CN108599184A - 一种电力***的有效无功补偿地点的离线选择方法 - Google Patents
一种电力***的有效无功补偿地点的离线选择方法 Download PDFInfo
- Publication number
- CN108599184A CN108599184A CN201810466394.8A CN201810466394A CN108599184A CN 108599184 A CN108599184 A CN 108599184A CN 201810466394 A CN201810466394 A CN 201810466394A CN 108599184 A CN108599184 A CN 108599184A
- Authority
- CN
- China
- Prior art keywords
- node
- place
- reactive
- load compensation
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及一种电力***的有效无功补偿地点的离线选择方法。根据实时电力网络结构和潮流,获得***的无功补偿地点排序,具体地:首先,给定一个电压危险节点,并通过多端口戴维南等值将局部***等效成双节点***;而后,计算各无功补偿节点对电压不稳定地点的相关性指标;再而,将所得到的相关性指标进行归一化计算;最后,设置一个门槛值K,剔除掉相关性指标小于K的节点,得到有效的无功补偿地点的集合。本发明能够准确甄别有效的无功补偿节点,快速提高***的电压稳定性。
Description
技术领域
本发明属于电力***技术领域,涉及一种电力***的有效无功补偿地点的离线选择方法,具体涉及一种基于网络结构和电压幅值的电力***的有效无功补偿地点的离线选择方法。
背景技术
当前电力***中,主要采取暂态电压稳定指标,或者灵敏度分析作为参考依据对无功补偿控制地点进行评估,在这过程中往往需要较为复杂的算法、较大的计算量,对各类技术都有较高的要求。因此,需要设计一种方便简单的无功控制地点选择方式,来提高电力***无功控制的效率,这对电力***的分析和方案制定有十分重要的意义。
本发明利用多端口戴维南等效的原理,根据广域动态信息***实测网络阻抗信息和电压幅值,计算反映电压不稳定地点与无功补偿节点联系密切程度的指标Mj,通过对相关性指标的归一化计算和筛选,离线得到有效的无功补偿节点。
发明内容
本发明的目的在于提供一种电力***的有效无功补偿地点的离线选择方法,仅需要获知局部电网的阻抗信息和各无功补偿节点控制前后的电压信息,便可得到有效无功补偿地点的选择方法。
为实现上述目的,本发明的技术方案是:一种电力***的有效无功补偿地点的离线选择方法,根据广域动态信息***实测网络阻抗信息和控制前后的电压幅值,选择有效的无功补偿地点,具体实现步骤如下:
步骤S01、假设节点i是电压危险节点,通过多端口戴维南等值,将多节点电网等效成节点i两阻抗两节点电网;计算反映电压不稳定地点i与无功补偿节点j之间的相关性指标Mj;
其中:为节点i网络阻抗倒数的共轭;为节点j与节点i的互阻抗的共轭;Vj为节点j控制前的电压幅值,Vj′为节点j控制后的电压幅值;
步骤S02、以所有节点相关性指标的最大值为基准,对所有得到的相关性指标进行归一化计算:
其中:Ma为节点a的相关性指标;Ka为节点a的归一化后的相关性指标;Mmax为所有节点相关性指标的最大值;
步骤S03、计算无功补偿节点j的可调节能力:
其中:ηj为无功补偿节点j的调节能力;Qj为节点j的剩余可调节无功功率;Qmax为节点j的最大可调节无功功率。
步骤S04、设置门槛值K和η,剔除掉Ka<K或ηj<η的无功补偿节点,得到有效的无功补偿节点集合。
相较于现有技术,本发明具有以下有益效果:本发明仅需要获知局部电网的阻抗信息和各无功补偿节点控制前后的电压信息,便可得到有效无功补偿地点的选择方法;相比于现有方法,能够准确甄别有效的无功补偿节点,快速提高***的电压稳定性。
附图说明
图1是计算示例IEEE14节点图。
图2是节点i两阻抗两节点电网。
图3是有效无功补偿地点的选择方法流程图。
具体实施方式
下面结合附图,对本发明的技术方案进行具体说明。
如图3所示,本发明的一种电力***的有效无功补偿地点的离线选择方法,根据广域动态信息***实测网络阻抗信息和控制前后的电压幅值,选择有效的无功补偿地点,具体实现步骤如下:
步骤S01、假设节点i是电压危险节点,通过多端口戴维南等值,将多节点电网等效成节点i两阻抗两节点电网;计算反映电压不稳定地点i与无功补偿节点j之间的相关性指标Mj;
其中:为节点i网络阻抗倒数的共轭;为节点j与节点i的互阻抗的共轭;Vj为节点j控制前的电压幅值,Vj′为节点j控制后的电压幅值;
步骤S02、以所有节点相关性指标的最大值为基准,对所有得到的相关性指标进行归一化计算:
其中:Ma为节点a的相关性指标;Ka为节点a的归一化后的相关性指标;Mmax为所有节点相关性指标的最大值;
步骤S03、计算无功补偿节点j的可调节能力:
其中:ηj为无功补偿节点j的调节能力;Qj为节点j的剩余可调节无功功率;Qmax为节点j的最大可调节无功功率。
步骤S04、设置门槛值K和η,剔除掉Ka<K或ηj<η的无功补偿节点,得到有效的无功补偿节点集合。
以下为本发明的具体实施例。
本发明方法的计算实例选择IEEE14节点***(如图1所示)。某时刻,在节点13和节点14间发生断线,节点14成为电压危险节点。
第一步:通过戴维南等值,将复杂电网等效成节点i两阻抗两节点电网,其结果如图2所示。
第二步:计算反映电压危险节点与无功补偿地点密切关系的指标Mi,其结果如表1所示。
表1各无功补偿节点对节点14的M指标
第三步:将得到的指标进行归一化处理,结果如表2所示
表2各无功补偿节点对节点14的归一化指标
第四步:设置一个门槛值K=0.2,剔除掉指标小于K的节点,得到有效的无功补偿节点,节点14、节点9、节点10。
以上是本发明的较佳实施例,凡依本发明技术方案所作的改变,所产生的功能作用未超出本发明技术方案的范围时,均属于本发明的保护范围。
Claims (1)
1.一种电力***的有效无功补偿地点的离线选择方法,其特征在于,根据广域动态信息***实测网络阻抗信息和控制前后的电压幅值,选择有效的无功补偿地点,具体实现步骤如下:
步骤S01、假设节点i是电压危险节点,通过多端口戴维南等值,将多节点电网等效成节点i两阻抗两节点电网;计算反映电压不稳定地点i与无功补偿节点j之间的相关性指标Mj;
其中:为节点i网络阻抗倒数的共轭;为节点j与节点i的互阻抗的共轭;Vj为节点j控制前的电压幅值,Vj′为节点j控制后的电压幅值;
步骤S02、以所有节点相关性指标的最大值为基准,对所有得到的相关性指标进行归一化计算:
其中:Ma为节点a的相关性指标;Ka为节点a的归一化后的相关性指标;Mmax为所有节点相关性指标的最大值;
步骤S03、计算无功补偿节点j的可调节能力:
其中:ηj为无功补偿节点j的调节能力;Qj为节点j的剩余可调节无功功率;Qmax为节点j的最大可调节无功功率。
步骤S04、设置门槛值K和η,剔除掉Ka<K或ηj<η的无功补偿节点,得到有效的无功补偿节点集合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810466394.8A CN108599184B (zh) | 2018-05-16 | 2018-05-16 | 一种电力***的有效无功补偿地点的离线选择方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810466394.8A CN108599184B (zh) | 2018-05-16 | 2018-05-16 | 一种电力***的有效无功补偿地点的离线选择方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108599184A true CN108599184A (zh) | 2018-09-28 |
CN108599184B CN108599184B (zh) | 2021-04-27 |
Family
ID=63631322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810466394.8A Expired - Fee Related CN108599184B (zh) | 2018-05-16 | 2018-05-16 | 一种电力***的有效无功补偿地点的离线选择方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108599184B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103199549A (zh) * | 2013-04-10 | 2013-07-10 | 湖南大学 | 一种受端电网动态无功补偿装置配置位置选择的方法 |
CN104617585A (zh) * | 2015-02-13 | 2015-05-13 | 东南大学 | 无功补偿配置方法 |
CN106026118A (zh) * | 2016-05-26 | 2016-10-12 | 国家电网公司 | 基于节点电压回复指标的电网动态无功补偿节点选择方法 |
CN107658881A (zh) * | 2017-09-27 | 2018-02-02 | 国网上海市电力公司 | 基于戴维南等值方法的电压稳定临界点判断方法 |
-
2018
- 2018-05-16 CN CN201810466394.8A patent/CN108599184B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103199549A (zh) * | 2013-04-10 | 2013-07-10 | 湖南大学 | 一种受端电网动态无功补偿装置配置位置选择的方法 |
CN104617585A (zh) * | 2015-02-13 | 2015-05-13 | 东南大学 | 无功补偿配置方法 |
CN106026118A (zh) * | 2016-05-26 | 2016-10-12 | 国家电网公司 | 基于节点电压回复指标的电网动态无功补偿节点选择方法 |
CN107658881A (zh) * | 2017-09-27 | 2018-02-02 | 国网上海市电力公司 | 基于戴维南等值方法的电压稳定临界点判断方法 |
Non-Patent Citations (1)
Title |
---|
FUYUAN HUANG: "A grid-side reactive power control strategy for highly offshore wind power penetrated systems", 《JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY》 * |
Also Published As
Publication number | Publication date |
---|---|
CN108599184B (zh) | 2021-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107843810B (zh) | 一种基于状态估计的有源配电网故障区段在线定位方法 | |
Tortelli et al. | Fast decoupled power flow to emerging distribution systems via complex pu normalization | |
WO2015085286A1 (en) | Systems and methods for identifying faulted segments in multiphase power networks | |
CN107492888B (zh) | 一种直流受端交流***的电压薄弱区域评估方法 | |
WO2019154135A1 (zh) | 一种基于网络抗毁度的微电网可靠性评估方法 | |
CN104716646B (zh) | 一种基于注入电流的节点耦合度分析方法 | |
Orozco-Henao et al. | A robust method for single phase fault location considering distributed generation and current compensation | |
CN108809273A (zh) | 基于lms自适应滤波的复数直接频率估计方法 | |
Khalili et al. | PMU-based decoupled state estimation for unsymmetrical power systems | |
CN104979829A (zh) | 一种基于改进的FastICA算法的谐波电流估计方法 | |
Duong et al. | Online voltage stability monitoring based on PMU measurements and system topology | |
CN105203865B (zh) | 分布式电源并网逆变器及电容的在线测试***的工作方法 | |
CN109858061A (zh) | 面向电压功率灵敏度估计的配电网络等值与化简方法 | |
CN112600210A (zh) | 一种应用于低电压治理装置的电压自适应调整方法 | |
CN108599184A (zh) | 一种电力***的有效无功补偿地点的离线选择方法 | |
KR101988670B1 (ko) | 배전계통의 상태추정 장치 | |
Amini et al. | DC power flow estimation utilizing Bayesian-based LMMSE estimator | |
CN108923433A (zh) | 一种提高电压稳定性的有效切负荷地点在线选择方法 | |
CN112285421B (zh) | 基于最小范数准则的***侧谐波阻抗估计方法 | |
Li et al. | A simultaneous phase sequence exchange control method based on transient energy function | |
Perez et al. | Improved Thévenin equivalent methods for real-time voltage stability assessment | |
CN108923439A (zh) | 一种电力***有效无功补偿地点的在线选择方法 | |
CN108574287A (zh) | 一种基于网络结构的电力***无功补偿地点排序方法 | |
Ahmed et al. | Application of modal transformations for power system harmonic impedance measurement | |
Van Tuykom et al. | Use of phasor measurements and tuned weights for unbalanced system state estimation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210427 |
|
CF01 | Termination of patent right due to non-payment of annual fee |