CN108590571A - A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage - Google Patents

A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage Download PDF

Info

Publication number
CN108590571A
CN108590571A CN201810258211.3A CN201810258211A CN108590571A CN 108590571 A CN108590571 A CN 108590571A CN 201810258211 A CN201810258211 A CN 201810258211A CN 108590571 A CN108590571 A CN 108590571A
Authority
CN
China
Prior art keywords
well
water
profile control
injection
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810258211.3A
Other languages
Chinese (zh)
Inventor
张�荣
李宪文
杨海恩
黎晓茸
唐凡
陈洪涛
徐春梅
陈荣环
吴天江
朱家杰
薛芳芳
任建科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810258211.3A priority Critical patent/CN108590571A/en
Publication of CN108590571A publication Critical patent/CN108590571A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Medicinal Preparation (AREA)
  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)

Abstract

A kind of Low-permeability, fractured water breakthrough oil reservoir of present invention offer determines method for Profile Control in Injection Well agent dosage, sees that the injection water time calculates underground and effectively controls volume using producing well, and then calculate Amount of profile control agent, specifically includes following steps:Step 1:Determination can profile control water injection well, inquire the water injection well and correspond to all producing well historical production datas;Step 2:According to the aqueous rising of producing well history in well group and salt content situation of change, judge that each oil-extracting well water injection well is shown in the injection water time in the well group;Step 3:According to the water breakthrough time for the producing well for seeing injection water in well group at first, the control volume of the water injection well is calculated;Step 4:Profile control agent injects 0.2 0.3 times of water injection rate volume when dosage is oil well water breakthrough.The present invention can be scientific and reasonable carry out Amount of profile control agent design, to greatest extent improve intake profile, expand swept volume, to improve the validity of profile control measures.

Description

A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage
Technical field
The invention belongs to technical field of petroleum industry, and in particular to a kind of Low-permeability, fractured water breakthrough oil reservoir is for water injection well tune It cuts open agent dosage and determines method.
Background technology
The dosage design of profile control agent is mainly the following at present:One assumes that profile control object is homogeneous reservoir, according to side Case designs radius of profile control and calculates injected slurry volume;Second is that PI (Pressure Index) and RE (Reservoir Engineering) The Amount of profile control agent of decision-making technic determines method, and the injection test experiment at scene is needed to determine use level coefficient;Second is that method for numerical simulation, The processes such as history matching, multistage plug combined prediction are needed, are taken longer;Third, front and back injectability ratio method, needs in advance really It sets the tone and cuts open the ratio between the water absorbing capacity of interval before and after the processing, flexibility is poor.
The prior art has following design Amount of profile control agent to design:
(1)W=β hf Δ PI ', W is Amount of profile control agent in formula, and unit is cubic meter;β is use level coefficient, and unit is m3/(MPa· m);Hf is the thickness of water filling layer, and unit is m;Δ PI ' is the variable quantity of PI values before and after injection test profile control agent, and unit is MPa.
(2)W=HS Ф, W is Amount of profile control agent in formula, and unit is cubic meter;H is profile control thickness, and unit is rice, and S is profile control Area, unit are square metre that Ф is the degree of control of profile control interval, and unit is %.
(3)The total Amount of profile control agent of W=α, W is Amount of profile control agent in formula, and unit is cubic meter;α is tested according to indicative curve As a result calculation of distribution coefficient.
Invention content
In order to overcome the problems, such as it is existing time-consuming, flexibility difference is ineffective, the present invention provides a kind of Low-permeability, fractured and sees Water oil reservoir determines method, the scientific and reasonable carry out Amount of profile control agent design of the present invention, maximum limit for Profile Control in Injection Well agent dosage The improvement intake profile of degree expands swept volume, to improve the validity of profile control measures.
The technical solution adopted by the present invention is:
A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage, it is characterised in that:Utilize producing well See that the injection water time calculates underground and effectively controls volume, and then calculate Amount of profile control agent, specifically includes following steps:
Step 1 determine can profile control water injection well, inquire the water injection well and correspond to all producing well historical production datas;
Step 2 judges each oil recovery in the well group according to the aqueous rising of producing well history in well group and salt content situation of change Well water injection well is shown in the injection water time;
Step 3 calculates the control volume of the water injection well according to the water breakthrough time for the producing well for seeing injection water in well group at first;
Step 4 profile control agent injects 0.2-0.3 times of water injection rate volume when dosage is oil well water breakthrough.
In the step 1, determination can profile control water injection well the specific steps are:
1)The well head pressure depression curve of each well in block is tested;Ensure the work of neighbouring each well in testing time section Condition does not change, and for Low-permeability, fractured water breakthrough oil reservoir, the closed-in time is 24 hours or more;
2)After the completion of test, the pressure index PI values of each well are calculated;
3)All wells in calculation blockIPIAverage value, selection are less than blockIPIThe water injection well of average value is profile control well, etc. In or higher than block it is averageIPIThe water injection well of average value is disregarded.
The step 2)In, calculate the PI values of each well:
In formula:
PIFor the pressure index of well, MPa;
PFor the well well head pressure changed with the closed-in time, MPa;
tFor closed-in time, min, for Low-permeability, fractured water breakthrough oil reservoir, the closed-in time is 24 hours.
The step 3)In, all wells in calculation blockIPIAverage value:
In formula:IPIFor the PI values after zero dimension;
k i For reservoir original permeability, μm2
hFor reservoir effective thickness, m;
qFor the injection rate of water injection well, m3/d;
μFor the fluid viscosity in reservoir, mPas;
PIFor the pressure index of well, MPa.
In the step two, according to the aqueous rising of producing well history in well group and salt content situation of change, the well is judged Each oil-extracting well water injection well is shown in that injection water time, detailed process are in group:The historical production data of each oil well in the well group is inquired, Extraction daily output water, aqueous, salt content, that is, Cl from creation data-Data, using the time as abscissa draw curve, according to oil recovery Well produces water curve, aqueous curve, Cl-Graphic change calculates each producing well and sees the injection water time, when producing well production water and contain There is step rising or Cl in water curve-There is step decline in curve, that is, judges that the oil well is shown in injection water, when point of inflexion on a curve Between be producing well see injection the water time.
In the step one, the creation data includes daily output water, aqueous and salt content, that is, Cl-Data.
In the step three, the i.e. accumulative water filling volume of control volume of the water injection well
V Control = V It is tired = V Day notes ×t 1
In formula:V Control For the control volume of the water injection well, m3
V It is tired For the accumulative water injection rate to the water injection well in the most short water breakthrough time from going into operation certainly, m3
V Day notes For the water injection well daily water-injection rate, m3
t 1 For most short water breakthrough time, day.
In the step four, profile control agent design quantity is the 20-30% that water injection well controls volume,
V Profile control = V Control ×(20-30)%
In formula:V Profile control For profile control well design maximum dosage, m3
V Control For the control volume of the water injection well, m3
Beneficial effects of the present invention are:
Method provided by the invention, the development of low permeability oil field microcrack, oil well is to exacerbate reservoir with fracturing production Property.Compared to conventional profile control dosage design method, the present invention calculates profile control dosage, fracture type water breakthrough class according to water filling control volume Type oil reservoir is more targeted.
The present invention is described in further details below with reference to embodiment.
Specific implementation mode
Embodiment 1:
In order to overcome the problems, such as it is existing time-consuming, flexibility difference is ineffective, the present invention provides a kind of Low-permeability, fractured water breakthrough oil What Tibetan used determines that method, the scientific and reasonable carry out Amount of profile control agent design of the present invention are maximum for Profile Control in Injection Well agent dosage The improvement intake profile of limit expands swept volume, to improve the validity of profile control measures.
A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage, sees injection water using producing well Time calculates underground and effectively controls volume, and then calculates Amount of profile control agent, specifically includes following steps:
Step 1 determine can profile control water injection well, inquire the water injection well and correspond to all producing well historical production datas;
Step 2 judges each oil recovery in the well group according to the aqueous rising of producing well history in well group and salt content situation of change Well water injection well is shown in the injection water time;
Step 3 calculates the control volume of the water injection well according to the water breakthrough time for the producing well for seeing injection water in well group at first;
Step 4 profile control agent injects 0.2-0.3 times of water injection rate volume when dosage is oil well water breakthrough.
Low permeability oil field microcrack is developed, and oil well is to exacerbate reservoir heterogeneity with fracturing production.Compared to conventional profile control Dosage design method, the present invention calculate profile control dosage according to water filling control volume, and fracture type water breakthrough type oil reservoir has more needle To property.
The present invention improves intake profile, expands wave to greatest extent according to scientific and reasonable carry out Amount of profile control agent design And volume, to improve the validity of profile control measures.
Embodiment 2:
On the basis of above-described embodiment, in the present embodiment, in the step 1, determination can profile control water injection well specific step Suddenly it is:
1)The well head pressure depression curve of each well in block is tested;Ensure the work of neighbouring each well in testing time section Condition does not change, and for Low-permeability, fractured water breakthrough oil reservoir, the closed-in time is 24 hours or more;
2)After the completion of test, the pressure index PI values of each well are calculated;
3)All wells in calculation blockIPIAverage value, selection are less than blockIPIThe water injection well of average value is profile control well, etc. In or higher than block it is averageIPIThe water injection well of average value is disregarded.
The step 2)In, calculate the PI values of each well:
In formula:
PIFor the pressure index of well, MPa;
PFor the well well head pressure changed with the closed-in time, MPa;
tFor closed-in time, min, for Low-permeability, fractured water breakthrough oil reservoir, the closed-in time is 24 hours.
The step 3)In, all wells in calculation blockIPIAverage value:
In formula:IPIFor the PI values after zero dimension;
k i For reservoir original permeability, μm2
hFor reservoir effective thickness, m;
qFor the injection rate of water injection well, m3/d;
μFor the fluid viscosity in reservoir, mPas;
PIFor the pressure index of well, MPa.
In the step two, according to the aqueous rising of producing well history in well group and salt content situation of change, the well is judged Each oil-extracting well water injection well is shown in that injection water time, detailed process are in group:The historical production data of each oil well in the well group is inquired, Extraction daily output water, aqueous, salt content, that is, Cl from creation data-Data, using the time as abscissa draw curve, according to oil recovery Well produces water curve, aqueous curve, Cl-Graphic change calculates each producing well and sees the injection water time, when producing well production water and contain There is step rising or Cl in water curve-There is step decline in curve, that is, judges that the oil well is shown in injection water, when point of inflexion on a curve Between be producing well see injection the water time.
In the step one, the creation data includes daily output water(Unit is m3), aqueous and salt content, that is, Cl-(It is single Position is mg/L)Data.
In the step three, the i.e. accumulative water filling volume of control volume of the water injection well
V Control = V It is tired = V Day notes ×t 1
In formula:V Control For the control volume of the water injection well, m3
V It is tired For the accumulative water injection rate to the water injection well in the most short water breakthrough time from going into operation certainly, m3
V Day notes For the water injection well daily water-injection rate, m3
t 1 For most short water breakthrough time, day.
In the step four, profile control agent design quantity is the 20-30% that water injection well controls volume,
V Profile control = V Control ×(20-30)%
In formula:V Profile control For profile control well design maximum dosage, m3
V Control For the control volume of the water injection well, m3
In conjunction with the regulating section of oil wells mechanism of action, see that the injection water time calculates underground and effectively controls volume using producing well, in turn Calculate Amount of profile control agent.It is characterized in that containing following steps:
(1)Profile control water injection well is specified, the water injection well is inquired and corresponds to the aqueous rising of all producing well history and salt content variation.
(2)According to the aqueous rising of producing well history in well group and salt content situation of change, each oil recovery in the well group is judged Well water injection well is shown in the injection water time.
(3)According to the water breakthrough time for the producing well for seeing injection water in well group at first, the control volume of the water injection well is calculated.
(4)Profile control injects design quantity then and is 0.2-0.3 times of the water injection well control volume.
According to this method, white 205-37 wells profile control agent liquid measure dosage is now specifically given:White 205-37 wells are thrown in May, 2007 Note, well group correspond to the white 206-37 wells of oil well in April, 2008 it is aqueous reach 71% earliest, salt content 16000mg/L, hence it is evident that see To injection water, it is 0.8063 × 10 to add up water injection rate at this time4m3, inject water management volume and be slightly less than accumulative injection rate, then profile control agent Dosage 0.2PV=0.2 × 0.8063 × 104≈1600m3.Amount of profile control agent has lacked the requirement that profile control is not achieved, and Amount of profile control agent The input-output ratio of more oil wells will not be further added by, it is not necessary that waste, input is excessive, and benefit will not rise appreciably, so adjusting Cuing open 0.2-0.3 times that agent injection design quantity is then the water injection well control volume is economic benefit preferably and profile control effect is also most Good.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all Be with the present invention it is same or analogous design all belong to the scope of protection of the present invention within.It is not described in detail in present embodiment Data and the step category industry well known conventional means, do not describe one by one here.

Claims (8)

1. a kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage, it is characterised in that:Utilize oil recovery Well is shown in that the injection water time calculates underground and effectively controls volume, and then calculates Amount of profile control agent, specifically includes following steps:
Step 1 determine can profile control water injection well, inquire the water injection well and correspond to all producing well historical production datas;
Step 2 judges each oil recovery in the well group according to the aqueous rising of producing well history in well group and salt content situation of change Well water injection well is shown in the injection water time;
Step 3 calculates the control volume of the water injection well according to the water breakthrough time for the producing well for seeing injection water in well group at first;
Step 4 profile control agent injects 0.2-0.3 times of water injection rate volume when dosage is oil well water breakthrough.
2. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim 1 determines method for Profile Control in Injection Well agent dosage, It is characterized in that:In the step 1, determination can profile control water injection well the specific steps are:
The well head pressure depression curve of each well in block is tested;Ensure the work item of neighbouring each well in testing time section Part does not change, and for Low-permeability, fractured water breakthrough oil reservoir, the closed-in time is 24 hours or more;
After the completion of test, the pressure index PI values of each well are calculated;
All wells in calculation blockIPIAverage value, selection are less than blockIPIThe water injection well of average value is profile control well, is equal to Or it is average higher than blockIPIThe water injection well of average value is disregarded.
3. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim 2 determines method for Profile Control in Injection Well agent dosage, It is characterized in that:The step 2)In, calculate the PI values of each well:
In formula:
PIFor the pressure index of well, MPa;
PFor the well well head pressure changed with the closed-in time, MPa;
tFor closed-in time, min, for Low-permeability, fractured water breakthrough oil reservoir, the closed-in time is 24 hours.
4. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim 2 determines method for Profile Control in Injection Well agent dosage, It is characterized in that:The step 3)In, all wells in calculation blockIPIAverage value:
In formula:IPIFor the PI values after zero dimension;
k i For reservoir original permeability, μm2
hFor reservoir effective thickness, m;
qFor the injection rate of water injection well, m3/d;
μFor the fluid viscosity in reservoir, mPas;
PIFor the pressure index of well, MPa.
5. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim 1 determines method for Profile Control in Injection Well agent dosage, It is characterized in that:In the step two, according to the aqueous rising of producing well history in well group and salt content situation of change, judging should Each oil-extracting well water injection well is shown in that injection water time, detailed process are in well group:Inquire the history production number of each oil well in the well group According to extraction daily output water, aqueous, salt content, that is, Cl from creation data-Data, using the time as abscissa draw curve, according to Producing well produces water curve, aqueous curve, Cl-Graphic change calculates each producing well and sees the injection water time, when the production water of producing well And there is step rising or Cl in aqueous curve-There is step decline in curve, that is, judges that the oil well is shown in that injection water, curve turn The point time is that producing well is shown in the injection water time.
6. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim determines method for Profile Control in Injection Well agent dosage, It is characterized in that:In the step one, the creation data includes daily output water, aqueous and salt content, that is, Cl-Data.
7. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim 1 determines method for Profile Control in Injection Well agent dosage, It is characterized in that:In the step three, the i.e. accumulative water filling volume of control volume of the water injection well
V Control = V It is tired = V Day notes ×t 1
In formula:V Control For the control volume of the water injection well, m3
V It is tired For the accumulative water injection rate to the water injection well in the most short water breakthrough time from going into operation certainly, m3
V Day notes For the water injection well daily water-injection rate, m3
t 1 For most short water breakthrough time, day.
8. a kind of Low-permeability, fractured water breakthrough oil reservoir according to claim 1 is for water injection well
Amount of profile control agent determines method, it is characterised in that:In the step four, profile control agent design quantity is water injection well control volume Long-pending 20-30%,
V Profile control = V Control ×(20-30)%
In formula:V Profile control For profile control well design maximum dosage, m3
V Control For the control volume of the water injection well, m3
CN201810258211.3A 2018-03-27 2018-03-27 A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage Pending CN108590571A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810258211.3A CN108590571A (en) 2018-03-27 2018-03-27 A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810258211.3A CN108590571A (en) 2018-03-27 2018-03-27 A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage

Publications (1)

Publication Number Publication Date
CN108590571A true CN108590571A (en) 2018-09-28

Family

ID=63624766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810258211.3A Pending CN108590571A (en) 2018-03-27 2018-03-27 A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage

Country Status (1)

Country Link
CN (1) CN108590571A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494263A (en) * 2020-04-08 2021-10-12 中国石油化工股份有限公司 Method for plugging water channeling crack of tight oil reservoir oil well, volume calculation method and device
CN115961923A (en) * 2021-10-12 2023-04-14 中国石油天然气股份有限公司 Deep profile control and flooding method for fractured reservoir

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1173581A (en) * 1997-08-06 1998-02-18 石油大学(华东) Pressure index deciding method for block integral profile control for water packing-off
CN103678920A (en) * 2013-12-17 2014-03-26 中国石油天然气股份有限公司 Method suitable for calculating dosage of ultra-low permeability oil reservoir particle plugging agent
CN104632122A (en) * 2013-11-08 2015-05-20 中国石油天然气股份有限公司 Block profile control well selection method for low-permeability fractured reservoir
CN106368647A (en) * 2016-09-27 2017-02-01 中国石油天然气股份有限公司 Method for determining use level of profile control agent for horizontal well
CN106761618A (en) * 2016-12-26 2017-05-31 中国石油天然气股份有限公司 For the profile control method for determination of amount and its device of water injection well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1173581A (en) * 1997-08-06 1998-02-18 石油大学(华东) Pressure index deciding method for block integral profile control for water packing-off
CN104632122A (en) * 2013-11-08 2015-05-20 中国石油天然气股份有限公司 Block profile control well selection method for low-permeability fractured reservoir
CN103678920A (en) * 2013-12-17 2014-03-26 中国石油天然气股份有限公司 Method suitable for calculating dosage of ultra-low permeability oil reservoir particle plugging agent
CN106368647A (en) * 2016-09-27 2017-02-01 中国石油天然气股份有限公司 Method for determining use level of profile control agent for horizontal well
CN106761618A (en) * 2016-12-26 2017-05-31 中国石油天然气股份有限公司 For the profile control method for determination of amount and its device of water injection well

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
唐学权: "调剖工艺技术应用效果评价", 《内蒙古石油化工》 *
宋万超著: "《高含水期油田开发技术和方法》", 31 March 2003, 北京:地质出版社 *
张磊等: "鄂尔多斯盆地合水地区庄36井区油井见水特征分析及治理措施", 《重庆科技学院学报(自然科学版)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494263A (en) * 2020-04-08 2021-10-12 中国石油化工股份有限公司 Method for plugging water channeling crack of tight oil reservoir oil well, volume calculation method and device
CN115961923A (en) * 2021-10-12 2023-04-14 中国石油天然气股份有限公司 Deep profile control and flooding method for fractured reservoir

Similar Documents

Publication Publication Date Title
CN108319756B (en) A kind of compact reservoir volume fracturing seam net extended simulation and characterizing method
CN111980654B (en) Method for calculating capacity of staged fracturing horizontal well of heterogeneous shale oil reservoir
CN103244087B (en) A kind of low-permeability oil deposit profile control and water plugging selects well decision-making technique
CN107965306B (en) Acid injection fracturing method
CN111810101B (en) Dynamic analysis method and device for water-drive reservoir
CN103400020A (en) Numerical reservoir simulation method for measuring flowing situation of a plurality of intersected discrete cracks
CN103324770A (en) Method for predicting plane distribution law of effective natural fissures of oil reservoir
CN103628850A (en) Overall profile control and water plugging decision-making method for water-flooding oil field
CN109711595A (en) A kind of hydraulic fracturing operation effect evaluation method based on machine learning
CN108590571A (en) A kind of Low-permeability, fractured water breakthrough oil reservoir determines method for Profile Control in Injection Well agent dosage
CN109918769B (en) Method for calculating unsteady water invasion volume of fracture-cavity oil reservoir by using transient equation
CN106022626A (en) Water flooding reservoir positioning plugging water flooding virtual front edge calculation method
CN111911128B (en) High-tectonic stress normal-pressure shale gas-accumulation fracturing method
CN107288595B (en) Evaluation method for water injection utilization rate
CN105332685B (en) A kind of proppant multistage spread method for improving coal seam complex fracture support effect
CN113486537B (en) Well spacing design method, device and equipment based on gas-water alternating oil displacement
CN108678723A (en) A kind of occlusion lake basin shale oil reservoir fracturing improvement method
CN111927413B (en) Method for determining reasonable bottom hole pressure of constant-pressure injection of polymer injection well
CN113326465B (en) Dynamic analysis method and device for oil reservoir development
Kochetkov et al. Mathematical model of linear and non-linear proppant concentration increase during hydraulic fracturing–a solution for sequential injection of a number of proppant types
CN112651190B (en) Method for representing dual-medium seepage flow rate through fracture density
Holditch et al. The effect of viscous fluid properties on excess friction pressures measured during hydraulic fracture treatments
Bai et al. Effect evaluation and influencing factors of stratified water injection in low permeability reservoir
CN115936232A (en) Method and system for predicting density and encryption adjustment time of reasonable well pattern of tight gas reservoir
Zhang Research on polymer flooding inefficient oil well treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928