CN108343174A - Fabricated shear wall dry and wet mixed connection method - Google Patents
Fabricated shear wall dry and wet mixed connection method Download PDFInfo
- Publication number
- CN108343174A CN108343174A CN201810126321.4A CN201810126321A CN108343174A CN 108343174 A CN108343174 A CN 108343174A CN 201810126321 A CN201810126321 A CN 201810126321A CN 108343174 A CN108343174 A CN 108343174A
- Authority
- CN
- China
- Prior art keywords
- prefabricated panel
- upper layer
- groove
- shear wall
- lower layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of fabricated shear wall dry and wet mixed connection methods, the left and right ends of upper layer prefabricated panel and lower layer's prefabricated panel are located by connecting using nut first, then form cast-in-place shear connector structure at the middle part of upper layer prefabricated panel and lower layer's prefabricated panel.The present invention sets up four reinforcing bar connectors separately by using at top wall panel both ends, and groove is set in upper layer prefabricated panel bottom, by into groove casting concrete form cast-in-place shear connector structure, by the connection reinforcing steel bar locking being anchored on lower layer's prefabricated panel on reinforcing bar connector, keep the connection structure of upper layer prefabricated panel and lower layer's prefabricated panel easy for construction, dependable performance, the advantages of being connected with wet type present invention incorporates dry type connection, it is difficult to efficiently solve existing connection type site operation, quality is not easy the problem of ensureing, work progress can be simplified, improve assembling quality, improve the mechanical property of shear wall after assembling, to achieve the purpose that reduce cost.
Description
Technical field
The present invention relates to a kind of connection method of fabricated shear wall, especially a kind of fabricated shear wall dry and wet mixing connects
Connect method.
Background technology
Shear wall structure is the important component of skyscraper, has higher bearing capacity and lateral deformation stiffness, can be effective
Horizontal shear is resisted on ground, has good anti-seismic performance.In recent years, China's building industrialization and Process of Housing Industrialization are accelerated,
Assembly of shear wall structure gradually attracts attention and extensive use, have situ wet operation it is few, it is easy for construction, to ambient enviroment shadow
The advantages that ringing small, transport resource and small human resources input has boundless in China's multilayer and high residential building
Application prospect.Fabricated shear wall is vertically connected since it bears horizontal shear and the big feature of horizontal bending moment load
Mechanical property is centainly challenged.
The vertical connection type of precast shear wall includes mainly steel bushing grouting connection and indirect overlap joint slurry anchor connection and machinery
Connect three kinds of modes.When using sleeve grouting connection type, since it is desired that slip casting in the enclosed space, therefore slip casting effect is not
It is good, and quality examination is difficult, and grouting quality is difficult to ensure, and steel bushing needs to use high strength steel, and process is complicated,
Cost is excessively high, and construction precision requires high, the unsuitable thinner reinforcing bar use in section.There is site welding works for reinforcement welding connection
The problems such as work amount is big, welding quality is difficult to ensure.There is site operation difficulty for indirect overlap joint slurry anchor connection greatly, preformed hole forming
The problems such as quality is difficult to ensure, thus in fabricated construction interior wall prefabricated rate it is relatively low, and after lifting cast-in-place structural up to
Temporary support is needed before to preset strength.
Therefore, it is necessary to develop a kind of new fabricated shear wall connection method, with reduce difficulty of construction, reduce cost,
Ensure reliable in quality and the mechanical property of shear wall after assembly can be effectively improved.
Invention content
The present invention provides a kind of fabricated shear wall dry and wet mixing company to solve technical problem present in known technology
Method is connect, using this method, easy construction, cost are relatively low, connection is reliable, can improve the mechanical property of shear wall after assembly.
The present invention is adopted the technical scheme that solve technical problem present in known technology:A kind of assembled shearing
Wall dry and wet mixed connection method is equipped with unfilled corner structure, in the unfilled corner structure at four base angles of upper layer prefabricated panel
It is fixed with the reinforcing bar connector identical with it, the reinforcing bar connector is equipped with vertically arranged angle steel section, in the angle steel section
Bottom is fixed with horizontally disposed connecting bottom board, and the connecting bottom board is concordant with the bottom surface of upper layer prefabricated panel, described
Connecting bottom board is equipped with bolt hole, and the angle steel section is embedded in consistent manner on the upper layer prefabricated panel;In upper layer prefabricated panel
Bottom centre position be equipped with the closed groove in four sides, the top of the groove be equipped with pour mouth;In lower layer's prefabricated panel
Four vertex are equipped with the connection reinforcing bar opposite with the bolt hole correspondingly, and the connection Bar Anchorage is in the lower layer
On prefabricated panel, top is threaded;The fall U opposite with the groove is equipped in the top center position of lower layer's prefabricated panel
Type anchor rib and vertical anchor rib, the inverted U anchor rib and the vertical anchor rib are anchored at lower layer's prefabricated panel
It is interior;When assembly, the upper layer prefabricated panel is lifted to lower layer's prefabricated panel first, and makes the connection reinforcing bar one by one
The bolt hole is accordingly passed through, the groove and the mouth that pours are buckled in the inverted U anchor rib and described vertical at this time
On anchor rib, the top of the inverted U anchor rib is located in the groove, and the upper end of the vertical anchor rib extends to described pour
It builds in mouth;It adjusts the upper layer prefabricated panel and is allowed to vertical, then use nut that will connect reinforcing steel bar locking in the bar connecting
On device, the contact for completing the upper layer prefabricated panel and lower layer's prefabricated panel left and right ends is located by connecting;Finally by
A mouthful cast-in-place concrete is poured, forms cast-in-place shear connector structure in the groove.
The intensity of cast-in-place concrete is not less than the intensity of prefabricated panel concrete in the groove.
The side wall inclination angle of the groove is the ゜ of 55 ゜~75, and depth is 200~300mm.
It is equipped with horizontal lacing wire on the top of the inverted U anchor rib, the horizontal lacing wire is located in the groove.
Two reinforcing bar connectors positioned at upper layer prefabricated panel the same end are socketed together by junction steel plate,
The junction steel plate is concordant with the bottom surface of upper layer prefabricated panel.
It is fixed with horizontally disposed roof supporting at the top of the angle steel section.
The vertical anchor rib includes two symmetrically arranged on the left and the right.
The invention has the advantages and positive effects that:
One) upper layer prefabricated panel and lower layer's prefabricated panel use four corners by nut by the connection reinforcing bar of anchoring with
The contact that reinforcing bar connector links together is located by connecting method, prefabricated panel needs in upper layer when can efficiently solve construction
The problem of support, eliminates the temporary support of wallboard, while saving support, keeps positioning more precisely and simple;It connects simultaneously
Touch location structure plays good fixed function, makes upper layer prefabricated panel when construction that can keep steady under wind action
It is fixed;After contact location structure completes construction, it can be undertaken by the connection reinforcing bar to lock on reinforcing bar connector certain
Pulling force undertakes a part of moment-in-plane, and the anti-bending strength of structure is made to be improved;Contact location structure avoids weldering simultaneously
Operation and Auxiliary support are connect, is fabricated construction truly, site operation is made to become more convenient.
Two) intermediate cast-in-place shear connector structure is formed using the closed groove in four sides is cast-in-place, can avoid using support shuttering,
It is easy for construction, cost can be reduced.Shear connector is formed after the completion of cast-in-place, can be improved the shear behavior of connection structure, be made dress
Overall performance with formula shear wall is improved.The convenient and efficient of site operation is realized while reducing cost;In groove
Inverted U anchor rib and the vertical anchor rib of band crotch that stretches into pouring hole form indirect overlap joint with vertical distribution bar in wallboard
The bending construction of connection, end can shorten the lap of splice, with traditional sleeve connection, be welded to connect and indirectly compared with slurry anchor connection
It constructs more simple and easy to do, cost is lower.
In conclusion the present invention sets up four reinforcing bar connectors separately by using at top wall panel both ends, and in top wall panel
Groove is set, by the structure of the casting concrete formation shear connector main body into groove, keeps upper layer prefabricated panel and lower layer prefabricated
The connection structure of wallboard is easy for construction, dependable performance effectively solves the advantages of connection with wet type present invention incorporates dry type connection
The problem of existing connection type site operation of having determined is difficult, quality is not easy to ensure can simplify work progress, improve assembly matter
Amount, the mechanical property for improving shear wall after assembly, to achieve the purpose that reduce cost.
Description of the drawings
Fig. 1 is using the cloth muscle structural schematic diagram before present invention connection;
Fig. 2 is the upward view using the upper layer prefabricated panel of the present invention;
Fig. 3 is that the structural schematic diagram after the construction of both ends contact location structure is completed using the present invention;
Fig. 4 is using the structural schematic diagram after the completion of present invention connection;
Fig. 5 is the 1-1 sections of Fig. 4;
Fig. 6 is the 2-2 sections of Fig. 4;
Fig. 7 is the detail drawing for the reinforcing bar connector that the present invention uses;
Fig. 8 is the schematic three dimensional views using the present invention.
In figure:1, upper layer prefabricated panel;1-1, vertical distribution bar;1-2, horizontal distribution reinforcing bar;1-3, upper layer anchor steel
Muscle;2, lower layer's prefabricated panel;2-1, vertical distribution bar;2-2, horizontal distribution reinforcing bar;2-3, connection reinforcing bar;2-4, inverted U anchor
Gu muscle;2-5, vertical anchor rib;2-6, horizontal lacing wire;3, reinforcing bar connector;3-1, angle steel section;3-2, connecting bottom board;3-3, branch
Support plate;4, junction steel plate;5, cast-in-place shear connector structure;6, groove;7, mouth is poured.
Specific implementation mode
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and coordinate attached drawing
Detailed description are as follows:
Please refer to Fig.1~Fig. 8, a kind of fabricated shear wall dry and wet mixed connection method, four of prefabricated panel 1 on upper layer
It is equipped with unfilled corner structure at base angle, the reinforcing bar connector 3 identical with it, the bar connecting are fixed in the unfilled corner structure
Device 3 is equipped with vertically arranged angle steel section 3-1, and horizontally disposed connecting bottom board 3-2 is fixed in the bottom of the angle steel section 3-1,
The connecting bottom board 3-2 is concordant with the bottom surface of the upper layer prefabricated panel 1, and bolt hole, institute are equipped on the connecting bottom board 3-2
Angle steel section 3-1 is stated to be embedded in consistent manner on the upper layer prefabricated panel 1;On upper layer, the bottom centre position of prefabricated panel 1 is equipped with
The closed groove 6 in four sides is equipped in the top of the groove 6 and pours mouth 7;Lower layer's prefabricated panel 2 four vertex one by one
Accordingly lower layer's prefabricated panel is anchored at equipped with connection the reinforcing bar 2-3, the connection reinforcing bar 2-3 opposite with the bolt hole
On 2, top is threaded;The inverted U opposite with the groove is equipped in the top center position of lower layer's prefabricated panel 2 to anchor
It is pre- that muscle 2-4 and vertical anchor rib 2-5, the inverted U anchor rib 2-4 and the vertical anchor rib 2-5 are anchored at the lower layer
In wallboard 2 processed;When assembly, the upper layer prefabricated panel 1 is lifted to lower layer's prefabricated panel 2 first, and make the company
It meets reinforcing bar 2-3 and passes through the bolt hole correspondingly, the groove 6 and the mouth 7 that pours are buckled in the inverted U anchor at this time
Gu on muscle 2-4 and the vertical anchor rib 2-5, the top of the inverted U anchor rib 2-4 is located in the groove 6, described vertical
The upper end of anchor rib 2-5 extends to described pour in mouth 7;It adjusts the upper layer prefabricated panel 1 and is allowed to vertical, then use nut
Connection reinforcing bar 2-3 is locked on the reinforcing bar connector 3, the upper layer prefabricated panel 1 and lower layer's prefabricated panel 2 are completed
The contact of left and right ends is located by connecting;Finally by 7 cast-in-place concrete of mouth is poured, cast-in-place shearing is formed in the groove 6
Bond structure 5.
In the present embodiment, in the groove 6 cast-in-place concrete intensity be not less than prefabricated panel concrete intensity.Institute
The side wall inclination angle for stating groove is the ゜ of 55 ゜~75, and depth is 200~300mm.For the ease of the prefabricated of upper layer prefabricated panel 1, in institute
It states and is fixed with horizontally disposed roof supporting 3-3 at the top of angle steel section 3-1, in prefabricated upper layer prefabricated panel 1, just do not have to herein
Formwork.In order to enhance the bonding strength of intermediate cast-in-place shear connector structure 5, water is equipped on the top of the inverted U anchor rib 2-4
Horizontal drawing muscle 2-6, the horizontal lacing wire 2-6 are located in the groove 6.In the present embodiment, the vertical anchor rib 2-5 includes a left side
Be arranged symmetrically two of the right side.The angle steel section 3-1 is using made of equal leg angle.It is same positioned at the upper layer prefabricated panel 1
Two reinforcing bar connectors 3 at end are socketed together by junction steel plate 4, the junction steel plate 4 and the upper layer dry wall
The bottom surface of plate 1 is concordant, can prevent reinforcing bar connector 3 from deviating outward.
Although the preferred embodiment of the present invention is described above in conjunction with attached drawing, the invention is not limited in upper
The specific implementation mode stated, the above mentioned embodiment is only schematical, be not it is restrictive, this field it is common
Technical staff under the inspiration of the present invention, in the case where not departing from present inventive concept and scope of the claimed protection, goes back
Many forms can be made, within these are all belonged to the scope of protection of the present invention.
Claims (7)
1. a kind of fabricated shear wall dry and wet mixed connection method, which is characterized in that at four base angles of upper layer prefabricated panel
It is equipped with unfilled corner structure, the reinforcing bar connector identical with it is fixed in the unfilled corner structure, the reinforcing bar connector is equipped with
Vertically arranged angle steel section is fixed with horizontally disposed connecting bottom board, the connecting bottom board and institute in the bottom of the angle steel section
The bottom surface for stating upper layer prefabricated panel is concordant, and bolt hole is equipped on the connecting bottom board, and the angle steel section is embedded in institute in consistent manner
It states on the prefabricated panel of upper layer;On upper layer, the bottom centre position of prefabricated panel is equipped with the closed groove in four sides, in the groove
Top is equipped with and pours mouth;
It is equipped with the connection reinforcing bar opposite with the bolt hole, the company correspondingly in four vertex of lower layer's prefabricated panel
Bar Anchorage is connect on lower layer's prefabricated panel, top is threaded;It is set in the top center position of lower layer's prefabricated panel
There are the inverted U anchor rib opposite with the groove and vertical anchor rib, the inverted U anchor rib and the equal anchor of vertical anchor rib
Gu in lower layer's prefabricated panel;
When assembly, the upper layer prefabricated panel is lifted to lower layer's prefabricated panel first, and makes the connection reinforcing bar one
One accordingly passes through the bolt hole, and the groove and the mouth that pours are buckled in the inverted U anchor rib and described perpendicular at this time
To on anchor rib, the top of the inverted U anchor rib is located in the groove, and the upper end of the vertical anchor rib extends to described
It pours in mouth;It adjusts the upper layer prefabricated panel and is allowed to vertical, then use nut that will connect reinforcing steel bar locking and connect in the reinforcing bar
It connects on device, the contact for completing the upper layer prefabricated panel and lower layer's prefabricated panel left and right ends is located by connecting;Finally lead to
It crosses and pours a mouthful cast-in-place concrete, form cast-in-place shear connector structure in the groove.
2. fabricated shear wall dry and wet mixed connection method according to claim 1, which is characterized in that existing in the groove
The intensity of pouring concrete is not less than the intensity of prefabricated panel concrete.
3. fabricated shear wall dry and wet mixed connection method according to claim 1, which is characterized in that the side of the groove
Wall inclination angle is the ゜ of 55 ゜~75, and depth is 200~300mm.
4. fabricated shear wall dry and wet mixed connection method according to claim 1, which is characterized in that in the inverted U
The top of anchor rib is equipped with horizontal lacing wire, and the horizontal lacing wire is located in the groove.
5. fabricated shear wall dry and wet mixed connection method according to claim 1, which is characterized in that be located at the upper layer
Two reinforcing bar connectors of prefabricated panel the same end are socketed together by junction steel plate, the junction steel plate with it is described on
The bottom surface of layer prefabricated panel is concordant.
6. fabricated shear wall dry and wet mixed connection method according to claim 1, which is characterized in that in the angle steel section
Top be fixed with horizontally disposed roof supporting.
7. fabricated shear wall dry and wet mixed connection method according to claim 1, which is characterized in that the vertical anchoring
Muscle includes two symmetrically arranged on the left and the right.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810126321.4A CN108343174B (en) | 2018-02-08 | 2018-02-08 | Fabricated shear wall dry and wet mixed connection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810126321.4A CN108343174B (en) | 2018-02-08 | 2018-02-08 | Fabricated shear wall dry and wet mixed connection method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108343174A true CN108343174A (en) | 2018-07-31 |
CN108343174B CN108343174B (en) | 2019-08-16 |
Family
ID=62959376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810126321.4A Active CN108343174B (en) | 2018-02-08 | 2018-02-08 | Fabricated shear wall dry and wet mixed connection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108343174B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555240A (en) * | 2019-01-09 | 2019-04-02 | 南京工业大学 | Partially prestressed fabricated shear wall structure |
CN111622382A (en) * | 2020-05-25 | 2020-09-04 | 天津大学 | Vertical connection structure of assembled hollow shear wall |
CN112681528A (en) * | 2020-12-22 | 2021-04-20 | 青岛新华友建工集团股份有限公司 | Connecting structure and connecting method of prefabricated part and building main body |
CN113202208A (en) * | 2021-04-30 | 2021-08-03 | 福州大学 | Assembled steel-concrete combined shear wall and construction method thereof |
CN114045958A (en) * | 2021-11-29 | 2022-02-15 | 江苏科技大学 | Synchronous grouting tooth socket applied to fabricated shear wall and construction method thereof |
CN118087749A (en) * | 2024-04-25 | 2024-05-28 | 广东省建科建筑设计院有限公司 | Quick-mounting precast concrete shear wall with edge member and assembly structure thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433945A (en) * | 2011-08-30 | 2012-05-02 | 东南大学 | Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure |
CN103981998A (en) * | 2014-05-28 | 2014-08-13 | 王睿敏 | Pre-cast shear wallboard as well as shear wall and construction method for shear wall |
CN203961054U (en) * | 2014-07-03 | 2014-11-26 | 天津大学建筑设计研究院 | A kind of combined connecting structure of fabricated shear wall plate |
CN104763082A (en) * | 2015-03-26 | 2015-07-08 | 天津大学建筑设计研究院 | Upper and lower connecting structure of assembled shearing force wall |
CN204876177U (en) * | 2015-08-13 | 2015-12-16 | 文登蓝岛建筑工程有限公司 | Prefabricated wall body of high -speed joint |
CN106760054A (en) * | 2017-03-01 | 2017-05-31 | 同济大学 | Precast reinforced concrete shear wall |
-
2018
- 2018-02-08 CN CN201810126321.4A patent/CN108343174B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433945A (en) * | 2011-08-30 | 2012-05-02 | 东南大学 | Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure |
CN103981998A (en) * | 2014-05-28 | 2014-08-13 | 王睿敏 | Pre-cast shear wallboard as well as shear wall and construction method for shear wall |
CN203961054U (en) * | 2014-07-03 | 2014-11-26 | 天津大学建筑设计研究院 | A kind of combined connecting structure of fabricated shear wall plate |
CN104763082A (en) * | 2015-03-26 | 2015-07-08 | 天津大学建筑设计研究院 | Upper and lower connecting structure of assembled shearing force wall |
CN204876177U (en) * | 2015-08-13 | 2015-12-16 | 文登蓝岛建筑工程有限公司 | Prefabricated wall body of high -speed joint |
CN106760054A (en) * | 2017-03-01 | 2017-05-31 | 同济大学 | Precast reinforced concrete shear wall |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555240A (en) * | 2019-01-09 | 2019-04-02 | 南京工业大学 | Partially prestressed fabricated shear wall structure |
CN109555240B (en) * | 2019-01-09 | 2023-11-24 | 南京工业大学 | Partially prestressed assembled shear wall structure |
CN111622382A (en) * | 2020-05-25 | 2020-09-04 | 天津大学 | Vertical connection structure of assembled hollow shear wall |
CN112681528A (en) * | 2020-12-22 | 2021-04-20 | 青岛新华友建工集团股份有限公司 | Connecting structure and connecting method of prefabricated part and building main body |
CN113202208A (en) * | 2021-04-30 | 2021-08-03 | 福州大学 | Assembled steel-concrete combined shear wall and construction method thereof |
CN114045958A (en) * | 2021-11-29 | 2022-02-15 | 江苏科技大学 | Synchronous grouting tooth socket applied to fabricated shear wall and construction method thereof |
CN114045958B (en) * | 2021-11-29 | 2022-12-30 | 江苏科技大学 | Synchronous grouting tooth socket applied to fabricated shear wall and construction method thereof |
CN118087749A (en) * | 2024-04-25 | 2024-05-28 | 广东省建科建筑设计院有限公司 | Quick-mounting precast concrete shear wall with edge member and assembly structure thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108343174B (en) | 2019-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108343174B (en) | Fabricated shear wall dry and wet mixed connection method | |
CN105756202A (en) | Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab | |
CN205604473U (en) | Assembled shear force wall tooth's socket formula connection structure who combines coincide floor | |
CN207194006U (en) | A kind of prefabricated concrete retaining wall | |
CN102691365B (en) | Connecting structure for assembly type concrete shear wall edge member | |
CN105926766B (en) | Fabricated shear wall Alveolus type attachment structure assembly engineering method | |
CN105715068B (en) | Existing brick mix structure shock isolating pedestal underpinning structure and its construction method | |
CN203701334U (en) | Reinforced and prefabricated type shear wall structure | |
CN103790267A (en) | Reinforcement type prefabricated assembly type shear wall structure and construction method thereof | |
CN209620089U (en) | A kind of assembled counterfort retaining wall of floor piecemeal lifting | |
CN207905170U (en) | Hybrid connections assembly of shear wall structure | |
CN108999076A (en) | A kind of the class socket joint connection structure and its construction method of column and adjacent members | |
CN109680835A (en) | A kind of self-bearing type precast concrete wall panel, concrete walls, structural system and engineering method | |
CN112695795A (en) | Precast concrete T shape post rim of a cup basis | |
CN204551800U (en) | A kind of novel single-row reinforcement assembling shear wall | |
CN109184030A (en) | A kind of assembly concrete shear wall Type Composite Structure System and installation method | |
CN206070796U (en) | A kind of vertical attachment means of prefabricated assembled shear wall slab | |
CN109024973A (en) | A kind of connection structure and its construction method for precast shear wall | |
CN106930436A (en) | A kind of reinforced concrete shear wall of built-in prestress steel diagonal brace | |
CN109914589A (en) | A kind of prestressed reinforced concrete prefabricated post vertical connection structure and its construction method | |
CN2658220Y (en) | Cement soil compound pile with abnormal concrete | |
CN1260425A (en) | Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment | |
CN208009700U (en) | A kind of assembled integral steel reinforced concrete frame support composite shear wall structure | |
CN110230362A (en) | The precast concrete shear wall plate connection method vertically connected with prestress wire | |
CN110424566A (en) | Reinforced precast concrete wall panel, concrete walls, structural system and engineering method are poured in one kind |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 300073 Tianda architectural creative building (Science Park), No.192 Anshan West Road, Nankai District, Tianjin Patentee after: Tianjin University architectural design and Planning Research Institute Co.,Ltd. Patentee after: Zhang Xizhi Address before: No.192 Anshan West Road, Nankai District, Tianjin 300073 Patentee before: TIANJIN University RESEARCH INSTITUTE OF ARCHITECTRUAL DESIGN & URBAN PLANNING Patentee before: Zhang Xizhi |