CN108412221A - A kind of aging blocks install the passage unobstructed construction of elevator additional - Google Patents

A kind of aging blocks install the passage unobstructed construction of elevator additional Download PDF

Info

Publication number
CN108412221A
CN108412221A CN201810214567.7A CN201810214567A CN108412221A CN 108412221 A CN108412221 A CN 108412221A CN 201810214567 A CN201810214567 A CN 201810214567A CN 108412221 A CN108412221 A CN 108412221A
Authority
CN
China
Prior art keywords
elevator
aging blocks
install
construction
resident family
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810214567.7A
Other languages
Chinese (zh)
Inventor
龚辉
蓝樯
赵婧
金勇�
孙杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zheng Hua Architectural Design Co Ltd
Original Assignee
Beijing Zheng Hua Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zheng Hua Architectural Design Co Ltd filed Critical Beijing Zheng Hua Architectural Design Co Ltd
Priority to CN201810214567.7A priority Critical patent/CN108412221A/en
Publication of CN108412221A publication Critical patent/CN108412221A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • E04H1/04Apartment houses arranged in two or more levels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses the passage unobstructed constructions that a kind of aging blocks install elevator additional, it is related to installing elevator technology field additional, its key points of the technical solution are that including the elevator being arranged on the outside of aging blocks, it is both provided with the elevator hall for being connected to the two for every layer between the elevator and aging blocks, the height of the elevator hall is corresponding with each door opening height of floor resident family respectively, the bench of former double race stair and the half space dismounting positioned at half storey in aging blocks, it is changed to straight stair and horizontal corridor, resident family doorway is located at same floor absolute altitude with elevator hall and horizontal corridor.The aging blocks of the present invention install additional elevator resident family can be made to take elevator is front and back not to have to half storey stair of going further, realize barrier free accessibility, facilitate different as wheelchair class user can come in and go out freedom.Using unique construction scheme, it also can guarantee construction period resident family's energy safe passing, reduce a series of problems, such as moving outside placement caused by constructing to resident family.

Description

A kind of aging blocks install the passage unobstructed construction of elevator additional
Technical field
The present invention relates to elevator technology field is installed additional, more particularly to a kind of aging blocks install elevator additional.
Background technology
Domestic multilayer(6 layers and be less than 6 layers)Residential building also has comparable quantity, with resident population aging it is upper It rises, stair have constituted the obstacle of trip for the inconvenient people of old man and trip.But the resident built is covered in the 80s and 90s Till now also in effective service life, reconstructed cost of dismantling is too high in building, and waste is also resulted in resource;Based on this present situation, Installing elevator additional to old-fashioned tier building becomes a kind of necessary trend.
The patent document that the existing day for announcing is 2011.12.14, notification number is CN202072374U discloses a kind of multi-story Room installs elevator additional, and elevator is mounted on into the other side of corridor, remaining hoistway door is located at turning platforms at different levels.
Although can be by the way that downstairs, elevator in-position is the stair turning platform between two layers, goes out elevator on elevator Afterwards, half storey of going further also is needed, entrance is got to.For the inconvenient old man for even needing to go out by wheelchair of legs and feet, There is no fundamentally solve the problems, such as convenient building up and down.
Invention content
The purpose of the present invention is to provide the passage unobstructed constructions that a kind of aging blocks install elevator additional, it can use that electricity is taken at family It is terraced front and back without half storey stair of going further, it goes home or outgoing more convenient.
The present invention above-mentioned purpose one technical scheme is that:
A kind of aging blocks install elevator additional, including the elevator being arranged on the outside of aging blocks, are both provided with for every layer between the elevator and aging blocks By the two be connected to elevator hall, the height of the elevator hall is correspondings with each story height of floor resident family respectively, resident family doorway and The concordant horizontal corridor of height is built between elevator hall.
By using above-mentioned technical proposal, when user goes out, leaves and corresponding floor is moved to by horizontal corridor behind house Elevator hall on, corresponding floor is then raised or lowered to by elevator, or directly drop to one layer and go out again, when going home Same operation;User takes that elevator is front and back not to have to half storey stair of going further, and it is dumb or even lose fortune thoroughly to solve legs and feet Problem difficult downstairs on the old man of kinetic force is gone home or outgoing more convenient.
The present invention is further arranged to:Be between the doorway and horizontal corridor of the aging blocks resident family former building rest it is flat Platform is provided with positioned at the other side in horizontal corridor for the inclination ladder in this layer of resident family downstairs, the horizontal corridor and inclination ladder row Cloth is in each layer of aging blocks.
By using above-mentioned technical proposal, user by horizontal corridor and can tilt on ladder downstairs as usual, be independent of each other.
The present invention is further arranged to:The both sides of the elevator hall offer window.
By using above-mentioned technical proposal, increase ventilative property and translucency in elevator hall, when user being made to wait for elevator more Comfortably.
The present invention is further arranged to:Structure is gone along with sb. to guard him in the horizontal corridor and the side setting for tilting the separate aging blocks wall of ladder Part.
By using above-mentioned technical proposal, pedestrian is protected, when stair activity is safer.
The present invention is further arranged to:The elevator includes hoistway holder, and the elevator hall is arranged on floor holder, building Layer holder is equipped with switch gate.
The present invention is further arranged to:The switch gate includes the outward swinging door being arranged on the floor holder of ground floor, It further include the inward swinging door on the floor holder being arranged more than the second layer.
By using above-mentioned technical proposal, switch gate is set as two layers inside and outside, and protective is more preferable.
The present invention above-mentioned purpose two technical scheme is that:A kind of aging blocks install the passage of elevator additional Unobstructed construction construction method, includes the following steps:S1, mechanical breaking aging blocks staircase exterior wall reinforce half space at floor Beam;S2, elevator and elevator hall are built, debugging elevator can normal operation;S3, aging blocks stair are removed since the top layer, remove Construction and installation predetermined level corridor and prefabricated inclination are terraced again afterwards, have often constructed one layer and have successively carried out down again.
By using above-mentioned technical proposal, half space beam is reinforced, ensure that the stability of existing building;It is original Stair are removed according to layer, make resident family of lower layer normal pass, are installed prefabricated horizontal corridor and are tilted ladder, to shorten construction period, subtract The inconvenience that Shaoshi work is brought to resident family;Horizontal corridor makes resident family's seating elevator is front and back not have to half storey stair of going further after completing installation, Barrier free accessibility is realized, is facilitated different as wheelchair class user can come in and go out freedom.Using unique construction scheme, can also protect Construction period resident family's energy safe passing is demonstrate,proved, a series of problems, such as moving outside placement caused by constructing to resident family is reduced.
The present invention is further arranged to:In S2, S3, when the resident family of construction period institute's construction floor will come in and go out, in elevator hall Interim aisle is set up between former half space.
By using above-mentioned technical proposal, interim aisle enables resident family smoothly to come in and go out in construction period, reduces because of construction The inconvenience brought to resident family.
In conclusion the invention has the advantages that:
1, by the way that elevator is arranged in the outside of aging blocks, horizontal corridor is built in the stair channel of aging blocks, user takes before and after elevator Without half storey stair of going further, thoroughly solve the problems, such as that legs and feet are dumb in addition the old man of loss of athletic ability on downstairs hardly possible, return Family is outgoing more convenient;
2, ladder is tilted by the side setting in horizontal corridor, user can be as usual by tilting on ladder downstairs, above and below elevator Building is independent of each other;
3, by horizontal corridor and tilting fender member being arranged on ladder, pedestrian is protected, when stair activity is safer.
Description of the drawings
Fig. 1 is the cooperation schematic diagram of aging blocks and elevator in embodiment 1;
Fig. 2 is horizontal corridor and the structural schematic diagram for tilting ladder in embodiment 1.
In figure, 1, aging blocks;11, horizontal corridor;12, ladder is tilted;13, half space;14, fender member;2, elevator;3, electric The terraced Room;31, window.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1:A kind of aging blocks install the passage unobstructed construction of elevator additional, as shown in Figure 1 and Figure 2, including are located at aging blocks 1 Elevator 2 on the outside of building doorway, elevator 2 include hoistway holder, are both provided between hoistway holder and aging blocks 1 and are connected to the two for every layer Elevator hall 3, the height of elevator hall 3 is corresponding with each door opening height of floor resident family, builds the concordant water of height between the two Flat corridor 11, is the half space 13 in former building between the doorway and horizontal corridor 11 of 1 resident family of aging blocks, horizontal corridor 11 it is another Side be provided in this layer of resident family downstairs inclination ladder 12, tilt ladder 12 be straight stair, horizontal corridor 11 and tilt ladder 12 according to Resident family's walking up and down in stair channel is realized in secondary arrangement.
Floor holder is equipped between adjacent elevator hall 3, floor holder is equipped with switch gate;Switch gate includes being arranged on ground Outward swinging door on the floor holder of face layer, further includes the inward swinging door on the floor holder being arranged more than the second layer.
The both sides of elevator hall 3 are further opened with the window 31 of C1222;Horizontal corridor 11 and inclination ladder 12 are double current ladder.
When building horizontal corridor 11 and tilting ladder 12, put down by the bench of the former double race stair of aging blocks 1 and positioned at the rest of half storey Platform is removed;The building of the 80s and 90s is mostly brick mix structure, and using brick wall come load-bearing, the components such as reinforced concrete beam column plate are constituted Mixed Architecture.Many walls are load-carrying members in brick mix structure, do not allow dismounting, so when removing original stair It needs to distinguish load bearing wall and non-load bearing wall, in order to avoid original structure intensity is impacted.
Horizontal corridor 11 and tilt that ladder 12 is prefabricated using armored concrete or steel, the bench of the former double race stair of aging blocks 1 and It has been removed positioned at the half space of half storey and then the horizontal corridor 11 to every layer and inclination ladder 12 is installed successively;It is horizontal Fender members 14 are arranged in the sides of corridor 11 and inclination ladder 12 far from wall.
When old man goes out, is moved in the elevator hall 3 of corresponding floor by horizontal corridor 11 after leaving house, then passed through Elevator 2 is raised or lowered to corresponding floor, or directly drops to one layer and go out again, is equally operated when going home;Old man Take that elevator 2 is front and back not to have to half storey stair of going further, thoroughly solve that legs and feet are dumb in addition the old man of loss of athletic ability above and below The problem of building hardly possible is gone home or outgoing more convenient;User can be independent of each other as usual by tilting on ladder 12 downstairs.
In the present invention that the change of stair is larger, construction organization is critically important, using construction scheme appropriate, can reduce A series of problems caused by constructing to resident family.
When aging blocks 1 install elevator 2 additional, properly protect measure in advance, ensures construction safety;It is old that mechanical breaking is first passed through when construction Then 1 staircase exterior wall of building reinforces the half space beam at floor, elevator 2 and elevator hall is built on the outside of 1 building doorway of aging blocks 3, after the completion of building to elevator 2 debug can normal operation, then from top layer open up remove 1 stair of aging blocks, remove Construction and installation predetermined level corridor 11 and prefabricated inclination terraced 12 again afterwards, has often constructed one layer and has successively carried out downwards again, construction period When the resident family of institute's construction floor will come in and go out, interim aisle can be set up between 2 Room of elevator and former half space 13, keep resident family smooth It comes in and goes out, the original stair that do not remove keep normal pass;Building waste caused by construction period is collected cleaning in time.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (10)

1. a kind of aging blocks install the passage unobstructed construction of elevator additional, it is characterised in that:Including the elevator being arranged on the outside of aging blocks (1) (2), between the elevator (2) and aging blocks (1) every layer be both provided with the elevator hall (3) for being connected to the two, the elevator hall (3) Height is corresponding with each story height of floor resident family respectively, and highly concordant water is built between resident family doorway and elevator hall (3) Flat corridor (11).
2. aging blocks according to claim 1 install the passage unobstructed construction of elevator additional, it is characterised in that:The aging blocks (1) It is the original half space of aging blocks (13) between the doorway of resident family and horizontal corridor (11), is located at the other side of horizontal corridor (11) It is provided with for the inclination ladder (12) in this layer of resident family downstairs, the horizontal corridor (11) is arranged in aging blocks (1) with terraced (12) are tilted Each layer in.
3. aging blocks according to claim 1 install the passage unobstructed construction of elevator additional, it is characterised in that:The elevator hall (3) both sides offer window (31).
4. aging blocks according to claim 2 install the passage unobstructed construction of elevator additional, it is characterised in that:The horizontal corridor (11) and terraced (12) are tilted as double current ladder.
5. aging blocks according to claim 2 install the passage unobstructed construction of elevator additional, it is characterised in that:The inclination ladder (12) it is straight stair.
6. aging blocks according to claim 2 install the passage unobstructed construction of elevator additional, it is characterised in that:The horizontal corridor (11) and fender member (14) is arranged in the side of inclination terraced (12) far from aging blocks (1) wall.
7. aging blocks according to claim 1 install the passage unobstructed construction of elevator additional, it is characterised in that:The elevator (2) Including hoistway holder, the elevator hall (3) is arranged on hoistway holder, and floor holder, building are equipped between adjacent elevator hall (3) Layer holder is equipped with switch gate.
8. aging blocks according to claim 7 install the passage unobstructed construction of elevator additional, it is characterised in that:The switch gate packet Include the outward swinging door being arranged on the floor holder of ground floor, further include on the floor holder being arranged more than the second layer in open Door.
9. a kind of aging blocks install the passage unobstructed construction construction method of elevator additional, it is characterised in that:Include the following steps:
S1, mechanical breaking aging blocks (1) staircase exterior wall reinforce half space beam at floor;
S2, elevator (2) and elevator hall (3) are built, debugging elevator (2) can normal operation;
S3, aging blocks (1) stair are removed since the top layer, construction and installation predetermined level corridor (11) and prefabricated inclinations are terraced again after dismounting (12), it has often constructed one layer and has successively carried out down again.
10. aging blocks according to claim 9 install the passage unobstructed construction of elevator additional, it is characterised in that:In S2, S3, apply When the resident family of institute's construction floor will come in and go out between duration, interim aisle is set up between elevator (2) Room and former half space (13), is made Family can smoothly come in and go out.
CN201810214567.7A 2018-03-15 2018-03-15 A kind of aging blocks install the passage unobstructed construction of elevator additional Pending CN108412221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810214567.7A CN108412221A (en) 2018-03-15 2018-03-15 A kind of aging blocks install the passage unobstructed construction of elevator additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810214567.7A CN108412221A (en) 2018-03-15 2018-03-15 A kind of aging blocks install the passage unobstructed construction of elevator additional

Publications (1)

Publication Number Publication Date
CN108412221A true CN108412221A (en) 2018-08-17

Family

ID=63131757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810214567.7A Pending CN108412221A (en) 2018-03-15 2018-03-15 A kind of aging blocks install the passage unobstructed construction of elevator additional

Country Status (1)

Country Link
CN (1) CN108412221A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386004A (en) * 2018-03-16 2018-08-10 航天建筑设计研究院有限公司 Elevator landing is registered one's residence building and method of construction
CN109025362A (en) * 2018-10-18 2018-12-18 广西大学 The plug-in installation elevator in the through former gate in aisle
CN109025359A (en) * 2018-10-08 2018-12-18 广西大学 The plug-in installation elevator in the through former gate of longitudinal Cantilever Beams support
CN109025358A (en) * 2018-09-29 2018-12-18 广西大学 A kind of installation elevator at through resident's original gate
CN109019256A (en) * 2018-10-18 2018-12-18 广西大学 First build the plug-in installation elevator in the through former gate in aisle
CN109019255A (en) * 2018-09-29 2018-12-18 广西大学 The new-type installation elevator at through resident's original gate
CN109052107A (en) * 2018-10-08 2018-12-21 广西大学 Center pillar wall supports the through plug-in installation elevator in resident's original gate
CN109081219A (en) * 2018-09-29 2018-12-25 广西大学 The installation elevator at through resident's original gate of center pillar support
CN109132792A (en) * 2018-09-29 2019-01-04 广西大学 The installation elevator at the through resident's original gate in slightly-inclined slope
CN109160402A (en) * 2018-09-29 2019-01-08 广西大学 Saving land used outside building can go directly the installation elevator at resident's original gate
CN109162481A (en) * 2018-11-08 2019-01-08 广西大学 The plug-in installation elevator in the through former gate in aisle is first built entirely
CN109162476A (en) * 2018-10-12 2019-01-08 广西大学 The through plug-in installation elevator method in resident's original gate
CN109184251A (en) * 2018-10-08 2019-01-11 广西大学 Double race stair lead to the plug-in installation elevator in former gate
CN109235920A (en) * 2018-10-12 2019-01-18 广西大学 The plug-in installation elevator in the through former gate of oblique Cantilever Beams support
CN109455597A (en) * 2018-09-29 2019-03-12 广西大学 New center pillar supports through resident's original gate to install elevator additional
CN109534129A (en) * 2018-11-08 2019-03-29 广西大学 Half storey platform changes the through former gate of floor platform and installs elevator method additional
CN112079235A (en) * 2020-10-13 2020-12-15 朱幕松 Economical building is plus installs elevator
CN112681792A (en) * 2020-12-18 2021-04-20 湖南湖大合力土木工程技术发展有限公司 Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway
CN113216686A (en) * 2020-06-08 2021-08-06 郑牧之 Method for modifying elevator installed on step
CN117328706A (en) * 2023-11-30 2024-01-02 中国建筑设计研究院有限公司 Modification method and modification system for barrier-free micro-disturbing elevator installation of existing house

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001295479A (en) * 2000-04-13 2001-10-26 Tomoe Giken:Kk Method of additionally installing elevator in medium/ low-rise building
CN2937350Y (en) * 2006-07-07 2007-08-22 邓海燕 Structure for rebuilding old house
CN103790392A (en) * 2013-12-09 2014-05-14 倪既民 Barrier-free communication structure for adding elevator to multi-storey residential building
CN208105926U (en) * 2018-03-15 2018-11-16 北京正华建筑设计有限公司 A kind of aging blocks install the passage unobstructed construction of elevator additional

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001295479A (en) * 2000-04-13 2001-10-26 Tomoe Giken:Kk Method of additionally installing elevator in medium/ low-rise building
CN2937350Y (en) * 2006-07-07 2007-08-22 邓海燕 Structure for rebuilding old house
CN103790392A (en) * 2013-12-09 2014-05-14 倪既民 Barrier-free communication structure for adding elevator to multi-storey residential building
CN208105926U (en) * 2018-03-15 2018-11-16 北京正华建筑设计有限公司 A kind of aging blocks install the passage unobstructed construction of elevator additional

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386004B (en) * 2018-03-16 2019-05-10 航天建筑设计研究院有限公司 Elevator landing is registered one's residence building and method of construction
CN108386004A (en) * 2018-03-16 2018-08-10 航天建筑设计研究院有限公司 Elevator landing is registered one's residence building and method of construction
CN109160402A (en) * 2018-09-29 2019-01-08 广西大学 Saving land used outside building can go directly the installation elevator at resident's original gate
CN109025358B (en) * 2018-09-29 2024-05-14 广西大学 Additional elevator for directly reaching original resident gate
CN109455597A (en) * 2018-09-29 2019-03-12 广西大学 New center pillar supports through resident's original gate to install elevator additional
CN109025358A (en) * 2018-09-29 2018-12-18 广西大学 A kind of installation elevator at through resident's original gate
CN109019255A (en) * 2018-09-29 2018-12-18 广西大学 The new-type installation elevator at through resident's original gate
CN109081219A (en) * 2018-09-29 2018-12-25 广西大学 The installation elevator at through resident's original gate of center pillar support
CN109132792A (en) * 2018-09-29 2019-01-04 广西大学 The installation elevator at the through resident's original gate in slightly-inclined slope
CN109184251A (en) * 2018-10-08 2019-01-11 广西大学 Double race stair lead to the plug-in installation elevator in former gate
CN109052107A (en) * 2018-10-08 2018-12-21 广西大学 Center pillar wall supports the through plug-in installation elevator in resident's original gate
CN109025359A (en) * 2018-10-08 2018-12-18 广西大学 The plug-in installation elevator in the through former gate of longitudinal Cantilever Beams support
CN109162476A (en) * 2018-10-12 2019-01-08 广西大学 The through plug-in installation elevator method in resident's original gate
CN109235920A (en) * 2018-10-12 2019-01-18 广西大学 The plug-in installation elevator in the through former gate of oblique Cantilever Beams support
CN109019256A (en) * 2018-10-18 2018-12-18 广西大学 First build the plug-in installation elevator in the through former gate in aisle
CN109025362A (en) * 2018-10-18 2018-12-18 广西大学 The plug-in installation elevator in the through former gate in aisle
CN109162481A (en) * 2018-11-08 2019-01-08 广西大学 The plug-in installation elevator in the through former gate in aisle is first built entirely
CN109534129A (en) * 2018-11-08 2019-03-29 广西大学 Half storey platform changes the through former gate of floor platform and installs elevator method additional
CN113216686A (en) * 2020-06-08 2021-08-06 郑牧之 Method for modifying elevator installed on step
CN112079235A (en) * 2020-10-13 2020-12-15 朱幕松 Economical building is plus installs elevator
CN112681792A (en) * 2020-12-18 2021-04-20 湖南湖大合力土木工程技术发展有限公司 Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway
CN117328706A (en) * 2023-11-30 2024-01-02 中国建筑设计研究院有限公司 Modification method and modification system for barrier-free micro-disturbing elevator installation of existing house

Similar Documents

Publication Publication Date Title
CN108412221A (en) A kind of aging blocks install the passage unobstructed construction of elevator additional
AU2017281305B2 (en) Method for modernizing a building and structure with a lift system constructed in a building
CN106829696A (en) It is secondary to install elevator structure additional
NL1030264C2 (en) Elevator device and method for its formation.
CN108240120A (en) Aging blocks reinforce add-story reconstruction structure
CN111719815A (en) Method for modernizing a building with an elevator installation and structural assembly for carrying out the method
CN108412224A (en) Accessible household elevator outside a kind of building
CN208105926U (en) A kind of aging blocks install the passage unobstructed construction of elevator additional
CN111946084A (en) Elevator quarter-layer entrance type stair reconstruction structure and construction method
CN105600647A (en) Method for retrofitting elevator in existing multi-storey residential building
CN111852061A (en) Flat-floor entrance structure for modifying old building by additionally arranging elevator stairs and construction method thereof
CN109019256A (en) First build the plug-in installation elevator in the through former gate in aisle
JP2004124676A (en) Structure and construction method for barrier-free lifting facility of staircase type multiple dwelling house
CN208105928U (en) Aging blocks reinforce add-story reconstruction structure
CN213651548U (en) Corridor structure for realizing flat-layer house entrance by additionally arranging elevator in existing building
CN202016792U (en) Integral elevator
CN211229631U (en) Elevator shaft for adding elevator flat floor to house in existing house
CN211736487U (en) Flat floor is gone into family and is installed elevator additional
CN112681792A (en) Corridor reconstruction method for realizing flat-floor entrance by adding elevator to crossed stairway
CN213269048U (en) Novel stair flat floor entrance structure with elevator installed in old building
CN111042571A (en) Flat-layer entrance added elevator and construction method thereof
CN220747757U (en) Shaft structure for additionally installing elevator in old building with stair slope close to window
JP2003232136A (en) Method of installing more elevators for dwelling unit access and its construction procedure
CN206590722U (en) It is secondary to install elevator structure additional
CN212295746U (en) Structure of elevator is installed additional to no elevator residential building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180817