CN108343431A - A kind of bedrock fracture ground water regime drift net probes into method - Google Patents

A kind of bedrock fracture ground water regime drift net probes into method Download PDF

Info

Publication number
CN108343431A
CN108343431A CN201810129221.7A CN201810129221A CN108343431A CN 108343431 A CN108343431 A CN 108343431A CN 201810129221 A CN201810129221 A CN 201810129221A CN 108343431 A CN108343431 A CN 108343431A
Authority
CN
China
Prior art keywords
water
depth
drilling
round trip
rock core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810129221.7A
Other languages
Chinese (zh)
Other versions
CN108343431B (en
Inventor
邢立亭
迟光耀
李常锁
邢学睿
赵振华
康凤新
李江柏
侯新宇
冯全霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Jinan
Original Assignee
University of Jinan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Jinan filed Critical University of Jinan
Priority to CN201810129221.7A priority Critical patent/CN108343431B/en
Publication of CN108343431A publication Critical patent/CN108343431A/en
Application granted granted Critical
Publication of CN108343431B publication Critical patent/CN108343431B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/003Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B25/00Apparatus for obtaining or removing undisturbed cores, e.g. core barrels or core extractors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/04Measuring depth or liquid level

Landscapes

  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Geophysics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of bedrock fracture ground water regime drift nets to probe into method, this method is based on the basis of the hydrogeologic prospecting of Bed Rock Region, while drilling well, measure the piezometric head after the footage per round trip one by one of each drilling hole, the piezometric head value for obtaining different depth in exploratory hole observes data, and then underground water drift net is drawn, analysis calculates the groundwater flow intensity of different depth.This method need not carry out geological conditions artificial generalization, there is no calculate error using the actual measurement head value for the interior different depth that drills as foundation, completely eliminate previous numerical computations or the error of laboratory experiment, precision is reliable, and the achievement of acquirement meets field reality, has science.In addition this method can carry out water-level observation by ongoing geotechnical boring or hydrogeology or engineering geological drilling work, without putting into special underground water drift net prospecting, saved the time, improved efficiency, had compared with hi-tech economy.

Description

A kind of bedrock fracture ground water regime drift net probes into method
Technical field
The present invention relates to groundwater science and engineering technical fields, specifically a kind of for probing into brittleness bedrock formation Middle water vein system drift net probes into method.
Background technology
Life, the production of the mankind be unable to do without water resource, and the large scale mining of underground water utilizes and many hydrogeology problems It administers, generally requires to find out that Analysis of Ground-water Seepage Field feature, drawing area ground water regime flow-net diagram can just solve these problems.It passes The ground water regime flow-net diagram of system is typically all to show by numerical simulation or the drafting of the methods of Analytic Method or laboratory experiment It is intended to, existing method, which not only needs to put into a large amount of investigation and prospecting, could obtain related data data, but also the flow-net diagram drawn Only with the schematic diagram of physical presence error.
There are major defects:First, numerical simulation and analytic method are to solve acquisition by generally changing hydrogeologic condition, calculate Hydrogeological parameter necessary to drift net itself is exactly a calculated value, often will appear the error of the order of magnitude, therefore theoretical calculation institute The drift net obtained is only a kind of schematic diagram, there is prodigious uncertainty;Two laboratory experiments are restricted by time scale and space scale, The scale effect of laboratory experiment method is huge, and especially indoor Physical Experiment there is no the method emulation heterogeneous crack in field to contain at present Water system, therefore laboratory experiment method is detached from the Nature physical condition.
Invention content
In view of the above-mentioned problems, the present invention provides a kind of bedrock fracture ground water regime drift nets to probe into method, this method base On the basis of the hydrogeologic prospecting of Bed Rock Region, while drilling well, measure each drilling hole footage per round trip one by one it Piezometric head afterwards, the piezometric head value for obtaining different depth in exploratory hole observes data, and then draws underground water drift net, analysis The groundwater flow intensity for calculating different depth, enriches the exploratory techniques method of hydrogeology, and ensure that and finally obtain Underground water drift net accuracy.
The technical scheme adopted by the invention to solve the technical problem is that:
A kind of bedrock fracture ground water regime drift net probes into method, includes the following steps,
The first step:It chooses a drill site as needed to be drilled, and each footage per round trip is more than 0.5 meter and is less than 2 meters;
Second step:The first round trip drilling footage length L1 is recorded, and puts into strip coring;
Third walks:The length M1 of the core taken out in second step is measured, and calculates core recovery percentage M1/L1, if taking rate Less than 70%, then tripping in drilling tool pulls remaining rock core out again;
4th step:Bedding fissure, the structural fracture developmental state of second step and/or the acquired rock core of third step are observed, Record cranny development section depth H 11-H12;
5th step:The complete segment length of rock core is measured,
5.1, when the complete segment length of rock core is more than 0.5 meter, record the depth J11-J12 of rock core complete segment, prepare second time Secondary drilling;
5.2 when the complete segment length of rock core is less than 0.5 meter, prepares the second round trip drilling;
6th step:The second round trip drilling footage length L2 is recorded, and puts into strip coring;
7th step:The length M2 of the core taken out in the 6th step is measured, and calculates core recovery percentage M2/L2, if taking rate Less than 70%, then tripping in drilling tool pulls remaining rock core out again;
8th step:Bedding fissure, the structural fracture developmental state of the rock core acquired by the 6th step and/or the 7th step are observed, Record cranny development section depth H 21-H22;
9th step:The complete segment length of rock core is measured,
9.1 when the complete segment length of rock core is more than 0.5 meter,
9.1.1 rock core complete segment depth J21-J22 is recorded,
9.1.2, water-stop is fixed on to the lower end of drilling rod, and the water-filled capsule of water-stop is passed through into high-pressure hose and pressure testing Pump is connected, and then water-stop is positioned in drilling by drilling machine, and the water-filled capsule of water-stop is made to be located at the second round trip drilling The intermediate position of middle J21-J22;
9.1.3 hydraulic test pump carries out water-filling pressurization to water-filled capsule;
9.1.4 after pressurization reaches specified pressure, the head value in drilling rod and the mixing water level outside drilling rod are measured every 5min Value, until the head value stabilization in pipe, records the mixing water place value Z2 outside the head value Y2 and pipe in pipe at this time;
9.1.5 water-stop is taken out in release, prepares third round trip drilling;
9.2 when the complete segment length of rock core is less than 0.5 meter, prepares third round trip drilling;
Tenth step, repeats the operation of the 6th step to the 9th step, measures the core recovery percentage Mi/ of each round trip one by one Li, cranny development section depth H i1-Hi2, rock core complete segment depth Ji1-Ji2, head value Yi and the outer mixing water place value of pipe in pipe Zi, until probing terminates;
The data of acquirement have:
Under different depth, head value Y1, Y2, Y3 in pipe ..., Yi ..., Yn;
Under different depth, mixing water place value Z2, Z3 outside pipe ..., Zi ..., Zn;
11st step, according to the depths different with outer mixing water place value Zi draftings are managed of head value Yi in the pipe of the different depth of measurement The head value curve of degree, and judge the pressure-bearing characteristic of different depth underground water, type;
12nd step chooses at least one drill site successively along plane direction of groundwater flow, and successively in the probing of selection Repeat operation of the first step to the 11st step on point;
13rd step, in conjunction with the recharge of ground water, runoff direction, rock and water-bearing layer spatial distribution and measured each brill The head value Yi for visiting the different depth of point draws ground water regime flow-net diagram;
14th step calculates the hydraulic gradient and hydrodynamic condition of different depth according to ground water regime flow-net diagram;
15th step:According to the developmental state determination of different depth rock core bedding fissure, structural fracture on different drill sites The distributing position of the water barrier of different drill sites, and then judge the hydraulic connection between the different depth of different drill sites;
16th step, the tripping in water quality monitor in the drilling of each drill site, according to 2 meters of measuring space of footage per round trip PH, conductivity and temperature in hole is compared to bottom hole, and with the piezometric head value Yi of each round trip, is confirmed and is verified lithic drainage The reasonability that flow-net diagram of uniting is drawn.
Further, it measures each round trip and carries the mixing water level Xi before being bored under mixing water level Ti and next round trip after boring, And compares Xi and Ti and auxiliary verification is carried out to the judgement of fractured situation.
Further, tripping in water-stop each time carry out head measurement before, tripping in water pump to designated depth, and outward It draws water, until water quality becomes clear.
Further, tripping in water-stop carry out head test when, when water-filled capsule be located at depth 100m with it is shallow when pressurize To 1.1MPa, it is forced into 2.1MPa when depth of the water-filled capsule between 100-200m, when water-filled capsule is located at 200- It is forced into 3.1MP when depth between 300m, 4.1MPa is forced into when depth of the water-filled capsule between 300-400m, when It is forced into 5.1Mpa when depth of the water-filled capsule between 400-500m.
Further, it is drilled using revolution boring method.
Further, the bit diameter used when probing is 127mm or 168mm.
Further, it is to punch water-bearing layer the condition of end to be drilled in the tenth step.
The beneficial effects of the invention are as follows:
1, using the actual measurement head value of different depth in drilling as foundation, artificial generalization need not be carried out to geological conditions, There is no error is calculated, previous numerical computations or the error of laboratory experiment are completely eliminated, precision is reliable, and the achievement of acquirement meets open country Outer reality has science.
2, water-level observation, nothing can be carried out by ongoing geotechnical boring or hydrogeology or engineering geological drilling work Special underground water drift net prospecting need to be put into, the time has been saved, has improved efficiency, had compared with hi-tech economy.
3, scientific in principle, method be simple, convenient disassembly, easy to operate, and data are easy to obtain, and have stronger practicability.
Description of the drawings
Fig. 1 is structural schematic diagram when carrying out head test;
Fig. 2 is the head value curve of the first drill site;
Fig. 3 is ground water regime flow-net diagram.
In figure:1- hydraulic test pumps, 2- high-pressure hoses, 3- water-stops, 31- water-filled capsules, 4- drilling rods, 5- water level testers, 51- Probe.
Specific implementation mode
A kind of bedrock fracture ground water regime drift net probes into method, includes the following steps:
The first step:A drill site is chosen according to practical study requirements of one's work, is then drilled using revolution boring method, And each footage per round trip is more than 0.5 meter and is less than 2 meters.Bit diameter can select 127mm or 168mm as a kind of specific embodiment party Formula, the drill bit described in the present embodiment is using 127mm's.
Second step:After first round trip is crept into, the first round trip drilling footage length L1 is recorded, and put into strip and take rock The heart.
Third walks:It measures the length M1 of the core taken out in second step, and calculates core recovery percentage, i.e. M1/L1, if taking Rate is less than 70%, then tripping in drilling tool pulls remaining rock core out again, then carries brill, and survey by water level tester 5 and probe 51 Surely the mixing water level T1 after boring is carried.
4th step:The rock core acquired by second step and/or third step is observed, and observes the bedding fissure of rock core, construct and split Gap developmental state, record cranny development section depth H 11-H12;
5th step:The complete segment length of rock core is measured,
5.1, when the complete segment length of rock core is more than 0.5 meter, record the depth J11-J12 of rock core complete segment, and pass through water level Tester 5 and probe 51 measure the mixing water level X1 in hole at this time, then compare X1 and T1, to the cranny development feelings in the 4th step The judgement of condition carries out auxiliary verification, is ready for the second round trip drilling;
5.2, when the complete segment length of rock core is less than 0.5 meter, directly measure hole at this time by water level tester 5 and probe 51 Interior mixing water level X1, then compares X1 and T1, carries out auxiliary verification to the judgement of the fractured situation in the 4th step, then Prepare the second round trip drilling.
Due to carry bore and it is next time lower bore between time interval at least two hours, if there are cranny development section, Will necessarily have differences between X1 and T1, i.e. X1 are more than T1.If cranny development section is not present, theoretically answered between X1 and T1 This is equal, to carry out auxiliary verification to the judgement of the fractured situation in the 4th step.
6th step:The second round trip drilling is carried out, records the second round trip drilling footage length L2, and put into strip coring.
7th step:It measures the length M2 of the core taken out in the 6th step, and calculates core recovery percentage, i.e. M2/L2, if taking Rate is less than 70%, then tripping in drilling tool pulls remaining rock core out again, then carries brill, and survey by water level tester 5 and probe 51 Surely the mixing water level T2 after boring is carried.
8th step:The rock core acquired by the 6th step and/or the 7th step is observed, and observes the bedding fissure of rock core, construct and split Gap developmental state, record cranny development section depth H 21-H22.
9th step:The complete segment length of rock core is measured,
9.1 when the complete segment length of rock core is more than 0.5 meter,
9.1.1 rock core complete segment depth J21-J22 is recorded, J21-J22 in then being crept into the second round trip under water pump Then intermediate position uses water pump to extracardiac pumping, until water quality becomes clear.
This is primarily due to will produce rock powder in drilling process, and rock powder can block the crack of brittle rock, hole, rock powder After the crack and the hole that block brittle rock, hydraulic connection is caused to weaken, water level in borehole changes insensitive, obtained waterlevel data There is error.By water pump to extracardiac pumping, crevice water is made to be washed away with hole to the crack of blocking during extravasation, ensured Obtain the accuracy of data.
9.1.2, water-stop 3 is fixed on to the lower end of drilling rod 4, and the water-filled capsule of water-stop 3 31 is passed through into high-pressure hose 2 It is connected with hydraulic test pump 1, then water-stop 3 is positioned in drilling by drilling machine, and the water-filled capsule 31 of water-stop 3 is made to be located at the The intermediate position of J21-J22 in two round trips drilling.
As a kind of specific implementation mode, fixation is set by welding for the upper end of water-stop 3 described in the present embodiment It is equipped with a swivel nut, the lower end of the drilling rod 4 is provided with external screw thread, and the swivel nut is solid by the lower end of screw thread and the drilling rod 4 Fixed connection.Water-stop described herein belongs to the prior art, and details are not described herein.As a kind of specific implementation mode, this reality Water-stop described in example is applied using the ZFA64-2 type water conservancy Geological Engineerings of Hebei Yutong Special Rubber Tube Co., Ltd's production with stopping Hydrophone.
9.1.3 hydraulic test pump 1 carries out water-filling pressurization to water-filled capsule 31.When water-filled capsule 31 be located at depth 100m with it is shallow when add It is depressed into 1.1MPa, 2.1MPa is forced into when depth of the water-filled capsule 31 between 100-200m, when water-filled capsule 31 is located at It is forced into 3.1MP when depth between 200-300m, is forced into when depth of the water-filled capsule 31 between 300-400m 4.1MPa is forced into 5.1Mpa when depth of the water-filled capsule 31 between 400-500m, and so on.
9.1.4 after pressurization reaches specified pressure, the head value in drilling rod 4 and the mixing water outside drilling rod 4 are measured every 5min Place value, until the head value stabilization in pipe, i.e., the interior head value luffing of continuous 30 minutes pipes is no more than 2mm, and record is at this time in pipe Mixing water place value Z2 outside head value Y2 and pipe.
9.1.5 water-stop 3 is taken out in release, and the mixing water level in hole at this time is measured by water level tester 5 and probe 51 Then X2 compares X2 and T2, carry out auxiliary verification to the judgement of the fractured situation in the 8th step, be ready for third round trip Drilling.
9.2, when the complete segment length of rock core is less than 0.5 meter, directly measure hole at this time by water level tester 5 and probe 51 Interior mixing water level X2, then compares X2 and T2, carries out auxiliary verification to the judgement of the fractured situation in the 8th step, then Prepare third round trip drilling.
Tenth step, repeats the operation of the 6th step to the 9th step, measures the core recovery percentage Mi/ of each round trip one by one Li, the mixing water level Ti after boring, the mixing water level Xi before lower brill, cranny development section depth H i1-Hi2, rock core complete segment depth are put forward The head value Yi and outer mixing water place value Zi of pipe in Ji1-Ji2, pipe, until probing terminates.
The data of acquirement have:
Under different depth, carry bore after mixing water level T1, T2, T3 ..., Ti ..., Tn;
Under different depth, mixing water level X1, X2, X3 before lower brill ..., Xi ..., Xn;
Under different depth, head value Y1, Y2, Y3 in pipe ..., Yi ..., Yn;
Under different depth, mixing water place value Z2, Z3 outside pipe ..., Zi ..., Zn;
What it is due to Y1 surveys is head value, and what X1 was surveyed is mixing water level, when drilling is to crack section, starts to be discharged in drilling, Head at this time is exactly water level, so Y1 described herein is equal to X1.With going deep into for probing, the crack segment number punched is got over Come more, Xi is the mixing water level for all cracks section punched, and Yi is the head of a certain crack section, so not phases after the two Deng.
In addition the condition that the probing terminates is to punch water-bearing layer.
11st step according to head value Yi in the pipe of the different depth of measurement and manages outer the first brill of mixing water place value Zi draftings The head value curve for visiting point, as shown in Fig. 2, and judging the first drill site not by the head value curve of the first drill site of drafting With the pressure-bearing characteristic of depth underground water, type.
12nd step chooses at least one drill site successively along plane direction of groundwater flow, and successively in the probing of selection Repeat operation of the first step to the 11st step on point.
As a kind of specific implementation mode, drill site at two, i.e. the first drill site and the second probing are chosen in the present embodiment Point.
13rd step is bored in conjunction with the recharge of ground water, runoff direction, rock and water-bearing layer spatial distribution and measured first The head value for visiting the different depth of point and the second drill site draws ground water regime flow-net diagram, as shown in Figure 3.
14th step calculates the hydraulic gradient and hydrodynamic condition of different depth according to ground water regime flow-net diagram.
By Darcy formulaIt can deriveSince Q, K are unknown numbers, stillThan Value is constant, be may be usedCharacterize the size variation of runoff intensity.
In formula, Q is the run-off m between two streamlines3/s;
A unit width cross-sectional area m between streamline2
Δ H is the piezometric head difference m between equal head lines;
L is two spacing m waited between head lines;
K is the infiltration coefficient m of runoff zones;
15th step:According to the developmental state determination of different depth rock core bedding fissure, structural fracture on different drill sites The distributing position of the water barrier of different drill sites, and then judge the hydraulic connection between the different depth of different drill sites, it is base The problems such as artificial recharge of rock water vein, the prevention of mining area water damage, crevice water exploitation, crevice water pollution prevention provide science according to According to.
16th step, the portable MANTA multi-parameter water quality monitors of tripping in the drilling of each drill site, according to round trip PH, conductivity and temperature in the measuring space hole of 2 meters of drilling depth to bottom hole, and by the PH of measurement, conductivity and temperature with it is each The piezometric head value Yi of round trip is compared, and further confirms that and verify the reasonability of ground water regime flow-net diagram drafting.

Claims (7)

1. a kind of bedrock fracture ground water regime drift net probes into method, it is characterised in that:Include the following steps,
The first step:It chooses a drill site as needed to be drilled, and each footage per round trip is more than 0.5 meter and is less than 2 meters;
Second step:The first round trip drilling footage length L1 is recorded, and puts into strip coring;
Third walks:The length M1 of the core taken out in second step is measured, and calculates core recovery percentage M1/L1, if taking rate is less than 70%, then tripping in drilling tool pulls remaining rock core out again;
4th step:Observe bedding fissure, the structural fracture developmental state of second step and/or the acquired rock core of third step, record Cranny development section depth H 11-H12;
5th step:The complete segment length of rock core is measured,
5.1, when the complete segment length of rock core is more than 0.5 meter, record the depth J11-J12 of rock core complete segment, prepare the second round trip and bore Into;
5.2 when the complete segment length of rock core is less than 0.5 meter, prepares the second round trip drilling;
6th step:The second round trip drilling footage length L2 is recorded, and puts into strip coring;
7th step:The length M2 of the core taken out in the 6th step is measured, and calculates core recovery percentage M2/L2, if taking rate is less than 70%, then tripping in drilling tool pulls remaining rock core out again;
8th step:Bedding fissure, the structural fracture developmental state of the rock core acquired by the 6th step and/or the 7th step are observed, is recorded Cranny development section depth H 21-H22;
9th step:The complete segment length of rock core is measured,
9.1 when the complete segment length of rock core is more than 0.5 meter,
9.1.1 rock core complete segment depth J21-J22 is recorded,
9.1.2, water-stop is fixed on to the lower end of drilling rod, and the water-filled capsule of water-stop is passed through into high-pressure hose and hydraulic test pump phase Even, then water-stop is positioned in drilling by drilling machine, and the water-filled capsule of water-stop is made to be located in the second round trip drilling The intermediate position of J21-J22;
9.1.3 hydraulic test pump carries out water-filling pressurization to water-filled capsule;
9.1.4 after pressurization reaches specified pressure, the head value in drilling rod and the mixing water place value outside drilling rod are measured every 5min, directly Head value stabilization in pipe records the mixing water place value Z2 outside the head value Y2 and pipe in pipe at this time;
9.1.5 water-stop is taken out in release, prepares third round trip drilling;
9.2 when the complete segment length of rock core is less than 0.5 meter, prepares third round trip drilling;
Tenth step, repeats the operation of the 6th step to the 9th step, measures the core recovery percentage Mi/Li of each round trip one by one, splits Gap develops section depth H i1-Hi2, rock core complete segment depth Ji1-Ji2, the head value Yi and outer mixing water place value Zi of pipe in pipe, up to Probing terminates;
The data of acquirement have:
Under different depth, head value Y1, Y2, Y3 in pipe ..., Yi ..., Yn;
Under different depth, mixing water place value Z2, Z3 outside pipe ..., Zi ..., Zn;
11st step according to head value Yi in the pipe of the different depth of measurement and manages outer mixing water place value Zi draftings different depth Head value curve, and judge the pressure-bearing characteristic of different depth underground water, type;
12nd step chooses at least one drill site successively along plane direction of groundwater flow, and successively on the drill site of selection Repeat operation of the first step to the 11st step;
13rd step, in conjunction with the recharge of ground water, runoff direction, rock and water-bearing layer spatial distribution and measured each drill site The head value Yi of different depth draw ground water regime flow-net diagram;
14th step calculates the hydraulic gradient and hydrodynamic condition of different depth according to ground water regime flow-net diagram;
15th step:It is different according to different depth rock core bedding fissure, the developmental state determination of structural fracture on different drill sites The distributing position of the water barrier of drill site, and then judge the hydraulic connection between the different depth of different drill sites;
16th step, the tripping in water quality monitor in the drilling of each drill site, according in the measuring space hole of 2 meters of footage per round trip PH, conductivity and temperature compared to bottom hole, and with the piezometric head value Yi of each round trip, confirm and verify ground water regime stream The reasonability that net figure is drawn.
2. a kind of bedrock fracture ground water regime drift net according to claim 1 probes into method, it is characterised in that:It measures every One round trip carries the mixing water level Xi before being bored under mixing water level Ti and next round trip after boring, and compares Xi and Ti to cranny development feelings The judgement of condition carries out auxiliary verification.
3. a kind of bedrock fracture ground water regime drift net according to claim 1 probes into method, it is characterised in that:Each Before secondary tripping in water-stop carries out head measurement, tripping in water pump is to designated depth, and to extracardiac pumping, until water quality becomes clear.
4. a kind of bedrock fracture ground water regime drift net according to claim 1 probes into method, it is characterised in that:In tripping in Water-stop carry out head test when, when water-filled capsule be located at depth 100m with it is shallow when be forced into 1.1MPa, when water-filled capsule is located at It is forced into 2.1MPa when depth between 100-200m, is forced into when depth of the water-filled capsule between 200-300m 3.1MP is forced into 4.1MPa when depth of the water-filled capsule between 300-400m, when water-filled capsule be located at 400-500m it Between depth when be forced into 5.1Mpa.
5. a kind of bedrock fracture ground water regime drift net according to claim 1 probes into method, it is characterised in that:Using return Turn boring method to be drilled.
6. a kind of bedrock fracture ground water regime drift net according to claim 5 probes into method, it is characterised in that:When probing The bit diameter used is 127mm or 168mm.
7. a kind of bedrock fracture ground water regime drift net according to claim 1 probes into method, it is characterised in that:Tenth step The condition that middle probing terminates is to punch water-bearing layer.
CN201810129221.7A 2018-02-08 2018-02-08 Method for exploring flow network of bedrock fracture underground water system Active CN108343431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810129221.7A CN108343431B (en) 2018-02-08 2018-02-08 Method for exploring flow network of bedrock fracture underground water system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810129221.7A CN108343431B (en) 2018-02-08 2018-02-08 Method for exploring flow network of bedrock fracture underground water system

Publications (2)

Publication Number Publication Date
CN108343431A true CN108343431A (en) 2018-07-31
CN108343431B CN108343431B (en) 2021-07-06

Family

ID=62958662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810129221.7A Active CN108343431B (en) 2018-02-08 2018-02-08 Method for exploring flow network of bedrock fracture underground water system

Country Status (1)

Country Link
CN (1) CN108343431B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109598049A (en) * 2018-11-28 2019-04-09 中化地质矿山总局地质研究院 Method for drilling rock fracture development degree and regional rock fracture development rule
CN109633764A (en) * 2018-12-18 2019-04-16 济南大学 A method of the horizontal seepage channel in runoff area is determined using tracer technique

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101110175A (en) * 2007-08-28 2008-01-23 成都理工大学 Geological environment simulating experiment device
CN201301703Y (en) * 2008-09-26 2009-09-02 天津大学 Device for measuring water level of underground well
CN101886424A (en) * 2009-05-14 2010-11-17 蔡宜真 Water retention system of infiltration well
US20100319448A1 (en) * 2009-06-17 2010-12-23 Keller Carl E Monitoring the water tables in multi-level ground water sampling systems
CN102063577A (en) * 2011-01-13 2011-05-18 黄河勘测规划设计有限公司 Method for calculating underground water seepage flow based on equipotential surface
US20150125209A1 (en) * 2012-04-28 2015-05-07 China Shenhua Energy Company Limited Method for Distributed Storage and Use of Underground Water in Mine
CN104899358A (en) * 2015-05-13 2015-09-09 山东科技大学 Prediction method for lateral distribution of ordovician limestone karst crack water network
CN106437692A (en) * 2016-08-23 2017-02-22 中国电建集团贵阳勘测设计研究院有限公司 Deep karst leakage passage detection structure and method based on drill rod inner pipe water level
CN206504768U (en) * 2017-02-21 2017-09-19 广西蓝天科技股份有限公司 A kind of guard aperture, hole sealing device for water table measure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101110175A (en) * 2007-08-28 2008-01-23 成都理工大学 Geological environment simulating experiment device
CN201301703Y (en) * 2008-09-26 2009-09-02 天津大学 Device for measuring water level of underground well
CN101886424A (en) * 2009-05-14 2010-11-17 蔡宜真 Water retention system of infiltration well
US20100319448A1 (en) * 2009-06-17 2010-12-23 Keller Carl E Monitoring the water tables in multi-level ground water sampling systems
CN102063577A (en) * 2011-01-13 2011-05-18 黄河勘测规划设计有限公司 Method for calculating underground water seepage flow based on equipotential surface
US20150125209A1 (en) * 2012-04-28 2015-05-07 China Shenhua Energy Company Limited Method for Distributed Storage and Use of Underground Water in Mine
CN104899358A (en) * 2015-05-13 2015-09-09 山东科技大学 Prediction method for lateral distribution of ordovician limestone karst crack water network
CN106437692A (en) * 2016-08-23 2017-02-22 中国电建集团贵阳勘测设计研究院有限公司 Deep karst leakage passage detection structure and method based on drill rod inner pipe water level
CN206504768U (en) * 2017-02-21 2017-09-19 广西蓝天科技股份有限公司 A kind of guard aperture, hole sealing device for water table measure

Non-Patent Citations (9)

* Cited by examiner, † Cited by third party
Title
A. PINZANI, N. COLI: ""A Practical Geostructural Approach For the Evaluation of Tunnel Water Inflow By Means of FEM Seepage Analysis"", 《AMERICAN ROCK MECHANICS ASSOCIATION》 *
F. BULUT, S. BOYNUKAHN, F. TARHAN, R. DILEK: "《A new approach to the evaluation of water-pressure test results obtained in bedrock by the US Bureau of Reclamation Method》", 《ENGINEERING GEOLOGY》 *
L. SURINAIDU: ""Hydrogeological and groundwater modeling studies to estimate the groundwater inflows into the coal Mines at different mine development stagesusing MODFLOW,Andhra Pradesh,India"", 《WATER RESOURCES AND INDUSTRY》 *
国家地质总局钻探技术手册编写组: "《钻探技术手册(下)》", 31 December 1977 *
王璐: "《某矿区孔隙水防治工程水文地质勘察要点简析》", 《中国新技术新产品》 *
***: ""变水头条件下水平井降水物理及数值模拟分析"", 《吉林水利》 *
许怡萍: "《水文水井钻探技术综述》", 《化工管理》 *
许春枝: ""关于露天煤矿边坡勘探工作的几点建议"", 《煤田地质与勘探》 *
陈耀忠: ""阿岗水库堆石坝的渗流流网测绘"", 《水利与建筑工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109598049A (en) * 2018-11-28 2019-04-09 中化地质矿山总局地质研究院 Method for drilling rock fracture development degree and regional rock fracture development rule
CN109633764A (en) * 2018-12-18 2019-04-16 济南大学 A method of the horizontal seepage channel in runoff area is determined using tracer technique
CN109633764B (en) * 2018-12-18 2020-03-31 济南大学 Method for determining horizontal seepage channel of runoff area by adopting tracing technology

Also Published As

Publication number Publication date
CN108343431B (en) 2021-07-06

Similar Documents

Publication Publication Date Title
CN102561330B (en) Integrated construction method for artificial dug pile and steel pipe concrete column
CN103293560B (en) A kind of method of testing adopting triple stress court
WO2019233105A1 (en) Device and method for measuring flow rate, flow direction, and geological parameter of deep-well cross-hole groundwater
Zhao et al. In-situ stress measurements and regional stress field assessment in the Xinjiang candidate area for China's HLW disposal
CN106192971B (en) A kind of artesian water water-level observation well construction and the method for multilayer water-level observation
CN107589471A (en) A kind of Railway Tunnel Synthetic Geological Prediction Ahead of Construction method
CN104929146B (en) A kind of multilayer karst growth zone pile foundation engineering method
CN107102378B (en) Utilize the method for hole pressure touching methods measurement artesian aquifer water level and head height
CN111189507B (en) Karst water stratification discrimination and underground water level observation method
CN108241772A (en) Consider Tunnel Gushing method for determination of amount in the crack artesian aquifer of multiple factors
CN104297129A (en) Hydrogeologic testing method based on water injection free vibration method
Lee et al. Analysis of the quality of parameter estimates from repeated pumping and slug tests in a fractured porous aquifer system in Wonju, Korea
CN205719868U (en) Contaminated soil and subsoil water inject in situ repairs the pilot system that dilation angle determines
CN205748469U (en) Many Information Field monitoring systems of a kind of reservoir landslide
CN103362500A (en) Detection system and method for cracks and caverns of fractured-vuggy carbonate reservoirs along with drilling
CN108343431A (en) A kind of bedrock fracture ground water regime drift net probes into method
Wan et al. Field measurement by fully grouted vibrating wire piezometers
JP2019060100A (en) Hydraulic property evaluation method
CN108106687B (en) Method for exploring bedrock underground water flow net containing soft interlayer and double-capsule water stopper
CN104459823A (en) Method for testing sea breach interface through comprehensive geophysical prospection
CN104831743A (en) Assessment method of water-rich surrounding rock grouting water controlling effect
CN205999876U (en) A kind of artesian water water-level observation well construction
Davison et al. Investigations of the groundwater transport characteristics of a large fracture zone in a granite batholith at different size scales
Pooranampillai et al. A case history on the design, construction, and field quality control of cement Deep Soil Mixing
Zhang et al. Detection and evaluation of crack development near the fault zone under the influence of coal mining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant