CN108680444A - A kind of pulling force fatigue experimental device that falls for power construction safety belt - Google Patents
A kind of pulling force fatigue experimental device that falls for power construction safety belt Download PDFInfo
- Publication number
- CN108680444A CN108680444A CN201810887155.XA CN201810887155A CN108680444A CN 108680444 A CN108680444 A CN 108680444A CN 201810887155 A CN201810887155 A CN 201810887155A CN 108680444 A CN108680444 A CN 108680444A
- Authority
- CN
- China
- Prior art keywords
- safety belt
- support
- falls
- pulling force
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/32—Investigating strength properties of solid materials by application of mechanical stress by applying repeated or pulsating forces
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0001—Type of application of the stress
- G01N2203/0005—Repeated or cyclic
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/003—Generation of the force
- G01N2203/0032—Generation of the force using mechanical means
- G01N2203/0033—Weight
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0058—Kind of property studied
- G01N2203/0069—Fatigue, creep, strain-stress relations or elastic constants
- G01N2203/0073—Fatigue
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/02—Details not specific for a particular testing method
- G01N2203/026—Specifications of the specimen
- G01N2203/0262—Shape of the specimen
- G01N2203/0278—Thin specimens
- G01N2203/0282—Two dimensional, e.g. tapes, webs, sheets, strips, disks or membranes
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Emergency Lowering Means (AREA)
Abstract
The present invention provides a kind of pulling force fatigue experimental device that falls for power construction safety belt, including slip ring, contact pin, track groove, sliding traveler, idler wheel, arc fagging and Le lean on slot, the rear end of three track grooves is that opening is arranged, and eaves positional symmetry, which is supported by two, outside the rear end of left and right sidewall abuts against plate, and the half that the length of track groove is sliding traveler;Shaft inserting extends through bearing block, and left end lock sleeve is equipped with a diameter of meter of sector gear at one, and its right end lock sleeve, equipped with gear at one, the gear of this gear and driving motor passes through chain drive;The installation plate face of bearing block side locking support of tightening up a screw has photoelectric sensor switch at one, the setting of two groups of arc faggings of the invention, two groups of arc faggings and thereon two at strangle by slot can support combinations formed to strangle at two and lean on frame, this strangles at two and can simulate the chest of human body and abdomen skeleton by frame safety belt is allow easily to strangle by lock thereon.
Description
Technical field
The invention belongs to safety belt test device, electrical equipment technical fields, and more specifically, more particularly to one kind is used for
The pulling force fatigue experimental device that falls of power construction safety belt.
Background technology
Safety belt is widely used in the fields such as building, electrician, vehicle, high-altitude activity, is the weight to guarantee personal safety
Accessory is wanted, therefore, the load-bearing capacity of safety belt is particularly significant, needs to carry out it shock of a fall fatigue survey before safety belt manufacture
Examination.
By retrieving the patent of such as Patent No. CN201620267354.7, a kind of safety belt buffer test is disclosed
Device, including testing jig, the buffer to be measured, lifting gear, detection device, the console that are connect with iron man;The lifting gear
It is respectively set including two sliding slots for being vertically arranged in testing jig both sides and stretching testing jig upper end respectively, horizontal positioned and both ends
Reel, the rope that decelerating motor drives are held and pass through on the tester rack to slide bar, setting in two sliding slots;Two cunnings
It is provided with pulley between the upper end of slot;The mounting bracket for fixing iron man is provided on the slide bar;One end of the rope around
It crosses pulley to connect with mounting bracket, the other end is wound on reel;The detection device includes the sensing that setting is held on the tester rack
Device;The console is connect with decelerating motor, cylinder, pickup wire respectively;The present invention is by regarding iron man as load from eminence
It freely falls, can really acquire out every main performance data of safety belt buffer, and DATA REASONING is accurate.
Such as patent of Patent No. CN202916063U again discloses a kind of multi-functional impulse detection dress of safety belt
It sets, by column 1, two-layer platform guardrail, floor cross member, bottom longeron, three beam, three layers of longeron, lifting lug 1, support post, branch
Support crossbeam, column 2, electric hoist, winder, lifting lug 2, turnover panel, one layer of platform, sensor, ladder, ceiling, lightning arrester, experiment
Baffle, release, rubber people mould, guide chain, conducting wire and computer are formed.Rubber people's mould is fixed on one layer of platform, using leading
Rubber people's mould is placed on turnover panel by chain, and the railing class safety belt dressed with it is fixed on lifting lug 1, with winder and
Electric hoist by rubber people's mould promoted and connect with release, hook is connect with the release under lifting lug 2, the conducting wire on release and
Computer connects.When release discharges rubber people's mould, moment impact force value is transferred to computer by sensor, and computer carries out data
Collection analysis makes the examining report for the suspension safety belt overall dynamics Road test that falls.
Based on patent at above-mentioned two and prior art people is combined to find, existing test device is mostly using lifting
Machine carries out lifting shock-testing, need to wind steel wire rope since elevator is completed rear elevator every time, strength youngster causes its test
Interval time is longer, so that bump is tested less efficient, and impact the shock buffer structure optimization design of clump weight not
It is enough reasonable, after clump weight dives downwards and pulls apart lifting rope impact, it violent heavy can directly strike against on substrate, make
It influences to use at clump weight gross distortion, and the disintegrating slag that generates can splash the problem of hurting sb.'s feelings when hitting.
Then, it in view of this, being studied improvement for existing structure and missing, provides a kind of for power construction peace
The pulling force fatigue experimental device that falls of full band, to achieve the purpose that with more more practical value.
Invention content
In order to solve the above technical problem, the present invention provides a kind of pulling force fatigue examinations of falling for power construction safety belt
Experiment device, longer to solve existing safety belt test device to test interval time, bump is tested less efficient, and counterweight
Easy the problem of the hurting sb.'s feelings of splashing of the shock disintegrating slag of block.
Purpose and effect of the present invention for the pulling force fatigue experimental device that falls of power construction safety belt, by detail below
Technological means is reached:
A kind of pulling force fatigue experimental device that falls for power construction safety belt, including support mounting bracket, motor installation
Plate, bearing block, shaft, sector gear, driving motor, photoelectric sensor switch control electronic box, lead, locating ring, link, support
Axis welds strut, and buffer spring, clip, slip ring, contact pin, track groove, sliding traveler, idler wheel, arc fagging and Le lean on slot, institute
It states support mounting bracket welding to be supported on the rear side protrusion rectangular slab of substrate, and the top screw locking of mounting bracket is supported to be fixed with
Bearing block at one;Supporting welding has motor mounting plate at one between the support mounting bracket, this motor mounting plate, which is located at support, pacifies
Shelve the underface of top plate, and motor mounting plate tightens up a screw to be locked and is integrated with the driving motor of speed reducer at one;It is described
Installation settings has control electronic box at one on supporting rod at the rear side two of support mounting bracket, this being internally integrated for electronic box of control is equipped with
Digital display counting controller at frequency converter and one at one, wherein frequency converter are electrically connected with driving motor can direct controlling and driving electricity
The start and stop of machine, and digital display technology controller is then electrically transmitted with photoelectric sensor switch and is connect, digital display technology controller can thang-kng electricity
The feedback signal of inductive switch counts sector gear rotating cycle with its internal logic computing circuit;The branch at three
Axis position relationship supporting welding triangular in shape is supportted in the top of substrate, and about apical position support between support shaft set
It is equipped with track groove at one, presenting lower equidistant interval between support shaft at three face outer walls of this track groove and three is connected with row weldering
Connect strut;The rear end of the track groove is that opening is arranged, and eaves positional symmetry, which is supported by two, outside the rear end of left and right sidewall abuts against
Plate, and the half that the length of track groove is sliding traveler;The shaft inserting extends through bearing block, left end lock sleeve
Equipped with a diameter of meters of sector gear at one, and its right end lock sleeve is equipped with gear at one, the gear of this gear and driving motor
Pass through chain drive;The installation plate face of bearing block side locking support of tightening up a screw has photoelectric sensor switch at one.
Further, the sliding traveler rear wall, which is got on the bus, is formed with a tooth-arranging strip, and tail end welding is hung and has a prescription shape
The weight of lead, this rectangular lead is 125 kilograms, the body wt for the Electrician Operation personnel that can be simulated, and sliding
Equidistant support arrangements are provided with ten groups of idler wheels on the front side outer wall of dynamic platform sling, and sliding traveler just passes through this ten groups of roller-coaster insertings
In the inside of track groove.
Further, in the case where the rotation of the shaft interlocks, sector gear can be with the dynamic cunning of engagement in rotation and support of sliding traveler
Dynamic platform sling upward sliding, and sector gear can be detached from just with it when sliding traveler slides into extreme higher position, be slided at this time
Dynamic platform sling loses jacking power and starts to dive downwards under the action of lead, completes the shock-testing to safety belt lifting rope.
Further, the apical position supporting welding of the lead front side wall has link at one, before, left and right three surface side
Also welding is supported by locating ring at one in the bottom centre position of wall, this at three locating ring correspondence be inserted in support shaft at three
On, and the bottom of locating ring is both provided with the circular pressing plate of trepanning among at one at three.
Further, the terminal position of the support shaft is arranged with buffer spring at one at three, and this buffering elastic at three
Spring is placed between the bottom circular pressing plate of locating ring at three and substrate.
Further, symmetric support has arc everywhere between the row described in front end between support shaft and track groove welds strut
Shape fagging, arc fagging and is supported between two groups of arc faggings and is strangled at one anyhow in being correspondingly arranged on upper and lower two groups everywhere for this
By slot.
Further, it is arranged with slip ring at two in support shaft described in front end, this is rotatably connected at one on slip ring at two
Spring, and the other end of spring is rotatablely connected clip at one again at two.
Further, the main body of the clip is jagged cylinder to be opened up at one, and circle presss from both sides on the inner wall of cylinder apical position
Symmetric support has contact pin everywhere.
Compared with prior art, the present invention has the advantages that:
The present apparatus carries out shock-testing, sector gear rotation by the engaged transmission of sector gear and sliding traveler to lifting rope
One circle can carry out one-shot test, this has been significantly shorter test interval, effective solution bump test effect
In addition rate low problem the sliding location structure of present apparatus optimization design impact clump weight and hits buffer structure, can
So that breeding block is slided straight, and avoids after safety belt lifting rope is broken clump weight is directly violent from striking against substrate
On cause disintegrating slag splashing hurt sb.'s feelings.
Description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is three dimensional structure diagram of the present invention.
Fig. 3 is back three dimensional structure diagram of the present invention.
Fig. 4 is lead structural schematic diagram of the present invention.
Fig. 5 is sliding traveler of the present invention and track groove slidable fit structural schematic diagram.
Fig. 6 is part A partial enlarged view of the present invention.
Fig. 7 is part B partial enlarged view of the present invention.
Fig. 8 is clip structure schematic diagram of the present invention.
In figure, the correspondence of component names and accompanying drawing number is:
1- supports mounting bracket, 2- motor mounting plates, 3- bearing blocks, 4- shafts, 5- sector gears, 6- driving motors, 7- light
Inductance inductive switch, 8- control electronic box, 9- leads, 901- locating rings, 902- links, 10- support shafts, 1001- welding struts, 11-
Buffer spring, 12- clips, 1201- slip rings, 1202- contact pins, 13- track grooves, 14- sliding travelers, 1401- idler wheels, 15- arcs
Fagging, 16-, which is strangled, leans on slot.
Specific implementation mode
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for
Illustrate the present invention, but cannot be used for limiting the scope of the invention.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term "upper",
The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as pair
The limitation of the present invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or
Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects
Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine
Tool connects, and can also be electrical connection;It can be directly connected, it can also be indirectly connected through an intermediary.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment:
As shown in attached drawing 1 to attached drawing 8:
The present invention provides a kind of pulling force fatigue experimental device that falls for power construction safety belt, including support mounting bracket
1, motor mounting plate 2, bearing block 3, shaft 4, sector gear 5, driving motor 6, photoelectric sensor switch 7, control electronic box 8, lead
9, locating ring 901, link 902, support shaft 10, welding strut 1001, buffer spring 11, clip 12, slip ring 1201, contact pin
1202, track groove 13, sliding traveler 14, idler wheel 1401, arc fagging 15 and Le lean on slot 16, the welding of support mounting bracket 1 branch
The rear side supportted in substrate protrudes on rectangular slab, and the top screw locking of mounting bracket 1 is supported to be fixed with bearing block 3 at one;It is described
Supporting welding has motor mounting plate 2 at one between support mounting bracket 1, this motor mounting plate 2 is being located at 1 top plate of support mounting bracket just
Lower section, and motor mounting plate 2 tightens up a screw to be locked and is integrated with the driving motor 6 of speed reducer at one;The support mounting bracket 1
Rear side two on supporting rod installation settings have control electronic box 8 at one, this being internally integrated for electronic box 8 of control is equipped with frequency conversion at one
Digital display counting controller at device and one, wherein frequency converter and driving motor 6 be electrically connected can direct controlling and driving motor 6 open
Stop, and digital display technology controller then with photoelectric sensor switch 7 electrically transmission connect, digital display technology controller can thang-kng electric induction open
The feedback signal of pass 7 counts 5 rotating cycle of sector gear with its internal logic computing circuit;The support shaft at three
10 position relationship supporting weldings triangular in shape in the top of substrate, and about apical position support between support shaft 10 set
Track groove 13 at one are equipped with, presenting lower equidistant interval between support shaft 10 at three face outer walls of this track groove 13 and three is connected with
One row welds strut 1001;The rear end of the track groove 13 is that opening is arranged, eaves positional symmetry branch outside the rear end of left and right sidewall
Support, which has, abuts against plate at two, and the half that the length of track groove 13 is sliding traveler 14;The inserting of the shaft 4 extends through axis
Bearing 3, left end lock sleeve is equipped with a diameter of 0.5 meter of sector gear 5 at one, and its right end lock sleeve is equipped with gear at one,
The gear of this gear and driving motor 6 passes through chain drive;The installation plate face of 3 side of bearing block locking support of tightening up a screw has
Photoelectric sensor switch 7 at one.
Wherein, 14 rear wall of the sliding traveler, which is got on the bus, is formed with a tooth-arranging strip, and tail end welding is hung and has a prescription shape lead
The weight of block 9, this rectangular lead 9 is 125 kilograms, the body wt for the Electrician Operation personnel that can be simulated, and sliding
Equidistant support arrangements are provided with ten groups of idler wheels 1401 on the front side outer wall of dynamic platform sling 14, and sliding traveler 14 just passes through this ten groups of idler wheels
1401 slidings are plugged in the inside of track groove 13, and sliding traveler 14 is 9 upward sliding of lead and implements underriding shock-testing sliding
Carrier is the main function components of whole device, and ten groups of idler wheels 1401 thereon can ensure its fluency slided up and down.
Wherein, in the engagement in rotation of the meeting of sector gear 5 and sliding traveler 14 and the dynamic cunning of support under rotating gearing of the shaft 4
14 upward sliding of dynamic platform sling, and sector gear 5 can be detached from just with it when sliding traveler 14 slides into extreme higher position, this
When sliding traveler 14 lose jacking power and start to dive downwards under the action of lead 9, complete to survey the impact of safety belt lifting rope
Examination, sector gear 5 are the active force transmission parts of device body, can be realized by its continuous rotation and be connected to safety belt lifting rope
Continuous multiple shock-testing, until the junction of lifting rope and safety belt tears and bursts at the seams disconnection or lifting rope ontology reaches fatigue and breaks
It splits number to pull apart, existing test device mostly carries out lifting shock-testing using elevator, since elevator is surveyed every time
Elevator need to wind steel wire rope after examination, and strength youngster causes its test interval longer, make bump test efficiency compared with
It is low, and the present apparatus carries out shock-testing, 5 turns of sector gear by the engaged transmission of sector gear 5 and sliding traveler 14 to lifting rope
A dynamic circle can carry out one-shot test, this has been significantly shorter the test interval, efficiently solves above-mentioned bump
The problem of inefficiency of test.
Wherein, the apical position supporting welding of 9 front side wall of the lead has link 902 at one, before, left and right three surface side
Also welding is supported by locating ring 901 at one in the bottom centre position of wall, this at three the correspondence of locating ring 901 be inserted at three
In support shaft 10, and at three the bottom of locating ring 901 be both provided at one among trepanning circular pressing plate, locating ring 901 at three
Sliding plug corresponding with support shaft at three 10 can enough limit the sliding trace of lead 9 excessively, make its slide up and down straight avoid to
It rolls during lower underriding sliding and by 14 bending of sliding traveler.
Wherein, the terminal position of the support shaft 10 is arranged with buffer spring 11 at one at three, and this buffering elastic at three
Spring 11 is placed between the bottom circular pressing plate of locating ring 901 at three and substrate, after safety belt lifting rope is broken, lead 9
Locating ring 901 at three can be interlocked to continue slide downward and be pressed against at three on buffer spring 11, buffer spring 11 is anti-at three
Bullet support is lower can to avoid direct violent the striking against of lead 9 that disintegrating slag splashing is caused to hurt sb.'s feelings on substrate.
Wherein, symmetric support has four between the row between support shaft 10 and track groove 13 described in front end welds strut 1001
Locate arc fagging 15, arc fagging 15 is in be correspondingly arranged on upper and lower two groups, and supported between two groups of arc faggings 15 everywhere for this
Anyhow strangle at one and lean on slot 16, two groups of arc faggings 15 and thereon two at strangle by slot 16 can support combinations formed at two to strangle and lean on
Frame, this strangles at two and can simulate the chest of human body and abdomen skeleton by frame safety belt is allow easily to strangle by lock in it
On.
Wherein, slip ring 1201 at two are arranged in support shaft 10 described in front end, this is rotatablely connected on slip ring 1201 at two
There is a spring at one, and the other end of spring is rotatablely connected clip 12 at one again at two, by slip ring 1201 at two, clip at two
12 can follow the lifting of safety lifting rope to slide up and down, and then complete to be fixedly clamped to the implementation of safety lifting rope, and in safety lifting rope
Spring can be implemented to shrink and tie tight to safety lifting rope at two after fracture, avoid safety lifting rope in the moment of disconnection, and generation is acutely got rid of
Dynamic pumping hinders operating personnel or winding is involved in the back lash of sector gear 5 and sliding traveler 14.
Wherein, the main body of the clip 12 is to open up jagged cylinder at one, and right on the inner wall of circle folder cylinder apical position
Title is supported by contact pin 1202 everywhere, and contact pin 1202 is inserted into lifting rope internal clearance everywhere, and clip 12 is avoided to be got rid of from lifting rope
It falls.
The specifically used mode of the present embodiment and effect:
Safe band body is strangled to be positioned at Liang Chu by fastening and see to strangle and be leaned on frame and by lifting rope by the process for using of the present invention first
Hook be mounted on link 902, then by control electronic box 8 on button control driving motor 6 and counter controller,
The rotation of driving motor 6 interlocks lower sector gear 5 and starts to rotate, and as sector gear 5 rotates, can be engaged with sliding traveler 14
Together and 14 upward sliding of sliding traveler is pushed, sector gear 5 just can be with when sliding traveler 14 slides into extreme higher position
It is detached from, and sliding traveler 14 loses jacking power and starts to dive downwards under the action of lead 9 at this time, completes to safety belt
The one-shot of lifting rope is tested, and follows the continuous rotation of sector gear 5 that can realize that carrying out multiple impact to safety belt lifting rope surveys
Examination, until the junction of lifting rope and safety belt tears and bursts at the seams disconnection or lifting rope ontology reaches fatigue fracture number and pulls
It is disconnected, in above process photoelectric sensor switch 7 can 5 number of revolutions of feedback count sector gear, number of revolutions counting is
The fracture times of fatigue of safety belt lifting rope.
The embodiment of the present invention provides for the sake of example and description, and is not exhaustively or by this to send out
It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing
It is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application to select and describe embodiment
It will be appreciated that various embodiments with various modifications of the present invention to design suitable for special-purpose.
Claims (8)
1. a kind of pulling force fatigue experimental device that falls for power construction safety belt, it is characterised in that:This is used for power construction
The pulling force fatigue experimental device that falls of safety belt includes support mounting bracket, motor mounting plate, bearing block, shaft, sector gear, drive
Dynamic motor, photoelectric sensor switch, control electronic box, lead, locating ring, link, support shaft, welding strut, buffer spring, clip,
Slip ring, contact pin, track groove, sliding traveler, idler wheel, arc fagging and Le lean on slot, the support mounting bracket welding to be supported in substrate
Rear side protrusion rectangular slab on, and support mounting bracket top screw locking be fixed with bearing block at one;The support mounting bracket
Between supporting welding have motor mounting plate at one, this motor mounting plate be located at support mounting bracket top plate underface, and motor pacify
Loading board, which tightens up a screw to be locked, is integrated with the driving motor of speed reducer at one;Supporting rod at the rear side two of the support mounting bracket
Upper installation settings has control electronic box at one, this being internally integrated for electronic box of control is equipped at one digital display counting at frequency converter and one
Controller, wherein frequency converter and driving motor be electrically connected can direct controlling and driving motor start and stop, and digital display technology controller
It then electrically transmits and connect with photoelectric sensor switch, digital display technology controller can lead to the feedback signal of photoelectric sensor switch in it
Portion's logical operation circuit counts sector gear rotating cycle;The support shaft position relationship support weldering triangular in shape at three
Be connected to the top of substrate, and about apical position support between support shaft be provided with track groove at one, this track groove
Lower equidistant interval is presented at three face outer walls and three between support shaft and is connected with row welding strut;The rear end of the track groove is
Opening is arranged, and eaves positional symmetry, which is supported by two, outside the rear end of left and right sidewall abuts against plate, and the length of track groove is that sliding is hung
The half of plate;The shaft inserting extends through bearing block, and left end lock sleeve is equipped with a diameter of meters of sector at one
Wheel, and its right end lock sleeve is equipped with gear at one, the gear of this gear and driving motor passes through chain drive;The bearing block one
The installation plate face of side locking support of tightening up a screw has photoelectric sensor switch at one.
2. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:It is described
Sliding traveler rear wall, which is got on the bus, is formed with a tooth-arranging strip, and tail end welding is hung and has a prescription shape lead, the weight of this rectangular lead
It is 125 kilograms, the body wt for the Electrician Operation personnel that can be simulated, and the front side outer wall of sliding traveler is first-class
Support arrangements are provided with ten groups of idler wheels, sliding traveler is just plugged in the inside of track groove by this ten groups of roller-coasters.
3. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:Institute
Sliding traveler upward sliding can be moved with the engagement in rotation and support of sliding traveler by stating the lower sector gear of rotation gearing of shaft, and wait sliding
Sector gear can be detached from just with it when dynamic platform sling slides into extreme higher position, and sliding traveler loses jacking power in lead at this time
Start to dive downwards under the action of block, completes the shock-testing to safety belt lifting rope.
4. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:It is described
The apical position supporting welding of lead front side wall has link at one, before, the bottom centre position of left and right three surface side wall also welds
Connect and be supported by locating ring at one, this at three locating ring correspondence be inserted at three in support shaft, and at three locating ring bottom
It is both provided with the circular pressing plate of trepanning among at one.
5. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:At three
The terminal position of the support shaft is arranged with buffer spring at one, and this at three buffer spring be placed in the bottom of locating ring at three
Between portion's circular pressing plate and substrate.
6. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:Front end
Symmetric support has arc fagging everywhere between a row between the support shaft and track groove welds strut, this arc fagging everywhere
In being correspondingly arranged on upper and lower two groups, and supports to strangle at one anyhow between two groups of arc faggings and lean on slot.
7. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:Front end
Slip ring at two is arranged in the support shaft, this is rotatably connected to spring at one at two on slip ring, and at two spring it is another
End is rotatablely connected clip at one again.
8. being used for the pulling force fatigue experimental device that falls of power construction safety belt as described in claim 1, it is characterised in that:It is described
The main body of clip is jagged cylinder to be opened up at one, and symmetric support has contact pin everywhere on the inner wall of circle folder cylinder apical position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810887155.XA CN108680444B (en) | 2018-08-06 | 2018-08-06 | Falling tension fatigue test device for electric power construction safety belt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810887155.XA CN108680444B (en) | 2018-08-06 | 2018-08-06 | Falling tension fatigue test device for electric power construction safety belt |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108680444A true CN108680444A (en) | 2018-10-19 |
CN108680444B CN108680444B (en) | 2020-09-29 |
Family
ID=63815207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810887155.XA Active CN108680444B (en) | 2018-08-06 | 2018-08-06 | Falling tension fatigue test device for electric power construction safety belt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108680444B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111136533A (en) * | 2020-01-03 | 2020-05-12 | 沈水文 | Automatic highlight chamfering equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201819790U (en) * | 2010-08-09 | 2011-05-04 | 河南省电力公司南阳供电公司 | Full-body safety belt tester |
CN204788911U (en) * | 2015-06-01 | 2015-11-18 | 江苏城工建设科技有限公司 | Multi -functional safety belt testing arrangement |
CN204882258U (en) * | 2015-08-11 | 2015-12-16 | 牡丹江金缘钩缓制造有限责任公司 | Safety belt prophylactic test device |
CN205426908U (en) * | 2016-03-16 | 2016-08-03 | 河南工程学院 | Automatic rotation type simulation modeling experiment platform |
CN205483550U (en) * | 2016-04-01 | 2016-08-17 | 昆山精研杰自动化科技有限公司 | Safety belt buffer testing arrangement |
CN107340192A (en) * | 2017-08-14 | 2017-11-10 | 芜湖海格力斯起重机械制造有限公司 | A kind of car belt fatigue detection device |
CN107576577A (en) * | 2017-10-17 | 2018-01-12 | 安徽恒力安全检测技术有限公司 | Safety belt test mechanism, testing machine |
-
2018
- 2018-08-06 CN CN201810887155.XA patent/CN108680444B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201819790U (en) * | 2010-08-09 | 2011-05-04 | 河南省电力公司南阳供电公司 | Full-body safety belt tester |
CN204788911U (en) * | 2015-06-01 | 2015-11-18 | 江苏城工建设科技有限公司 | Multi -functional safety belt testing arrangement |
CN204882258U (en) * | 2015-08-11 | 2015-12-16 | 牡丹江金缘钩缓制造有限责任公司 | Safety belt prophylactic test device |
CN205426908U (en) * | 2016-03-16 | 2016-08-03 | 河南工程学院 | Automatic rotation type simulation modeling experiment platform |
CN205483550U (en) * | 2016-04-01 | 2016-08-17 | 昆山精研杰自动化科技有限公司 | Safety belt buffer testing arrangement |
CN107340192A (en) * | 2017-08-14 | 2017-11-10 | 芜湖海格力斯起重机械制造有限公司 | A kind of car belt fatigue detection device |
CN107576577A (en) * | 2017-10-17 | 2018-01-12 | 安徽恒力安全检测技术有限公司 | Safety belt test mechanism, testing machine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111136533A (en) * | 2020-01-03 | 2020-05-12 | 沈水文 | Automatic highlight chamfering equipment |
Also Published As
Publication number | Publication date |
---|---|
CN108680444B (en) | 2020-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109132929B (en) | Be used for bridge construction machinery quick hoisting device | |
CN105092395B (en) | A kind of device for increasing the load of horizontal impact testing stand | |
CN108680444A (en) | A kind of pulling force fatigue experimental device that falls for power construction safety belt | |
CN107399639A (en) | A kind of efficient copper cash admission machine equipment for counting the number of turns | |
CN202614492U (en) | Elevator buffer testing equipment | |
CN203786268U (en) | Rolling door motor testing device | |
CN109186917A (en) | A kind of safety net impact resistance experimental rig | |
CN107555323B (en) | A kind of electric power overhaul equipment hoisting device | |
CN203246988U (en) | Lift car traction system provided with two car roof rope return wheels | |
CN208932736U (en) | A kind of Construction of Civil Engineering safe construction elevator | |
CN109850535A (en) | A kind of large-scale workpiece turnover device | |
CN211115085U (en) | Platform over-and-under type single tub of communication tower convenient to maintenance operation | |
CN209326925U (en) | A kind of band shield track falling weight impact test equipment | |
CN107576470A (en) | A kind of impact frock of automobile batteries housing | |
CN102445392A (en) | Flexible heating appliance dynamic loaded mechanical strength testing machine | |
CN209583464U (en) | A kind of movable arm tower crane pull rod | |
CN208902370U (en) | A kind of elevator door pendulum impact test frame | |
CN208994899U (en) | A kind of lifting device of architectural engineering | |
CN107063898A (en) | A kind of pendulum test machine | |
CN108639994B (en) | Sublance rotating lifting gear | |
CN102305705B (en) | Multiproject electric hoist test bed | |
CN207423517U (en) | A kind of motor for door of garage test device | |
CN213397467U (en) | Crane tension testing device | |
CN204666355U (en) | A kind of chain block performance parameter measurement mechanism | |
CN109809310A (en) | A kind of movable arm tower crane pull rod and its installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200827 Address after: 650600 Shangsuan District, Jinning Industrial Park, Kunming City, Yunnan Province Applicant after: KUNMING FEIXIANG MATERIAL TECHNOLOGY Co.,Ltd. Address before: 518000 Guangdong, Shenzhen, Luohu District, Dongmen street, 123 Shennan Road, Shenzhen, department store building, east side, 1-B02 Applicant before: SHENZHEN FULAIGUO TECHNOLOGY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |