CN108547260A
CN108547260A CN201810568743.7A CN201810568743A CN108547260A CN 108547260 A CN108547260 A CN 108547260A CN 201810568743 A CN201810568743 A CN 201810568743A CN 108547260 A CN108547260 A CN 108547260A
Authority
CN
China
Prior art keywords
concrete
library
antiseepage
impervious barrier
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810568743.7A
Other languages
Chinese (zh)
Inventor
陈波
居浩
李刚
高传彬
郑晓晖
李波
周界束
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201810568743.7A priority Critical patent/CN108547260A/en
Publication of CN108547260A publication Critical patent/CN108547260A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of construction methods of the full library basin Anti-seeping technology of karst area, according to the different and different leaky properties of reservoir area landform, the full library basin blocked using bottom storehouse impervious barrier bedding, library bank gunite concrete barrier sheet bedding, concrete is completely spread anti-seepage method and carries out antiseepage.The present invention takes full advantage of the protective layer of local material and excavated material as bottom storehouse region antiseepage film bedding, is a kind of simple and practicable, effective construction method, and achieve the benefit of preferable economy by selecting subregion seepage control measure;According to the different and different leaky properties of reservoir area landform, the joint anti-seepage method of antiseepage is blocked using bottom storehouse antiseepage film, library bank gunite concrete barrier sheet bedding, concrete, control leakage to the greatest extent, reaches the anti-seepage effect of the full bedding in full library, can be that similar engineering construction is used for reference.

Description

A kind of full library basin Anti-seeping technology structure of karst area and construction method
Technical field
The present invention relates to a kind of full library basin Anti-seeping technology structure of karst area and construction methods, belong to water conservancy and hydropower work The complicated geologicals such as journey technical field more particularly to karst area's reservoir leakage processing technology field.
Background technology
With the development of water resources and hydropower construction cause, the dam that the country is built is more and more, the good dam site of geological conditions Also fewer and fewer.Currently, many dams are built in the area of karsts developing area, build a dam herein, based process, reservoir periphery and library The Anti-seeping technology of area's leakage passage is particularly important, while the construction technology handled is also more complicated.
Due to karst area, formation lithology is complicated, and under corrosion, karst area is frequently accompanied by depression, solution cavity, dark River, sinkhole, the water spot that disappears, karst, coal hole and other Geological Defects and possible leakage passage, make karst area build When reservoir, since Reservoir region leaks, reservoir can not normal water storage, do not simply fail to complete former design objective, and dam body has leakage Aquaporin equally jeopardizes the safety of dam body.And solution cavity, the underground river etc. of karst area are difficult to find out, and all find out workload Greatly, investment is big, and therefore, Karst Reservoir Area leakage problems become the principal element for restricting entire engineering.
There are solution cavity, underground river, karst and other Geological Defects for being difficult to find out and cost is high for karst area With possible leakage passage, the seepage control method mainly used in engineering at present mainly has:Soft felt bedding antiseepage, concrete paving Lid antiseepage, the antiseepage of cement bonded sand cemented rock ditch seam, solution cavity will be carried out cement grout and cement sand washing filling, concrete cutoff wall, Concrete cutoff wall etc. Anti-seeping technology mode.These processing modes mostly be directed to it can be found that specific breakthrough taken Seepage control measure based on " stifled " is stored as disclosed in the Chinese patent application No. is CN201320712498.5 for karst area A kind of karst area pressurized tunnel disclosed in the leakage preventing structure of drainage facility, the Chinese patent application No. is CN201320324147.7 Bottom carries and is used for red mud dump in karst terrain disclosed in leakage preventing structure, the Chinese patent application No. is CN200610200048.2 Horizontal leakage preventing structure, red mud dump in karst terrain disclosed in the Chinese patent application No. is CN200610200047.8 draining A kind of karst area large size is molten disclosed in method and its drainage arrangement and Chinese patent application No. is CN201520779752.2 The composite anti-penetrating structure in hole.
Solution cavity, underground river of karst area etc. are difficult to find out, and all find out heavy workload, and investment is big, therefore use above-mentioned anti- Ooze treatment measures inevitably occur antiseepage be not thorough, be not comprehensive, uneconomic problem, or even there is the leakage after reservoir filling.And And soft felt bedding anti-seepage method in above-mentioned seepage control measure, reservoir area shoulder can only be handled, exist for steeper area and be applicable in limitation The problem of property.To reach the effect of the full library basin antiseepage in karst area, be just badly in need of one kind can in the gentle section antiseepage in reservoir area and In the leakage preventing structure of reservoir area steep slope section antiseepage.
Invention content
In order to solve the above technical problems, the present invention provides a kind of full library basin Anti-seeping technology structure of karst area and applying Work method, the full library basin Anti-seeping technology structure of the karst area and construction method are oozed according to the difference and difference of reservoir area landform Feature is leaked, the full library basin blocked using bottom storehouse impervious barrier bedding, library bank gunite concrete barrier sheet bedding, concrete completely spreads antiseepage Method carries out antiseepage.
The present invention is achieved by the following technical programs.
A kind of construction method of the full library basin Anti-seeping technology of karst area provided by the invention, includes the following steps:
1. according to normal pool level, reservoir level or less reservoir area coating is cleared up;
2. infiltration lane present in the coating of reservoir level or less reservoir area is verified in exploration, infiltration lane is cleared up;
3. clearing up library bank, Slope leveling is made to come over and pledge allegiance to, irregular groove and fluid bowl is avoided the occurrence of, to the recessed of appearance Slot and fluid bowl are backfilled using C15 concrete;
4. step 2.~3. handled after, carry out bottom storehouse impervious barrier bedding;
5. setting gradually anti-skidding pier, concrete anti-seepage plate, concrete anchoring groove in the both sides of impervious barrier, construction is completed;
The anti-skidding pier is closely connect with impervious barrier, and impervious barrier is arranged in the position that bottom storehouse steepness is 20 °~30 °, mixes Solidifying soil barrier sheet is arranged in the position that library bank slope degree is 60 °~75 °, and the setting of concrete anchoring groove is 60 °~75 ° in library bank slope degree Local location;
The concrete anti-seepage plate carries out antiseepage using gunite concrete, and the part of antiseepage adds reinforcing bar;
The concrete anchoring groove is made of anchor pole and extension bar-mat reinforcement;
The infiltration lane includes disappear water spot, sinkhole, solution cavity, corroded breaking zone;
The impervious barrier includes clay liner, antiseepage film, clay protective layer, metalling;The clay liner, antiseepage film, Compacting is laid with successively from top to bottom for clay protective layer, metalling.
2. the step is divided into following steps:
(2.1) by the way of concrete blocking, infiltration lane is backfilled with C15 concrete, in infiltration lane Concrete cover is arranged in surface;
(2.2) it is cleared up in the maximum sized double-wide of infiltration lane plane, cleaning thickness is 25cm, has been cleared up It is backfilled afterwards with C15 concrete;
(2.3) pass through the backfill and cleaning of step (2.1)~(2.2), C15 concrete and infiltration lane form reservoir area antiseepage Body.
Based on a kind of full library basin Anti-seeping technology structure of karst area;Including impervious barrier, the impervious barrier includes clay Bed course, antiseepage film, clay protective layer, metalling, the clay liner, antiseepage film, clay protective layer, metalling from top to bottom according to Secondary compacting is laid with;The both sides of the impervious barrier successively be equipped with anti-skidding pier, concrete anti-seepage plate, concrete anchoring groove, anti-skidding pier with Impervious barrier closely connects, and impervious barrier is arranged in the position that bottom storehouse steepness is 20 °~30 °, and concrete anti-seepage plate is arranged in library bank The position that the gradient is 60 °~75 °, the local location that it is 60 °~75 ° in library bank slope degree that concrete anchoring groove, which is arranged,.
The concrete anti-seepage plate carries out antiseepage using gunite concrete, and the part of antiseepage adds reinforcing bar.
The concrete anchoring groove is made of anchor pole and extension bar-mat reinforcement.
The clay liner, clay protective layer thickness be 50cm, the thickness of metalling is 1m.
The steepness is the angle of inclination of library basin bottom part side slope.
The local location of concrete anchoring groove setting is:The position that library bank slope degree is 70 °~90 °.
The beneficial effects of the present invention are:
1. by selecting subregion seepage control measure, local material and excavated material are taken full advantage of as bottom storehouse region antiseepage film The protective layer of bedding is a kind of simple and practicable, effective construction method, and achieves the benefit of preferable economy;
2. anti-using bottom storehouse antiseepage film, library bank gunite concrete according to the different and different leaky properties of reservoir area landform Ooze plate bedding, concrete block antiseepage joint anti-seepage method, to the greatest extent control leakage, reach the antiseepage of the full bedding in full library Effect can be that similar engineering construction is used for reference.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is concrete anchoring groove drawing of the present invention;
Fig. 3 is basin karst cave treatment plan view in library of the present invention;
Fig. 4 is basin karst cave treatment sectional view in library of the present invention;
In figure:1- clay liners, 2- antiseepage films, 3- clay protective layers, 4- metallings, the anti-skidding piers of 5-, 6- concrete anti-seepages Plate, 7- concrete anchoring grooves, 8-C15 concrete, 9- infiltration lanes, the reservoir areas 10- impervious body.
Specific implementation mode
Be described further below technical scheme of the present invention, but claimed range be not limited to it is described.
As shown in figures 1-4, the construction method of the full library basin Anti-seeping technology of a kind of karst area, includes the following steps:
1. according to normal pool level, reservoir level or less reservoir area coating (i.e. bottom storehouse) is cleared up;
2. infiltration lane 9 present in the coating of reservoir level or less reservoir area is verified in exploration, infiltration lane 9 is cleared up; It is specifically divided into following steps:
(2.1) by the way of concrete blocking, infiltration lane 9 is backfilled with C15 concrete eights, in infiltration lane 9 Surface be arranged concrete cover;
(2.2) it is cleared up in the maximum sized double-wide of 9 plane of infiltration lane, cleaning thickness is 25cm, cleaning It is backfilled with C15 concrete eights after complete;
(2.3) pass through the backfill and cleaning of step (2.1)~(2.2), it is anti-that C15 concrete eights and infiltration lane 9 form reservoir area Ooze body 10.
3. clearing up library bank, Slope leveling is made to come over and pledge allegiance to, irregular groove and fluid bowl is avoided the occurrence of, to the recessed of appearance Slot and fluid bowl are backfilled using C15 concrete eights, in case 6 inside of concrete anti-seepage plate occurs making somebody a mere figurehead phenomenon;
4. step 2.~3. handled after, carry out bottom storehouse impervious barrier bedding;
5. setting gradually anti-skidding pier 5, concrete anti-seepage plate 6, concrete anchoring groove 7 in the both sides of impervious barrier, construction is completed, It is finally reached the full library basin horizontal leakage preventing that bottom storehouse impervious barrier bedding, 6 bedding of library bank gunite concrete barrier sheet and concrete block.
The anti-skidding pier 5 is closely connect with impervious barrier, and impervious barrier is arranged in the position that bottom storehouse steepness is 20 °~30 °, mixes Solidifying soil barrier sheet 6 is arranged in the position that library bank slope degree is 60 °~75 °, the setting of concrete anchoring groove 7 library bank slope degree be 60 °~ 75 ° of local location makes concrete anti-seepage plate 6 be completely embedded with reservoir stability;
The concrete anti-seepage plate 6 carries out antiseepage using gunite concrete, and the part of antiseepage adds reinforcing bar;
The concrete anchoring groove 7 is made of anchor pole and extension bar-mat reinforcement;
The infiltration lane 9 includes disappear water spot, sinkhole, solution cavity, corroded breaking zone;
The impervious barrier includes clay liner 1, antiseepage film 2, clay protective layer 3, metalling 4;The clay liner 1 is prevented Oozing film 2, clay protective layer 3, metalling 4, compacting is laid with successively from top to bottom.
Based on a kind of full library basin Anti-seeping technology structure of karst area;Including impervious barrier, the impervious barrier includes clay Bed course 1, antiseepage film 2, clay protective layer 3, metalling 4, the clay liner 1, antiseepage film 2, clay protective layer 3, metalling 4 from Under to it is upper successively compacting be laid with;The both sides of the impervious barrier are equipped with anti-skidding pier 5, concrete anti-seepage plate 6, concrete anchoring groove successively 7, anti-skidding pier 5 is closely connect with impervious barrier, and impervious barrier is arranged in the position that bottom storehouse steepness is 20 °~30 °, concrete anti-seepage plate 6 are arranged in the position that library bank slope degree is 60 °~75 °, and concrete anchoring groove 7 is arranged in the local position that library bank slope degree is 60 °~75 ° It sets.
The concrete anti-seepage plate 6 carries out antiseepage using gunite concrete, and the part of antiseepage adds reinforcing bar, increases it Stability avoids the halfway problem of antiseepage.
The concrete anchoring groove 7 is made of anchor pole and extension bar-mat reinforcement, and concrete anti-seepage plate 6 is made to be connect with reservoir stability tightly It is close, the case where avoiding antiseepage from being not thorough, incomplete problem, prevent from leaking after water storage.
The clay liner 1, clay protective layer 3 thickness be 50cm, the thickness of metalling 4 is 1m, prevents library water through oozing It leaks channel 9 and leaks.
The steepness is the angle of inclination of library basin bottom part side slope.
The local location that the concrete anchoring groove 7 is arranged is:The position that library bank slope degree is 70 °~90 °, local setting, So that concrete anchoring groove 7 cooperates with concrete anti-seepage plate 6, preferably achieve the effect that antiseepage.
Preferably, the thickness of clay liner 1 is about 0.5m, is destroyed to prevent antiseepage film 2, after being laid with 2 waterproof blanket of antiseepage film, paving If geotextiles, the clay protective layer 3 of 0.5m thickness and the rock ballast of 1.0m are laid in geotextiles as metalling, as protective layer, It is used as ballast simultaneously, to prevent flow scour riverbed.
Further, the reservoir area section gradient is analyzed according to the reservoir area geological section that early period, geological mapping provided first, and Carry out multidomain treat-ment;For reservoir surrounding bank slope area, that is, library bank, the usual gradient is steeper, using gunite concrete bedding, is formed Concrete anti-seepage plate 6 does Anti-seeping technology;For general shallower 24 ° or so the regions of library basin bottom part region, that is, bottom storehouse, using anti- Ooze 2 bedding antiseepage of film;In addition for having verified the leakage passages 9 such as existing sinkhole, the water spot that disappears in reservoir area, implementing bedding Before, it offsets water spot, sinkhole, corroded breaking zone and carries out antiseepage blocking by the way of the blocking of C15 concrete eights;Bottom storehouse antiseepage film 2 Bedding connects into a complete reliable library basin with 6 bedding of library bank gunite concrete barrier sheet, and library water is prevented to be oozed through leakage passage 9 Leakage.

Claims (8)

1. a kind of construction method of the full library basin Anti-seeping technology of karst area, it is characterised in that:Include the following steps:
1. according to normal pool level, reservoir level or less reservoir area coating is cleared up;
2. infiltration lane (9) present in the coating of reservoir level or less reservoir area is verified in exploration, infiltration lane (9) is cleared up;
3. clearing up library bank, Slope leveling is made to come over and pledge allegiance to, avoids the occurrence of irregular groove and fluid bowl, to the groove of appearance and Fluid bowl is backfilled using C15 concrete (8);
4. step 2.~3. handled after, carry out bottom storehouse impervious barrier bedding;
5. setting gradually anti-skidding pier (5), concrete anti-seepage plate (6), concrete anchoring groove (7) in the both sides of impervious barrier, complete to apply Work;
The anti-skidding pier (5) closely connect with impervious barrier, and impervious barrier is arranged in the position that bottom storehouse steepness is 20 °~30 °, coagulation Native barrier sheet (6) is arranged in the position that library bank slope degree is 60 °~75 °, and concrete anchoring groove (7) setting is 60 ° in library bank slope degree ~75 ° of local location;
The concrete anti-seepage plate (6) carries out antiseepage using gunite concrete, and the part of antiseepage adds reinforcing bar;
The concrete anchoring groove (7) is made of anchor pole and extension bar-mat reinforcement;
The infiltration lane (9) includes disappear water spot, sinkhole, solution cavity, corroded breaking zone;
The impervious barrier includes clay liner (1), antiseepage film (2), clay protective layer (3), metalling (4);The clay liner (1), compacting is laid with successively from top to bottom for antiseepage film (2), clay protective layer (3), metalling (4).
2. the construction method of the full library basin Anti-seeping technology of karst area as described in claim 1, it is characterised in that:The step Suddenly 2. it is divided into following steps:
(2.1) by the way of concrete blocking, infiltration lane (9) is backfilled with C15 concrete (8), in infiltration lane (9) concrete cover is arranged in surface;
(2.2) it is cleared up in the maximum sized double-wide of infiltration lane (9) plane, cleaning thickness is 25cm, has been cleared up It is backfilled afterwards with C15 concrete (8);
(2.3) pass through the backfill and cleaning of step (2.1)~(2.2), it is anti-that C15 concrete (8) and infiltration lane (9) form reservoir area Ooze body (10).
3. a kind of full library basin Anti-seeping technology structure of karst area, it is characterised in that:Including impervious barrier, the impervious barrier includes Clay liner (1), antiseepage film (2), clay protective layer (3), metalling (4), the clay liner (1), antiseepage film (2), clay Compacting is laid with successively from top to bottom for protective layer (3), metalling (4);The both sides of the impervious barrier are equipped with anti-skidding pier (5), mix successively Solidifying soil barrier sheet (6), concrete anchoring groove (7), anti-skidding pier (5) closely connect with impervious barrier, and impervious barrier setting is precipitous in bottom storehouse Degree is 20 °~30 ° of position, and it is 60 °~75 ° of position, concrete anchoring groove that concrete anti-seepage plate (6), which is arranged in library bank slope degree, (7) local location for being 60 °~75 ° in library bank slope degree is set.
4. the full library basin Anti-seeping technology structure of karst area as claimed in claim 3, it is characterised in that:The concrete is anti- It oozes plate (6) and antiseepage is carried out using gunite concrete, the part of antiseepage adds reinforcing bar.
5. the full library basin Anti-seeping technology structure of karst area as claimed in claim 3, it is characterised in that:The concrete anchor Gu Gou (7) is made of anchor pole and extension bar-mat reinforcement.
6. the full library basin Anti-seeping technology structure of karst area as claimed in claim 3, it is characterised in that:The clay liner (1), the thickness of clay protective layer (3) is 50cm, and the thickness of metalling (4) is 1m.
7. the full library basin Anti-seeping technology structure of karst area as claimed in claim 3, it is characterised in that:The steepness is The angle of inclination of library basin bottom part side slope.
8. the full library basin Anti-seeping technology structure of karst area as claimed in claim 3, it is characterised in that:The concrete anchor Gu Gou (7) setting local location be:The position that library bank slope degree is 70 °~90 °.
CN201810568743.7A 2018-06-05 2018-06-05 A kind of full library basin Anti-seeping technology structure of karst area and construction method Pending CN108547260A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810568743.7A CN108547260A (en) 2018-06-05 2018-06-05 A kind of full library basin Anti-seeping technology structure of karst area and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810568743.7A CN108547260A (en) 2018-06-05 2018-06-05 A kind of full library basin Anti-seeping technology structure of karst area and construction method

Publications (1)

Publication Number Publication Date
CN108547260A true CN108547260A (en) 2018-09-18

Family

ID=63492606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810568743.7A Pending CN108547260A (en) 2018-06-05 2018-06-05 A kind of full library basin Anti-seeping technology structure of karst area and construction method

Country Status (1)

Country Link
CN (1) CN108547260A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826155A (en) * 2019-03-21 2019-05-31 中建五局土木工程有限公司 Karst Geological Landscape river structure and its construction method
CN112272984A (en) * 2020-10-23 2021-01-29 南京朴厚生态科技有限公司 Coastal zone micro-ecological environment restoration system and construction method thereof
CN114427214A (en) * 2022-03-07 2022-05-03 中冶长天国际工程有限责任公司 Dam foundation reservoir bottom seepage-proofing paving structure and building method thereof
CN115467291A (en) * 2022-10-29 2022-12-13 中国水利水电建设工程咨询贵阳有限公司 Go up storehouse basin seepage prevention structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1371998A1 (en) * 1986-06-20 1988-02-07 Московский Государственный Научно-Исследовательский И Проектный Институт По Сельскому Строительству Method of making counter-seepage protection of water reservoirs
CN104047266A (en) * 2014-06-27 2014-09-17 黄河勘测规划设计有限公司 Seepage-proofing and leaking-stoppage method of leakage passage
CN104131575A (en) * 2014-04-11 2014-11-05 中国水利水电第十一工程局有限公司 Plugging and drainage method for dam foundation on karst highly developed stratum
CN107386209A (en) * 2017-07-24 2017-11-24 重庆交通大学 A kind of Karst funnel reservoir and its method of construction
CN107687155A (en) * 2017-09-27 2018-02-13 长江勘测规划设计研究有限责任公司 A kind of storehouse basin antiseepage is anti-to lift structure and method for arranging

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1371998A1 (en) * 1986-06-20 1988-02-07 Московский Государственный Научно-Исследовательский И Проектный Институт По Сельскому Строительству Method of making counter-seepage protection of water reservoirs
CN104131575A (en) * 2014-04-11 2014-11-05 中国水利水电第十一工程局有限公司 Plugging and drainage method for dam foundation on karst highly developed stratum
CN104047266A (en) * 2014-06-27 2014-09-17 黄河勘测规划设计有限公司 Seepage-proofing and leaking-stoppage method of leakage passage
CN107386209A (en) * 2017-07-24 2017-11-24 重庆交通大学 A kind of Karst funnel reservoir and its method of construction
CN107687155A (en) * 2017-09-27 2018-02-13 长江勘测规划设计研究有限责任公司 A kind of storehouse basin antiseepage is anti-to lift structure and method for arranging

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王芸: "喀斯特岩溶地区水库防渗处理分析" *
邱勇等: "联合防渗在坝塘水库中的应用" *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826155A (en) * 2019-03-21 2019-05-31 中建五局土木工程有限公司 Karst Geological Landscape river structure and its construction method
CN109826155B (en) * 2019-03-21 2024-01-30 中建五局土木工程有限公司 Karst geological river channel structure and construction method thereof
CN112272984A (en) * 2020-10-23 2021-01-29 南京朴厚生态科技有限公司 Coastal zone micro-ecological environment restoration system and construction method thereof
CN114427214A (en) * 2022-03-07 2022-05-03 中冶长天国际工程有限责任公司 Dam foundation reservoir bottom seepage-proofing paving structure and building method thereof
CN114427214B (en) * 2022-03-07 2023-12-29 中冶长天国际工程有限责任公司 Dam foundation reservoir bottom seepage-proofing paving structure and construction method thereof
CN115467291A (en) * 2022-10-29 2022-12-13 中国水利水电建设工程咨询贵阳有限公司 Go up storehouse basin seepage prevention structure

Similar Documents

Publication Publication Date Title
CN105002913B (en) A kind of highly permeable stratum deep basal pit back cover water sealing structure and its construction method
CN108547260A (en) A kind of full library basin Anti-seeping technology structure of karst area and construction method
CN109881694A (en) A kind of constructing structure blocked for foundation pit substrate Sand and method
CN109056786A (en) Face upward inclined road shoulder wall water drainage behind the wall system and construction method
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN105421497B (en) The waterproof construction method of sole plate and ground wall connecting node in combined fender construction system
CN206090638U (en) Underground side wall post -cast strip waterproof construction
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN205399440U (en) Inflation dirt road moat structure
CN113323017B (en) Construction method of side wall fertilizer groove foam concrete backfill system
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN107100206A (en) A kind of prevention and controls of basement leakage
CN110052471A (en) A kind of oil and gas well drilling waste landfill process
CN109469042A (en) A kind of antiseepage stockyard place karst cave treatment structure
CN208455573U (en) A kind of full library basin Anti-seeping technology structure of karst area
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN209482261U (en) With the dam structure faced forever in conjunction with multi-functional drainage box culvert
CN111636483A (en) Waterproof device for reverse construction concrete structure gap and construction method
CN205954651U (en) Concrete open caisson back cover structure
CN108842813A (en) Open trench tunnel differential settlement control structure and construction technology
CN206189430U (en) A escape canal for deep overburden ground
CN204825916U (en) Highly permeable stratum deep basal pit back cover stagnant water structure
JP4315620B2 (en) Impermeable treatment method for managed waste landfill revetment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180918