, the layer height of the ore body is 10m.
7. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:In step 3, construct top plate barren rock cutting groove when, the width of the barren rock cutting groove is 4m.
8. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:In step 3, construct top plate barren rock cutting groove when, the height of the barren rock cutting groove is less than 25m.
9. the thick false top lean ore body mining methods of the underground mining in non-metal deposition type as described in claim 1 mine, feature It is:In step 4, construct ore cutting groove when, the height of the ore cutting groove is less than 25m.
CN201810344687.9A 2018-04-17 2018-04-17 A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine Pending CN108691544A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810344687.9A CN108691544A (en) 2018-04-17 2018-04-17 A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810344687.9A CN108691544A (en) 2018-04-17 2018-04-17 A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine

Publications (1)

Publication Number Publication Date
CN108691544A true CN108691544A (en) 2018-10-23

Family

ID=63845728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810344687.9A Pending CN108691544A (en) 2018-04-17 2018-04-17 A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine

Country Status (1)

Country Link
CN (1) CN108691544A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764904A (en) * 2020-06-30 2020-10-13 贵州开磷有限责任公司 Underground mining method
CN111997616A (en) * 2020-09-14 2020-11-27 中南大学 Method for continuously recycling residual top-bottom column by adopting large section

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2116448C1 (en) * 1996-12-03 1998-07-27 Дальневосточный государственный технический университет Method for mining inclined ore bodies
CN104018836A (en) * 2014-06-25 2014-09-03 中南大学 Divided mining method for inclined medium-thick ore body with unstable false roof
CN104100270A (en) * 2014-06-13 2014-10-15 贵州开磷(集团)有限责任公司 Trackless mining method for gently inclined ore vein
CN106593447A (en) * 2017-02-24 2017-04-26 贵州开磷集团股份有限公司 Mining method for gently inclined medium-thickness ore body in underground mining

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2116448C1 (en) * 1996-12-03 1998-07-27 Дальневосточный государственный технический университет Method for mining inclined ore bodies
CN104100270A (en) * 2014-06-13 2014-10-15 贵州开磷(集团)有限责任公司 Trackless mining method for gently inclined ore vein
CN104018836A (en) * 2014-06-25 2014-09-03 中南大学 Divided mining method for inclined medium-thick ore body with unstable false roof
CN106593447A (en) * 2017-02-24 2017-04-26 贵州开磷集团股份有限公司 Mining method for gently inclined medium-thickness ore body in underground mining

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘江凌: "较厚假顶矿体开采工艺研究", 《化工矿物与加工》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764904A (en) * 2020-06-30 2020-10-13 贵州开磷有限责任公司 Underground mining method
CN111764904B (en) * 2020-06-30 2021-12-14 贵州开磷有限责任公司 Underground mining method
CN111997616A (en) * 2020-09-14 2020-11-27 中南大学 Method for continuously recycling residual top-bottom column by adopting large section
CN111997616B (en) * 2020-09-14 2021-05-18 中南大学 Method for continuously recycling residual top-bottom column by adopting large section

Similar Documents

Publication Publication Date Title
CN105626071B (en) Mining method for gently inclined thin ore body
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN102635356B (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN108612530A (en) A kind of mining methods of upper disk rock crusher slant middle thick orebody
CN105041314A (en) Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN103557002A (en) Panel mechanized centralized ore-pass upward horizontal cut-and-filling stoping method
CN1982649A (en) Mining method
CN1474032A (en) Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN103821558A (en) Coal mine gob filling mining system and gob-side entry retaining filling process
CN104453996B (en) A kind of packed method of mining by the way of filling of Upward slicing wall type
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
RU2333363C1 (en) Method of monitoring gas emission during mining operations in series of highly gaseous coal seams
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN105626073A (en) Mining method capable of preserving cutting groove based on filling mining method
CN103527196A (en) Method for recovery of room-type coal pillar through loess filling
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN110030013B (en) Gob-side entry retaining method for three-seam periodic roof cutting self-entry side of transition support area
CN104265297A (en) Mining method for multilayer fragile gently-inclined extra-narrow ore vein
CN106593447B (en) A kind of underground mining gently inclined medium thick orebody mining methods
CN114165210B (en) Deep coal resource fluidization mining method and system
CN108691544A (en) A kind of thick false top lean ore body mining methods of the underground mining in non-metal deposition type mine
CN104948190B (en) Method for caving top surrounding rock to form covering layer recovery stud
CN106522955A (en) Studding recovery method for reconstructing covering layer through dead zone wastefill and top surrounding rock spallation collaboratively
CN108086978B (en) Coal mining method suitable for deep well extra-thick coal seam
RU2449125C1 (en) Method to mine large sloping ore bodies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181023