CN108643875A CN201810454819.3A CN201810454819A CN108643875A CN 108643875 A CN108643875 A CN 108643875A CN 201810454819 A CN201810454819 A CN 201810454819A CN 108643875 A CN108643875 A CN 108643875A
Authority
CN
China
Prior art keywords
water
analysis result
reservoir
injection
oil reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810454819.3A
Other languages
Chinese (zh)
Other versions
CN108643875B (en
Inventor
杨阳
吴忠宝
张文旗
阎逸群
王俊文
张原�
张萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201810454819.3A priority Critical patent/CN108643875B/en
Publication of CN108643875A publication Critical patent/CN108643875A/en
Application granted granted Critical
Publication of CN108643875B publication Critical patent/CN108643875B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The embodiment of the application discloses a water injection development adjustment method, a water injection development adjustment device and a water injection development adjustment system for a low-permeability clastic rock oil reservoir, wherein the method comprises the steps of analyzing and processing the application condition of an injection and production system according to the well pattern and the well spacing and the water drive control degree to obtain a first analysis result; analyzing and processing the water driving condition according to the overall water driving degree and the longitudinal water driving balance coefficient to obtain a second analysis result; analyzing and processing the water injection utilization condition according to the formation pressure maintaining level and the water storage rate to obtain a third analysis result; analyzing and processing the reservoir protection condition according to the average water injection pressure and the average water absorption strength to obtain a fourth analysis result; and determining a water injection development adjustment implementation mode of the target work area according to the first analysis result, the second analysis result, the third analysis result and the fourth analysis result. By utilizing the embodiments of the application, the finally determined water injection development adjustment scheme can be more accurate.

Description

A kind of waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir, apparatus and system
Technical field
The present invention relates to oil-gas field development technical fields, particularly, are related to a kind of water filling of hyposmosis clastic rock oil reservoir and open Send out method of adjustment, apparatus and system.
Background technology
Low permeability oil field reserves and scale are increasingly expanded, and have very big potentiality to become advocating war for China's future oil-gas exploration and development .The theoretical research of waterflood development of low-permeability reservoirs has just been carried out early in eighties of last century sixties domestic and foreign scholars.On the one hand, Low-permeability oil deposit has the characteristics that reservoir densification, and on the other hand, low-permeability oil deposit generally development is multiple in geologic structure, fluid distrbution Miscellaneous area causes waterflooding extraction problem more, and difficulty is big.Therefore, it is necessary to analyse in depth to influence waterflood development of low-permeability reservoirs effect Key technical index, formed be suitable for waterflood development of low-permeability reservoirs effect evaluation method.To see clearly reservoir waterflooding Existing main problem is adjusted development plan even changes development mode in time, prevents the unnecessary injury of oil reservoir, carry High field output and recovery ratio, ensure efficiently, constantly waterflooding extraction.
Currently, related waterflooding development effect assessment technique is primarily adapted for use in middle and high infiltration oil reservoir both at home and abroad.For example, using a variety of WATER FLOODING CHARACTERISTIC CURVE predicts the waterflooding result of water flood field, utilizes gray relative analysis method evaluating oilfield waterflooding extraction effect The method etc. of fruit.But these methods also expose some shortcomings when being applied to hyposmosis clastic rock oil reservoir, as development effectiveness is commented Valence index relationship is complicated, and correlation is very strong between some indexs, and some indexs are isolated and are not in contact with or some evaluations refer to Mark has limitation, is suitable only for the oil field a certain development phase.Meanwhile low-permeability oil deposit is also different from middle and high infiltration oil reservoir, it is low Infiltration oil reservoir has that many middle and high infiltration reservoir waterfloodings are no, and art methods do not account for above-mentioned ask yet Topic, so as to cause correct evaluation cannot be made to waterflood development of low-permeability reservoirs effect.Therefore, being badly in need of one kind at present can be more Rationally, the method for more accurately evaluating waterflood development of low-permeability reservoirs effect, to realize to waterflood development of low-permeability reservoirs side Case is correctly adjusted.
Invention content
The embodiment of the present application is designed to provide a kind of waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir, device And system, the waterflooding extraction Adjusted Option finally determined can be made more targeted and more acurrate.
A kind of waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir provided by the present application, apparatus and system are to pass through packet Include following manner realization:
A kind of waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir, including:
Situation is applicable in the injection and extraction system of target area according to Well Pattern And Spacing and water drive control and carries out analyzing processing, Obtain the first analysis result;
Water drive producing status of the equalizing coefficient to target area is employed according to whole water-flooding performance and longitudinal water drive Analyzing processing is carried out, the second analysis result is obtained;
It keeps horizontal and injection water retaining in reservoir to carry out analyzing processing to the water filling utilization obstacle of target area according to strata pressure, obtains Obtain third analysis result;
Analyzing processing is carried out to the reservoir protection situation of target area according to average water injection pressure and mean water absorption intensity, Obtain the 4th analysis result;
The mesh is determined according to first analysis result, the second analysis result, third analysis result, the 4th analysis result The waterflooding extraction for marking work area adjusts embodiment.
The waterflooding extraction method of adjustment of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, the note to target area are adopted System is applicable in situation and carries out analyzing processing, including;
The corresponding Well Pattern And Spacing of maximum efficient rate is determined according to economic limit well space, judges that the Well Pattern And Spacing in target work area is It is no to belong to the corresponding Well Pattern And Spacing of the maximum efficient rate, and judge whether each reservoir water flooding controlling extent value in target work area is big In equal to the first predetermined threshold value;
If it is judged that being to be, obtains the injection and extraction system and be applicable in satisfactory first analysis result of situation.
The waterflooding extraction method of adjustment of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, the water drive to target area Producing status carries out analyzing processing, including:
Judge whether the whole water-flooding performance in target work area is more than or equal to the second predetermined threshold value, and longitudinal water-driven Whether it is less than third predetermined threshold value with equalizing coefficient;
If it is judged that being to be, satisfactory second analysis result of the water drive producing status is obtained.
The waterflooding extraction method of adjustment of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, the water filling to target area Utilization obstacle carries out analyzing processing, including:
Judge that target work area strata pressure keeps horizontal and whether is more than the 4th predetermined threshold value, and judges the variation of injection water retaining in reservoir Whether satisfaction presets injection water retaining in reservoir condition;
If it is judged that being to be, the satisfactory third analysis result of the water filling utilization obstacle is obtained.
The waterflooding extraction method of adjustment of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, the reservoir to target area Conservation status carries out analyzing processing, including:
Judge whether the average water injection pressure in target work area and formation fracture pressure ratio are less than the 5th predetermined threshold value, and Judge whether mean water absorption intensity is more than the 6th predetermined threshold value;
If it is judged that being to be, satisfactory 4th analysis result of the reservoir protection situation is obtained.
The waterflooding extraction method of adjustment of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, it is described to judge the whole of target work area Whether body water-flooding performance is more than or equal to the second predetermined threshold value, including:
Mesh is determined according to the ratio of the cumulative oil production and reservoir reserve of the cumulative water production of water-drive pool and water-drive pool Mark the whole water-flooding performance in work area.
The waterflooding extraction method of adjustment of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, it is described to judge the vertical of target work area Employ whether equalizing coefficient is less than third predetermined threshold value to water drive, including:
The zero dimension water-flooding performance for determining each oil reservoir is calculated according to the water-flooding performance of each oil reservoir;
Each oil reservoir is ranked up from big to small by water-flooding performance, using small number of plies accumulative perception as abscissa number It is that ordinate data draw curve according to, zero dimension water-flooding performance accumulative perception;
Determine that longitudinal water drive in target work area employs equalizing coefficient according to the area of curve and abscissa.
On the other hand, the embodiment of the present application also provides a kind of waterflooding extraction adjusting apparatus of hyposmosis clastic rock oil reservoir, packet It includes:
Injection and extraction system analysis module, for the injection and extraction system according to Well Pattern And Spacing and water drive control to target area The situation of being applicable in carries out analyzing processing, obtains the first analysis result;
Water drive employs analysis module, for employing equalizing coefficient to mesh according to whole water-flooding performance and longitudinal water drive The water drive producing status for marking region carries out analyzing processing, obtains the second analysis result;
Water filling utilizes analysis module, for keeping water filling profit of the horizontal and injection water retaining in reservoir to target area according to strata pressure Analyzing processing is carried out with situation, obtains third analysis result;
Reservoir protection analysis module, for the basis averagely reservoir of water injection pressure and mean water absorption intensity to target area Conservation status carries out analyzing processing, obtains the 4th analysis result;
Waterflooding extraction adjust module, for according to first analysis result, the second analysis result, third analysis result, 4th analysis result determines the waterflooding extraction adjustment embodiment in the target work area.
The waterflooding extraction adjusting apparatus of the hyposmosis clastic rock oil reservoir of the embodiment of the present application, including processor and for storing The memory of processor-executable instruction is realized when described instruction is executed by the processor and is included the following steps:
Situation is applicable in the injection and extraction system of target area according to Well Pattern And Spacing and water drive control and carries out analyzing processing, Obtain the first analysis result;
Water drive producing status of the equalizing coefficient to target area is employed according to whole water-flooding performance and longitudinal water drive Analyzing processing is carried out, the second analysis result is obtained;
It keeps horizontal and injection water retaining in reservoir to carry out analyzing processing to the water filling utilization obstacle of target area according to strata pressure, obtains Obtain third analysis result;
Analyzing processing is carried out to the reservoir protection situation of target area according to average water injection pressure and mean water absorption intensity, Obtain the 4th analysis result;
The mesh is determined according to first analysis result, the second analysis result, third analysis result, the 4th analysis result The waterflooding extraction for marking work area adjusts embodiment.
On the other hand, the embodiment of the present application also provides a kind of waterflooding extraction adjustment system of hyposmosis clastic rock oil reservoir, packet It includes at least one processor and stores the memory of computer executable instructions, the processor is realized when executing described instruction The step of said one or multiple embodiment the methods.
A kind of waterflooding extraction method of adjustment for hyposmosis clastic rock oil reservoir that this specification one or more embodiment provides, Apparatus and system determines evaluation index based on the key factor of tangible effect hyposmosis clastic rock water flooding effect, from Four injection and extraction system adaptability, water drive producing status, water filling utilization obstacle and reservoir protection situation aspects are come rationally and accurate True evaluation hyposmosis clastic rock reservoir waterflooding effect.And correlation is small between above-mentioned each index, and it is representative strong, to more The reason of reflecting flood effectiveness comprehensively and reach the effect so that finally determining waterflooding extraction Adjusted Option has more needle To property and more acurrate.
Description of the drawings
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments described in application, for those of ordinary skill in the art, in the premise of not making the creative labor property Under, other drawings may also be obtained based on these drawings.In the accompanying drawings:
Fig. 1 is a kind of flow of the waterflooding extraction method of adjustment embodiment for hyposmosis clastic rock oil reservoir that this specification provides Schematic diagram;
Fig. 2 is different well pattern forms in the example that this specification provides, the comparison signal of well spacing waterflooding extraction recovery ratio Figure;
Fig. 3 is each oil reservoir connection situation and water drive control schematic diagram in the example that this specification provides;
Fig. 4 is that longitudinal water drive employs balance degree analysis curve synoptic diagram in the example that this specification provides;
Fig. 5 is injection water retaining in reservoir and theoretical curve contrast schematic diagram in the example that this specification provides;
Fig. 6 is a kind of module of the waterflooding extraction adjusting apparatus embodiment for hyposmosis clastic rock oil reservoir that this specification provides Structural schematic diagram.
Specific implementation mode
In order to make those skilled in the art more fully understand the technical solution in this specification, below in conjunction with this explanation Attached drawing in book one or more embodiment carries out the technical solution in this specification one or more embodiment clear, complete Site preparation describes, it is clear that described embodiment is only specification a part of the embodiment, instead of all the embodiments.Based on saying Bright book one or more embodiment, it is obtained by those of ordinary skill in the art without making creative efforts all Other embodiment should all belong to the range of this specification example scheme protection.
Low-permeability oil deposit is different from middle and high infiltration oil reservoir, and fine and close reservoir makes grease flowing law become non-from Darcy Flow and reach West stream, some usual middle and high infiltration reservoir water Indexes of Evaluation Effect lack directive significance for low-permeability oil deposit;Simultaneously as Waterflood development of low-permeability reservoirs exposes the no problem of many middle and high infiltration reservoir waterfloodings, such as typical " note not into, adopt not It goes wrong, conventional middle and high infiltration oil reservoir is caused to utilize WATER FLOODING CHARACTERISTIC CURVE method comparative evaluation to be either based on many indexes merely It is not particularly suited for low-permeability oil deposit using the method for multiple fuzzy comprehensive evaluation.
In view of the above-mentioned problems, this application provides a kind of waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir, it is based on It influences hyposmosis clastic rock reservoir waterflooding key factor and determines evaluation index, it is suitable from injection and extraction system using the evaluation index Answer four situation, water drive producing status, water filling utilization obstacle and reservoir protection situation aspect assay hyposmosis clastic rocks Reservoir waterflooding effect, and corresponding developing adjustment scheme is targetedly determined according to corresponding analysis result.Wherein, it notes The evaluation index of extraction system adaptive condition may include Well Pattern And Spacing adaptability and water drive control, and water-flooding performance is commented Valence index may include that whole water drive producing status and longitudinal water drive employ balanced situation, and the evaluation index of water filling utilization obstacle can To include reasonable formation pressure holding level and injection water retaining in reservoir, the evaluation index of reservoir protection situation may include water injection pressure and suction Water intensity.Correlation is small between above-mentioned each index, representative strong, to ensure that the reasonability of final waterflooding program adjustment And accuracy.
Using the scheme of each embodiment of the application, the prior art can be effectively solved in hyposmosis clastic rock waterflooding extraction The problem of effect assessment, can be applied to trial zone waterflooding development effect evaluation and remaining oil reservoir Potential Evaluation, and Development plan is targetedly adjusted, and then adjusts implementing measure.
Fig. 1 is a kind of waterflooding extraction method of adjustment embodiment stream of hyposmosis clastic rock oil reservoir that this specification provides Journey schematic diagram.Although present description provides such as following embodiments or method operating procedure shown in the drawings or apparatus structure, It is less after may include either more in the method or device without performing creative labour or part merging based on routine Operating procedure or modular unit.In the step of there is no necessary causalities in logicality or structure, these steps are held Row sequence or the modular structure of device are not limited to this specification embodiment or execution shown in the drawings sequence or modular structure.It is described Method or modular structure device in practice, server or end product in application, can be according to embodiment or attached Method shown in figure or the execution of modular structure carry out sequence be either parallel to be executed (such as parallel processor or multiple threads Environment, the even implementation environment including distributed treatment, server cluster).
Specific one embodiment as shown in Figure 1, the hyposmosis clastic rock oil reservoir that this specification provides waterflooding extraction tune In one embodiment of adjusting method, the method may include:
S2, the applicable situation of the injection and extraction system of target area is carried out at analysis according to Well Pattern And Spacing and water drive control Reason.
In the present embodiment, it may include that injection and extraction system fits hyposmosis clastic rock oil reservoir that the injection and extraction system, which is applicable in situation, Ying Xing.In some embodiments of this specification, the note of Well Pattern And Spacing and water drive control to target area can be utilized Extraction system is applicable in situation and carries out analyzing processing, obtains the first analysis result.First analysis result may include injection and extraction system Be applicable in situation whether meet the requirements, undesirable reason etc..For example, it is assumed that the water drive control in target work area is not met Preset condition, it is possible to determine that it is undesirable that injection and extraction system is applicable in situation;Correspondingly, the first analysis result may include noting to adopt to be The applicable situation of system is undesirable, water drive control is not up to predetermined threshold value etc..Similarly, other following analysis results can wrap The reason of including corresponding waterflooding development effect and not up to development effectiveness etc., it is in order to avoid repeated description, hereinafter not another One is described in detail.
Hyposmosis clastic rock oil reservoir is fine and close, and grease flowing law is low speed non-darcy flow, therefore is difficult between injection-production well Effective displacement is formed, using Well Pattern And Spacing and water drive control two indices, can more targetedly, reasonably be divided Analysis evaluation injection and extraction system is applicable in situation.
In one embodiment of this specification, the corresponding well pattern well of maximum efficient rate can be determined according to economic limit well space Away from judging whether the Well Pattern And Spacing in target work area belongs to the corresponding Well Pattern And Spacing of the maximum efficient rate, and judge target work Whether each reservoir water flooding controlling extent value in area is more than or equal to the first predetermined threshold value.If it is judged that being to be, the note is obtained Extraction system is applicable in satisfactory first analysis result of situation.To which the evaluation that can be quantified using the scheme of the present embodiment is related Index improves the accuracy and reasonability of waterflooding development effect evaluation.
In another embodiment of this specification, following formula can also be utilized to quantitatively determine the economic limit of oil reservoir in advance Well spacing L:
Wherein, M is constant, and economy ultimate well spacing density S can be expressed as:
Wherein, A is oil area, and N is oil in-place, NmingFor single well-controlled economic limit oil in place, into one Step, single well-controlled economic limit oil in place N can be determined using following formulaming
Wherein, ERFor recovery ratio.
Further, single well-controlled economic limit recoverable reserves NminkIt can be determined according to following two formula:
Wherein, WiFor recoverable reserves recovery percent of reserves in the development evaluation time limit, qminIt is averaged economic limit day oil-producing for individual well Amount, β are the ratio of oil-water well sum and oil well number, and C is crude oil commodity rate, and P is oil sale price, and O operates for crude oil production Expense, IDIt is invested for individual well drilling well (including perforation, pressure break etc.), IBIndividual well surface construction (including system engineering and mine are built) is thrown Money, T are the exploitation payback period of recoverable reserves, and R is loan rate, and τ is rate when recovering the oil.
It is then possible under the premise of more than economic limit well space, design different well pattern forms, different well spacings oil reservoir injection Water development plan compares each scheme waterflooding development effect using numerical simulation technology, determines the corresponding well pattern shape of maximum efficient rate Formula and optimal well-spacing range.As shown in Fig. 2, Fig. 2 indicates different well spacings, the recovery percent of reserves of well pattern (recovery ratio) analysis comparison signal Figure.The existing Well Pattern And Spacing in target work area well pattern form corresponding with maximum efficient rate and well spacing are compared again, judge mesh Whether the Well Pattern And Spacing in mark work area belongs to the corresponding Well Pattern And Spacing of the maximum efficient rate.
In another embodiment of this specification, the water drive control may include injection water institute under the conditions of existing well pattern The ratio for the reserves and its gross reserves in oil area that can be fed through to.It can such as be analyzed by effect by well group dynamic, in conjunction with quiet State data (such as log) determines each Oil layer connectivity between well, then calculates each reservoir water flooding controlling extent:
Wherein, α is reservoir water flooding controlling extent, h0To penetrate out effective thickness, h1To penetrate out the effective thickness of connection.Such as Fig. 3 Shown, Fig. 3 indicates each oil reservoir connection situation and calculates the water drive control change curve schematic diagram obtained.Then, judge Whether each reservoir water flooding controlling extent data in target work area are more than or equal to the first predetermined threshold value, if it is greater, then judging result is It is.Preferably, in an embodiment of this specification, first predetermined threshold value can be 75%.
S4, it employs equalizing coefficient according to whole water-flooding performance and longitudinal water drive and shape is employed to the water drive of target area Condition carries out analyzing processing.
In the present embodiment, the water-flooding performance can the intake profile of all test wells and all tests per year The production profile material computation of oil well may include that total water sucting thickness is always penetrated with water injection well and opens the ratio for being connected to thickness or total yield Liquid thickness is always penetrated with oil well and opens the ratio for being connected to thickness.In some embodiments of this specification, whole water-driven can be utilized It is employed equalizing coefficient two indices with degree and longitudinal water drive and analyzing processing is carried out to the water drive producing status of target area, obtained Obtain the second analysis result.For example, it is assumed that whole water-flooding performance does not meet preset condition, first analysis result can wrap There may be do not penetrate out oil reservoir on including that water drive producing status is undesirable, whole water-flooding performance is not up to standard and being longitudinal Deng.The extremely strong oil reservoir of vertical heterogeneity all suffers from the huge challenge of interlayer contradiction, using whole water-flooding performance and indulges Employing equalizing coefficient two indices to water drive can be with the whole and longitudinal water drive producing status of significantly more efficient clear oil reservoir.
In one embodiment of this specification, it can be determined that whether the whole water-flooding performance in target work area is more than or equal to Second threshold and longitudinal water drive employ equalizing coefficient and are less than third threshold value;If it is judged that being to be, the water drive is obtained Satisfactory second analysis result of producing status.
It, can also be according to the cumulative water production of water-drive pool and tiring out for water-drive pool in another embodiment of this specification The ratio of product oil production and reservoir reserve quantitatively determines the whole water-flooding performance in target work area.For example, the one of this specification In a little embodiments, oil reservoir entirety water-flooding performance λ can be determined using following formula0
Wherein, Z ' is dynamic reservoir by water flood, and N indicates reservoir reserve.
Further, dynamic reservoir by water flood Z ' can be determined according to following formula:
Z'=7.5422B0.969 (9)
Wherein, QwIndicate the cumulative water production of water-drive pool, QoIndicate that the cumulative oil production of water-drive pool, A, B indicate water Oil reservoirs mining-employed reserves constant.
In another embodiment of this specification, it further can also quantitatively calculate longitudinal water drive and employ equalizing coefficient.Example Such as, the zero dimension water-flooding performance for determining each oil reservoir can be calculated according to the water-flooding performance of each oil reservoir, and each oil reservoir is pressed Water-flooding performance is ranked up from big to small, and journey is employed by abscissa data, zero dimension water drive of small number of plies accumulative perception It is that ordinate data draw curve to spend accumulative perception.Then, the vertical of target work area is determined according to the area of curve and abscissa Equalizing coefficient is employed to water drive.
Oil field producing profile testing data can be counted first, calculate the water-flooding performance of each oil reservoir:
Wherein, λ is reservoir water flooding development degree, h0To penetrate out effective thickness, h2To produce liquid thickness.
Correspondingly, zero dimension water-flooding performance can be expressed as:
Wherein, λciFor i-th layer of zero dimension water-flooding performance, λiFor i-th layer of water-flooding performance.
Based on economics Gini coefficient concept, each oil reservoir is sorted from small to large by water-flooding performance, it is tired with the small number of plies Product percentage is abscissa, and zero dimension water-flooding performance accumulative perception is that ordinate draws curve.Wherein, an oil reservoir can To be subdivided into multiple substratums.For example, one shares 3 oil reservoirs, it is ordered as A from small to large by water-flooding performance1、A3、A2, wherein A1Oil-bearing sand is 5 substratums, A2Oil-bearing sand is 4 substratums, A3Oil-bearing sand is 6 substratums, then A1The small number of plies of oil reservoir is tired Product percentage is 5/ (5+4+6)=33%, A1And A3Small number of plies accumulative perception be 73%, A1、A3And A2The small number of plies accumulation Percentage is 100%.Similarly, A can be calculated1、(A1And A3)、(A1、A3And A2) accumulation of corresponding zero dimension water-flooding performance Percentage, as shown in Figure 4.Assuming that curve and the surrounded areas of straight line y=x are a, curve and the surrounded area of x-axis are b, then may be used A/ (a+b) is employed equalizing coefficient as longitudinal water drive.As shown in Figure 4, the value of a+b is 0.5, then longitudinal water drive employs equilibrium Coefficient is also denoted as the form of 1-2b.Determine that longitudinal water drive employs equalizing coefficient to accurate quantitative analysis.
It is then possible to judge target work area whole water-flooding performance whether be more than or equal to the second predetermined threshold value and Longitudinal water drive employs whether equalizing coefficient is less than third predetermined threshold value.Preferably, second predetermined threshold value may include 75%, The third predetermined threshold value may include 0.3.
S6, horizontal according to strata pressure holding and injection water retaining in reservoir carries out at analysis the water filling utilization obstacle of target area Reason obtains third analysis result.
In the present embodiment, the water filling utilization obstacle can refer in accumulation injection water, deduct and be plucked out of ground simultaneously with crude oil After the accumulation water in face, the injected water volume for staying in oil reservoir accounts for the percentage of total injection rate.In some embodiments of this specification, The water filling utilization obstacle of target area can be carried out at analysis using strata pressure holding level and injection water retaining in reservoir two indices Reason obtains third analysis result.For example, it is assumed that injection water retaining in reservoir meets preset condition, but reasonable formation pressure holding level is not met Preset condition, then the third analysis result may include that water filling utilization obstacle is undesirable, injection water retaining in reservoir is up to standard, reasonable stratum Pressure keeps horizontal not up to standard, reservoir water producing level height, water injection rate deficiency etc..Stratum after hyposmosis clastic rock oil reservoir development Rapid pressure drop, water filling are to ensure that stratum maintains pressure appropriate, so that oil reservoir is had very strong driving force, be laminated using ground Water holding of trying hard to keep is flat and injection water retaining in reservoir two indices, can fully consider whether water filling can effectively maintain strata pressure and injection Can water effectively drive accurately and effectively to evaluate water filling utilization obstacle.
In one embodiment of this specification, it can be determined that target work area strata pressure keeps horizontal and whether is more than the 4th in advance If threshold value, and judge whether the variation of injection water retaining in reservoir meets default injection water retaining in reservoir condition, if it is judged that being to be, described in acquisition The satisfactory third analysis result of water filling utilization obstacle.
In another embodiment of this specification, oil reservoir oil sample can also be taken to carry out bubble point pressure experiment, determine oil reservoir Then saturation pressure quantitatively calculates strata pressure and keeps horizontal, as follows:
Wherein, δ is that strata pressure keeps horizontal, PbFor bubble point pressure, PCFor current strata pressure.Then, it is laminated with judging Whether water holding of trying hard to keep is flat is more than the 4th predetermined threshold value.Preferably, the 4th predetermined threshold value can be 1.
In another embodiment of this specification, the injection water retaining in reservoir in target work area can be calculated first, wherein injection water retaining in reservoir can be with The ratio of injection rate is accounted for for the injection rate of waterflooding oil field and the difference of water acquisition amount.It is then possible to draw the water in target work area Rate and recovery percent of reserves curve, curve and preset standard plate are compared, judge injection water retaining in reservoir curve whether with default recovery ratio Above standard curve coincide.As shown in figure 5, Fig. 5 indicates injection water retaining in reservoir and standard curve contrast schematic diagram.Preferably, described pre- If recovery ratio can be 25%.
S8, the reservoir protection situation of target area is carried out at analysis according to average water injection pressure and mean water absorption intensity Reason.
In the present embodiment, the reservoir protection situation may include that Waterflooding on Reservoirs destroys the influence brought.This theory In some embodiments of bright book, the reservoir protection of average water injection pressure and mean water absorption intensity to target area can be utilized Situation carries out analyzing processing, obtains the 4th analysis result.Hyposmosis clast petrosal foramen, to shout scale small, small during water drive The migration of grain be easy to cause reservoir damage, more accurately can reasonably be commented using average water injection pressure and mean water absorption intensity Valence reservoir protection situation.
In one embodiment of this specification, it can be determined that the average water injection pressure in target work area and formation fracture pressure ratio Whether value is less than the 5th predetermined threshold value, and judges whether mean water absorption intensity is more than the 6th predetermined threshold value, if it is judged that It is to be, obtains satisfactory 4th analysis result of the reservoir protection situation.
When it is implemented, the average water injection pressure of target work area oil reservoir injection well can be counted (including because of water injection pressure The high and water injection well of closing well);And the mean water absorption intensity of oil reservoir injection well can be counted.Then, judge that target work area is average Water injection pressure with respect to formation fracture pressure magnitude relationship, and judge mean water absorption intensity whether be more than the 6th predetermined threshold value. Preferably, in one embodiment of this specification, when the average water injection pressure calculated to shaft bottom is less than formation fracture pressure It is reasonable when 85%, when mean water absorption intensity is more than 0.5m3It is normal when/(md).When water injection pressure is reasonable and injection index When normal, determine that waterflooding extraction reservoir protection meets the requirements.
S10, institute is determined according to first analysis result, the second analysis result, third analysis result, the 4th analysis result State the waterflooding extraction adjustment embodiment in target work area.
In the present embodiment, above-mentioned first, second, third and fourth analysis result, then, the above analysis can be obtained as a result, really The waterflooding extraction in the fixed target work area adjusts embodiment.Wherein, first analysis result, the second analysis result, third Analysis result, the 4th analysis result may include corresponding waterflooding development effect and not up to development effectiveness reason etc..Then, The waterflooding extraction adjustment embodiment in target work area can be determined according to first, second, third and fourth analysis result.
For example, in some embodiments of this specification, when injection and extraction system adaptability, water drive producing status, water filling utilize When situation and reservoir protection situation meet the requirements, it can be without to waterflooding extraction that adjustment embodiment is opened in corresponding water filling It is adjusted.In other embodiments of this specification, when injection and extraction system adaptability, water drive producing status, water filling utilize shape There are when undesirable aspect in condition and reservoir protection situation, then can be according to not up to corresponding development effectiveness the reason of Carry out waterflooding extraction adjustment.
For example, the Well Pattern And Spacing for working as target work area belongs to the corresponding Well Pattern And Spacing of maximum efficient rate and each oil-reservoir water controls When processing procedure degree reaches 75% or more, then above-mentioned judging result is to be, then waterflooding development effect is that evaluation injection and extraction system is applicable in shape Condition meets the requirements.If the well pattern or well spacing in target work area are not belonging to the corresponding Well Pattern And Spacing of maximum efficient rate or each reservoir water flooding Controlling extent is not up to 75% or more.Such as determine that well spacing 175m, well pattern form are the corresponding recovery ratio highest of anti-7 well patterns, and The current well spacing in target work area is 350m, well pattern form is anti-7 well patterns.Then oil reservoir is mismatched with injection and extraction system, i.e. water filling is opened It is that the applicable situation of evaluation injection and extraction system is undesirable to send out effect.The reason of being not up to development effectiveness accordingly can be well spacing mistake Width can then be adjusted waterflooding program, and waterflooding extraction Adjusted Option can be well space shortening infilled well pattern.To profit Reasonable, accurate evaluation to waterflooding development effect may be implemented in the scheme provided with the various embodiments described above, and can be further real Now waterflooding program targetedly and correctly adjust.
In order to enable further verifying the practicability and feasibility of this method, this specification additionally provides using above-mentioned side Another specific example of case, each reality above-mentioned to this specification by taking Xinjiang Oilfield hyposmosis clastic rock oil reservoir trial zone as an example The method described in example is applied to illustrate.
(1) it is 159m to calculate the oil reservoir economic limit well space.Under the premise of more than economic limit well space, different wells are designed The reservoir waterflooding scheme of web form, different well spacings compares each scheme waterflooding development effect, as a result using numerical simulation technology For the anti-seven spot pattern recovery ratio highests of 175m, and oil reservoir is the anti-seven spot patterns of 350m at present, therefore Well Pattern And Spacing adaptability at present Difference, such as Fig. 2.
(2) it is analyzed by effect by well group dynamic, each oil reservoir is connected between determining well in conjunction with static data (such as log) Property, calculating each reservoir water flooding controlling extent is nearly all not achieved 75%, such as Fig. 3.
(3) oil reservoir entirety water-flooding performance 64.8% is calculated, longitudinal water drive employs equalizing coefficient 0.28, shows longitudinal dynamic With equilibrium, such as Fig. 4.
(4) saturation pressure of oil reservoir is 20.1MPa, and strata pressure 17MPa at present, reasonable formation pressure holding level are 89%, the changing rule of injection water retaining in reservoir matches with the theoretical curve of waterflood recovery efficiency factor 27%, such as Fig. 5.
(5) statistics reservoir formation fracture pressure is 40MPa, and the average water injection pressure for converting water injection well is 35MPa, is more than ground The 85% of layer fracture pressure, mean water absorption intensity 0.3m3/ (md).
(6) confluence analysis result.
Well Pattern And Spacing adaptability and water drive control be not up to standard, shows that oil reservoir is mismatched with injection and extraction system, it should contract Dense well spacing infilled well pattern.Longitudinal water drive employs equilibrium, but whole water-flooding performance is not up to standard, this show on longitudinal there may be Oil reservoir is not penetrated out, and there are prodigious rolling flared end potentiality.Injection water retaining in reservoir is up to standard, but reasonable formation pressure keeps horizontal not up to standard, Show that reservoir water producing level is high, but water injection rate is inadequate, and stratum energy cannot be replenished in time.Water injection pressure and injection index It is not up to standard, if situation is not improved after infilled well pattern, shows that reservoir damage is serious, should check injection water quality, add Suitable inorganic agent.
Assessment indicator system in the scheme that this specification said one or multiple embodiments provide is all based on conscientiously The key factor for influencing hyposmosis clastic rock water flooding effect determines, and each index related small, representative strong, can be with Overall merit flood effectiveness and the reason of reach the effect.And it is utilized from injection and extraction system adaptability, water drive producing status, water filling The waterflooding development effect in four aspect evaluation hyposmosis clastic rock oil fields of situation and reservoir protection situation, reflects low-permeability oil Hide the importance that waterflooding development forms effective displacement and reservoir protection.
In addition, in one or more embodiment of this specification, method and the exploitation of index of correlation calculating are given The method of effect quantitatively evaluation, a variety of Method means such as integrated application mathematical statistics, reservoir engineering and numerical simulation so that should Technology is more scientific, accurate.The scheme provided using each embodiment of this specification carries out hyposmosis clastic rock Evaluation of Affusion Effect, It may make that having evaluated oil reservoir future modification scenario has regulations to abide by.
Each embodiment in this specification is described in a progressive manner, identical similar portion between each embodiment Point just to refer each other, and each embodiment focuses on the differences from other embodiments.Specifically it is referred to The description of aforementioned relevant treatment related embodiment, does not do repeat one by one herein.
It is above-mentioned that this specification specific embodiment is described.Other embodiments are in the scope of the appended claims It is interior.In some cases, the action recorded in detail in the claims or step can be come according to different from the sequence in embodiment It executes and desired result still may be implemented.In addition, the process described in the accompanying drawings not necessarily require show it is specific suitable Sequence or consecutive order could realize desired result.In some embodiments, multitasking and parallel processing be also can With or it may be advantageous.
A kind of waterflooding extraction method of adjustment for hyposmosis clastic rock oil reservoir that this specification one or more embodiment provides, Evaluation index is determined based on the key factor of tangible effect hyposmosis clastic rock water flooding effect, is adapted to from injection and extraction system Property, water drive producing status, water filling utilization obstacle and the aspect of reservoir protection situation four come rationally and accurately evaluate hypotonic Saturating clastic rock reservoir waterflooding effect.And correlation is small between above-mentioned each index, and it is representative strong, to more comprehensively reflect note Water effect and the reason of reach the effect so that finally determining waterflooding extraction Adjusted Option is more targeted and more accurate Really.
Based on the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir described above, this specification is one or more real It applies example and a kind of waterflooding extraction adjusting apparatus of hyposmosis clastic rock oil reservoir is also provided.The device may include having used this theory System, software (application), module, component, server of bright book embodiment the method etc. simultaneously combine necessary implementation hardware Device.Based on same innovation thinking, for example following reality of device in one or more embodiments that this specification embodiment provides It applies described in example.Since the implementation that device solves the problems, such as is similar to method, the specific device of this specification embodiment Implementation may refer to the implementation of preceding method, and overlaps will not be repeated.It is used below, term " unit " or " module " The combination of the software and/or hardware of predetermined function may be implemented.Although device described in following embodiment is preferably with software It realizes, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.Specifically, Fig. 6 specifications A kind of modular structure schematic diagram of the waterflooding extraction adjusting apparatus embodiment of the hyposmosis clastic rock oil reservoir provided, such as Fig. 6 are described Device may include:
Injection and extraction system analysis module 102 can be used for according to Well Pattern And Spacing and water drive control to target area Injection and extraction system is applicable in situation and carries out analyzing processing, obtains the first analysis result;
Water drive employs analysis module 104, can be used for employing equilibrium according to whole water-flooding performance and longitudinal water drive Coefficient carries out analyzing processing to the water drive producing status of target area, obtains the second analysis result;
Water filling utilizes analysis module 106, can be used for according to strata pressure holding level and injection water retaining in reservoir to target area Water filling utilization obstacle carry out analyzing processing, obtain third analysis result;
Reservoir protection analysis module 108 can be used for according to average water injection pressure and mean water absorption intensity to target area The reservoir protection situation in domain carries out analyzing processing, obtains the 4th analysis result;
Waterflooding extraction adjusts module 110, can be used for according to first analysis result, the second analysis result, third point Analysis result, the 4th analysis result determine the waterflooding extraction adjustment embodiment in the target work area.
It should be noted that device described above can also include other embodiment party according to the description of embodiment of the method Formula.Concrete implementation mode is referred to the description of related method embodiment, does not repeat one by one herein.
A kind of waterflooding extraction adjusting apparatus for hyposmosis clastic rock oil reservoir that this specification one or more embodiment provides, Evaluation index is determined based on the key factor of tangible effect hyposmosis clastic rock water flooding effect, is adapted to from injection and extraction system Property, water drive producing status, water filling utilization obstacle and the aspect of reservoir protection situation four come rationally and accurately evaluate hypotonic Saturating clastic rock reservoir waterflooding effect.And correlation is small between above-mentioned each index, and it is representative strong, to more comprehensively reflect note Water effect and the reason of reach the effect so that finally determining waterflooding extraction Adjusted Option is more targeted and more accurate Really.
The method or apparatus described in above-described embodiment that this specification provides can realize that business is patrolled by computer program It collects and records on a storage medium, the storage medium can be read and be executed with computer, realize this specification embodiment institute The effect of description scheme.Therefore, this specification also provides a kind of waterflooding extraction adjusting apparatus of hyposmosis clastic rock oil reservoir, including Processor and the memory for storing processor-executable instruction, realize to include following step when described instruction is executed by the processor Suddenly:
Situation is applicable in the injection and extraction system of target area according to Well Pattern And Spacing and water drive control and carries out analyzing processing, Obtain the first analysis result;
Water drive producing status of the equalizing coefficient to target area is employed according to whole water-flooding performance and longitudinal water drive Analyzing processing is carried out, the second analysis result is obtained;
It keeps horizontal and injection water retaining in reservoir to carry out analyzing processing to the water filling utilization obstacle of target area according to strata pressure, obtains Obtain third analysis result;
Analyzing processing is carried out to the reservoir protection situation of target area according to average water injection pressure and mean water absorption intensity, Obtain the 4th analysis result;
The mesh is determined according to first analysis result, the second analysis result, third analysis result, the 4th analysis result The waterflooding extraction for marking work area adjusts embodiment.
The storage medium may include the physical unit for storing information, typically by after information digitalization again with profit The media of the modes such as electricity consumption, magnetic or optics are stored.The storage medium, which has, may include:Letter is stored in the way of electric energy The device of breath such as, various memory, such as RAM, ROM;The device of information is stored in the way of magnetic energy such as, hard disk, floppy disk, magnetic Band, core memory, magnetic bubble memory, USB flash disk;Using optical mode store information device such as, CD or DVD.Certainly, also its Readable storage medium storing program for executing of his mode, such as quantum memory, graphene memory etc..
It should be noted that device described above can also include other embodiment party according to the description of embodiment of the method Formula.Concrete implementation mode is referred to the description of related method embodiment, does not repeat one by one herein.
A kind of waterflooding extraction adjusting apparatus of hyposmosis clastic rock oil reservoir described in above-described embodiment is low based on tangible effect The key factor of infiltration clastic rock water flooding effect determines evaluation index, and shape is employed from injection and extraction system adaptability, water drive Four condition, water filling utilization obstacle and reservoir protection situation aspects rationally and accurately to evaluate hyposmosis clastic rock oil reservoir injection Water development effectiveness.And correlation is small between above-mentioned each index, and it is representative strong, to more comprehensively reflect flood effectiveness and reach The reason of effect so that finally determining waterflooding extraction Adjusted Option is more targeted and more acurrate.
This specification also provides a kind of waterflooding extraction adjustment system of hyposmosis clastic rock oil reservoir, and the system can be single The waterflooding extraction of only hyposmosis clastic rock oil reservoir adjusts system, can also apply in a plurality of types of oil reservoir development data evaluations Or in processing, solution release system.The system can be individual server, can also include the use of the one of this specification The server cluster, system (including distributed system), software of a or multiple the methods or one or more embodiment devices (application), practical operation device, logic gates device, quantum computer etc. simultaneously combine the necessary terminal dress for implementing hardware It sets.The waterflooding extraction adjustment system of the hyposmosis clastic rock oil reservoir may include at least one processor and storage computer The memory of executable instruction, the processor realize institute in above-mentioned any one or multiple embodiments when executing described instruction The step of stating method.
It should be noted that system described above can also include others according to the description of method or device embodiment Embodiment, concrete implementation mode are referred to the description of related method embodiment, do not repeat one by one herein.
A kind of waterflooding extraction of hyposmosis clastic rock oil reservoir described in above-described embodiment adjusts system, low based on tangible effect The key factor of infiltration clastic rock water flooding effect determines evaluation index, and shape is employed from injection and extraction system adaptability, water drive Four condition, water filling utilization obstacle and reservoir protection situation aspects rationally and accurately to evaluate hyposmosis clastic rock oil reservoir injection Water development effectiveness.And correlation is small between above-mentioned each index, and it is representative strong, to more comprehensively reflect flood effectiveness and reach The reason of effect so that finally determining waterflooding extraction Adjusted Option is more targeted and more acurrate.
It should be noted that this specification device or system described above according to the description of related method embodiment also May include other embodiments, concrete implementation mode is referred to the description of embodiment of the method, does not go to live in the household of one's in-laws on getting married one by one herein It states.Each embodiment in this specification is described in a progressive manner, and identical similar part is mutual between each embodiment Mutually referring to each embodiment focuses on the differences from other embodiments.Especially for hardware+program For class, storage medium+program embodiment, since it is substantially similar to the method embodiment, so description is fairly simple, it is related Place illustrates referring to the part of embodiment of the method.
It is above-mentioned that this specification specific embodiment is described.Other embodiments are in the scope of the appended claims It is interior.In some cases, the action recorded in detail in the claims or step can be come according to different from the sequence in embodiment It executes and desired result still may be implemented.In addition, the process described in the accompanying drawings not necessarily require show it is specific suitable Sequence or consecutive order could realize desired result.In some embodiments, multitasking and parallel processing be also can With or it may be advantageous.
System, device, module or the unit that above-described embodiment illustrates can specifically realize by computer chip or entity, Or it is realized by the product with certain function.It is a kind of typically to realize that equipment is computer.Specifically, computer for example may be used Think personal computer, laptop computer, vehicle-mounted human-computer interaction device, cellular phone, camera phone, smart phone, individual Digital assistants, media player, navigation equipment, electronic mail equipment, game console, tablet computer, wearable device or The combination of any equipment in these equipment of person.
For convenience of description, it is divided into various modules when description apparatus above with function to describe respectively.Certainly, implementing this The function of each module is realized can in the same or multiple software and or hardware when specification one or more, it can also The module for realizing same function is realized by the combination of multiple submodule or subelement etc..Device embodiment described above is only It is only illustrative, for example, in addition the division of the unit, only a kind of division of logic function can have in actual implementation Dividing mode, such as multiple units or component can be combined or can be integrated into another system or some features can be with Ignore, or does not execute.Another point, shown or discussed mutual coupling, direct-coupling or communication connection can be logical Some interfaces are crossed, the INDIRECT COUPLING or communication connection of device or unit can be electrical, machinery or other forms.
It is also known in the art that other than realizing controller in a manner of pure computer readable program code, it is complete Entirely can by by method and step carry out programming in logic come so that controller with logic gate, switch, application-specific integrated circuit, programmable The form of logic controller and embedded microcontroller etc. realizes identical function.Therefore this controller is considered one kind Hardware component, and the structure that the device for realizing various functions that its inside includes can also be considered as in hardware component.Or Person even, can will be considered as either the software module of implementation method can be hardware again for realizing the device of various functions Structure in component.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, computing device includes one or more processors (CPU), input/output interface, net Network interface and memory.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability Including so that process, method, commodity or equipment including a series of elements include not only those elements, but also wrap Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that wanted including described There is also other identical elements in the process of element, method or equipment.
It will be understood by those skilled in the art that this specification one or more embodiment can be provided as method, system or calculating Machine program product.Therefore, this specification one or more embodiment can be used complete hardware embodiment, complete software embodiment or The form of embodiment combining software and hardware aspects.Moreover, this specification one or more embodiment can be used at one or It is multiple wherein include computer usable program code computer-usable storage medium (include but not limited to magnetic disk storage, CD-ROM, optical memory etc.) on the form of computer program product implemented.
This specification one or more embodiment can computer executable instructions it is general on Described in hereafter, such as program module.Usually, program module includes executing particular task or realization particular abstract data type Routine, program, object, component, data structure etc..This this specification one can also be put into practice in a distributed computing environment Or multiple embodiments, in these distributed computing environments, by being held by the connected remote processing devices of communication network Row task.In a distributed computing environment, program module can be located at the local and remote computer including storage device In storage medium.
Each embodiment in this specification is described in a progressive manner, identical similar portion between each embodiment Point just to refer each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality For applying example, since it is substantially similar to the method embodiment, so description is fairly simple, related place is referring to embodiment of the method Part explanation.In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", The description of " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, structure, material Or feature is contained at least one embodiment or example of this specification.In the present specification, to the signal of above-mentioned term Property statement must not necessarily be directed to identical embodiment or example.Moreover, specific features, structure, material or the spy of description Point may be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, Those skilled in the art can be by different embodiments or examples described in this specification and different embodiments or examples Feature is combined.
Above is only an example of the present application, it is not intended to limit this application.For those skilled in the art For, the application can have various modifications and variations.It is all within spirit herein and principle made by any modification, equivalent Replace, improve etc., it should be included within the scope of claims hereof.

Claims (10)

1. a kind of waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir, which is characterized in that including:
Situation is applicable in the injection and extraction system of target area according to Well Pattern And Spacing and water drive control and carries out analyzing processing, is obtained First analysis result;
Equalizing coefficient is employed according to whole water-flooding performance and longitudinal water drive to carry out the water drive producing status of target area Analyzing processing obtains the second analysis result;
It keeps horizontal and injection water retaining in reservoir to carry out analyzing processing to the water filling utilization obstacle of target area according to strata pressure, obtains the Three analysis results;
Analyzing processing is carried out to the reservoir protection situation of target area according to average water injection pressure and mean water absorption intensity, is obtained 4th analysis result;
The target work is determined according to first analysis result, the second analysis result, third analysis result, the 4th analysis result The waterflooding extraction in area adjusts embodiment.
2. the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir according to claim 1, which is characterized in that described right The injection and extraction system of target area is applicable in situation and carries out analyzing processing, including;
The corresponding Well Pattern And Spacing of maximum efficient rate is determined according to economic limit well space, judges whether the Well Pattern And Spacing in target work area belongs to In the corresponding Well Pattern And Spacing of the maximum efficient rate, and judge whether each reservoir water flooding controlling extent value in target work area is more than In the first predetermined threshold value;
If it is judged that being to be, obtains the injection and extraction system and be applicable in satisfactory first analysis result of situation.
3. the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir according to claim 1, which is characterized in that described right The water drive producing status of target area carries out analyzing processing, including:
Judge whether the whole water-flooding performance in target work area is more than or equal to the second predetermined threshold value, and longitudinal water drive is employed Whether the coefficient that weighs is less than third predetermined threshold value;
If it is judged that being to be, satisfactory second analysis result of the water drive producing status is obtained.
4. the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir according to claim 1, which is characterized in that described right The water filling utilization obstacle of target area carries out analyzing processing, including:
Judge that target work area strata pressure keeps horizontal and whether is more than the 4th predetermined threshold value, and judge injection water retaining in reservoir variation whether Meet and presets injection water retaining in reservoir condition;
If it is judged that being to be, the satisfactory third analysis result of the water filling utilization obstacle is obtained.
5. the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir according to claim 1, which is characterized in that described right The reservoir protection situation of target area carries out analyzing processing, including:
Whether the average water injection pressure and formation fracture pressure ratio for judging target work area are less than the 5th predetermined threshold value, and judge Whether mean water absorption intensity is more than the 6th predetermined threshold value;
If it is judged that being to be, satisfactory 4th analysis result of the reservoir protection situation is obtained.
6. the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir according to claim 3, which is characterized in that described to sentence Whether the whole water-flooding performance in disconnected target work area is more than or equal to the second predetermined threshold value, including:
Target work is determined according to the ratio of the cumulative oil production and reservoir reserve of the cumulative water production of water-drive pool and water-drive pool The whole water-flooding performance in area.
7. the waterflooding extraction method of adjustment of hyposmosis clastic rock oil reservoir according to claim 3, which is characterized in that described to sentence Longitudinal water drive in disconnected target work area employs whether equalizing coefficient is less than third predetermined threshold value, including:
The zero dimension water-flooding performance for determining each oil reservoir is calculated according to the water-flooding performance of each oil reservoir;
Each oil reservoir is ranked up from big to small by water-flooding performance, using small number of plies accumulative perception as abscissa data, nothing Dimension water-flooding performance accumulative perception is that ordinate data draw curve;
Determine that longitudinal water drive in target work area employs equalizing coefficient according to the area of curve and abscissa.
8. a kind of waterflooding extraction adjusting apparatus of hyposmosis clastic rock oil reservoir, which is characterized in that including:
Injection and extraction system analysis module, for being applicable in the injection and extraction system of target area according to Well Pattern And Spacing and water drive control Situation carries out analyzing processing, obtains the first analysis result;
Water drive employs analysis module, for employing equalizing coefficient to target area according to whole water-flooding performance and longitudinal water drive The water drive producing status in domain carries out analyzing processing, obtains the second analysis result;
Water filling utilizes analysis module, for keeping horizontal and injection water retaining in reservoir to utilize shape to the water filling of target area according to strata pressure Condition carries out analyzing processing, obtains third analysis result;
Reservoir protection analysis module, for the basis averagely reservoir protection of water injection pressure and mean water absorption intensity to target area Situation carries out analyzing processing, obtains the 4th analysis result;
Waterflooding extraction adjusts module, for according to first analysis result, the second analysis result, third analysis result, the 4th Analysis result determines the waterflooding extraction adjustment embodiment in the target work area.
9. a kind of waterflooding extraction adjusting apparatus of hyposmosis clastic rock oil reservoir, which is characterized in that including processor and for storing The memory of processor-executable instruction is realized when described instruction is executed by the processor and is included the following steps:
Situation is applicable in the injection and extraction system of target area according to Well Pattern And Spacing and water drive control and carries out analyzing processing, is obtained First analysis result;
Equalizing coefficient is employed according to whole water-flooding performance and longitudinal water drive to carry out the water drive producing status of target area Analyzing processing obtains the second analysis result;
It keeps horizontal and injection water retaining in reservoir to carry out analyzing processing to the water filling utilization obstacle of target area according to strata pressure, obtains the Three analysis results;
Analyzing processing is carried out to the reservoir protection situation of target area according to average water injection pressure and mean water absorption intensity, is obtained 4th analysis result;
The target work is determined according to first analysis result, the second analysis result, third analysis result, the 4th analysis result The waterflooding extraction in area adjusts embodiment.
10. the waterflooding extraction of hyposmosis clastic rock oil reservoir a kind of adjusts system, which is characterized in that including at least one processor with And the memory of storage computer executable instructions, the processor are realized arbitrary in claim 1-7 when executing described instruction The step of one the method.
CN201810454819.3A 2018-05-14 2018-05-14 Water injection development adjustment method, device and system for low-permeability clastic rock oil reservoir Active CN108643875B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810454819.3A CN108643875B (en) 2018-05-14 2018-05-14 Water injection development adjustment method, device and system for low-permeability clastic rock oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810454819.3A CN108643875B (en) 2018-05-14 2018-05-14 Water injection development adjustment method, device and system for low-permeability clastic rock oil reservoir

Publications (2)

Publication Number Publication Date
CN108643875A true CN108643875A (en) 2018-10-12
CN108643875B CN108643875B (en) 2020-10-09

Family

ID=63755136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810454819.3A Active CN108643875B (en) 2018-05-14 2018-05-14 Water injection development adjustment method, device and system for low-permeability clastic rock oil reservoir

Country Status (1)

Country Link
CN (1) CN108643875B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397436A (en) * 2019-06-24 2019-11-01 中国石油化工股份有限公司 A kind of stifled feasibility analysis method and system of oil reservoir tune
CN110485988A (en) * 2019-08-19 2019-11-22 中国石油天然气股份有限公司大港油田分公司 A kind of low permeability reservoir simulation grid refinement method and device
CN111852462A (en) * 2019-04-29 2020-10-30 中国石油天然气股份有限公司 Method and device for acquiring dynamic reserves of oil well
CN112049624A (en) * 2019-06-06 2020-12-08 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserves of oil well
CN112270067A (en) * 2020-09-25 2021-01-26 中国石油天然气股份有限公司 Method for evaluating new well dynamic reserve of tight gas reservoir
CN112267859A (en) * 2020-11-09 2021-01-26 中国石油天然气股份有限公司 Periodic water injection reservoir screening quantitative evaluation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790926A (en) * 2015-03-20 2015-07-22 中国石油大学(北京) Fracture-vug type oil reservoir water-flooding development effect evaluation method
CN105631138A (en) * 2015-12-29 2016-06-01 北京凯博瑞石油科技有限公司 Oil and gas reservoir development unit and well group numerical simulation dynamic analysis method
CN105888656A (en) * 2016-03-15 2016-08-24 中国石油天然气股份有限公司 Method for quantitatively evaluating hydraulic permeability under pressure of natural microcrack development tight reservoir
CN206144547U (en) * 2016-11-03 2017-05-03 王琳 Hyposmosis oil reservoir well pattern structure
CN106869888A (en) * 2015-12-11 2017-06-20 中国石油化工股份有限公司 The method for improving low-permeability oil deposit waterflooding effect

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790926A (en) * 2015-03-20 2015-07-22 中国石油大学(北京) Fracture-vug type oil reservoir water-flooding development effect evaluation method
CN106869888A (en) * 2015-12-11 2017-06-20 中国石油化工股份有限公司 The method for improving low-permeability oil deposit waterflooding effect
CN105631138A (en) * 2015-12-29 2016-06-01 北京凯博瑞石油科技有限公司 Oil and gas reservoir development unit and well group numerical simulation dynamic analysis method
CN105888656A (en) * 2016-03-15 2016-08-24 中国石油天然气股份有限公司 Method for quantitatively evaluating hydraulic permeability under pressure of natural microcrack development tight reservoir
CN206144547U (en) * 2016-11-03 2017-05-03 王琳 Hyposmosis oil reservoir well pattern structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
万文韬: "低渗透油藏超前注水早期开发效果评价以董志区为例", 《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》 *
甘霖等: "某复杂断块油藏储量动用程度评价", 《中国西部科技》 *
赵兴君: "低渗透油藏注采***优化提高采收率研究", 《科技与企业》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852462A (en) * 2019-04-29 2020-10-30 中国石油天然气股份有限公司 Method and device for acquiring dynamic reserves of oil well
CN112049624A (en) * 2019-06-06 2020-12-08 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserves of oil well
CN112049624B (en) * 2019-06-06 2024-04-30 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserve of oil well
CN110397436A (en) * 2019-06-24 2019-11-01 中国石油化工股份有限公司 A kind of stifled feasibility analysis method and system of oil reservoir tune
CN110485988A (en) * 2019-08-19 2019-11-22 中国石油天然气股份有限公司大港油田分公司 A kind of low permeability reservoir simulation grid refinement method and device
CN112270067A (en) * 2020-09-25 2021-01-26 中国石油天然气股份有限公司 Method for evaluating new well dynamic reserve of tight gas reservoir
CN112267859A (en) * 2020-11-09 2021-01-26 中国石油天然气股份有限公司 Periodic water injection reservoir screening quantitative evaluation method

Also Published As

Publication number Publication date
CN108643875B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN108643875A (en) Water injection development adjustment method, device and system for low-permeability clastic rock oil reservoir
Xizhe et al. Efficient development strategies for large ultra-deep structural gas fields in China
CN104747185B (en) Heterogeneous reservoir reservoir synthetical assortment evaluation method
CN104153769B (en) The division of a kind of fracture-pore reservoir flow unit and evaluation methodology
CN105735960A (en) Cluster interval optimizing method for segmental multi-cluster fracturing of horizontal well of low-permeability oil and gas reservoir
CN106250984A (en) Method and device for judging oil-water relation mode of oil well
CN105005712B (en) Limestone aquifer watery evaluation methodology
CN106156452A (en) A kind of Reservoir Analysis method
CN106246158B (en) Method and device for distributing wells in ultra-deep low-hole fractured sandstone gas reservoir
CN104462859A (en) Oil gas resource recovery coefficient determining method
CN110717301A (en) Flow unit information classification and identification method based on support vector machine algorithm
Chai et al. Study on recovery factor and interlayer interference mechanism of multilayer co-production in tight gas reservoir with high heterogeneity and multi-pressure systems
CN102704924B (en) Method and device for determining effective dry layer
Ikpeka et al. Application of machine learning models in predicting initial gas production rate from tight gas reservoirs
CN105718720A (en) Complex gas reservoir reserve quality classification comprehensive evaluation method
CN108561129A (en) Craven fault block reservoirs water to oil area remaining oil fast appraisement method
CN104834934B (en) A kind of nucleome capture method for being used to identify reservoir fluid
Chen et al. A new artificial intelligence recognition method of dominant channel based on principal component analysis
Xu et al. Efficient development method for high-viscosity, complex fault-block reservoir
Hu et al. Data-driven injection/production optimization for horizontal well pattern in a complex carbonate oilfield
Rabiei Excess water production diagnosis in oil fields using ensemble classifiers
CN111287739A (en) Residual oil distribution prediction method based on formation crude oil viscosity
Shiyun et al. A fine assessment technology for medium-high exploration degree plays
Fu et al. Artificial Intelligence Method of Flow Unit Division Based on Waveform Clustering: A Case Study on Zhetybay Oil Field, South Mangyshalk Basin, Kazakhstan
Wang et al. Evaluation of different well converting patterns with the distribution of streamlines on ultra high water cut reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant