CN108612318A - The installation adjusting method of prefabricated panel - Google Patents
The installation adjusting method of prefabricated panel Download PDFInfo
- Publication number
- CN108612318A CN108612318A CN201810540705.0A CN201810540705A CN108612318A CN 108612318 A CN108612318 A CN 108612318A CN 201810540705 A CN201810540705 A CN 201810540705A CN 108612318 A CN108612318 A CN 108612318A
- Authority
- CN
- China
- Prior art keywords
- prefabricated panel
- bolt
- flower basket
- construction
- adjusted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
Abstract
The present invention relates to a kind of installation adjusting methods of prefabricated panel, include the following steps:One:At least two groups bolt hole is reserved on prefabricated panel, every group of number of bolt hole is two;Two:Prefabricated panel is transported to after construction site, is first checked its appearance and size and prepared screw-bolt hole, confirms that errorless rear lifting is in place;Three:It after lifting is in place, is installed on prefabricated panel and flower basket bolt is adjusted, flower basket bolt one end is bolted with prefabricated panel, and the flower basket bolt other end is fixed to ground using chemical bolt;Four:The verticality that prefabricated panel is adjusted by adjusting adjustable flower basket bolt carries out the installation of wallboard and the component being connected after adjustment, after finally reaching some strength, remove and flower basket bolt is adjusted.The present invention effectively solves to solve the construction difficult problem of lifting, the adjustment of prefabricated panel, saves construction cost, reduces construction risk, improves construction efficiency.
Description
Technical field
The present invention relates to a kind of installations of prefabricated panel, the specifically installation adjusting method of prefabricated panel.
Background technology
With the continuous improvement of housing industrialization level, prefabricated outer wall panel, precast beam, precast stair etc. are building work
Application in journey is more and more extensive.But for PC components, the installation procedures such as lifting adjustment have component certain damage, such as
What, which further strengthens work progress, is particularly important the finished product protection of component.
According to fabricated construction technique needs, prefabricated panel mounting and adjusting is the key that construction, but prefabricated components are installed
It can not be fixed at once after in place, and verticality can not ensure, this just brings certain risk or difficulty of construction to construction.
Invention content
The present invention is directed to overcome the deficiencies of existing technologies, a kind of installation adjusting method of prefabricated panel is provided, is effectively solved
The construction difficult problem of lifting, the adjustment of prefabricated panel is solved, construction cost is saved, reduces construction risk, improves construction efficiency.
In order to solve the above-mentioned technical problem, the invention is realized in this way:
A kind of installation adjusting method of prefabricated panel, it is characterised in that it includes the following steps:
Step 1:At least two groups bolt hole is reserved on prefabricated panel, every group of number of bolt hole is two;
Step 2:Prefabricated panel is transported to after construction site, is first checked its appearance and size and prepared screw-bolt hole, is confirmed
Lifting is in place after errorless;
Step 3:It after lifting is in place, is installed on prefabricated panel and flower basket bolt is adjusted, flower basket bolt one end is logical with prefabricated panel
It crosses and is bolted, the flower basket bolt other end is fixed to ground using chemical bolt;
Step 4:The verticality that prefabricated panel is adjusted by adjusting adjustable flower basket bolt carries out wallboard and is connected after adjustment
The installation of the component connect after finally reaching some strength, removes and flower basket bolt is adjusted.
The installation adjusting method of the prefabricated panel, it is characterised in that:Reserved bolt hole is on the prefabricated panel
3-4 groups.
The installation adjusting method of the prefabricated panel, it is characterised in that:The prefabricated panel both sides are respectively mounted adjustable
Flower basket bolt.
The beneficial effects of the invention are as follows:The construction difficult problem for effectively solving the adjustment of prefabricated panel verticality, saves construction
Cost reduces construction risk, improves construction efficiency, safety easy for construction;The present invention is versatile, and construction is relatively flexible, adapts to
The construction of various specifications prefabricated panel.
Description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural schematic diagram of prefabricated panel.
Fig. 2 is prefabricated panel scheme of installation.
Specific implementation mode
As shown in Figure 1, 2:A kind of installation adjusting method of prefabricated panel, it includes the following steps:
According to fabricated construction technique needs, prefabricated panel mounting and adjusting is the key that construction, but prefabricated components are installed in place
After can not be fixed at once, and verticality can not ensure, this just brings certain risk or difficulty of construction, this hair to construction
Bright new construction method effectively avoids problem above, easy for construction, safety, and construction cost is low.
Specific implementation step:
Before implementation starts:
According to the appearance and size of prefabricated panel 1, the factors such as weight, and require PC components factory on prefabricated panel(On wallboard
At lower edge 800mm)Each to reserve two groups of bolts hole 2, every group of number of bolt hole is 2, for middle-size and small-size wallboard, reserves two above
Group bolt hole, but for large-scale component, 3-4 group bolts hole, the adjustment after being easily installed can be reserved.
Implementation process:
Prefabricated panel is transported to after construction site, and first to its appearance and size, suspender prepared screw-bolt hole is checked, after confirmation is errorless
Lifting is in place.
It after lifting is in place, is installed on prefabricated panel and flower basket bolt 3 is adjusted, flower basket bolt one end passes through bolt with wallboard
Connection, the other end are fixed to ground, are fixed using chemical bolt 4, for large-scale or larger weight prefabricated panel, wallboard both sides
It is required to mounting and adjusting flower basket bolt, ensures construction safety and conveniently;
The verticality that prefabricated panel is adjusted by adjusting flower basket bolt carries out the peace of wallboard and the component being connected after adjustment
Dress after finally reaching some strength, removes adjustment flower basket bolt.
Claims (3)
1. a kind of installation adjusting method of prefabricated panel, it is characterised in that it includes the following steps:
Step 1:At least two groups bolt hole is reserved on prefabricated panel, every group of number of bolt hole is two;
Step 2:Prefabricated panel is transported to after construction site, is first checked its appearance and size and prepared screw-bolt hole, is confirmed
Lifting is in place after errorless;
Step 3:It after lifting is in place, is installed on prefabricated panel and flower basket bolt is adjusted, flower basket bolt one end is logical with prefabricated panel
It crosses and is bolted, the flower basket bolt other end is fixed to ground using chemical bolt;
Step 4:The verticality that prefabricated panel is adjusted by adjusting adjustable flower basket bolt carries out wallboard and is connected after adjustment
The installation of the component connect after finally reaching some strength, removes and flower basket bolt is adjusted.
2. the installation adjusting method of prefabricated panel according to claim 1, it is characterised in that:It is reserved on the prefabricated panel
Bolt hole be 3-4 groups.
3. the installation adjusting method of prefabricated panel according to claim 1, it is characterised in that:The prefabricated panel both sides are equal
Flower basket bolt is adjusted in installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810540705.0A CN108612318A (en) | 2018-05-30 | 2018-05-30 | The installation adjusting method of prefabricated panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810540705.0A CN108612318A (en) | 2018-05-30 | 2018-05-30 | The installation adjusting method of prefabricated panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108612318A true CN108612318A (en) | 2018-10-02 |
Family
ID=63664522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810540705.0A Pending CN108612318A (en) | 2018-05-30 | 2018-05-30 | The installation adjusting method of prefabricated panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108612318A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296914A (en) * | 2018-11-23 | 2019-02-01 | 邢道坤 | Folded suspension type measuring instrument bracket and its application method |
CN113944337A (en) * | 2021-10-29 | 2022-01-18 | 上海宝冶集团有限公司 | Prefabricated wall installation elevation control method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2334067C1 (en) * | 2006-12-07 | 2008-09-20 | Общество с ограниченной ответственностью "Свой дом" | Method of columns assembly and device for columns gripping |
CN102230315A (en) * | 2011-04-18 | 2011-11-02 | 有利华建筑预制件有限公司 | Prefabricated part and semi-prefabricated construction method for multistory building |
CN104790676A (en) * | 2015-04-29 | 2015-07-22 | 中国十七冶集团有限公司 | Rapid leveling and alignment device and method for installation of prefabricated wallboards |
CN107558746A (en) * | 2017-11-06 | 2018-01-09 | 新疆远大华美建筑工业有限公司 | A kind of out-hung panel bearing diagonal fixing means and instrument |
CN207332338U (en) * | 2017-10-13 | 2018-05-08 | 三峡大学 | A kind of assembled architecture wallboard adjustment mechanism |
-
2018
- 2018-05-30 CN CN201810540705.0A patent/CN108612318A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2334067C1 (en) * | 2006-12-07 | 2008-09-20 | Общество с ограниченной ответственностью "Свой дом" | Method of columns assembly and device for columns gripping |
CN102230315A (en) * | 2011-04-18 | 2011-11-02 | 有利华建筑预制件有限公司 | Prefabricated part and semi-prefabricated construction method for multistory building |
CN104790676A (en) * | 2015-04-29 | 2015-07-22 | 中国十七冶集团有限公司 | Rapid leveling and alignment device and method for installation of prefabricated wallboards |
CN207332338U (en) * | 2017-10-13 | 2018-05-08 | 三峡大学 | A kind of assembled architecture wallboard adjustment mechanism |
CN107558746A (en) * | 2017-11-06 | 2018-01-09 | 新疆远大华美建筑工业有限公司 | A kind of out-hung panel bearing diagonal fixing means and instrument |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109296914A (en) * | 2018-11-23 | 2019-02-01 | 邢道坤 | Folded suspension type measuring instrument bracket and its application method |
CN113944337A (en) * | 2021-10-29 | 2022-01-18 | 上海宝冶集团有限公司 | Prefabricated wall installation elevation control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612318A (en) | The installation adjusting method of prefabricated panel | |
CN206174138U (en) | Joint construction suitable for steel house room externally -hanging wallboard and major structure | |
CN102425529B (en) | Field installation method for vertical-shaft wind-driven generator | |
CN206800622U (en) | A kind of assembled integral concrete shear force wall balcony attachment structure | |
CN206054945U (en) | A kind of low cost list branch pipe(tube) antidetonation crane system | |
CN209227877U (en) | Hood type ceiling system for steel structure truss roof system | |
CN204164505U (en) | Universal Joining clasp lifting device | |
CN103526866B (en) | Dry-hang stone curtain wall and mounting method thereof | |
CN103541477B (en) | For keel and the mounting method thereof of dry-hang stone curtain wall | |
CN110566241A (en) | Quickly-assembled supporting shed frame | |
CN206607709U (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN215443391U (en) | Transmission line and 5G communication sharing steel pipe pole | |
CN106013558B (en) | A kind of mounting connection structure and installation method of GRC Side fascias complex region | |
CN102777703A (en) | Assembly type light pipeline hanger | |
CN204476179U (en) | Auxiliary frame construction and installation fixture | |
CN208918008U (en) | A kind of assembled wallboard and attachment device | |
CN108999318B (en) | Unit curtain wall side buried single pendant structure, unit body with side buried single pendant and unit curtain wall mounting method | |
CN206118212U (en) | Multi -media case with adjustable civil buildings are three -dimensional | |
CN107269014B (en) | Hydraulic climbing formwork angle-variable protective net system | |
CN206495378U (en) | A kind of curtain wall with rainwater collecting function | |
CN206545219U (en) | Airport roof photovoltaic bracket basis and airport roof photovoltaic support structure | |
CN206800452U (en) | A kind of assembled pipe gallery support of industrialized production | |
CN110106982A (en) | A kind of method of construction in house | |
CN210566663U (en) | Novel pipeline support device | |
CN216109026U (en) | Follow-on built-in fitting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181002 |