CN108444052B - A kind of control method and air-conditioning of air-conditioning - Google Patents

A kind of control method and air-conditioning of air-conditioning Download PDF

Info

Publication number
CN108444052B
CN108444052B CN201810167293.0A CN201810167293A CN108444052B CN 108444052 B CN108444052 B CN 108444052B CN 201810167293 A CN201810167293 A CN 201810167293A CN 108444052 B CN108444052 B CN 108444052B
Authority
CN
China
Prior art keywords
air
conditioning
electrode plate
user
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810167293.0A
Other languages
Chinese (zh)
Other versions
CN108444052A (en
Inventor
陈颖聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201810167293.0A priority Critical patent/CN108444052B/en
Priority to PCT/CN2018/083289 priority patent/WO2019165686A1/en
Publication of CN108444052A publication Critical patent/CN108444052A/en
Application granted granted Critical
Publication of CN108444052B publication Critical patent/CN108444052B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/56Remote control
    • F24F11/57Remote control using telephone networks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/79Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling the direction of the supplied air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • F24F2110/12Temperature of the outside air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2120/00Control inputs relating to users or occupants
    • F24F2120/10Occupancy
    • F24F2120/12Position of occupants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2120/00Control inputs relating to users or occupants
    • F24F2120/10Occupancy
    • F24F2120/14Activity of occupants

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Human Computer Interaction (AREA)
  • Signal Processing (AREA)
  • Fluid Mechanics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention is suitable for air-conditioning technical field, provides the control method and air-conditioning of a kind of air-conditioning, comprising: obtain the environmental parameter of the action space of air-conditioning;Outdoor temperature, average shell temperature and current number are imported into the transformation model of air-conditioning output power, determine the output power of air-conditioning;Ratio between each user density is calculated, and determines pendulum leaf in the residence time of each swing angle based on ratio;Air-conditioning is controlled to run with output power and residence time.The present invention is manually adjusted without user, can be reduced unnecessary energy consumption according to the current suitable operating parameter of environment configurations, be realized energy-efficient purpose.

Description

A kind of control method and air-conditioning of air-conditioning
Technical field
The invention belongs to air-conditioning technical field more particularly to the control methods and air-conditioning of a kind of air-conditioning.
Background technique
Air-conditioning, as the capital equipment for adjusting room temperature now, it has also become essential electric appliance is set on popular life It is one of standby, thus whether airconditioning control facilitates intelligence, increasingly pays close attention to by user.However existing air conditioner controlling technology, it needs The operating parameter of air-conditioning is adjusted manually, to increase the operating procedure of user, and when indoor user quantity is sent out When changing, the case where air-conditioning still keeps original operational mode to work, electricity is be easy to cause to waste, energy-saving effect compared with Difference.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of control method of air-conditioning and air-conditioning, to solve existing air-conditioning Control method, the case where needing user to manually adjust, and electricity be easy to cause to waste, the poor problem of energy-saving effect.
The first aspect of the embodiment of the present invention provides a kind of control method of air-conditioning, comprising:
Obtain the environmental parameter of the action space of air-conditioning;The environmental parameter includes: outdoor temperature, in the action space Each fan that the average shell temperature and the air conditioning exhausting of user is formed in the current number of user, the action space User density in shape region;Wherein, each fan-shaped region specifically: the pendulum leaf of the air-conditioning is located at each preset pendulum The outlet air region formed when dynamic angle;
The outdoor temperature, the average shell temperature and the current number are imported into turning for air-conditioning output power Mold changing type determines the output power of the air-conditioning;
Ratio between each user density is calculated, and determines the pendulum leaf in each swing based on the ratio The residence time of angle;
The air-conditioning is controlled to run with the output power and the residence time.
The second aspect of the embodiment of the present invention provides a kind of air-conditioning, including memory, processor and is stored in described In memory and the computer program that can run on the processor, the processor are realized when executing the computer program Following steps:
Obtain the environmental parameter of the action space of air-conditioning;The environmental parameter includes: outdoor temperature, in the action space Each fan that the average shell temperature and the air conditioning exhausting of user is formed in the current number of user, the action space User density in shape region;Wherein, each fan-shaped region specifically: the pendulum leaf of the air-conditioning is located at each preset pendulum The outlet air region formed when dynamic angle;
The outdoor temperature, the average shell temperature and the current number are imported into turning for air-conditioning output power Mold changing type determines the output power of the air-conditioning;
Ratio between each user density is calculated, and determines the pendulum leaf in each swing based on the ratio The residence time of angle;
The air-conditioning is controlled to run with the output power and the residence time.
The third aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, and the computer program performs the steps of when being executed by processor
Obtain the environmental parameter of the action space of air-conditioning;The environmental parameter includes: outdoor temperature, in the action space Each fan that the average shell temperature and the air conditioning exhausting of user is formed in the current number of user, the action space User density in shape region;Wherein, each fan-shaped region specifically: the pendulum leaf of the air-conditioning is located at each preset pendulum The outlet air region formed when dynamic angle;
The outdoor temperature, the average shell temperature and the current number are imported into turning for air-conditioning output power Mold changing type determines the output power of the air-conditioning;
Ratio between each user density is calculated, and determines the pendulum leaf in each swing based on the ratio The residence time of angle;
The air-conditioning is controlled to run with the output power and the residence time.
The control method and air-conditioning for implementing a kind of air-conditioning provided in an embodiment of the present invention have the advantages that
The embodiment of the present invention determines the sky based on environmental parameter by obtaining the environmental parameter in air-conditioning place room automatically The output power and pendulum leaf of tune control operation of air conditioner in the residence time of each fan-shaped region, and based on above-mentioned parameter, It is manually adjusted without user, unnecessary energy consumption can be reduced according to the current suitable operating parameter of environment configurations, it is real Existing energy-efficient purpose.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is a kind of implementation flow chart of the control method for air-conditioning that first embodiment of the invention provides;
Fig. 2 is the schematic diagram for the air conditioning exhausting overlay area that one embodiment of the invention provides;
Fig. 3 is the specific implementation flow chart of the control method S101 for air-conditioning that second embodiment of the invention provides a kind of;
Fig. 4 is the placement schematic diagram of four electrode plates on a kind of doorframe of one embodiment of the invention offer;
Fig. 5 is the specific implementation flow chart of the control method S1012 for air-conditioning that third embodiment of the invention provides a kind of;
Fig. 6 is a kind of specific implementation flow chart of the control method for air-conditioning that fourth embodiment of the invention provides;
Fig. 7 is a kind of structural block diagram for air-conditioning that one embodiment of the invention provides;
Fig. 8 be another embodiment of the present invention provides a kind of air-conditioning schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The embodiment of the present invention determines the sky based on environmental parameter by obtaining the environmental parameter in air-conditioning place room automatically The output power and pendulum leaf of tune control operation of air conditioner in the residence time of each fan-shaped region, and based on above-mentioned parameter, The case where solving and user is needed to manually adjust, and electricity is be easy to cause to waste, the poor problem of energy-saving effect.
In embodiments of the present invention, the executing subject of process is air-conditioning.It is equipped with intelligent processing module in the air-conditioning and adopts Collect module, processing operation is carried out by the environmental parameter obtained to acquisition module, determine the operating parameter of current air-conditioning, control is empty Allocation and transportation row.Fig. 1 shows the implementation flow chart of the control method of the air-conditioning of first embodiment of the invention offer, and details are as follows:
In S101, the environmental parameter of the action space of air-conditioning is obtained;The environmental parameter includes: outdoor temperature, described The current number of user in action space, the average shell temperature of user and the air conditioning exhausting shape in the action space At each fan-shaped region in user density;Wherein, each fan-shaped region specifically: the pendulum leaf of the air-conditioning is located at each The outlet air region formed when a preset swing angle.
In the present embodiment, the environment of air-conditioning action space includes indoor environment and outdoor environment two parts.Wherein, room Interior environmental parameter include the number of user in action space, in action space user average shell temperature and air conditioning exhausting shape User density in each fan-shaped region of formula.It can be covered since air-conditioning will form one during carrying out swing flap by pendulum leaf Cover area, and the outlet air region at air-conditioning a certain moment be less than can overlay area a fan-shaped region, can overlay area be Region is formed by centered on air-conditioning, to put leaf when each preset swing angle is blown by the fan-shaped region.Cause This, can by can overlay area be divided into that multiple boundaries are adjacent but the fan-shaped region of complementary overhangs, i.e. the pendulum leaf of air-conditioning be located at it is each The outlet air region formed when a preset swing angle, and the user people for including based on the area of the fan-shaped region and the area Number, then can determine the user density of the fan-shaped region.
In the present embodiment, the action space of air-conditioning specifically: the sky that environment temperature is constituted by the region that air-conditioning regulates and controls Between, it can be by the space of air-conditioning influence.
In addition to above-mentioned indoor environment parameter, the environmental parameter of air-conditioning acquisition further includes outdoor temperature, optionally, can also be wrapped Include outside humidity and intensity of illumination.Since humidity and intensity of illumination adjust the temperature of air-conditioning, there is also certain shadows It rings, such as intensity of illumination is bigger, then it represents that the heat radiation influence of sunray is bigger, if desired maintains indoor be in stablize at this time A certain temperature, relative to intensity of illumination for weaker environment, the output power of air-conditioning can be higher;Similarly, outside humidity It can have a certain impact to the temperature sensing of user, humidity is larger, then it represents that the content of water is higher in air, and the specific heat capacity of water It is larger, therefore if desired cool down to interior, then required temperature fall time is longer, can properly increase the output work of air-conditioning Rate.
In the present embodiment, air-conditioning can acquire above-mentioned multinomial environmental parameter by built-in different types of sensor.Air-conditioning Outdoor temperature can be obtained by temperature sensor;Particularly, which can be placed at air-conditioner outdoor unit, then air-conditioning It is communicatively coupled by the modes such as Bluetooth communication, wireless LAN communication or serial communication and temperature sensor, obtains temperature The outdoor temperature of sensor feedback.Air-conditioning can multiple preset angles by ultrasonic wave sending and receiving module, into action space Transmitting ultrasonic wave and the echo-signal for receiving ultrasound feedback, determine the user's number for including in the room.Air-conditioning can also lead to Thermal radiation sensor is crossed, obtains the heat radiation images in room, and determine the user in the room based on the heat radiation images The surface temperature of several and each user then finds out the average shell temperature of the indoor user, and is based on the heat radiation images, Determine the user density of each fan-shaped region.
Preferably, air-conditioning can execute the relevant operation of S101 at predetermined intervals, to realize with environmental parameter Variation adjust automatically air-conditioning operating parameter purpose.Particularly, the time interval is according to the difference of the operating status of air-conditioning Change to being adapted to property.For example, air-conditioning is in shutdown or standby mode, then the time interval can be longer, such as 10 minutes Or 30 minutes;And under air-conditioning is in operating status, then the time interval can be shorter, such as 1 minute or 30 seconds.
In S102, it is defeated that the outdoor temperature, the average shell temperature and the current number are imported into air-conditioning The transformation model of power out determines the output power of the air-conditioning.
In the present embodiment, environmental parameter is then divided into two classes, calculated separately by air-conditioning after obtaining above-mentioned environmental parameter Residence time of the output power and air-conditioning of air-conditioning in each fan-shaped region.Wherein, for calculating the output power of air-conditioning Environmental parameter includes: outdoor temperature, the average shell temperature of indoor user and user's number.
In the present embodiment, air-conditioning imports the number of user in outdoor temperature, average shell temperature and action space Into the transformation model of preset air-conditioning output power, output power corresponding to room where calculating current time air-conditioning is more Greatly.Specifically, outdoor temperature is higher, then the output power of air-conditioning is bigger;The average shell temperature of user is higher, then air-conditioning is defeated Power is bigger out;Current number is more, then the heat distributed is more, therefore the output power of air-conditioning is also bigger.Therefore, based on upper Three relationships between environmental parameter and output power are stated, can determine that the transformation model can are as follows:
P=α TIt is outdoor·βTTable·γQ;P∝TIt is outdoor, P ∝ TTable, P ∝ Q;
Wherein, P is the output power of air-conditioning;TIt is outdoorFor outdoor temperature, TTableFor average shell temperature, Q is current number.α,β And γ is regulation coefficient.Above-mentioned three parameters are positively correlated with the output power of air-conditioning.
Optionally, air-conditioning can also determine the output temperature of air-conditioning according to outdoor temperature and the shell temperature of user.With Family can be arranged a target temperature in air-conditioning, i.e., air-conditioning can maintain covered room in the target temperature.Wherein, if room The shell temperature of outer temperature and user and the difference of the target temperature are bigger, then the running temperature of air-conditioning then can be lower;If room The shell temperature of outer temperature and user and the difference of the target temperature are smaller, then the running temperature of air-conditioning can be higher but still can Lower than target temperature, to be based on above-mentioned two parameter, the running temperature of the air-conditioning can be determined.
Optionally, air-conditioning can also obtain indoor humidity, and the indoor humidity is compared with preset humidity range, It determines the need for opening humidification mode, or opens dehumidification mode.
Further, as another embodiment of the present invention, the transformation model of the air-conditioning output power specifically:
Wherein, the PIt is practicalFor the output power of air-conditioning;The N is the current number;The T1For outdoor temperature;Institute State T2For the average shell temperature;The δ is preset regulation coefficient;The PBenchmarkThe reference output power of the air-conditioning.
In the present embodiment, air-conditioning can determine whether the difference of outdoor temperature and the average shell temperature of user, if above-mentioned difference is got over Greatly, then it represents that the comfort level of user is lower, needs to adjust room temperature by increasing power at this time, to adjust user's as early as possible Comfort level;If above-mentioned difference is smaller, then it represents that the comfort level of user is higher, can suitably reduce power at this time, realizes energy-efficient Effect.
In the present embodiment, air-conditioning can also determine that a weighting coefficient, the weighting coefficient are according to current numberDue to the characteristic of tanh (δ N) function be when number is lower, numerical value can less than 1, and it is fewer in number in the case where Usually air-conditioning is in the stage just opened, and room temperature and ambient temperature keep maintaining an equal level substantially at this time, therefore air-conditioning is defeated Power cannot be too low out, avoids the overlong time of adjustment temperature, therefore can just make up by the characteristic of tanh (δ N) function The problem of above situation, when fewer in number, tanh (δ N) value less than 1, can guarantee that output power is unlikely to too low, and work as number When more, the numerical value meeting approximation 1 of tanh (δ N), to guarantee that direct proportion increase can be presented in output power with the increase of number Relationship, meet the adjustment demand of practical air-conditioning.
In embodiments of the present invention, air-conditioning can determine one by the number of outdoor temperature, average shell temperature and user A weighting coefficient, and reference output power is weighted based on the weighting coefficient, determine current suitable output power, The purpose for realizing the dynamic adjustment of air-conditioning output power, improves the efficiency of air-conditioning parameter adjustment.
In S103, ratio between each user density is calculated, and determine the pendulum leaf each based on the ratio The residence time of a swing angle.
In the present embodiment, the pendulum leaf of air-conditioning is not at the uniform velocity swung, but can include according in different fan-shaped regions User density determines pendulum leaf in the residence time of the corresponding predetermined angle in each fan-shaped region.Specifically, air-conditioning obtains each fan The mode of the user density in shape region can be with are as follows: for air-conditioning for example, by ultrasonic wave sending and receiving module or infrared induction module, obtaining should User profile in room, and the area covered based on the user profile and each fan-shaped region, determine the sector The number of area's intra domain user, so that it is determined that the user density.
In the present embodiment, define air-conditioning pendulum leaf swing round trip in swingable range needed for the time be one Swing period, therefore the pendulum leaf of air-conditioning can be calculated in the residence time of default swing angle according to the user density and swing period It obtains, specific calculating process is as follows:
Wherein, T (i) is to put leaf in the residence time of the corresponding swing angle in i-th of fan-shaped region;ρiFor i-th of sector The user density in region;T is swing period;N is the number of fan-shaped region.
Illustratively, Fig. 2 is the schematic diagram for the air conditioning exhausting overlay area that one embodiment of the invention provides.Institute referring to fig. 2 Show, SAlwaysFor the total overlay area of air conditioning exhausting;S1~S4It is pendulum leaf in the fan section that four default swing angle when institute's outlet air are formed Domain.Wherein, S1~S4The number of user be respectively 2,1,3 and 1.User based on above-mentioned each fan-shaped region Number and the area coverage of fan-shaped region, can determine the user density of each fan-shaped region, to obtain each preset The residence time of swing angle.Such as the area of each fan-shaped region is 1 square metre, then the user of aforementioned four fan-shaped region Density chalk are as follows: 2 people/m2, 1 people/m2, 3 people/m2And 1 people/m2.If swing period is 14s,
In S104, controls the air-conditioning and run with the output power and the residence time.
In the present embodiment, air-conditioning is determining output power and after the residence time of each fan-shaped region, then base Operation of air conditioner is controlled in the value of above-mentioned two parameter, if also determining other than determining the output power of air-conditioning certainly in S103 Output temperature and dehumidifying moistening function whether is opened, then the number of this secondary control operating parameter is four.
Above as can be seen that a kind of control method of air-conditioning provided in an embodiment of the present invention by obtaining air-conditioning place automatically The environmental parameter in room, and the output power of the air-conditioning is determined based on environmental parameter and puts leaf in each fan-shaped region Residence time, and operation of air conditioner is controlled based on above-mentioned parameter, it manually adjusts, can be closed according to current environment configurations without user Suitable operating parameter reduces unnecessary energy consumption, realizes energy-efficient purpose.
Fig. 3 shows the specific implementation flow of the control method S101 of air-conditioning of second embodiment of the invention offer a kind of Figure.Shown in Figure 3, relative to embodiment described in Fig. 1, S101 includes in a kind of control method of air-conditioning provided in this embodiment S1011~S1012, specific details are as follows:
In S1011, the action space is passed in and out for detecting user if detecting and being set in the action space The quantity of electric charge of at least two groups electrode plate in electrode plate groups jumps, then when obtaining the corresponding jump of every group of electrode plate Between;Wherein, mutually indepedent between every group of electrode plate and isolation, every group of electrode plate includes two electrodes being oppositely arranged Plate, and the distance between every group of electrode plate and described air-conditioning value are different.
In the present embodiment, electrode plate groups have can be set in action space, which makees for detecting user and passing in and out With space, i.e. user can go together between each group of electrode plate in electrode plate groups, by changing Jie between each group electrode plate Electric constant has detected whether that user passes in and out action space.Specifically, which may be disposed at the entrance of institute's action space Doorframe on.It include at least two groups electrode plate in the electrode plate groups, in the present embodiment with first group of electrode plate and second group Electrode plate is named.Every group of electrode plate includes two electrode plates being oppositely arranged, if this group of electrode plate is set on doorframe, Two electrode plates of this group of electrode plate can be respectively arranged on the opposite side of doorframe, constituted the structure of a similar capacitor, needed Illustrate, every group of electrode plate is in independent DC circuit, when connecting the switch of the DC circuit, on this group of electrode plate Each electrode plate can assemble certain quantity of electric charge.For ease of description, two electricity for including on first group of electrode plate are now limited Pole plate is respectively first electrode plate and second electrode plate, and two electrode plates for including on second group of electrode plate are respectively third electricity Pole plate and the 4th electrode plate.Since when nobody passes through, the medium between first electrode plate and second electrode plate is air, The quantity of electric charge is to maintain stable.However human body is that have certain conduction property, it is not identical as the dielectric constant of air, if User passes through between first electrode plate and second electrode plate when passing in and out doorframe, then can change first electrode plate and second electrode The dielectric constant of dielectric between plate will do it the process of charge or discharge so as to cause two electrode plates, change two electricity The quantity of electric charge on pole plate.As a same reason, features described above can also equally will appear for third electrode plate and the 4th electrode plate.Base In above-mentioned principle, whether air-conditioning can be sent out by the quantity of electric charge on the quantity of electric charge and second group of electrode plate of first group of electrode plate of detection Raw jump, determines whether someone by doorframe, judges whether the number of air-conditioning action space is changed.
In the present embodiment, due to not identical as the distance between air-conditioning between every group of electrode plate, that is, there is one group of electrode Plate can be closer apart from outdoor, and another group of electrode plate distance is indoor closer, thus the bound-time of the electrode plate based on different groups, Can then determine that user is from the outside into the room, or be walk out from interior to outdoor, therefore, it is determined that be to user number into Row increases operation or reduces operation.
Fig. 4 shows the placement schematic diagram of four electrode plates on a kind of doorframe provided in an embodiment of the present invention.Institute referring to fig. 4 Show, the plate face of first electrode plate and second electrode plate be it is relative to each other, a capacitor can be seemed, constitute first group of electrode plate, And opposite second group of electrode plate, i.e., another group of electrode plate being made of third electrode plate and the 4th electrode plate, is to be closer to It is indoor;And the plate face of third electrode plate and the 4th electrode plate be also it is relative to each other, relative to first electrode plate and second electricity Outdoor is closer to for pole plate.Certainly, above-mentioned 4 electrode plates are placed in the left and right sides of doorframe in Fig. 4, but not It is limited to this, first electrode plate and second electrode plate can be placed on two opposite side up and down of doorframe, at this point, third electrode plate and the Four electrode plates can be both placed on two opposite side of left and right of doorframe, can also be placed on two opposite side up and down, as long as guaranteeing third Electrode plate and the 4th electrode plate are proximate to outdoor for first electrode plate and second electrode plate, i.e., apart from air-conditioning Distance is farther out.
In the present embodiment, the DC circuit of first electrode plate and second electrode plate is equipped with an electric charge induction module, should Electric charge induction module is used to detect the size of the quantity of electric charge of first electrode plate and/or second electrode plate, when electric charge induction module is examined When measuring the quantity of electric charge of first electrode plate and/or second electrode plate and changing, i.e., a charge jump instruction is sent to air-conditioning, After air-conditioning receives the charge jump instruction, then identify that the quantity of electric charge of the first electrode plate changes, and electricity will be received Record has the first bound-time at the time of lotus jump instruction.Similarly, detection the third electrode plate quantity of electric charge with the presence or absence of jump and Obtain that the case where mode of the second bound-time is with above-mentioned discussion is identical, and details are not described herein.Certainly, if air-conditioning is to be placed in door Near frame, then air-conditioning can also directly with the DC circuit and third electrode plate where first electrode plate where another direct current Circuit is connected directly, and by the signal input waveform for the pin connecting respectively with two DC circuits, is determined whether there is and is similar to The input waveform of pulse signal determines whether the case where there are quantity of electric charge jumps.
In S1012, the bound-time based on each group electrode plate count user in the action space when the one before Number.
In the present embodiment, detection of air-conditioning is to the first bound-time earlier than the second bound-time, then it represents that there are user from To outdoor, i.e., indoor number reduces indoor moving, it is therefore desirable to be adjusted to the number of indoor user.
In the present embodiment, detection of air-conditioning is later than the second bound-time to the first bound-time, then it represents that there are user from Outdoor is moved to interior, i.e., indoor number increases, and the number to user in action space is needed to be adjusted.
In embodiments of the present invention, by the way that two arrays of electrodes plate is arranged on the doorframe of action space, and based on electrode plate Quantity of electric charge variation, determine whether to enter there are user or leave air-conditioning action space, to realize the number to indoor user Increase adjustment is carried out, compared with the technology of existing occupancy identification, cost of manufacture is lower, and is transformed more convenient, adds Add 4 electrode plates, reduces the cost of air-conditioning provided by the invention.
Fig. 5 shows the specific implementation flow of the control method S1012 of air-conditioning of third embodiment of the invention offer a kind of Figure.It is shown in Figure 5, relative to embodiment described in Fig. 3, S1012 packet in a kind of control method of air-conditioning provided in this embodiment Following steps are included, specific details are as follows:
In S501, whether the first bound-time is detected earlier than the second bound-time.
In S502, if earlier than second group electrode plate of the first bound-time of first group of electrode plate in the electrode plate groups The second bound-time, then obtain first group of electrode plate in first quantity of electric charge of first jumping moment.
In the present embodiment, what air-conditioning received can be the change curve of the quantity of electric charge of first electrode plate, in the feelings Under condition, air-conditioning can obtain the peak value in the quantity of electric charge of the first jumping moment first electrode plate, and the corresponding numerical value of the peak value is made For first quantity of electric charge.When due to by region between first electrode plate and second electrode plate, charge and discharge caused by number difference The degree of electricity is also different, and the numerical value for being reflected in i.e. jumping moment first quantity of electric charge on the quantity of electric charge can be different.Therefore, air-conditioning can be with By obtaining the size of first quantity of electric charge, the jumping moment is determined, while it is specially how many to leave indoor number.
Certainly, other than the change curve, air-conditioning according to be the mode being directly accessed pin on DC circuit First electrode plate is detected with the presence or absence of jump, the then letter of the class pulse signal occurred when can jump based on first electrode plate Number amplitude is converted to the quantity of electric charge, as first quantity of electric charge.
In S503, the reduction number of user's reduction is determined based on first quantity of electric charge, and according to the reduction number Adjust the current number of user in the action space;The first distance value of first group of electrode plate and the air-conditioning is less than institute State the second distance value of second group of electrode plate.
In the present embodiment, air-conditioning is preset with the mapping table of the jump quantity of electric charge and current number, is obtaining first After the quantity of electric charge, the number of this number of passing through can be inquired by the mapping table, using the number of the passage number as use The reduction number of family reduction, and the number of user in action space is correspondingly reduced, realize the mesh of the number of adjustment user in real time 's.
In S504, if first bound-time is later than second bound-time, second group of electrode is obtained Second quantity of electric charge of the plate in second jumping moment.
In the present embodiment, since the implementation of S504 is identical with the implementation of S502, design parameter can join See the associated description of S502, details are not described herein.
In S505, the increased increase number of user is determined based on second quantity of electric charge, and according to the increase number Adjust the current number of user in the action space.
In the present embodiment, it should be noted that, still can be with when S505 inquires second quantity of electric charge corresponding increase number Using the mapping table of the jump quantity of electric charge and current number, particularly, if the electricity that first electrode plate and second electrode plate are constituted Capacitance and the third electrode plate for holding structure are identical as the capacitance of capacitance structure that the 4th electrode plate is constituted, it is determined that increase Add the mapping table of number and determine that the mapping table for reducing number is identical, therefore in this case, air-conditioning can Only to save a mapping table.Certainly, if the capacitance not phase for the capacitance structure that above-mentioned two pairs of electrodes plate is constituted Together, then air-conditioning needs to obtain two mapping tables to match with the capacitance of two pairs of electrodes plate, so that it is determined that increasing number And reduce number.
In the present embodiment, air-conditioning can determine second by inquiring mapping table after second quantity of electric charge has been determined Increase number corresponding to the quantity of electric charge, and correspondingly in increasing action space user number, realize in real time adjustment user Several purposes.
In embodiments of the present invention, it by obtaining the quantity of electric charge of jumping moment, determines current number, realizes accurate adjustment The purpose of the number of user in action space, improves the accuracy rate of control.
Fig. 6 shows a kind of specific implementation flow chart of the control method of air-conditioning of fourth embodiment of the invention offer.Ginseng As shown in Figure 6, relative to embodiment described in Fig. 1 to Fig. 5, a kind of control method of air-conditioning provided in this embodiment is in the acquisition Before the environmental parameter of air-conditioning action space, further includes: S601~S603, specific details are as follows:
In S601, the room temperature of presently described action space is obtained at predetermined intervals.
In the present embodiment, if air-conditioning is in standby or off-mode, air-conditioning can obtain at predetermined intervals works as The room temperature of preceding action space, and the room temperature is compared with preset start-up temperature, determine whether Current Temperatures Whether the entry condition of air-conditioning is met.If current room temperature is less than or equal to preset start-up temperature, shape is remained turned off State or standby mode certainly, can also be by obtaining current room temperature, with preset starting when air-conditioning is in starting Temperature is compared, and is determined a need for closing air-conditioning running, is reduced the consumption of energy;Conversely, being preset if room temperature is greater than Start-up temperature, then need further to judge with the presence or absence of user in the action space of current air-conditioning, therefore execute the phase of S602 Close operation.
In S602, if the room temperature outside preset temperature range, obtains user in the action space Current number.
In the present embodiment, if air-conditioning detects that indoor temperature is greater than preset start-up temperature, then it represents that current indoor Temperature it is higher, it may be necessary to cooled down by air-conditioning.In this case, air-conditioning can determine whether of user in the action space Number, and the number of the user is compared with preset starting number, it is determined whether meet number entry condition.If user's Number is less than or equal to preset starting number, then air-conditioning is kept to be in standby or off-mode;Conversely, if the number of user is big In preset starting number, then the relevant operation of S603 is executed.
Preferably, the preset starting number be 0, when in action space have at least one user and room temperature is higher When, then start air-conditioning;If user is not present in action space, also air-conditioning is kept to be in shutdown or standby even if room temperature is higher State avoids the unnecessary wasting of resources.
In S603, if the current number is greater than preset starting number, start the air-conditioning, and it is empty to execute acquisition Adjust the operation of the environmental parameter of action space.
In the present embodiment, after the user's number for detecting the interior space is greater than preset starting number, and it is current Room temperature then start the air-conditioning also above start-up temperature, and obtain other environmental parameters, realize adjust automatically operation of air conditioner The purpose of parameter.
In embodiments of the present invention, by setting temperature entry condition and number entry condition, realize that air-conditioning opens automatically It is dynamic, and will not result in waste of resources, improve the energy-saving efficiency of air-conditioning.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Fig. 7 shows a kind of structural block diagram of air-conditioning of one embodiment of the invention offer, and each unit which includes is used Each step in the corresponding embodiment of execution Fig. 1.Referring specifically to the associated description in embodiment corresponding to Fig. 1 and Fig. 1. For ease of description, only the parts related to this embodiment are shown.
Referring to Fig. 7, the air-conditioning includes:
Environmental parameter acquiring unit 71, the environmental parameter of the action space for obtaining air-conditioning;The environmental parameter includes: In outdoor temperature, the action space in the current number, the action space of user user average shell temperature, Yi Jisuo State the user density in each fan-shaped region of air conditioning exhausting formation;Wherein, each fan-shaped region specifically: the air-conditioning Pendulum leaf be located at the outlet air region formed when each preset swing angle;
Output power calculates unit 72, for by the outdoor temperature, the average shell temperature and described working as the one before Number imported into the transformation model of air-conditioning output power, determines the output power of the air-conditioning;
Residence Time Calculation unit 73, for calculating ratio between each user density, and it is true based on the ratio Residence time of the fixed pendulum leaf in each swing angle;
Conditioning control unit 74 is run for controlling the air-conditioning with the output power and the residence time.
Optionally, environmental parameter acquiring unit 71 includes:
Bound-time acquiring unit, if being set in the action space for detecting for detecting described in user's disengaging The quantity of electric charge of at least two groups electrode plate in the electrode plate groups of action space jumps, then it is respectively right to obtain every group of electrode plate The bound-time answered;Wherein, mutually indepedent between every group of electrode plate and isolation, every group of electrode plate include two opposite The electrode plate of setting, and the distance between every group of electrode plate and described air-conditioning value are different;
Current number statistic unit counts the current number for the bound-time based on each group electrode plate.
Optionally, current number statistic unit, comprising:
First quantity of electric charge acquiring unit, if the first bound-time for first group of electrode plate in the electrode plate groups is early In the second bound-time of second group of electrode plate, then first group of electrode plate is obtained in the first electricity of first jumping moment Lotus amount;
Number determination unit is reduced, for determining the reduction number of user's reduction based on first quantity of electric charge, and according to The reduction number adjusts the current number;The first distance value of first group of electrode plate and the air-conditioning is less than described the The second distance value of two groups of electrode plates;
Second quantity of electric charge acquiring unit obtains if being later than second bound-time for first bound-time Second quantity of electric charge of the second group of electrode plate in second jumping moment;
Increase number determination unit, for determining the increased increase number of user based on second quantity of electric charge, and according to The increase number adjusts the current number.
Optionally, the transformation model of the air-conditioning output power specifically:
Wherein, the PIt is practicalFor the output power of air-conditioning;The N is the current number;The T1For outdoor temperature;Institute State T2For the average shell temperature;The δ is preset regulation coefficient;The PBenchmarkThe reference output power of the air-conditioning.
Optionally, the air-conditioning further include:
Room temperature acquiring unit, for obtaining the room temperature of presently described action space at predetermined intervals;
Current number determination unit, if obtaining the effect outside preset temperature range for the room temperature The current number of user in space;
Starting of air conditioner unit starts the air-conditioning, and hold if being greater than preset starting number for the current number Row obtains the operation of the environmental parameter of air-conditioning action space.
Therefore, air-conditioning provided in an embodiment of the present invention equally may not need user and manually adjust, can be according to current ring Border configures suitable operating parameter, reduces unnecessary energy consumption, realizes energy-efficient purpose.
Fig. 8 be another embodiment of the present invention provides a kind of air-conditioning schematic diagram.As shown in figure 8, the air-conditioning 8 of the embodiment Include: processor 80, memory 81 and is stored in the calculating that can be run in the memory 81 and on the processor 80 Machine program 82, such as the control program of air-conditioning.The processor 80 realizes above-mentioned each sky when executing the computer program 82 Step in the control method embodiment of tune, such as S101 shown in FIG. 1 to S104.Alternatively, the processor 80 execute it is described The function of each unit in above-mentioned each Installation practice, such as the function of module 71 to 74 shown in Fig. 7 are realized when computer program 82.
Illustratively, the computer program 82 can be divided into one or more units, one or more of Unit is stored in the memory 81, and is executed by the processor 80, to complete the present invention.One or more of lists Member can be the series of computation machine program instruction section that can complete specific function, and the instruction segment is for describing the computer journey Implementation procedure of the sequence 82 in the air-conditioning 8.For example, the computer program 82, which can be divided into environmental parameter, obtains list Member, output power calculating unit, residence Time Calculation unit and conditioning control unit, each unit concrete function are as described above.
The air-conditioning may include, but be not limited only to, processor 80, memory 81.It will be understood by those skilled in the art that figure 8 be only the example of air-conditioning 8, does not constitute the restriction to air-conditioning 8, may include components more more or fewer than diagram, or Combine certain components or different components, for example, the air-conditioning can also include input-output equipment, network access equipment, Bus etc..
Alleged processor 80 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 81 can be the internal storage unit of the air-conditioning 8, such as the hard disk or memory of air-conditioning 8.It is described Memory 81 is also possible to the External memory equipment of the air-conditioning 8, such as the plug-in type hard disk being equipped on the air-conditioning 8, intelligence Storage card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) Deng.Further, the memory 81 can also both include the internal storage unit of the air-conditioning 8 or set including external storage It is standby.The memory 81 is for other programs and data needed for storing the computer program and the air-conditioning.It is described to deposit Reservoir 81 can be also used for temporarily storing the data that has exported or will export.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (8)

1. a kind of control method of air-conditioning characterized by comprising
Obtain the environmental parameter of the action space of air-conditioning;The environmental parameter includes: outdoor temperature, user in the action space Current number, each fan section that the average shell temperature and the air conditioning exhausting of user are formed in the action space User density in domain;Wherein, each fan-shaped region specifically: the pendulum leaf of the air-conditioning is located at each preset angle of oscillation The outlet air region formed when spending;
The outdoor temperature, the average shell temperature and the current number are imported into the modulus of conversion of air-conditioning output power Type determines the output power of the air-conditioning;The transformation model of the air-conditioning output power specifically:
Wherein, the PIt is practicalFor the output power of air-conditioning;The N is the current number;The T1For outdoor temperature;The T2For The average shell temperature;The δ is preset regulation coefficient;The PBenchmarkFor the reference output power of the air-conditioning;
Ratio between each user density is calculated, and determines the pendulum leaf in each swing angle based on the ratio Residence time;
The air-conditioning is controlled to run with the output power and the residence time.
2. control method according to claim 1, which is characterized in that the environmental parameter for obtaining air-conditioning action space, Include:
It is passed in and out in the electrode plate groups of the action space extremely if detecting and being set in the action space for detecting user The quantity of electric charge of few two arrays of electrodes plate jumps, then obtains every group of corresponding bound-time of electrode plate;Wherein, described every Mutually indepedent and be isolated between group electrode plate, every group of electrode plate includes two electrode plates being oppositely arranged, and every group of electrode The distance between plate and air-conditioning value is different;
The current number of user in the action space is counted based on the bound-time of each group electrode plate.
3. control method according to claim 2, which is characterized in that the bound-time based on each group electrode plate Count the current number, comprising:
If second of the first bound-time of first group of electrode plate in the electrode plate groups earlier than second group of electrode plate jumps Between, then first group of electrode plate is obtained in first quantity of electric charge of first bound-time;
The reduction number of user's reduction is determined based on first quantity of electric charge, and the effect sky is adjusted according to the reduction number The current number of interior user;The first distance value of first group of electrode plate and the air-conditioning is less than second group of electrode plate Second distance value;
If first bound-time is later than second bound-time, obtains second group of electrode plate and jumped described second Become second quantity of electric charge at moment;
The increased increase number of user is determined based on second quantity of electric charge, and the effect sky is adjusted according to the increase number The current number of interior user.
4. control method according to claim 1-3, which is characterized in that in the acquisition air-conditioning action space Before environmental parameter, comprising:
The room temperature of presently described action space is obtained at predetermined intervals;
If the room temperature outside preset temperature range, obtains the current number of user in the action space;
If the current number is greater than preset starting number, start the air-conditioning, and executes and obtain air-conditioning action space The operation of environmental parameter.
5. a kind of air-conditioning, which is characterized in that the air-conditioning include memory, processor and storage in the memory and can The computer program run on the processor, the processor realize following steps when executing the computer program:
Obtain the environmental parameter of the action space of air-conditioning;The environmental parameter includes: outdoor temperature, user in the action space Current number, each fan section that the average shell temperature and the air conditioning exhausting of user are formed in the action space User density in domain;Wherein, each fan-shaped region specifically: the pendulum leaf of the air-conditioning is located at each preset angle of oscillation The outlet air region formed when spending;
The outdoor temperature, the average shell temperature and the current number are imported into the modulus of conversion of air-conditioning output power Type determines the output power of the air-conditioning;The transformation model of the air-conditioning output power specifically:
Wherein, the PIt is practicalFor the output power of air-conditioning;The N is the current number;The T1For outdoor temperature;The T2For The average shell temperature;The δ is preset regulation coefficient;The PBenchmarkFor the reference output power of the air-conditioning;
Ratio between each user density is calculated, and determines the pendulum leaf in each swing angle based on the ratio Residence time;
The air-conditioning is controlled to run with the output power and the residence time.
6. air-conditioning according to claim 5, which is characterized in that the environmental parameter for obtaining air-conditioning action space, comprising:
It is passed in and out in the electrode plate groups of the action space extremely if detecting and being set in the action space for detecting user The quantity of electric charge of few two arrays of electrodes plate jumps, then obtains every group of corresponding bound-time of electrode plate;Wherein, described every Mutually indepedent and be isolated between group electrode plate, every group of electrode plate includes two electrode plates being oppositely arranged, and every group of electrode The distance between plate and air-conditioning value is different;
The current number of user in the action space is counted based on the bound-time of each group electrode plate.
7. air-conditioning according to claim 6, which is characterized in that the bound-time statistics based on each group electrode plate The current number, comprising:
If second of the first bound-time of first group of electrode plate in the electrode plate groups earlier than second group of electrode plate jumps Between, then first group of electrode plate is obtained in first quantity of electric charge of first bound-time;
The reduction number of user's reduction is determined based on first quantity of electric charge, and the effect sky is adjusted according to the reduction number The current number of interior user;The first distance value of first group of electrode plate and the air-conditioning is less than second group of electrode plate Second distance value;
If first bound-time is later than second bound-time, obtains second group of electrode plate and jumped described second Become second quantity of electric charge at moment;
The increased increase number of user is determined based on second quantity of electric charge, and the effect sky is adjusted according to the increase number The current number of interior user.
8. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of any one of such as Claims 1-4 of realization the method.
CN201810167293.0A 2018-02-28 2018-02-28 A kind of control method and air-conditioning of air-conditioning Active CN108444052B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810167293.0A CN108444052B (en) 2018-02-28 2018-02-28 A kind of control method and air-conditioning of air-conditioning
PCT/CN2018/083289 WO2019165686A1 (en) 2018-02-28 2018-04-17 Control method for air conditioner and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810167293.0A CN108444052B (en) 2018-02-28 2018-02-28 A kind of control method and air-conditioning of air-conditioning

Publications (2)

Publication Number Publication Date
CN108444052A CN108444052A (en) 2018-08-24
CN108444052B true CN108444052B (en) 2019-05-07

Family

ID=63192790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810167293.0A Active CN108444052B (en) 2018-02-28 2018-02-28 A kind of control method and air-conditioning of air-conditioning

Country Status (2)

Country Link
CN (1) CN108444052B (en)
WO (1) WO2019165686A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109556253B (en) * 2018-10-18 2020-01-17 珠海格力电器股份有限公司 Control method, device and equipment for courtyard machine
CN110658380B (en) * 2019-10-09 2021-09-28 广东美的制冷设备有限公司 Power detection method and device, air conditioner and storage medium
CN113375300A (en) * 2020-03-09 2021-09-10 青岛海尔空调器有限总公司 Intelligent control method and intelligent control equipment of air conditioner
CN112648712A (en) * 2020-10-28 2021-04-13 青岛海尔空调器有限总公司 Air conditioner indoor unit and configuration method of air supply area thereof
CN114484804B (en) * 2022-02-09 2023-02-17 珠海格力电器股份有限公司 Air conditioner control method, air conditioner, electronic device and storage medium
CN114963413B (en) * 2022-04-21 2023-07-04 日立楼宇技术(广州)有限公司 Control method, device, equipment and storage medium of air conditioner
CN115218407A (en) * 2022-06-22 2022-10-21 青岛海尔空调器有限总公司 Control method and device of indoor unit and air conditioner
CN115789885B (en) * 2023-02-08 2023-04-25 南通联恒新材料有限公司 Air treatment system for large scale

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001153431A (en) * 1999-12-01 2001-06-08 Matsushita Electric Ind Co Ltd Wind direction control method for air-conditioner
WO2009098847A1 (en) * 2008-02-08 2009-08-13 Panasonic Corporation Air conditioner
CN106482287B (en) * 2015-08-31 2019-07-02 青岛海尔空调电子有限公司 A kind of method and air-conditioning wind direction control method that heat source is positioned using infrared signal
CN105890121B (en) * 2016-05-09 2019-03-08 珠海格力电器股份有限公司 Air conditioner control method and device and air conditioner
CN106440193A (en) * 2016-09-19 2017-02-22 广东美的制冷设备有限公司 Air conditioner and collecting assembly, control structure, adjusting system and adjusting method of air conditioner
CN106545976B (en) * 2016-12-08 2020-06-23 美的集团武汉制冷设备有限公司 Air conditioner and air speed control method thereof
CN106931601B (en) * 2017-03-23 2019-09-17 中国联合网络通信集团有限公司 Air-conditioning temperature control method and air-conditioning temperature-controlling system
CN107255307B (en) * 2017-05-24 2020-02-04 青岛海尔空调器有限总公司 Air conditioner
CN107300242A (en) * 2017-06-14 2017-10-27 珠海格力电器股份有限公司 Air conditioner control method and device
CN107367016B (en) * 2017-06-21 2019-10-11 珠海格力电器股份有限公司 Intelligent control method and device for air conditioner and air conditioner
CN107631423B (en) * 2017-08-18 2019-12-03 青岛海尔空调器有限总公司 A kind of air-conditioner control method and air conditioner based on position of human body

Also Published As

Publication number Publication date
WO2019165686A1 (en) 2019-09-06
CN108444052A (en) 2018-08-24

Similar Documents

Publication Publication Date Title
CN108444052B (en) A kind of control method and air-conditioning of air-conditioning
CN106545956B (en) Control method and device of fresh air machine
CN104374042B (en) Air conditioner load control method and system
CN103982986B (en) Air-conditioner and comfortable control method thereof and device
CN108426348A (en) Floor air conditioner and its control method and computer readable storage medium
CN101048624A (en) System and method for zone heating and cooling
CN101393570A (en) Operation emulation system for central air-conditioning
CN106352506A (en) Air conditioner and automatic control method thereof
WO2016022730A1 (en) Occupancy-based service delivery systems and methods
CN206234965U (en) Air-conditioning networking linked system
WO2022252672A1 (en) Control method and apparatus for air conditioning, and household appliance
CN106091232A (en) Air speed control method and device for air conditioner and air conditioning system
US20160290673A1 (en) Apparatus and method for adaptively applying central hvac system and individual hvac system
CN209588261U (en) A kind of controlling machine room temperature energy saver
CN103884083B (en) A kind of energy-saving environment protection intelligent air conditioning system and working method thereof
CN105202694A (en) Air conditioner control method
CN107014042A (en) Air conditioner control method and system
CN201589371U (en) Temperature-adjusting device based on physical activity level detection and system thereof
CN106500274A (en) The energy conserving system that is implemented in VAV systems by wireless sensor network and method
CN115451556A (en) Intelligent control system and method for household central air conditioner
WO2022160979A1 (en) Control method and apparatus for air conditioner, and electronic device and storage medium
CN105202624A (en) Household wireless intelligent and stepless adjusting temperature control system
CN110513820A (en) Air conditioning control method, control device and air conditioner
CN109084425A (en) Air conditioner and its control method and computer readable storage medium
CN110131849A (en) Control method and device for air-conditioning system, the control method and device for air-conditioning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant