CN108385890A - A kind of method of plaster tablet suspended ceiling module assembled - Google Patents
A kind of method of plaster tablet suspended ceiling module assembled Download PDFInfo
- Publication number
- CN108385890A CN108385890A CN201810334968.6A CN201810334968A CN108385890A CN 108385890 A CN108385890 A CN 108385890A CN 201810334968 A CN201810334968 A CN 201810334968A CN 108385890 A CN108385890 A CN 108385890A
- Authority
- CN
- China
- Prior art keywords
- keel
- type
- type keel
- mounting part
- plug connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The present invention relates to a kind of methods of plaster tablet suspended ceiling module assembled, include the following steps:More first c-type keel are connect to form keel framework with a single u-shaped keel;Keel framework is fixed in gypsum plate face after connection;Second c-type keel are connected perpendicular to the first c-type keel, in first c-type keel one end;The first c-type keel other end will be plugged in along side pendant.For the present invention by batch production processing, mass production, it is irregular to not only solve the construction quality caused by construction level in traditional construction, while reducing the problem of environmental pollutions such as construction process, on-site noise, dust.
Description
Technical field
The invention belongs to technical field of buildings more particularly to a kind of mounting techniques of plaster tablet suspended ceiling.
Background technology
Traditional plaster tablet suspended ceiling installation generally use first installs top keel, keelson, then carries out major-minor keel frame
Installation and leveling finally carry out the installation of plasterboard.But there are following drawbacks for such mounting means:
1. site operation rubbish is more, not environmentally;
2. on-site noise is big;
3. construction quality varies with each individual;
4. construction material needs a variety of stocks;
5. it is long to install the leveling time.
Invention content:
In order to solve the site operation rubbish of the prior art mostly not environmentally, on-site noise is big, construction quality varies with each individual, applies
The problems such as work material needs a variety of stocks, the installation leveling time is long, the present invention provides a kind of installation method of plaster tablet suspended ceiling.
For this purpose, this technology provides following technical scheme:
A kind of method of plaster tablet suspended ceiling module assembled, includes the following steps:By more first c-type keel and a single u-shaped
Keel connect to form keel framework;Keel framework is fixed in gypsum plate face after connection;By the second c-type keel perpendicular to first
C-type keel are connected in first c-type keel one end;The first c-type keel other end will be plugged in along side pendant.
Further include keelson, push up the installation of keel, keelson is fixed on metope, top keel are fixed on top surface, side
Keel are connect with the first c-type keel along side pendant, are inserted into the U-type groove of top keel at the top of the second c-type keel.
Described along side pendant includes the first mounting part and the second mounting part being fixedly connected, and the first mounting part includes fixed connects
The horizontal part and vertical component effect connect, the connection of horizontal part and vertical component effect insertion the first c-type keel realization and the first c-type keel, second
Keelson is inserted into mounting part, realizes the connection with keelson.
First mounting part is fixedly connected with the second mounting part by a vertical connection wall, and the second mounting part is hung with first
Socket part is parallel and oppositely extending, forms Z-shaped structure.
Location hole is arranged in first mounting part horizontal part;Second mounting part is oriented to the setting of keelson junction and turns over
Side.
It further include the installation of the first c-type keel and the second vertical surface gypsum board of c-type keel.
Second c-type keel and the first c-type keel are realized by keel connecting member to be connected.
Keel connecting member includes the first plug connector, the second plug connector and connection wall, the first plug connector and the second plug connector with
Connection wall is vertical, and the first plug connector and the second plug connector extend in the same direction or oppositely extending along connection wall;First plug connector and second
Plug connector is inserted into respectively in orthogonal c-type keel, realizes the connection of c-type keel.
First plug connector and the second plug connector are central axial arranged symmetrically along connection wall.Advantages of the present invention:
The plaster tablet suspended ceiling technology of the present invention, it not only solves traditional construction by batch production processing, mass production
The middle construction quality caused by construction level is irregular, while reducing the dirt of the environment such as construction process, on-site noise, dust
Dye problem.
Description of the drawings:
Fig. 1 is along side hanger structure schematic diagram;
Fig. 2 is the first keel connecting member structural schematic diagram;
Fig. 3 is second of keel connecting member structural schematic diagram;
Fig. 4 is the first c-type keel and U-shaped keel assembling schematic diagram;
The module and plasterboard assembling schematic diagram that Fig. 5 is Fig. 4;
The module and keel connecting member assembling schematic diagram that Fig. 6 is Fig. 5;
Fig. 7 is the module and the second c-type keel assembling schematic diagram of Fig. 5;
Fig. 8 is the module of Fig. 7 and is completed schematic diagram along side pendant;
Fig. 9 is that module assembled completes schematic diagram;
Figure 10 is top keel, keelson scheme of installation;
Figure 11 is that module mounts schematic diagram;
Figure 12 is that module mounts schematic diagram;
Figure 13 is that module mounts schematic diagram;
Figure 14 is that furred ceiling completes overall schematic.
Specific implementation mode:
A kind of method of plaster tablet suspended ceiling module assembled, includes the following steps:By more first c-type keel and a single u-shaped
Keel connect to form keel framework;Keel framework is fixed in gypsum plate face after connection;By the second c-type keel perpendicular to first
C-type keel are connected in first c-type keel one end;The first c-type keel other end will be plugged in along side pendant.
Further include keelson, push up the installation of keel, keelson is fixed on metope, top keel are fixed on top surface, side
Keel are connect with the first c-type keel along side pendant, are inserted into the U-type groove of top keel at the top of the second c-type keel.
Described along side pendant includes the first mounting part and the second mounting part being fixedly connected, and the first mounting part includes fixed connects
The horizontal part and vertical component effect connect, the connection of horizontal part and vertical component effect insertion the first c-type keel realization and the first c-type keel, second
Keelson is inserted into mounting part, realizes the connection with keelson.
First mounting part is fixedly connected with the second mounting part by a vertical connection wall, and the second mounting part is hung with first
Socket part is parallel and oppositely extending, forms Z-shaped structure.
Location hole is arranged in first mounting part horizontal part;Second mounting part is oriented to the setting of keelson junction and turns over
Side.
It further include the installation of the first c-type keel and the second vertical surface gypsum board of c-type keel.
Second c-type keel and the first c-type keel are realized by keel connecting member to be connected.
Keel connecting member includes the first plug connector, the second plug connector and connection wall 23, the first plug connector and the second plug connector
Vertical with connection wall, the first plug connector and the second plug connector extend in the same direction or oppositely extending along connection wall;First plug connector and
Two plug connectors are inserted into respectively in orthogonal c-type keel, realize the connection of c-type keel.
First plug connector and the second plug connector are central axial arranged symmetrically along connection wall.
The present invention implementation steps be:
The first step:Decomposition module.It carries out construction site and measures room, furred ceiling plasterboard is divided according to room-size, with
Ensure the size of module, is convenient for the transport and carrying of module.
Second step:Stock.Keel, plasterboard are cut according to actual module size;
Third walks:Module assembled.
1. more first c-type keel 31 are plugged in U-shaped keel 4 according to block size, such as Fig. 4;
2. the first c-type keel and U-shaped keel are fixed in gypsum plate face 5, such as Fig. 5;
3. keel connecting member 2 is inserted into the flange of the first c-type keel, (keel connection is added in right amount according to block size
Number of packages amount, but it is minimum there are two), the first plug connector 21 and the second plug connector 22 are inserted into respectively in orthogonal c-type keel, real
The connection of existing c-type keel, such as Fig. 6;
4. the second c-type keel keel connecting member 2 is fixed on the first c-type keel, the second c-type keel are connect with keel
Part is fixed with tapping screw, such as Fig. 7;
5. the other end of the first c-type keel, such as Fig. 8 will be plugged in along side pendant 1.
6. module assembled finishes.(Fig. 8 arrow direction views are Fig. 9)
4th step:Keelson, top keel installation.
Keelson 7 is fixed on metope, top keel 8 are fixed on top surface, and connection type generally matches stay bolt or nail
Son.Such as Figure 10.
5th step:Scene mounts.
1. assembled module is transported to scene, and mounted by Figure 11 modes;
2. being articulated on keelson 7 along side pendant 1, the second c-type keel 32 connect with top keel 8 tapping screw or rivet
It connects, such as Figure 12.
3. scene cuts plasterboard, the plasterboard cut is fixed on self threading pin on the facade of module, such as Figure 13.
It is furred ceiling overall effect figure as shown in figure 14 4. installation of ceiling is completed.
Claims (9)
1. a kind of method of plaster tablet suspended ceiling module assembled, it is characterised in that:Include the following steps:By more first c-type keel
It connect to form keel framework with a single u-shaped keel;Keel framework is fixed in gypsum plate face after connection;By the second c-type keel
It is connected perpendicular to the first c-type keel, in first c-type keel one end;The first c-type keel other end will be plugged in along side pendant.
2. a kind of method of plaster tablet suspended ceiling module assembled as described in claim 1, it is characterised in that:Further include keelson, top
The installation of keel, keelson is fixed on metope, and top keel are fixed on top surface, keelson and the first c-type keel along side
Pendant connects, and is inserted into the U-type groove of top keel at the top of the second c-type keel.
3. a kind of method of plaster tablet suspended ceiling module assembled as claimed in claim 2, it is characterised in that:It is described to include along side pendant
The first mounting part and the second mounting part being fixedly connected, the first mounting part include the horizontal part and vertical component effect being fixedly connected, horizontal
Portion and vertical component effect are inserted into the first c-type keel and realize that keelson is inserted into connection with the first c-type keel, the second mounting part, realize with
The connection of keelson.
4. a kind of method of plaster tablet suspended ceiling module assembled as claimed in claim 3, it is characterised in that:First mounting part and
Second mounting part is fixedly connected by a vertical connection wall, and the second mounting part is parallel and oppositely extending with the first mounting part, forms Z
Font structure.
5. a kind of method of plaster tablet suspended ceiling module assembled as claimed in claim 3, it is characterised in that:First mounting part water
Location hole is arranged in flat portion;Guide turnup is arranged with keelson junction in second mounting part.
6. a kind of method of plaster tablet suspended ceiling module assembled as described in claim 1, it is characterised in that:It further include the first c-type dragon
The installation of bone and the second vertical surface gypsum board of c-type keel.
7. a kind of method of plaster tablet suspended ceiling module assembled as described in claim 1, it is characterised in that:Second c-type keel and
One c-type keel are realized by keel connecting member and are connected.
8. a kind of method of plaster tablet suspended ceiling module assembled as claimed in claim 7, it is characterised in that:Keel connecting member includes the
One plug connector, the second plug connector and connection wall, the first plug connector and the second plug connector are vertical with connection wall, the first plug connector and
Two plug connectors extend in the same direction or oppositely extending along connection wall;First plug connector and the second plug connector are inserted into orthogonal C respectively
In type keel, the connection of c-type keel is realized.
9. a kind of method of plaster tablet suspended ceiling module assembled as claimed in claim 8, it is characterised in that:First plug connector and
Second plug connector is central axial arranged symmetrically along connection wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810334968.6A CN108385890B (en) | 2018-04-15 | 2018-04-15 | A kind of method of plaster tablet suspended ceiling module assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810334968.6A CN108385890B (en) | 2018-04-15 | 2018-04-15 | A kind of method of plaster tablet suspended ceiling module assembled |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108385890A true CN108385890A (en) | 2018-08-10 |
CN108385890B CN108385890B (en) | 2019-10-15 |
Family
ID=63064585
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810334968.6A Active CN108385890B (en) | 2018-04-15 | 2018-04-15 | A kind of method of plaster tablet suspended ceiling module assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108385890B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667378A (en) * | 2019-01-23 | 2019-04-23 | 山东集顶装饰科技有限公司 | A kind of lightgage steel joist fast joint structure |
CN109914738A (en) * | 2019-04-08 | 2019-06-21 | 深圳市坐标建筑装饰工程股份有限公司 | A kind of ceiling type dry hanging plate material metope |
CN110158844A (en) * | 2019-05-31 | 2019-08-23 | 青岛泰新岳建筑科技有限公司 | It is a kind of without nailization module furred ceiling |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100583675B1 (en) * | 2005-09-07 | 2006-05-26 | 김기철 | Installation structure of ceiling finish materials for lightweight steel-frames |
CN202380622U (en) * | 2012-01-06 | 2012-08-15 | 孙江平 | Keel connecting piece |
CN204456575U (en) * | 2015-01-28 | 2015-07-08 | 寻杰 | Split module plaster tablet suspended ceiling |
CN105971180A (en) * | 2016-06-29 | 2016-09-28 | 浙江亚厦装饰股份有限公司 | Integrated suspended ceiling assembly and assembling method thereof |
CN206189709U (en) * | 2016-11-22 | 2017-05-24 | 韩合桥 | Collection moulding massing plasterboard suspended ceiling |
CN107237442A (en) * | 2016-03-28 | 2017-10-10 | 北新集团建材股份有限公司 | A kind of keelson and skeleton keel connecting structure |
CN206581473U (en) * | 2017-03-24 | 2017-10-24 | 业之峰诺华家居装饰集团股份有限公司 | A kind of vertical connecting structure of lightgage steel joist |
CN107514088A (en) * | 2017-09-15 | 2017-12-26 | 韩合桥 | Integrated modular flat-top and its construction method |
CN206957025U (en) * | 2017-06-19 | 2018-02-02 | 韩合桥 | Light steel keel gypsum board furred ceiling integration module |
CN207177049U (en) * | 2017-09-15 | 2018-04-03 | 韩合桥 | Buckle-type false keel side vertical connections |
-
2018
- 2018-04-15 CN CN201810334968.6A patent/CN108385890B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100583675B1 (en) * | 2005-09-07 | 2006-05-26 | 김기철 | Installation structure of ceiling finish materials for lightweight steel-frames |
CN202380622U (en) * | 2012-01-06 | 2012-08-15 | 孙江平 | Keel connecting piece |
CN204456575U (en) * | 2015-01-28 | 2015-07-08 | 寻杰 | Split module plaster tablet suspended ceiling |
CN107237442A (en) * | 2016-03-28 | 2017-10-10 | 北新集团建材股份有限公司 | A kind of keelson and skeleton keel connecting structure |
CN105971180A (en) * | 2016-06-29 | 2016-09-28 | 浙江亚厦装饰股份有限公司 | Integrated suspended ceiling assembly and assembling method thereof |
CN206189709U (en) * | 2016-11-22 | 2017-05-24 | 韩合桥 | Collection moulding massing plasterboard suspended ceiling |
CN206581473U (en) * | 2017-03-24 | 2017-10-24 | 业之峰诺华家居装饰集团股份有限公司 | A kind of vertical connecting structure of lightgage steel joist |
CN206957025U (en) * | 2017-06-19 | 2018-02-02 | 韩合桥 | Light steel keel gypsum board furred ceiling integration module |
CN107514088A (en) * | 2017-09-15 | 2017-12-26 | 韩合桥 | Integrated modular flat-top and its construction method |
CN207177049U (en) * | 2017-09-15 | 2018-04-03 | 韩合桥 | Buckle-type false keel side vertical connections |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667378A (en) * | 2019-01-23 | 2019-04-23 | 山东集顶装饰科技有限公司 | A kind of lightgage steel joist fast joint structure |
CN109914738A (en) * | 2019-04-08 | 2019-06-21 | 深圳市坐标建筑装饰工程股份有限公司 | A kind of ceiling type dry hanging plate material metope |
CN110158844A (en) * | 2019-05-31 | 2019-08-23 | 青岛泰新岳建筑科技有限公司 | It is a kind of without nailization module furred ceiling |
Also Published As
Publication number | Publication date |
---|---|
CN108385890B (en) | 2019-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206957025U (en) | Light steel keel gypsum board furred ceiling integration module | |
CN108385890B (en) | A kind of method of plaster tablet suspended ceiling module assembled | |
CN207092456U (en) | A kind of assembled finishing wallboard connection system | |
CN106401023A (en) | Modularization wall body and assembling method thereof | |
CN106760136A (en) | A kind of leveling mounting structure of hang ceiling panel plate stitch | |
CN210395790U (en) | Light steel keel structure for lamp pool modeling | |
CN107514088A (en) | Integrated modular flat-top and its construction method | |
CN205063152U (en) | Integrated furred ceiling decorative board mounting structure | |
CN208137255U (en) | A kind of connector of assembled suspended ceiling module | |
CN214498191U (en) | Wall plane ceramic tile mounting structure | |
CN215889027U (en) | Assembled wall system with wallboard capable of being installed transversely and vertically in two directions | |
CN210216864U (en) | Suspended ceiling falling-level vertical frame installation structure with lamp slot | |
CN207405849U (en) | Integrated modular flat-top | |
CN207484800U (en) | Flat-top furred ceiling transverse and longitudinal keel connecting structure | |
CN108019016B (en) | Bamboo wood plastic external wall board | |
CN208202300U (en) | A kind of assembled plaster tablet suspended ceiling module false keel plane turning connector | |
CN209011409U (en) | A kind of integrated plaster tablet suspended ceiling | |
CN210887728U (en) | Light steel keel structure with light trough shape | |
CN203230089U (en) | Plate-type light steel keel special-shaped suspended ceiling structure | |
CN208202285U (en) | A kind of assembled plaster tablet suspended ceiling module light trough keel | |
CN112196150A (en) | Partition wall system is decorated to assembled | |
CN207812919U (en) | A kind of fixing device of decorative panel | |
CN210395806U (en) | Beam-column modeling light steel keel structure | |
CN217461145U (en) | Small-space assembled type top wall structure | |
CN210263586U (en) | Fold level molding light gauge steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |