CN108590316A - A kind of assembly concrete tower piece construction method - Google Patents

A kind of assembly concrete tower piece construction method Download PDF

Info

Publication number
CN108590316A
CN108590316A CN201810440288.2A CN201810440288A CN108590316A CN 108590316 A CN108590316 A CN 108590316A CN 201810440288 A CN201810440288 A CN 201810440288A CN 108590316 A CN108590316 A CN 108590316A
Authority
CN
China
Prior art keywords
template
concrete tower
concrete
tower
side template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810440288.2A
Other languages
Chinese (zh)
Inventor
胡小坚
唐刚
汪敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201810440288.2A priority Critical patent/CN108590316A/en
Publication of CN108590316A publication Critical patent/CN108590316A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention provides a kind of assembly concrete tower piece construction methods, in concrete tower inner template and exterior sheathing middle, twice side form is set, U-shaped steel muscle is inserted into respectively in two panels side template arranged side by side, the side form of confined space is formed between two panels side template arranged side by side, cell wall die cavity is formed between side template and exterior sheathing and side template and inner template, the cell wall of formation is docked for two semicircular ring concrete towers;" O " steel bar ring is formed on the U-shaped bottom of U-shaped steel muscle, and two panels semicircular ring concrete tower is assembled at the scene, is passed through from each " O " steel bar ring with reinforcing bar and is fixed with " O " steel bar ring, and slurry is perfused, and is assembled into the annulus of a completion.The present invention not only makes concrete tower fragment prefabricated, live piece, effectively shortens the construction period, and prefabricated tower block standard is unified, and splicing intensity is high, can effectively control mixed tower presentation quality, the manufacture and assembly of prestressed concrete tower cylinder can be preferably suitable for, there is wide popularizing application prospect.

Description

A kind of assembly concrete tower piece construction method
Technical field
The present invention relates to a kind of assembly concrete tower piece construction methods, are mainly used in wind energy project concrete towers In tube construction.
Background technology
In wind power engineering concrete towers tube construction, be related to concrete tower it is prefabricated and transport.Due to concrete towers Cylinder section is relatively large in diameter, weight is larger, it will usually carry out widening treatment to road in field.Special tower is first segment, since it is straight Diameter and weight are maximum, and town road cannot be satisfied transport and require.
Under normal conditions, fragment processing, but the concrete tower form removal after fragment can be carried out to precast concrete tower It is susceptible to the problems such as concrete side corner is damaged, form removal is difficult in journey, influences tower presentation quality.Meanwhile concrete tower End is handled according to artificial chiseling mode, not only influences quality, but also take time and effort.
Invention content
Technical problem to be solved by the invention is to provide a kind of assembly concrete tower piece construction methods, by this Concrete tower is carried out that fragment is prefabricated, and live piece effectively shortens the construction period by method, and prefabricated tower block standard is unified, Mixed tower presentation quality can effectively be controlled.For this purpose, the present invention uses following technical scheme:
A kind of assembly concrete tower piece construction method, it is characterised in that among concrete tower inner template and exterior sheathing Place's setting twice side form after concreting to form two semicircular ring concrete towers, and per pass side form is by two panels side arranged side by side Template forms, and multipair U-shaped steel muscle is inserted into respectively in two panels side template arranged side by side, end is reserved in inside side template, in two panels The side form that confined space is formed between side template arranged side by side, forms cell wall between side template and exterior sheathing and side template and inner template The cell wall of die cavity, formation is docked for two semicircular ring concrete towers;" O " steel bar is formed on the U-shaped bottom of each pair of U-shaped steel muscle Ring, each " O " steel bar ring arrange in the short transverse in side form, and two semicircular ring concrete towers are formed after concreting Cylinder exposes the U-shaped bottom of U-shaped steel muscle after side template is removed in the side of two semicircular rings;
The two panels semicircular ring concrete tower of formation is assembled at the scene, passed through from each " O " steel bar ring with reinforcing bar and with " O " Steel bar ring is fixed, and two semicircular ring concrete are finally assembled into the annulus of a completion by formwork, perfusion slurry.
On the basis of above-mentioned technical proposal using the present invention, the present invention also be can be used or be combined using further below Technical solution:
It is prefabricated into U-shaped steel muscle using the reinforcing bar of φ 16mm, and U-shaped steel muscle is inserted laterally into the reserved duct of side form, U-shaped steel U-shaped section of exposing side template of muscle, " O " steel bar ring of formation meet longitudinal reinforcement and penetrate.
When side template is installed, one side glue is pre-set with inner template, end template contact surface, is reserved in inner template and side template The alignment of hole center, blending bolt pre-tightened, plays the role of being fixed temporarily, and reexamines two panels side form plate top surface and side adjusts Together, bolt is finally tightened.
To brushing retarder in middle section on the outside of side template, retarder can delay the concrete set time being in contact with it, In order to which follow-up hydraulic pressure rinses, rough surface is formed, the not brush retarder of the both sides on the outside of side template in addition to middle section, using demoulding Agent is brushed, and is convenient for form removal, and form neat appearance.
Semicircular ring concrete tower, which is transported to, stacks place, washes away the semicircular ring coagulation after side template is removed using giant Native tower side forms concavo-convex rough surface until exposing aggregate.
Convex surface is made in middle section on the outside of side template.
Due to construction method using the present invention, not only make concrete tower fragment prefabricated, live piece effectively shortens and applies The work duration, and prefabricated tower block standard is unified, and splicing intensity is high, can effectively control mixed tower presentation quality, can preferably be applicable in In the manufacture and assembly of prestressed concrete tower cylinder, there is wide popularizing application prospect.
Description of the drawings
Fig. 1 is the mold and seam steel bar arrangement figure of the present invention.
Fig. 2 is two semicircular ring concrete tower stitching sections of present invention position schematic diagram.
Fig. 3 is the side schematic view of semicircular ring concrete tower of the present invention.
Fig. 4 is the schematic diagram of side template of the present invention.
Fig. 5 is two semicircular ring concrete tower stitching sections of present invention position vertical view.
Specific implementation mode
As shown in figure 1, figure 2, figure 3, figure 4 and figure 5, the present embodiment is that a kind of prefabricated PC concrete tower piece is applied Work method.Twice side form is set between concrete tower exterior sheathing 1 and inner template 2 to form two and half after concreting Annulus concrete tower, per pass side form are made of two panels side template 3 arranged side by side, and two panels side template arranged side by side is preferably symmetrical. Exterior sheathing 1 and inner template 2 can be circularized by polylith template group respectively, and side template 3 is typically in connecing for exterior sheathing 1 and inner template 2 At seam.
13 transverse direction ducts 10 are arranged in 3 upper edge short transverse of side template, and make convex surface 11 on the outside, by U-shaped φ 16mm Reinforcing bar 4 is symmetrically inserted into duct 10, forms " O " shaped steel rib ring 6, U-loop rebar sizes long 500mm, wide 250mm, U-shaped section of dew Go out side template 100mm, " O " steel bar ring of formation meets longitudinal reinforcement 5 and penetrates.Using rubber strip to 10 envelope of side form reserving hole channel It is stifled, and tightly blocked using glass cement to sealing place not in place and U-shaped ring reinforced steel bar perforation part, mortar leakage prevention is arranged side by side in two panels Side template 3 between formed confined space side form, can avoid concreting when leakage slurry to coagulation soil property during form removal The influence of amount, while it is convenient to also allow for form removal.Cell wall mould is formed between side template 3 and exterior sheathing 1 and side template 3 and inner template 1 Chamber, the outside cell wall 921 and inside cell wall 922 of formation are docked for two semicircular ring concrete towers.
The hole in the hole and exterior sheathing 1 for connecting inner template 2, above 12 table of Kong Junyong drawing reference numerals are provided on side template Show.When side template 3 is installed, one side glue is pre-set with inner template 2, end template contact surface, thickness uniformly, inner template 2 and side form The hole center connected to it alignment reserved on plate 3, blending bolt are pre-tightened, play the role of being fixed temporarily, and re-inspection is symmetrical Two pieces of side form plate top surfaces and side adjustment it is neat, finally tighten bolt.
The retarder of 3 outer convex surface of side template, 11 brushing thickness 1mm, it is desirable that brush 2 times, and brush uniformly, in order to rear Continuous hydraulic pressure rinses, and forms rough surface, is used convenient for construction party, removes concrete dabbing technique from, except side template outer convex surface 11 with It is outer to use releasing agent brushing, it is convenient for form removal, and form neat appearance.
Template installation is complete and casting concrete after, formed two semicircular ring concrete towers 7,8, template is torn open It removes.Semicircular ring concrete tower, which is transported to, stacks place, and to the high pressure water washing of side 9 of semicircular ring concrete towers cylinder, until Expose aggregate, forms coarse concave surface 91.
After concrete strength reaches 60MPa, semicircular ring concrete tower is transported to wind turbine seat in the plane using flat car, into The lifting docking of row loop wheel machine is assembled.Semicircular ring concrete tower is placed in 6 leveling supporting modules.Using below supporting module Bolt adjustment tower levelness, horizontal error control within 2mm.U-shaped steel muscle overlap width 100cm, error control System penetrates the longitudinal reinforcement 5 of two φ 25mm in " O " shaped steel rib ring 6 from top after 2mm, adjustment, using electric welding by φ The longitudinal reinforcement 5 of 25mm is connect with U-shaped φ 16mm reinforcing bars 4.After acceptance(check), between two semicircular ring concrete towers Internal cavity 13 is the space of original internal model, and installation pours C80 high intensity grouting materials, wait for for the template construction in the space Intensity reaches form removal after design requirement.
To sum up, above-mentioned prefabricated PC concrete tower piece structure includes two semicircular ring concrete towers 7,8, institute The side for stating semicircular ring concrete tower is in groove type end face, and the groove type end face of two semicircular ring concrete towers has outside Cell wall 921 and inside cell wall 922, the outside cell wall 921 and inside cell wall 922 of two semicircular ring concrete towers dock respectively, And form the internal cavity 13 between two semicircular ring concrete towers, the side of described two semicircular ring concrete towers, edge Its short transverse is provided with multiple U-shaped reinforcing bars 4, and the bottom of U-shaped reinforcing bar is exposed in internal cavity 13, two semicircular ring coagulations The U-shaped reinforcing bar of native tower coordinates in pairs, and multiple " O " the shaped steel rib rings 6 arranged along short transverse are formed in internal cavity 13, and And there is longitudinal reinforcement 5 to pass through from each " O " shaped steel rib ring 6 and be welded and fixed with " O " shaped steel rib ring 6;It is used in internal cavity 13 Grouting material tamps.The groove bottom of groove type end face is concavo-convex rough surface.
Above is only a specific embodiment of the present invention, but the structure feature of the present invention is not limited thereto, Ren Heben The technical staff in field in the field of the invention, made by changes or modifications all cover among protection scope of the present invention.

Claims (6)

1. a kind of assembly concrete tower piece construction method, it is characterised in that in concrete tower inner template and exterior sheathing Between setting twice side form to form two semicircular ring concrete towers after concreting, per pass side form is arranged side by side by two panels Side template forms, and multipair U-shaped steel muscle is inserted into respectively in two panels side template arranged side by side, end is reserved in inside side template, two The side form that confined space is formed between piece side template arranged side by side, forms slot between side template and exterior sheathing and side template and inner template The cell wall of wall die cavity, formation is docked for two semicircular ring concrete towers;" O " shaped steel is formed on the U-shaped bottom of each pair of U-shaped steel muscle Muscle ring, each " O " steel bar ring arrange in the short transverse in side form, and two semicircular ring concrete are formed after concreting Tower exposes the U-shaped bottom of U-shaped steel muscle after side template is removed in the side of two semicircular rings;
The two panels semicircular ring concrete tower of formation is assembled at the scene, passed through from each " O " steel bar ring with reinforcing bar and with " O " Steel bar ring is fixed, and two semicircular ring concrete are finally assembled into the annulus of a completion by formwork, perfusion slurry.
2. a kind of assembly concrete tower piece construction method according to claim 1, it is characterised in that:Utilize φ The reinforcing bar of 16mm is prefabricated into U-shaped steel muscle, and U-shaped steel muscle is inserted laterally into the reserved duct of side form, U-shaped section of U-shaped steel muscle Expose side template, " O " steel bar ring of formation meets longitudinal reinforcement and penetrates.
3. a kind of assembly concrete tower piece construction method according to claim 1, it is characterised in that:Side template is pacified When dress, one side glue is pre-set with inner template, end template contact surface, the hole center alignment reserved in inner template and side template, and It is pre-tightened with bolt, plays the role of being fixed temporarily, reexamined two panels side form plate top surface and side adjustment is neat, finally tighten spiral shell Bolt.
4. a kind of assembly concrete tower piece construction method according to claim 1, it is characterised in that:To side template Outside middle section brushing retarder, retarder can delay the concrete set time being in contact with it, in order to which follow-up hydraulic pressure rushes It washes, forms rough surface, the not brush retarder of the both sides on the outside of side template in addition to middle section is brushed using releasing agent, is convenient for Form removal, and form neat appearance.
5. a kind of assembly concrete tower piece construction method according to claim 4, it is characterised in that:Semicircular ring is mixed Solidifying soil tower, which is transported to, stacks place, washes away the semicircular ring concrete tower side after side template is removed using giant, until Expose aggregate, forms concavo-convex rough surface.
6. a kind of assembly concrete tower piece construction method according to claim 1, it is characterised in that:Outside side template Make convex surface in side middle section.
CN201810440288.2A 2018-05-10 2018-05-10 A kind of assembly concrete tower piece construction method Pending CN108590316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810440288.2A CN108590316A (en) 2018-05-10 2018-05-10 A kind of assembly concrete tower piece construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810440288.2A CN108590316A (en) 2018-05-10 2018-05-10 A kind of assembly concrete tower piece construction method

Publications (1)

Publication Number Publication Date
CN108590316A true CN108590316A (en) 2018-09-28

Family

ID=63636168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810440288.2A Pending CN108590316A (en) 2018-05-10 2018-05-10 A kind of assembly concrete tower piece construction method

Country Status (1)

Country Link
CN (1) CN108590316A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456071A (en) * 2019-01-18 2020-07-28 深圳国金电力新能设计院有限公司 Center cylinder of tower cylinder foundation, construction method of tower cylinder foundation and tower cylinder
CN112302881A (en) * 2020-09-15 2021-02-02 重庆大学 Precast concrete pipe sheet connecting structure for steel-concrete tower cylinder
CN113374646A (en) * 2021-06-16 2021-09-10 重庆大学 Light steel concrete prestressing force combination formula wind power tower section of thick bamboo and wind power tower thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883482A (en) * 2014-03-28 2014-06-25 北京金风科创风电设备有限公司 Precast concrete shell ring, manufacturing method thereof and fan tower barrel
CN106351359A (en) * 2016-11-07 2017-01-25 江苏科技大学 Assembly type shear wall based on anti-shearing joint seam structure and construction method thereof
CN106677419A (en) * 2017-01-28 2017-05-17 初明进 Manufacturing method of prefabricated concrete member with connecting steel bars
CN106948504A (en) * 2017-04-27 2017-07-14 中国十七冶集团有限公司 Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method
CN107116676A (en) * 2017-06-17 2017-09-01 中国二十二冶集团有限公司 Superelevation blower fan prestressed concrete tower tube construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883482A (en) * 2014-03-28 2014-06-25 北京金风科创风电设备有限公司 Precast concrete shell ring, manufacturing method thereof and fan tower barrel
CN106351359A (en) * 2016-11-07 2017-01-25 江苏科技大学 Assembly type shear wall based on anti-shearing joint seam structure and construction method thereof
CN106677419A (en) * 2017-01-28 2017-05-17 初明进 Manufacturing method of prefabricated concrete member with connecting steel bars
CN106948504A (en) * 2017-04-27 2017-07-14 中国十七冶集团有限公司 Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method
CN107116676A (en) * 2017-06-17 2017-09-01 中国二十二冶集团有限公司 Superelevation blower fan prestressed concrete tower tube construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁学文: "《混凝土工与混凝土制品工》", 31 January 1989, 中国建筑工业出版社 *
韩全卫: "《混凝土脱模剂和相关工程材料的应用》", 30 September 2008, 中国建材工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456071A (en) * 2019-01-18 2020-07-28 深圳国金电力新能设计院有限公司 Center cylinder of tower cylinder foundation, construction method of tower cylinder foundation and tower cylinder
CN112302881A (en) * 2020-09-15 2021-02-02 重庆大学 Precast concrete pipe sheet connecting structure for steel-concrete tower cylinder
CN113374646A (en) * 2021-06-16 2021-09-10 重庆大学 Light steel concrete prestressing force combination formula wind power tower section of thick bamboo and wind power tower thereof

Similar Documents

Publication Publication Date Title
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN105220808B (en) Large-span prestressed arch bar in-situ precast construction method of installation
CN108590316A (en) A kind of assembly concrete tower piece construction method
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN110468790A (en) A kind of aqueduct body post-pouring zone construction process
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN106182364A (en) A kind of detachable steel core and the method making pre-stressed concrete hollow beam
CN106948504A (en) Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method
CN110158645A (en) Prefabricated components Hybrid connections assembly concrete pipe gallery
CN105297893B (en) Mortise and tenon type concrete composite beam cross connecting structure and its construction method
CN106193588A (en) A kind of method pouring building post-cast strip and pour mould
CN105133492B (en) Concrete bridge deck with channels at bottom
CN208763817U (en) A kind of assembly concrete tower piece structure and template
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN110805464A (en) Subway station prefabricated rail top air duct and installation method thereof
CN101906757A (en) Assembly method for replacing plate type rubber support on abutment of highway bridge
CN106703190A (en) Prefabricating beam column joint structure containing prestressing pore path and construction method thereof
CN106088470B (en) Assembly concrete complex case shape beam and its construction method
CN210713517U (en) Assembled superposed beam structure
CN205444504U (en) Building structure post-cast strip
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN207405819U (en) A kind of assembly concrete variable cross-section shearing wall limb and its making mold
CN110159299A (en) The first branch grillage in 3D printing steel fiber reinforced concrete tunnel and its construction method
CN205840082U (en) A kind of BRT Lightweight core mould close rib composite floor structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928