CN108678418A - A kind of method of building movement - Google Patents

A kind of method of building movement Download PDF

Info

Publication number
CN108678418A
CN108678418A CN201810590559.2A CN201810590559A CN108678418A CN 108678418 A CN108678418 A CN 108678418A CN 201810590559 A CN201810590559 A CN 201810590559A CN 108678418 A CN108678418 A CN 108678418A
Authority
CN
China
Prior art keywords
building
ground
transport channel
movement according
floating hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810590559.2A
Other languages
Chinese (zh)
Other versions
CN108678418B (en
Inventor
陈启品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Tianli Dimensional Ecological Co Ltd
Original Assignee
Qingdao Tianli Dimensional Ecological Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Tianli Dimensional Ecological Co Ltd filed Critical Qingdao Tianli Dimensional Ecological Co Ltd
Priority to CN201810590559.2A priority Critical patent/CN108678418B/en
Publication of CN108678418A publication Critical patent/CN108678418A/en
Application granted granted Critical
Publication of CN108678418B publication Critical patent/CN108678418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of methods of building movement, are related to technical field of building construction, include the following steps:A, the floating hole of ground is dug in the outside of building, the ground of building is isolated out;Take the transport channel for transporting building between the initial position and target location of building;B, buoyant liquid is injected into the floating hole of ground, reduces pressure of the entire building to ground;Buoyant liquid is injected into transport channel;C, building is pushed to reach target location along transport channel from initial position.The invention has the advantages that saving a large amount of manpower and materials, the artificial quantity needed is greatly reduced, also, do mechanization operation may be used in most of work, and this method operating cost is also decreased, had good market prospects.

Description

A kind of method of building movement
Technical field
The present invention relates to technical field of building construction, especially a kind of method of building movement.
Background technology
With the development of urban planning, the regulation of the appearance of the city, some buildings, especially building occur influences the appearance of the city The problem of needing resettlement makes many buildings that still can be used and be even completed soon typically now all using the method rebuild is removed Have to remove and rebuild, causes artificial huge waste.
Now popular building movement is using the side disclosed in specification in application number CN97233233.2 Method, this method can reach 15min/ meters now, and this method needs to be laid with a large amount of track, and speed is slow, and in moving process In, need a large amount of people to be ceaselessly laid with roller, manpower and materials demand is big.
Application No. is the method that the patent of CN200710047920.9 discloses the mobile building on sloping floor, The shortcomings of there is above-mentioned needs to be laid with a large amount of track, and speed is slow.
Invention content
The purpose of the present invention is to solve in building moving process, needing to be laid with a large amount of track, speed is slow, The problems such as needing a large amount of manpower and materials devises a kind of method of building movement.
Realize above-mentioned purpose the technical scheme is that, a kind of method of building movement includes the following steps:
A, the floating hole of ground is dug in the outside of building, the ground of building is isolated out;In heavy construction Take the transport channel for transporting building between the initial position and target location of object;
B, buoyant liquid is injected into the floating hole of ground, reduces pressure of the entire building to ground;To transport channel Interior injection buoyant liquid;
C, building is pushed to reach target location along transport channel from initial position.
Further, further include in the step A, increase Lock gate in the side in the floating hole of ground and/or built in large size The Basolateral for building object increases Lock gate and/or increases Lock gate in the side of transport channel and bottom surface.
Further, further include that suction pump is set in the inside of building, is used in the step B and/or step C It is discharged in the water in building will be penetrated into.
Further, the buoyant liquid in the step B is water or sodium silicate.
Further, further include in the step B:It is increased up height on the top in the floating hole of ground, and then increases ground Vertical height between the hole bottom in floating hole and ground floating hole hole top.
Further, further include in the step B:Sealing cavity or cladding are added in the Basolateral of building Less than the material of buoyant liquid density.
Further, further include in the step B:In the inner bottom perforating of building, by high-pressure hydraulic pump to Eyelet water filling makes building and surface separation using high pressure moisture film.
Further, further include in the step B:It is big to push to the water filling angle of eyelet by changing high-pressure hydraulic pump Type building.
Further, multiple valves are equipped in the transport channel transport channel is divided into multiple passage aisles, in step C During pushing building movement, the valve adjacent with building is opened successively, and will be in a upper passage aisle Water be transported in the channel that will be reached.
Further, further include suction pump in the step C, the entrance of suction pump is arranged in the front end of building, The entrance of suction pump is arranged in the rear end of building.
The beneficial effects of the invention are as follows:A large amount of manpower and materials are saved, the artificial quantity needed is greatly reduced, also, Do mechanization operation may be used in most of work, and this method operating cost is also decreased, had good market prospects.
Description of the drawings
Fig. 1 is the schematic diagram 1 of building moving process of the present invention;
Fig. 2 is the schematic diagram 2 of building moving process of the present invention;
Fig. 3 is the schematic diagram 3 of building moving process of the present invention.
In above each figure, 1, building;2, valve a;3, valve b;4, valve c;5, valve d;6, the floating hole of ground.
Specific implementation mode
It is of the invention to reach the technological means and effect that predetermined goal of the invention is taken further to illustrate, below in conjunction with Attached drawing and preferred embodiment, to specific implementation mode, structure, feature and its effect according to the present invention, detailed description are as follows:
This application discloses a kind of method of building movement, which includes large-scale building and terrestrial reference Building etc., includes the following steps:
A, the floating hole of ground is dug in the outside of building, the ground of building is isolated out;In heavy construction The transport that the initial position (position where former building) of object takes transport building between target location is logical Road;
B, buoyant liquid is injected into the floating hole of ground, reduces pressure of the entire building to ground;To transport channel Interior injection buoyant liquid;
C, building is pushed to reach target location along transport channel from initial position.
To the pressure on ground as standard, building has ground certain the above-mentioned entire building of reduction Pressure, but the pressure is little, and dragging building is not interfered to be moved just in buoyant liquid;Or building is over the ground The pressure in face is zero, and building can float up.
The known buoyancy of object being placed in liquid arranges the volume of liquid equal to the density * acceleration of gravity * of liquid. In step B, if the liquid in the floating hole of injection ground cannot be satisfied above-mentioned standard, following method may be used.
1, the buoyant liquid for selecting new density big selects water under normal circumstances, it is of course also possible to select other floating Power liquid, such as seawater, sodium silicate can also use mercury in the case of different, but need to carry out recycling and protect environment.
2, it is increased up height on the top in the floating hole of ground, and then increases hole bottom and the ground floating hole hole top in the floating hole of ground Between vertical height.By the depth in the floating hole of ground, increase depth of the building in the floating hole of ground, and then increase big Type building arranges the volume of buoyant liquid, to increase buoyancy.
3, the material of sealing cavity or cladding less than buoyant liquid density is added in the Basolateral of building, such as Foam etc., by taking water is buoyant liquid as an example, since foam density is less than the density of water, foam can float on the surface, but it is wrapped It overlays on building, so given building one upward buoyancy.
In the construction process, what the Basolateral of building may be tightly grabs on the ground, may be used in large size The inner bottom perforating of building makes building and ground distributor by high-pressure hydraulic pump to eyelet water filling using high pressure moisture film From.In this process, water can be penetrated into below building in the floating hole of ground, human eye it can be seen that so as to Judge that building is loosened with ground.
In view of this method is to use buoyant liquid, and the buoyant liquid has mobility, therefore need in the floating hole of ground Side increases Lock gate and/or increases Lock gate and/or in the side of transport channel in the Basolateral of building Increase Lock gate with bottom surface, which can be the leakproofs material such as oilpaper.Here a variety of situations, can be according to reality The selection of being combined property of situation.It is of course also possible to which suction pump is arranged in the inside of building, built for large size will to be penetrated into Build the water discharge in object.
During pushing building movement, Fig. 1 may be used to method shown in Fig. 3, it will be in transport channel Be arranged that valve a2, valve b3, valve c4 and valve d5 etc. are multiple, the distance between two connected valves be more than building away from From.It is full of buoyant liquid in the floating hole 6 of ground in Fig. 1 and the transport channel between valve a2 and valve b3, opens valve a2, Building is shifted onto in the transport channel between valve a2 and valve b3 shown in Fig. 3, valve valve a2 is then shut off, it will The floating water for cheating the buoyant liquid in 6 of ground is extracted into the transport channel between valve b3 and valve c4, then carries out aforesaid operations, This method can save a large amount of buoyant liquid.
Building may be used hoist engine or runner be arranged in the bottom end of building in moving process; Suction pump can be utilized, the entrance of suction pump is arranged in the front end of building, the entrance setting of suction pump is built in large size The rear end for building object is pushed using the reaction force of buoyant liquid;Above-mentioned building inner bottom can also utilized Eyelet pushes building by changing high-pressure hydraulic pump to the water filling angle of eyelet.Herein not to specifically pushing method Do specific restriction.
Above with reference to preferred embodiment, invention has been described, but protection scope of the present invention is not restricted to This can carry out it various improvement and can be replaced wherein with equivalent without departing from the scope of the invention Component, as long as be not present structural conflict, it is mentioned in the various embodiments items technical characteristic can combine in any way Get up, and any reference signs in the claims should not be construed as limiting the involved claims, no matter comes from which point It sees, the present embodiments are to be considered as illustrative and not restrictive.Therefore, any to fall within the scope of the appended claims All technical solutions be within the scope of the invention.

Claims (11)

1. a kind of method of building movement, which is characterized in that include the following steps:
A, the floating hole of ground is dug in the outside of building, the ground of building is isolated out;In building Take the transport channel for transporting building between initial position and target location;
B, buoyant liquid is injected into the floating hole of ground, reduces pressure of the entire building to ground;It is noted into transport channel Enter buoyant liquid;
C, building is pushed to reach target location along transport channel from initial position.
2. a kind of method of building movement according to claim 1, which is characterized in that also wrapped in the step A Include, the side in the floating hole of ground increase Lock gate and/or building Basolateral increase Lock gate and/or The side of transport channel and bottom surface increase Lock gate.
3. a kind of method of building movement according to claim 1 or 2, which is characterized in that the step B and/ Or further include suction pump being set in the inside of building, for the discharge of the water in building will to be penetrated into step C.
4. a kind of method of building movement according to claim 1, which is characterized in that floating in the step B Power liquid is water or sodium silicate.
5. a kind of method of building movement according to claim 1, which is characterized in that also wrapped in the step B It includes:It is increased up height on the top in the floating hole of ground, and then increases hanging down between the hole bottom in the floating hole of ground and ground floating hole hole top Straight height.
6. a kind of method of building movement according to claim 1, which is characterized in that also wrapped in the step B It includes:The material of sealing cavity or cladding less than buoyant liquid density is added in the Basolateral of building.
7. a kind of method of building movement according to claim 1, which is characterized in that also wrapped in the step B It includes:In the inner bottom perforating of building, by high-pressure hydraulic pump to eyelet water filling, make building using high pressure moisture film With surface separation.
8. a kind of method of building movement according to claim 7, which is characterized in that also wrapped in the step B It includes:By changing high-pressure hydraulic pump building is pushed to the water filling angle of eyelet.
9. a kind of method of building movement according to claim 1, which is characterized in that utilized in the step C Runner is arranged in the bottom end of building to push building in hoist engine.
10. a kind of method of building movement according to claim 1, which is characterized in that in the transport channel Equipped with multiple valves transport channel is divided into multiple passage aisles, during step C pushes building movement, successively The valve adjacent with building is opened, and the water in a upper passage aisle is transported in the channel that will be reached.
11. a kind of method of building movement according to claim 10, which is characterized in that in the step C also Including suction pump, the entrance of suction pump is arranged in the front end of building, and the entrance of suction pump is arranged in building Rear end.
CN201810590559.2A 2018-06-09 2018-06-09 Method for moving large building Active CN108678418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810590559.2A CN108678418B (en) 2018-06-09 2018-06-09 Method for moving large building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810590559.2A CN108678418B (en) 2018-06-09 2018-06-09 Method for moving large building

Publications (2)

Publication Number Publication Date
CN108678418A true CN108678418A (en) 2018-10-19
CN108678418B CN108678418B (en) 2021-01-26

Family

ID=63810610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810590559.2A Active CN108678418B (en) 2018-06-09 2018-06-09 Method for moving large building

Country Status (1)

Country Link
CN (1) CN108678418B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066904A (en) * 1991-05-10 1992-12-09 刘祖荣 Industry and civilian construction conveying method
CN1118035A (en) * 1995-08-21 1996-03-06 黄鹏 Integral moving of high-rise large building
JPH09158235A (en) * 1995-12-07 1997-06-17 Dainetsuto:Kk Method for lifiting building
CN2316392Y (en) * 1997-05-20 1999-04-28 王爱国 Draught attachment for translation of building of two or more storeys
JP2002047811A (en) * 2000-08-02 2002-02-15 Chem Grouting Co Ltd Jack up method
JP2003343015A (en) * 2002-05-24 2003-12-03 Taisei Corp Transfer method of structure
CN102493701A (en) * 2011-11-30 2012-06-13 河南省电力公司郑州供电公司 Integrated suspension displacement method for double-loop terminal tower
JP2014040703A (en) * 2012-08-21 2014-03-06 Leafair Co Ltd Existent construction ground improvement structure
JP2014159723A (en) * 2013-02-21 2014-09-04 Kazuaki Nakazawa Construction method for structure tilting and ground improvement
CN206385741U (en) * 2017-01-20 2017-08-08 中国五冶集团有限公司 A kind of siphon drainge system for building

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066904A (en) * 1991-05-10 1992-12-09 刘祖荣 Industry and civilian construction conveying method
CN1118035A (en) * 1995-08-21 1996-03-06 黄鹏 Integral moving of high-rise large building
JPH09158235A (en) * 1995-12-07 1997-06-17 Dainetsuto:Kk Method for lifiting building
CN2316392Y (en) * 1997-05-20 1999-04-28 王爱国 Draught attachment for translation of building of two or more storeys
JP2002047811A (en) * 2000-08-02 2002-02-15 Chem Grouting Co Ltd Jack up method
JP2003343015A (en) * 2002-05-24 2003-12-03 Taisei Corp Transfer method of structure
CN102493701A (en) * 2011-11-30 2012-06-13 河南省电力公司郑州供电公司 Integrated suspension displacement method for double-loop terminal tower
JP2014040703A (en) * 2012-08-21 2014-03-06 Leafair Co Ltd Existent construction ground improvement structure
JP2014159723A (en) * 2013-02-21 2014-09-04 Kazuaki Nakazawa Construction method for structure tilting and ground improvement
CN206385741U (en) * 2017-01-20 2017-08-08 中国五冶集团有限公司 A kind of siphon drainge system for building

Also Published As

Publication number Publication date
CN108678418B (en) 2021-01-26

Similar Documents

Publication Publication Date Title
CN1963149B (en) Mining method for replacement of banded coal under building by waste rock
US11795643B2 (en) Method for constructing inner dump type strip mine pit bottom reservoirs section by section
CN103967493B (en) A kind of slight slope and thin ore body ore pillar mining codes
US20020119010A1 (en) Ship lift system and method for transportation of ships with recycling water system in canal
CN104405436B (en) A kind of method improving ore body Tight filling rate
CN105275471A (en) Method for determining surface mine exploiting limit
CN101812988A (en) Method for mining gently dipping to steep dipping thick and large ore bodies
CN105240014A (en) Method for reclaiming house type remaining coal pillars based on filling and rebuilding of entry protection coal-pillar band
CN109372511B (en) Method for dynamically filling coal mining subsidence land by using yellow river silt
CN109944610B (en) Method for rebuilding refuse landfill by using abandoned coal mine roadway
CN103437339A (en) Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
EP2602426A1 (en) Liquid guiding and collection process with secondary channels for in situ leaching
CN107503750A (en) A kind of Waste Dump inside Open Pit Mine presser feet, which is hung, helps parallel building method
CN106049518B (en) A kind of improved vacuum precipitation system and its control method
CN208415273U (en) Interstitital texture around subterranean tunnel
CN109446602A (en) A kind of Numerical Experimental Method of surface vertical borehole extraction super high seam gas
CN109899070B (en) Slow-inclination medium-thickness ore body solid-waste-free filling mining method based on ellipsoid ore drawing structure
CN104454001A (en) Dewatering system and dewatering method in tunnel of low-permeability silty-fine sand stratum
CN1952349A (en) Mining method for replacement of pressed coal under village by waste rock
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN108678418A (en) A kind of method of building movement
CN109295969A (en) The construction technology of different length drain bar series turbocharging vacuum pre-pressed soft soil foundation
CN109184784B (en) Fully-mechanized coal gangue synchronous filling system and method based on coal mining collapse degree reduction
CN106168133A (en) Open-air pit fill method
CN206457835U (en) A kind of open caisson

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant