CN108343088B - Non-earthing open cut tunnel structure along river - Google Patents

Non-earthing open cut tunnel structure along river Download PDF

Info

Publication number
CN108343088B
CN108343088B CN201810468006.XA CN201810468006A CN108343088B CN 108343088 B CN108343088 B CN 108343088B CN 201810468006 A CN201810468006 A CN 201810468006A CN 108343088 B CN108343088 B CN 108343088B
Authority
CN
China
Prior art keywords
box
river
box body
pile foundation
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810468006.XA
Other languages
Chinese (zh)
Other versions
CN108343088A (en
Inventor
吴绍珍
姜弘
张波
凌保林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201810468006.XA priority Critical patent/CN108343088B/en
Publication of CN108343088A publication Critical patent/CN108343088A/en
Application granted granted Critical
Publication of CN108343088B publication Critical patent/CN108343088B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a non-earthing open cut tunnel structure along river; including box, pile foundation, top weight structure, bottom counter weight structure, flood control wall and scour protection riprap structure, the pile foundation is installed on the riverbed, the installation of box is on pile foundation upper end, and the interior upper portion of box is provided with the case groove, the interior upper portion of box is provided with multiunit slotted hole, and top weight structure sets up on the case groove, and bottom counter weight structure sets up in the slotted hole, and flood control wall sets up at a side of box, and scour protection riprap structure sets up at wherein another side of box. According to the invention, on the premise of meeting the river flood discharge requirement, the river space on one side close to the flood control wall is fully utilized, and the open cut tunnel box body along the river is implemented, so that the traffic capacity along the river city along the river direction can be greatly improved, and the traffic jam condition is relieved; the self-weight combined counterweight and the weight are adopted to resist the buoyancy of the box body, so that the repeated stress conditions of compression resistance and pulling resistance of pile foundations are avoided, and the service life of the tunnel structure is prolonged.

Description

Non-earthing open cut tunnel structure along river
Technical Field
The invention relates to the technical field of tunnels, in particular to a non-earthing open cut tunnel structure along the river.
Background
At present, all implemented or planned river-crossing, river-crossing and land-based tunnels generally adopt shield tunnels, thick-earth open-cut tunnels or open tunnels. The tunnel plays an important role in the traffic field between cities or areas, and has a wide application range. However, there is a great restriction on road traffic along the river city, especially road traffic along the river direction, and traffic jams are serious in rush hours; the space in the river, especially the space of the river bed near the flood control wall, is often not fully utilized.
Thus, in road traffic schemes along cities, especially open cut tunnel schemes along rivers, it is a difficult problem for the implementation of tunnels between cities or regions.
Those skilled in the art are directed to solving the above-mentioned technical drawbacks.
Disclosure of Invention
In view of the above-mentioned drawbacks of the prior art, the technical purpose of the present invention is to provide a new tunnel arrangement selection scheme for supporting the traffic dispersion along the river city, which can fully utilize the river channel space in the vicinity of the flood control wall.
In order to achieve the technical aim, the invention provides a non-earthing open cut tunnel structure along river, which comprises a box body, a pile foundation, a top weighting structure, a bottom weighting structure, a flood control wall and an anti-scouring and stone-throwing structure, wherein the pile foundation is arranged on a riverbed, the box body is arranged at the upper end of the pile foundation, a box groove is formed in the inner upper part of the box body, a plurality of groups of slotted holes are formed in the inner lower part of the box body, the top weighting structure is arranged on the box groove, the bottom weighting structure is arranged in the slotted holes, the flood control wall is arranged on one side of the box body, and the anti-scouring and stone-throwing structure is arranged on the other side of the box body.
Preferably, the pile foundation is provided with several.
Preferably, two groups of box holes are formed in the box body.
Preferably, the tank body is provided with a culvert between two tank holes.
Preferably, the box body is of an uncovered structure.
The invention has the beneficial effects that:
according to the structure, on the premise of meeting the river flood discharge requirement, the river space on one side close to the flood control wall is fully utilized, the open cut tunnel box body along the river is implemented, the traffic capacity along the river city along the river direction can be greatly improved, and the traffic jam condition is relieved; the self-weight combined counterweight and the weight are adopted to resist the buoyancy of the box body, so that the repeated stress conditions of compression resistance and pulling resistance of the pile foundation are avoided, the stress performance of the tunnel structure and the pile foundation is greatly improved, the service life of the tunnel structure is prolonged, and the tunnel structure has very strong practicability.
The conception, specific structure, and technical effects of the present invention will be further described with reference to the accompanying drawings to fully understand the objects, features, and effects of the present invention.
Drawings
Fig. 1 is a structural diagram of the present invention.
Detailed Description
As shown in FIG. 1, in a concrete embodiment of the invention, the non-earthing open cut tunnel structure comprises a box body 1, a pile foundation 2, a top weighting structure 3, a bottom weighting structure 4, a flood control wall 6 and an anti-scouring and stone-throwing structure 5, wherein the pile foundation 1 is arranged on a river bed 7, the box body 1 is arranged at the upper end of the pile foundation 2, a box groove is formed in the inner upper part of the box body 1, a plurality of groups of slots are formed in the inner lower part of the box body 1, the top weighting structure 3 is arranged on the box groove, the bottom weighting structure 4 is arranged in the slots, the flood control wall 6 is arranged on one side of the box body 1, and the anti-scouring and stone-throwing structure 5 is arranged on the other side of the box body 1.
Further, the pile foundation 2 is provided with a plurality of pile foundations, and two groups of box holes 8 are formed in the box body 1.
Wherein, the box body 1 is provided with a culvert 9 between two box holes 8, the box body 1 is of an uncovered soil structure and is arranged above the riverbed 7 according to the road elevation requirement
According to the invention, on the premise of meeting the river flood discharge requirement, the river space on one side close to the flood control wall is fully utilized, and the open cut tunnel box body along the river is implemented, so that the traffic capacity along the river city along the river direction can be greatly improved, and the traffic jam condition is relieved; the self-weight combined counterweight and the weight are adopted to resist the buoyancy of the box body, so that the repeated stress conditions of compression resistance and pulling resistance of the pile foundation are avoided, the stress performance of the tunnel structure and the pile foundation is greatly improved, the service life of the tunnel structure is prolonged, and the tunnel structure has very strong practicability.
The foregoing describes in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be made in accordance with the concepts of the invention by one of ordinary skill in the art without undue burden. Therefore, all technical solutions which can be obtained by logic analysis, reasoning or limited experiments based on the prior art by the person skilled in the art according to the inventive concept shall be within the scope of protection defined by the claims.

Claims (1)

1. The utility model provides a no earthing is along river open cut tunnel structure which characterized in that: the anti-scour device comprises a box body (1), a pile foundation (2), a top weight structure (3), a bottom weight structure (4), a flood control wall (6) and an anti-scour riprap structure (5), wherein the pile foundation (2) is arranged on a river bed (7), the box body (1) is arranged at the upper end of the pile foundation (2), a box groove is formed in the inner upper portion of the box body (1), a plurality of groups of slotted holes are formed in the inner lower portion of the box body (1), the top weight structure (3) is arranged on the box groove, the bottom weight structure (4) is arranged in the slotted holes, the flood control wall (6) is arranged on one side edge of the box body (1), and the anti-scour riprap structure (5) is arranged on the other side edge of the box body (1); the pile foundation (2) is provided with a plurality of piles; two groups of box holes (8) are formed in the box body (1); a culvert (9) is arranged between the two box holes (8) of the box body (1); the box body (1) is of a non-earthing structure.
CN201810468006.XA 2018-05-16 2018-05-16 Non-earthing open cut tunnel structure along river Active CN108343088B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810468006.XA CN108343088B (en) 2018-05-16 2018-05-16 Non-earthing open cut tunnel structure along river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810468006.XA CN108343088B (en) 2018-05-16 2018-05-16 Non-earthing open cut tunnel structure along river

Publications (2)

Publication Number Publication Date
CN108343088A CN108343088A (en) 2018-07-31
CN108343088B true CN108343088B (en) 2023-07-04

Family

ID=62956218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810468006.XA Active CN108343088B (en) 2018-05-16 2018-05-16 Non-earthing open cut tunnel structure along river

Country Status (1)

Country Link
CN (1) CN108343088B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182755A (en) * 2021-12-20 2022-03-15 广州市市政工程机械施工有限公司 Open-cut tunnel with iron-sand-containing counterweight layer and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1298514A (en) * 1970-02-26 1972-12-06 Hollandsche Beton Mij N V Method and apparatus for constructing tunnels and the like
CN106759495A (en) * 2016-11-10 2017-05-31 南京鲁坚科智能科技有限公司 A kind of caisson, tunnel and the method that tunnel is built using caisson
CN106836246A (en) * 2016-12-20 2017-06-13 杭州江润科技有限公司 Open trench tunnel crosses the construction method of section building enclosure
CN106884427A (en) * 2017-03-30 2017-06-23 中交第四航务工程勘察设计院有限公司 Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN107059948A (en) * 2017-03-15 2017-08-18 广州地铁设计研究院有限公司 Reset processing method and system after a kind of open trench tunnel structure floating
CN206581303U (en) * 2017-01-11 2017-10-24 中铁隧道勘测设计院有限公司 A kind of seabed vacuum tunnel of band sightseeing function
CN207003483U (en) * 2017-04-26 2018-02-13 中交三航局第三工程有限公司 A kind of abnormally-structured bottom stab ilization system of open trench tunnel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1298514A (en) * 1970-02-26 1972-12-06 Hollandsche Beton Mij N V Method and apparatus for constructing tunnels and the like
CN106759495A (en) * 2016-11-10 2017-05-31 南京鲁坚科智能科技有限公司 A kind of caisson, tunnel and the method that tunnel is built using caisson
CN106836246A (en) * 2016-12-20 2017-06-13 杭州江润科技有限公司 Open trench tunnel crosses the construction method of section building enclosure
CN206581303U (en) * 2017-01-11 2017-10-24 中铁隧道勘测设计院有限公司 A kind of seabed vacuum tunnel of band sightseeing function
CN107059948A (en) * 2017-03-15 2017-08-18 广州地铁设计研究院有限公司 Reset processing method and system after a kind of open trench tunnel structure floating
CN106884427A (en) * 2017-03-30 2017-06-23 中交第四航务工程勘察设计院有限公司 Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN207003483U (en) * 2017-04-26 2018-02-13 中交三航局第三工程有限公司 A kind of abnormally-structured bottom stab ilization system of open trench tunnel

Also Published As

Publication number Publication date
CN108343088A (en) 2018-07-31

Similar Documents

Publication Publication Date Title
US10731624B2 (en) Tidal power generation and storage system and method of constructing a reservoir for such a system
CN108343088B (en) Non-earthing open cut tunnel structure along river
JP2013087574A (en) Breakwater device
GB2386144A (en) Buoyant flood prevention apparatus
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN110670621B (en) Assembly gravity type winged suction type caisson foundation
CN108221849B (en) Stepped stress-dividing seawall
KR102235976B1 (en) Arc-shaped sand dune to prevent local beach erosion and its construction method
KR20140099027A (en) Height variable type block structure
CN110670618A (en) Prefabricated gravity type suction caisson foundation with wing plates
CN110670620A (en) Cast-in-place gravity type suction caisson foundation with wing plates
CN214401845U (en) Assembled weir suitable for rock-based abrupt slope
EP3144452A1 (en) Building system
CN103850246A (en) End part protective shoe sleeve of steel plate pile
CN210766623U (en) Hydroelectric power generation is with slope protection that sinks that prevents
CN216664082U (en) Interlocking combined sheet pile structure for channel shore protection
CN221118384U (en) Ecological frame formula barricade structure of assembled river course
CN108086403A (en) Water intake structures
CN214089933U (en) Construction structure for passing through pipeline in pipeline river channel
CN214939823U (en) Flexible ecological algae control floating dam
CN115595942A (en) Low-head underground water diversion structure and construction method thereof
CN214401648U (en) Structure is consolidated and reformed transform to existing stereoplasm bank protection ecological landscape
CN219240777U (en) Tailing pond flood drainage system
CN203307783U (en) Ring-type thin-wall weir head structure of spillway of vertical shaft
CN214245619U (en) Water drainage device drains in water conservancy construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant